HomeMy WebLinkAbout2019/01/21 - Agenda Packet - SpecialJANUARY 21, 2019 - 8:30 AM
SPECIAL MEETING
CITY COUNCIL/FIRE PROTECTION DISTRICT AGENDA
Cultural Center, Celebration Hall, 12505 Cultural Center Drive
Rancho Cucamonga, CA
A CALL TO ORDER
Pledge of Allegiance
Roll Call:Mayor Michael
Mayor Pro Tem Kennedy
Council Members Hutchison, Scott and Spagnolo
B PUBLIC COMMUNICATIONS
This is the time and place for the general public to address the Fire Protection District
and City Council on any item listed on the agenda. State law prohibits the Fire Protection
District and City Council from addressing any issue not previously included on the Agenda. The
Fire Protection District and City Council may receive testimony and set the matter for a
subsequent meeting.
Comments are to be limited to five minutes per individual or less, as deemed necessary
by the Mayor, depending upon the number of individuals desiring to speak. All
communications are to be addressed directly to the Fire Board, or City Council not to the
members of the audience. This is a professional business meeting and courtesy and decorum
are expected. Please refrain from any debate between audience and speaker, making loud
noises, or engaging in any activity which might be disruptive to the decorum of the meeting.
C ITEMS OF DISCUSSION
C1. PROPOSED 2019 COUNCIL GOALS AND STATUS UPDATE FOR PREVIOUSLY
ADOPTED GOALS.
D ADJOURNMENT
CERTIFICATION
I, Linda A. Troyan, MMC, City Clerk Services Director of the City of Rancho Cucamonga, or
my designee, hereby certify under penalty of perjury that a true, accurate copy of the foregoing
agenda was posted on at least twenty-four (24) hours prior to the meeting per Government Code
54954.2 at 10500 Civic Center Drive, Rancho Cucamonga, California, on the City's website and
Cultural Center, Celebration Hall, 12505 Cultural Center Drive, Rancho Cucamonga, CA.
Page 1 of 1
RECOMMENDATION:
Staff recommends the City Council consider the proposed 2019 City Council Goals and adopt as
presented or amended.
BACKGROUND:
In preparation for the Team Building and Goals Meeting on January 21, 2019, staff has updated
the current Council Goals and Objectives (attached). Also included in the attachment are staff’s
recommended goals for 2019 for the Council’s consideration. The goals are divided into two
sections (new and active), with each one distinguishable by the page heading. The active goals
include the goals completed in the last year highlighted in orange.
ANALYSIS:
Staff are recommending 15 new goals and are continuing to work on 12 active goals. Since the
last goal setting, five goals have been completed.
FISCAL IMPACT:
Individual goals have varying financial impacts; funding sources for each goal are indicated on
the attached matrix.
COUNCIL GOAL(S) ADDRESSED:
This item addresses all the City Council goals.
ATTACHMENTS:
Attachment 1 – New and Active Goals Matrix
DATE: January 21, 2019
TO: Mayor and Members of the City Council
FROM: John R. Gillison, City Manager
BY: Elisa C. Cox, Deputy City Manager – Civic & Cultural Services
SUBJECT: PROPOSED 2019 COUNCIL GOALS AND STATUS UPDATE FOR
PREVIOUSLY ADOPTED GOALS
STAFF REPORT
NEW GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead Dept./Div.Year Established Estimated
Completion Date
Funding Source and
Ongoing Costs
N1
Increase Solution Oriented Police functions with enhanced
staffing. Focus efforts on addressing potential ABC concerns,
reviewing massage establishments, meeting regularly with all
hotels and enhanced transient outreach.
Police 2019 Q2 2019 Police Budget
N2
Focus efforts on reducing illegal dumping specifically multi-
housing and commercial property through enhanced patrols,
elevating public awareness; and exploring options with Burrtec
and property management.
Police / Engineering
/ Community
Improvement
2019 Q3 2020 General Fund
N3
Develop and implement a plan to allow for live viewing of PSVN
cameras outside of the PD monitoring room using mobile or
desktop browsers. Evaluate the ability to allow crowd-source
viewing of select cameras covering neighborhood assets.
DoIT 2019 Q4 2020
Potential cost sharing using
Fire and Law Enforcement
grants and general fund
N4 Position the City to be a competitive applicant for the State of
California Parks, Environment, and Water Bond 2018, Prop. 68.
