HomeMy WebLinkAbout20-15 ResolutionRESOLUTION NO. 20-15
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW
DRC2019-00590, A REQUEST FOR SITE PLAN AND ARCHITECTURAL
REVIEW OF A 103,945 SQUARE FOOT WAREHOUSE DISTRIBUTION
BUILDING ON 4.75 ACRES OF LAND IN THE GENERAL INDUSTRIAL (GI)
DISTRICT ON THE EAST SIDE OF PECAN AVENUE SOUTH OFARROW
ROUTE; AND MAKING FINDINGS IN SUPPORT THEREOF--APN: 0229-
171-02.
A. Recitals.
1. Shean Kim, on behalf of Xebec Realty, filed an application for the approval of Design
Review DRC2019-00590 as described in the title of this Resolution. Hereinafter in this Resolution,
the subject Design Review request is referred to as "the application."
2. On the 12th day of February 2020, the Planning Commission of the City of
Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said
hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above -referenced public hearing on February 12, 2020, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a property generally located on the east side of Pecan
Avenue, south of Arrow Route; and
b. The subject property is located on the east side of Pecan Avenue and south of
Arrow Route. The site is currently being used as a storage and maintenance yard for a trucking firm
and includes multiple metal buildings and portable office modules. The parcel is approximately 660
feet from east to west and 330 feet from north to south, with an area of approximately 206,895
square feet (4.75 acres). The right-of-way improvements and utility undergrounding along Pecan
Avenue have not been installed; and
C. The existing Land Use, General Plan and Zoning designations for the project site
and adjacent properties are as follows:
PLANNING COMMISSION RESOLUTION NO. 20-15
DRC2019-00590 — SHEAN KIM FOR XEBEC REALTY
February 12, 2020
Page 2
Land Use
General Plan
Zoning
Site
Vacant Parcel
General Industrial
General Industrial
GI
District
North
Industrial Building,
Family Residences
Single-
General Industrial
General Industrial (Gl) District
South
Trucking Firm
General Industrial
General Industrial
GI
District
East
Warehouse Building
General Industrial
General Industrial
G[
District
West
Trucking Firm
General Industrial
General Industrial
GI
District
d. The proposed building will be of concrete tilt -up construction. The basic layout of
the building will be typical for warehouse buildings. The primary (or long) axis for the building will be
aligned west to east. The office area will be located at the southwest corner of the building. There
will be a dock loading/storage area with 10 dock doors located at the rear (east side) of the building;
and
e. The project complies with all development standards including building and parking
setbacks, floor area ratio and landscape coverage as shown on the following table:
Required
Provided
Compliant?
Building Setback Street
25 Feet
70 Feet
Yes
Building Setback Side
5 Feet
40 and 50 Feet
Yes
Building Setback Rear
0 Feet
135 Feet
Yes
Parking Setback
15 Feet
45 Feet
Yes
Landscape Depth
25 Feet
33 Feet
Yes
Landscape Coverage
10 Percent
10.8 Percent
Yes
Floor Area Ratio
50 -- 60 Percent
50 Percent
Yes
Building Hei ht*
35 — 75 Feet
40 Feet
Yes
*35 Feet at Minimum Setback 1 Foot Additional Height for Each 1 Foot of Additional
Setback
f. The parking requirement for the project is based on the mix of office and
warehouse floor areas in the building. The project is required to provide 79 vehicle parking spaces
and 10 trailer parking spaces based on the proposed 8,000 square feet of office area and 95,945
square feet of warehouse area as shown in the following table:
Parking Ratio
Required
Provided
Parking
Parkin
Office Parking
8,000 SF
1:250 SF
32 Spaces
32 Spaces
Warehouse Parking
1:1,000 for 1na20,000 SF
(95,945 SF)
1:2,000 for 2 20,000 SF
45 Spaces
47 Spaces
1:4,000 for the Remaining SF
Total Vehicle Parking
77 Spaces
79 Spaces
Trailer Parking.
10 Dock High Doors
1 per Dock High Door
10 Spaces
10 Spaces
3. Based upon the substantial evidence presented to this Commission during the
above -referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
PLANNING COMMISSION RESOLUTION NO. 20-15
DRC2019-00590 — SHEAN KIM FOR XEBEC REALTY
February 12, 2020
Page 3
a. The proposed project is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located. The proposal is to
construct an industrial building of 103;945 square feet. The underlying General Plan designation is
General Industrial (Gi) District.
b. The proposed development is compatible with the existing and proposed land uses
in the surrounding area. The potential land uses that would be associated with this project are
consistent with the land uses within the vicinity where it is located and the expectations of the
community.. The zoning of the property and all properties surrounding the subject property is
General Industrial (GI) .District.