Community
Services 2019 Q2 2020 Park Development Fund
N5 Conduct updated analysis with respect to AB 2404 to ensure
that existing recreational athletic resource allocations are
equitable for all participants.
Community
Services / City
Attorney
2019 Ongoing No funding needed.
PUBLIC SAFETY
Proactively develop public safety programs and facilities to meet community needs
PARKS AND RECREATION DEVELOPMENT
Proceed with planning and development of major park and recreational projects
ENHANCING PREMIER COMMUNITY STATUS
As the community matures, undertake programs and projects to enhance Rancho Cucamonga's position as the premier community in our
region
ACTIVE GOALS page 1
NEW GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead Dept./Div.Year Established Estimated
Completion Date
Funding Source and
Ongoing Costs
N6 Launch a new mobile-first, service based City website, and
intranet.CMO & DoIT 2019 Q3 2019
Funds have already been
allocated in the DoIT budget,
$108,000
N7
Building off the Strategic Communications Plan, develop a
Community Engagement Policy with a health equity
framework to ensure RC's diverse community perspectives
are included in shaping City policies, practices, programs,
and services.
City Manager's
Office 2019 Q1 2020
Grant Funds received in the
amount of $25,000 from the
County of SB Dept of Public
Health.
N8
In order to improve safety and provide for economic
development, complete design and right-of-way activities
necessary to allow for the construction of the Etiwanda
Grade Separation Project.
Engineering 2019 Q2 2020
Trade Corridor
Enhancement Program
(TCEP) / SB1
$60,000,000
N9
To support improvement of traffic flow through active
management of the City's transportation infrastructure,
design and construct Phase I of the Advanced Traffic
Management System (ATMS) which will provide remote
connectivity between the Traffic Management Center and
100% of the traffic signals in the City.
Engineering 2019 Q2 2021 Transportation Development
Impact Fund
N10
As dockless bicycle/scooter share services continue to
expand throughout other communities, evaluate whether
these types of micro-transit services are appropriate for
Rancho Cucamonga and develop suitable regulations or
restrictions that reflects the community's interests
City Manager's
Office 2019 Q4 2019 No funding needed.
N11 Complete the design and fabrication of exhibits for the
Second Story and Beyond interactive discovery space at the
Biane Library.
Library Services 2019 Q3 2022 Library Foundation, Library
Reserves, General Fund
ACTIVE GOALS page 2
NEW GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead Dept./Div.Year Established Estimated
Completion Date
Funding Source and
Ongoing Costs
N12
In partnership with the Library and Community Services,
complete transition away from City directed and led
Foundations to a model resembling the Animal Center
Foundation. Develop Memorandum of Understandings with
each Foundation for future partnerships that advocate and
support the department's fundraising goals and initiatives.
Community
Services & Library 2019 Q3 2019 No funding needed
N13 Develop and adopt a comprehensive Tree Ordinance and
Urban Forestry Master Plan.
Public Works and
Admin Services 2019 Q4 2020 TBD
N14 Prepare the Etiwanda Heights Neighborhood and
Conservation Plan and submit it to Planning Commission
and City Council for review.
Community
Development 2019 Q4 2019 Funded
N15 Prepare a comprehensive update to the General Plan.
Community
Development /
CMO
2019 Q4 2022 Reserves
MID AND LONG RANGE PLANNING
Begin efforts to develop mid-range and long-term goals and vision for the City.
ACTIVE GOALS page 3
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A1
Continue to build/expand the
Public Safety Video Network
(PSVN) to include most
major public facilities in town
as well as the City
perimeter.
Police 2016 Q4 2017 Police budget; JAG grant;
Asset Seizure funds
In July, the Epicenter added to the
network; repairs and maintenance as
equipment approaches end of life. Now
working on phase II Central Park (Kids
Zone) and upgrading cameras City Hall
and RCPD.
PSVN at Epicenter has been finalized.
Central Park will be finalized by the end
of May. EOC PSVN Station project has
not been finalized and further Fire Grant
monies will need to be considered for
that along with Fire Station camera
integration to the system. 6th/Utica
monies will be used for other projects as
PSVN/ALPR cameras will be outfitted
into the Empire Lakes Program 1/4 mile
away. Banyan/Carnelian PSVN
progressing and should be finalized by
the end of June. Wilson/San Sevaine
ALPR is done while Baseline/Etiwanda
will be finalized by the end of June.
A2
ALPR, continue to build
safety to encircle the city for
investigation purposes.
Focus on westend of the city
and intersections south of I-
210.
Police 2016 Q4 2021 Police budget; JAG / COPS
grant; Asset Seizure funds
Foothill and Vineyard sent for
presentation with expected completion
date in 2019. Will look at intersections
south of 210 freeway to determine
additional needs.
Completed large project at Etiwanda and
Baseline. Wilson and San Sevaine
completed as part of 2017-18 project
PUBLIC SAFETY
Proactively develop public safety programs and facilities to meet community needs
ACTIVE GOALS page 4
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A3
Award a contract for the
construction of the re-build
of the San Bernardino Road
Station (172), which will
include a Police Department
substation, at the new
location at the northwest
corner of Vineyard and San
Bernardino Road.
Fire District 2017 Q1 2018
Fire District Capital
Building Reserves; City
Capital Reserves
During the environmental process, it was
determined that according to California
Environmental Protection Agency Tribal
Consultation Policy the property to be
developed needed to maintain
government-to-government relationships
and consultation with Californian Native
American tribes. To ensure best
practices, the process extended beyond
the time initially anticipated to award a
construction contract. In addition the
property required an earthquake fault
study to be completed, which took
several months. It is now anticipated a
construction contract will be approved by
the Fire Board in April 2019.
The Team RC project design team
including: the City Manager's Office,
Planning, Engineering, RCPD, HMC
Architects and Erickson Hall Construction
Management, have been meeting since
June of 2017. During those meetings, it
was determined that the scope of the
project needed to increase to include a
fully functioning Sheriff’s substation on
the west side of the city. Conceptual site
and building plans for the Public Safety
Facility have been created. It is
anticipated that the project design will go
through Planning Design Review and a
construction contract will be approved by
the Fire Board in mid-July 2018. This
facility will be based on modern
construction standards and is intended to
meet the District's mission for a minimum
of 50 years.
ACTIVE GOALS page 5
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A4
Working with the Taking
Back Our Community
Coalition and the League of
California Cities, raise public
awareness of why crime is
increasing in our state;
provide facts and impacts of
AB 109, Prop 47, and Prop
57; and advocate for State
legislative changes to
improve law enforcement's
ability to respond to crime.
City
Manager's
Office
2018 Q4 2020 General Fund
Still a member of the coalition, send
information quarterly to the Coalition of
impacts to the City of Rancho
Cucamonga. The Coalition reports that
several significant measures from 2018
are slated to be
reintroduced into CA next legislative
session.
C1
Complete the construction
and begin occupancy of the
new community RC Sports
Center; increase the City's
disaster resiliency with the
RCSC serving as the
primary evacuation center
during a catastrophic event.
Community
Services 2017 Q2 2018 General Fund and Fire
District Reserves Project Completed - July 2018
The new RC Sports Center is a sleek,
modern facility that will serve the
community by housing sports and other
City run programs, provide rentable
space to host events from small
seminars to large conferences, and also
act as the City's primary evacuation
center due to the inclusion of the large
emergency generator permanently
housed on site. This project is estimated
to be completed and open to the public
by June 2018.
PARKS AND RECREATION DEVELOPMENT
Proceed with planning and development of major park and recreational projects
ACTIVE GOALS page 6
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A5
Develop plan for
enhancements to the
Cultural Center Courtyard
that include shade and
seating, directional signage
from parking areas and
design work for future
capital improvements.
Community
Services/
Library/City
Manager's
Office/
Planning
2014 Q1 2015
Estimated funding requests
for 2014/15 of $50,000-
$60,000 to include site
furnishings, shade, signage
and design work for future
improvements.
The CEQA document, an addendum to
the adopted Victoria Gardens Master
Plan EIR, has been completed. Final
design documents will be completed and
the contract will be forwarded with the
addendum to the City Council for review
and approval/adoption by 4th quarter
2019.
A final conceptual design for the
courtyard was prepared and accepted.
The Planning Department drafted an
RFP for the CEQA clearance for the
project and circulated it to 8 consultants
on November 30, 2017. Responses are
due back to staff by January 11, 2018 at
6 pm. It is anticipated that a consultant
will be selected by January 31, 2018.
Next steps will include processing the
Design Review and appropriate CEQA
document for the project.
A6
Complete the survey and
environmental review,
develop a site plan, and
establish a rough cost of
development for Etiwanda
Creek Park.
Community
Services 2017 Q1 2018 Developer Impact Fees &
Fund Balance
Biological studies were completed in Nov
2018 with Environmental review in
Summer/Fall 2019. Construction
drawings scheduled for first quarter
2020.
The first phase of focused environmental
studies have been completed. Anticipate
the environmental to be completed by
July 2018, after which the site plan and
rough costs will be completed.
A7
Complete the survey and
environmental review,
develop a site plan and
establish a cost of
development for the Central
Park Trailhead as
envisioned in the Central
Park Master Plan.
Community
Services 2018 Q1 2019 Park Development Fund
Scope of project is now inclusive of all 70
acres to include the trailhead for survey
and environmental review. RFP for
environmental review is near completion.
Contract is expected to be awarded first
quarter 2019.
ACTIVE GOALS page 7
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
C2
Transform the second floor
of the Biane Library into an
interactive discovery space
[Second Story and Beyond].
When the Library
Foundation's $1.5M capital
campaign hits the $750,000
fundraising trigger point,
Library staff will consult an
exhibit design company to
begin the design phase.
Library
Services 2018 Q3 2021 Library Foundation, Library
Reserves, General Fund
Complete - The Foundation's capital
campaign goal was met in December
2018 triggering the next phase of the
project. Staff have begun interviewing
potential consultants to assist with the
RFP phase of exhibit design and
fabrication.
C3
Conduct a study on
Planning, Building and
Safety Fees to ensure that
fees are covering costs and
where needed, make
adjustments accordingly,
including reductions or
increases, as appropriate.
Administrative
Services 2018 Q2 2018 Complete
ENHANCING PREMIER COMMUNITY STATUS
As the community matures, undertake programs and projects to enhance Rancho Cucamonga's position as the premier community in our region
ACTIVE GOALS page 8
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
C4
Position the City to improve
its issuer credit rating from
the current AA (by S&P) to
AA+ or AAA in the next
three years.
Finance 2014 Q4 2017
Contract cost is $11,000;
PO encumbered in FY
2014/15; no anticipated
ongoing costs.
Complete. On January 16, 2019, the City
was notified that our issuer credit rating
was raised to AA+.
Debt Management Policy adopted in
December 2017. Consultant deferred
applying Standard & Poors' (S&P) rating
criteria to the City's current situation until
January 2018 to pin point additional
areas for enhancement. Consultant will
work with staff to complete Financial
Management Assessment (FMA) for
S&P's reference prior to next review,
which is anticipated to occur in the fall of
2018.
A8
Develop a Public Art Master
Plan to consider how
significant art pieces can be
incorporated into future
public and private
development, to include
funding options for both art
installation and long-term
maintenance.
City
Manager's
Office
2015 Q2 2016 Staff time
The Public Art Committee meets on a
quarterly basis and has been involved in
a number of City events including the
City Hall Art Exhibit gala and the
Community Paint Day event. This year
their work plan includes the development
of the Public Art Strategic Plan and
collaborating with the Wignall Museum
on the next City Hall Art Exhibit.
The public art ordinance was adopted on
July 19, 2017 and became effective on
August 21, 2017. The Public Art
Committee was appointed by Council on
December 20, 2017 and will be managed
by the City Manager's Office. One of the
tasks identified to be completed by the
committee is the development of the
Public Art Strategic Plan and the process
is expected to begin soon now that the
committee members have been
appointed.
ACTIVE GOALS page 9
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
C5
Review areas with industrial
zoning along arterials for
possible rezoning to permit
more commercial/office
uses. Example of one such
area is Rochester/Jack
Benny by Quakes Stadium.
Planning 2013 Q3 2013 Staff Time
Complete - The City has adopted a
series of Development Code changes
from 2015-18 to accommodate
repurposing of existing industrial
buildings, allow limited retail as an
ancillary use, and amend the use table to
add new uses such as "escape rooms"
and permit limited gun sales, etc.
Although the goal was specific to
analyzing possible zoning amendments
to the industrial areas along arterials, this
goal has been completed through the
code changes described above. The
changes allow for more
commercial/office uses, increased retail
opportunities, allow new business types
and limits impacts to parking and other
unintended impacts, meeting the intent of
the original goal. No additional changes
are proposed under this goal.
Staff has been working on evaluating the
changes in Land Use and business
needs along Foothill Blvd. and within the
Industrial Commercial Overlay Districts.
Many minor changes to the Development
Code have already been incorporated to
help guide development and allow
additional uses into these districts.
Example of this include the creation of
dedicated land uses for the repurposing
of industrial buildings for commercial use
and the addition of "escape rooms" as a
land use within the General Industrial
District. Additional changes are being
evaluated to determine if rezoning is the
best approach or if continuing to develop
more flexible standards and new uses
could be considered in these existing
districts. Staff anticipates that any draft
development standards would be
complete in 2018 so that both the Mixed
Use and Industrial development code
amendments could move forward to
Planning Commission and City Council
together.
MID AND LONG RANGE PLANNING
Begin efforts to develop mid-range and long-term goals and vision for the City.
ACTIVE GOALS page 10
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A9
Review the City's zoning
districts and
evaluate/investigate creating
overlay districts or specific
plan areas that will create
villages or development
districts in order to revitalize
underperforming or
underutilized areas and
create synergy amongst the
varying land uses.
Planning 2014 Q2 2016 Staff Time and may require
some consultant support.
The City contracted with Torti Gallas to
study the Foothill Corridor, evaluate the
efficacy of our standards at implementing
the General Plan, and recommend
walkability, access, and connectivity
standards. The study is expected to be
completed in second quarter 2019. In
addition, we contracted with Fehr and
Peers to develop a parking model that
can be used on a project by project basis
to assist staff in reviewing parking
standards for mixed use development
projects. The final model is expected to
be ready for use in second quarter 2019.
Staff has visited and researched other
City’s mixed-use standards to gather
ideas and concepts that could be
incorporated into our own Development
Code. Staff has since identified 8 – 10
mixed-use village areas along Foothill
Boulevard and has begun drafting a set
of design guidelines for the for future
mixed-use development. The guidelines
will consist of design principles for site
planning, parking, architecture,
landscaping, open space and signage.
Staff is also in the process of updating
the development standards to be
consistent with the mixed-use village
concept. This will allow each of the
mixed use areas to be developed in a
compatible manner with the existing
surrounding uses. The next step for the
mixed-use team will be to reach out and
begin working with a traffic consultant to
create appropriate parking standards for
Mixed Use developments.
ACTIVE GOALS page 11
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A10
Building upon existing
performance metrics,
develop additional tools,
such as business
intelligence dashboards and
interactive reporting, to
visualize and interpret
Citywide data in order to
enhance understanding and
decision making across
applicable service
categories.
Department of
Innovation &
Technology
2017 Q2 2018 Pursuing grant funding and
partnership cost offsets.
Continuing to work with Departments on
the right platforms to gather and share
accurate and relevant Citywide data.
DoIT is actively working with the City
Manager’s Office to evaluate the
implementation of ESRI based
Government Transparency tools to
compliment, or potentially replace,
existing Socrata performance reporting
modules. The GIS team has expanded
the RC2Go platform to include work
order management, allowing for
dashboard reporting on citizen reported
incidents as well as Public Works
responses. The DoIT team also
continues to work with the What Works
Cities initiative to develop performance
reporting on parks maintenance,
including the deployment of a GIS based
survey tool for park inspections that is
currently in testing.
A11
Advocate for changes in
SBCOG's function and
operation including updating
fee structure and to increase
COG services for the West
Valley.
Engineering /
City
Manager's
Office
2018 Ongoing No funding needed
Discussions around a potential West
Valley COG were on hiatus for much of
2018 due to elections. Discussions
related to resuming the conversation are
anticipated to begin in Spring 2019.
ACTIVE GOALS page 12
ACTIVE GOALS - JANUARY 2019 Revised 1/17/2019
Active Goals Lead
Dept./Div.
Year
Established
Original
Estimated
Completion
Date
Funding Source and
Ongoing Costs January 2019 Status January 2018 Status
A12
Enhance the efficiency and
effectiveness of the City's
weekly cash disbursement
(A/P) cycle by implementing
scanning and electronic
routing of invoices for
approval and payment within
the City's financial system.
Replace paper filing system
with digital filing system.
Finance and
DoIT 2018 Q4 2018
Minimal one-time funding
needed from Computer/
Technology Replacement
Fund for scanning
equipment and software to
facilitate scanning and
electronic storage/access
of documents
Staffing changes have occurred within
the A/P group. Surveying of other cities
for best practices is currently in process.
Tentative implementation is set for
Summer 2019.
ACTIVE GOALS page 13