C. The proposed development complies with each of the applicable provisions of the
Development Code. The proposed development complies with. all'standards outlined in the
Development Code, including, building and parking setbacks, average landscape depth, floor area
ratio, parking, dock and storage area screening, landscape coverage, site planning, and
architecture.
d. The proposed project, together with the conditions applicable thereto, will not be
detrimental to the public health, safety or welfare, or materially injurious to properties or
improvements in the vicinity. The potential land uses that would be associated with this project are
consistent with the land uses within the vicinity where it is located and the expectations of the
community. The zoning of the property and all properties surrounding the- subject property is
General Industrial (GI) District.
4. The Planning Department staff has determined that the project is categorically exempt
from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA
Guidelines. The project qualifies'under a Class 32 exemption under State CEQA Guidelines Section
15332 - In -Fill Development Projects for the following reasons: (1) the project is consistent with the
applicable General Plan designations and all applicable General Plan policies as well as with the
applicable zoning designation and regulations, (2) the proposed development occurs within the City
limits on a project site of no more than five acres substantially surrounded by urban uses, (3) the
project site has no value as a habitat for endangered, rare or threatened species, (4) approval of the
project would not result in any significant effects relating to traffic, noise, air quality, or water quality,
and (5) the site can be adequately served by all required utilities and public services.
The General Plan Land Use and Zoning Designation for the project site are Industrial Park (1P)
District, which permits the development and operation of a warehouse/distribution building of the
proposed size and configuration. The project complies with the City's development standards and
design guidelines, including setbacks, height, lot coverage, and design requirements. The project
site is located within the City limits, is under five acres, and is surrounded by existing residential
development and City infrastructure. The following are the five environmental factors that need to
be analyzed in order to determine that the project qualifies for the Categorical Exemption:
a) Traffic. A Trip Generation Analysis (Ganddini Group; August 8, 2019) was prepared for
the project which determined that the number of trips generated by the project would not
create a significant impact. The project site is presently being used by a truck repair and
storage operation which generates an estimated 242 daily vehicle trips. The proposed
warehouse distribution use will create an estimated 237 daily trips or a 5-trip reduction
from current conditions Based on the reduction in daily trips, it was determined that the
PLANNING COMMISSION RESOLUTION NO. 20-15
DRC2019-00590 — SHEAN KIM FOR XEBEC REALTY
February 12, 2020
Page 4
project was below the 50 peak hours trips that would necessitate a Traffic Impact
Analysis.
b) Noise: A Noise Impact Analysis (Recon; August 16, 2019) was prepared for the project.
The analysis determined that the construction and operational noise levels would not
exceed the City's noise thresholds and no mitigation measures were necessary.
c) Air Quality: Separate Air Quality and Green House Gas Analysis (Recon: August 21,
2019) were prepared for the project. The analysis determined that emissions associated
with construction and operation of the project would be below South Coast Air Quality
Maintenance District (SCAQMD) thresholds for both Air Quality and Green House Gases.
d) Water,Quality: A Water Quality Control exhibit (CA Engineering, Inc.; November 5, 2019)
was prepared for the project. It was also determined through the review of the project's
preliminary water quality plan that the project would not result in a significant impact
related to water quality of the site or surrounding properties.
e) Biological: A Biological Resource Assessment (BRA) (WRA; August 2019) was prepared
for the project site. The project site does not include any natural habitats and is
surrounded by development. The BRA determined that the project site does not contain
drainage features, ponded areas, wetlands or riparian habitats that would be under the
jurisdiction of federal, state or local agencies. Based on the onsite conditions, the project
is not anticipated to result in any impact to federally or State -listed plants or animals listed
as endangered or threatened or .to any iron -listed special -status species. No natural
communities will be affected by the project and the project is not within a Habitat
Conservation Plan area. The BRA does recommend a nesting bird survey priorto grading
if vegetation removal takes place during the bird nesting period (February 1 to August 31).
The Planning Commission has reviewed the Planning Department determination of exemption, and
based on its own independent judgment, concurs in the staffs determination of exemption.
5. Based' upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the attached standard conditions incorporated herein by this reference.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 12TH DAY OF FEBRUARY 2020.
PLANNING COM ISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Ton Guglielmo, Chairman
PLANNING COMMISSION RESOLUTION NO. 20-15
DRC2019-00590 — SHEAN KIM FOR XEBEC REALTY
February 12, 2020
Page 5
ATTEST:
AnneMclntosh, AICP, Secretary
I, Anne Mclntosh,;AICP, Secretary. of the Planning Commission for the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting, of the
Planning Commission'held on the 12th day of February 2020, by the following vote -to -wit:
AYES: COMMISSIONERS: GUGLIELMO, OAXACA, DOPP, MORALES
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS: WILLIAMS
ABSTAIN: COMMISSIONERS: