HomeMy WebLinkAbout2017-05-24 - Supplemental AL FL
4.
r _
Entry View From South
i
v0
I
rrm
CITY OF RANCHO CUCAMONGA
Project Description
• Applicant: National Community Renaissance of California
• Project Description: A request for
review of a 140-unit affordable
development
• Project Size: 4 acres of land
site plan and architectural
rental senior housing
• General Plan Designation: Low Medium
• Zoning: Low Medium (LM) District
• Density : 35 dwelling units per acre
Entitlements
• General Plan Amendment — DRC2016-00964
• Density Bonus Agreement — DRC2017-00156
• Design Review — DRC2016-00814
• Certificate of Appropriateness - DRC2016-00966
• Variance — DRC2017-00032
• Tree Removal Permit — DRC2016-00965
VDNOWVDnD OHDNVU JO AilD
A
�. - -- _
JL
`�N-r ,_� •'J `�.� r .`Aim' w_�y
. r
------ --- ---- - -
DAY CREEK CHANNEL
THE -UF
E - nuo
N
Project Overview
• 140 units on 3 floors built around center courtyard
• Craftsman architectural design theme
• 131 one bedroom units - 617 to 701 square feet
9 two bedroom units — 894 square feet
• 119 parking stalls, 82 in carport stalls and 37 in
uncovered stalls
• Pedestrian
connection
to Pacific Electric
Trail and
commercial
center under
construction to the
south
0
a
z
O
2
a
u
u
O
2
u
z
9
LL
O
V
Zoning/Density
• Zoning — Low Medium (LM) District (4-8 Dwelling Units per
Acre)
• Victoria Community Plan (VCP) permits zoning designation to
be increased 2 density ranges to provide plan flexibility
• VCP provides an incentive to construct affordable housing of a
1 unit increase in density for each affordable unit provided
• The project is 100 percent affordable
• Density may be increased to 24 to 48 dwelling units per acre
• Proposed density is 35 dwelling units per acre
Affordability
• Units are for Seniors 55 years and older
• Must stay affordable for 55 Years
• Owned and operated by National Community Renaissance
of California who operate 833 rental units in the City
Number of Units Offered Maximum eligible income Maximum monthly rent
15 $15,600 $359
49 $23,400 $539
43 $26,000 $599
32 $31,200 $719
Code Compliance/Concessions
• Project complies with all Code requirements except
number of required parking spaces, size of the privat
and the necessity for a Variance for wall height
for the
e decks
• Development Code permits affordable housing projects up to 3
concessions
• Applicant is requesting 2 concessions — parking and deck size
• Reduction in parking from 149 to 119 parking spaces
• Reduction in deck size from 100 to 81 square feet for upper
units and 150 to 107 square feet for ground floor units
• Variance to increase property line wall height from permitted 6
feet to up to 9 feet
it. �o
rrm
CITY OF RANCHO CUCAMONGA
Wt
" View From�k'
r-r -�r- r r if , li
ir-
m
rrm
CITY OF RANCHO CUCAMONGA
,p
South Elevation
North Elevation
East Elevation
V7-
West Elevation
IJ-
e I-Tu-nm "k
Recreational Amenities
• Pool and spa
• BBQ facilities
• Fire Pit
• Multiple fireplaces
• Lounge area
• Community room
• Multi -purpose room
• Warming area
• Technology areas
IIL
ft vol
sip
IL
t
}
4
.. , .. A
a k w-
CITY OF RANCHO CUCAMONGA
Tree
• Canyon Live Oak tree located at southeast corner of site
• Granted Historic Landmark Designation on October 21,
1987
• Believed at the time to be largest oak tree in the city
• Tree has since declined in
for removal
health and is recommended
• Certificate of Appropriateness required to determine
whether removal of Historic Landmark is appropriate
• General Plan Amendment required to modify General
Plan Figure LU-8
• Tree Removal Permit required to remove subject tree
Ny,: -
AN
1' T-
CITY OF RANCHO CUCAMONGA
CITY OF RANCHO CUCAMONGA
CITY OF RANCHO CUCAMONGA
CDFW Comments
CDFW Concerns: CDFW raised concerns that the Initial Study
(IS) identified several special -status wildlife and plant species
with potential to occur on the project site. The study, though,
concluded there was a low likelihood for these species to occur.
CDFW stated that focused studies for special -status wildlife and
plant species should have been performed to verify LSA Is
conclusion.
LSA Response: LSA maintains that the habitat on site is of low
value for the subject plant and animal species due to:
1. The small size of the project site (4 acres).
2. The site being disturbed due to previous onsite activities.
3. The site being isolated as a result of extensive surrounding
development.
CDFW Comments
(cont.)
LSA Site Reevaluation: LSA reevaluated the project site on May
12, 2017, and did not find any special -status wildlife or plant
species and determined that there was a low likelihood that they
would occur on the site.
LSA Conclusion: Although a few sensitive plant and animal
species may occur on the site, the project site would not support
their long term existence due to habitat degradation and
surrounding development. LSA finds that the potential impacts to
sensitive plant and animal species and their habitats is not
considered significant under CEQA.
Staff Response to Comments
• Staff reviewed LSA's
responses to the
issues raised by
CDFW
and
LSA's conclusion
that
the
impacts
to special status
animal
species and their habitat are not considered significant under
CEQA.
• Based on this finding, staff concludes that the original
determination made in the Initial Study, which was circulated on
April 3, 2017, is adequate and that no changes or additional
mitigation measures are necessary to address the issues
raised by CDFW.
• CEQA Section 15073.5 states that recirculation of the Initial
Study is not required when new information is added to the
mitigated negative declaration which merely clarified, amplifies
or makes insignificant modifications to the negative declaration.
.�;;. CITY OF RANCHO CUCAMONGA
•
Conclusion
Staff recommends the Planning Commission take the
following actions:
• Recommend the City Council adopt the attached Mitigated
Negative Declaration of environmental impacts.
• Recommend the City Council approve General Plan
Amendment DRC2016-00964 and Density Bonus
Agreement DRC2017-00156.
• Approve Design Review DRC2016-00814, Variance
DRC2017-00032 and Tree Removal Permit DRC2016-
00965.
• Recommend that the Historic Preservation Commission
approve Certificate of Appropriateness DRC2016-00966
Planning Commission
May 24, 2017
• Design Review DRC2016-00417 — A review of the a
proposal to construct a 4,250 square foot office
building on one developed parcel;
• Uniform Sign Program DRC2016-01036— A review
of a Uniform Sign Program for a 4,250 square foot
office building on one developed parcel.
.Z.�;. CITY OF RANCHO CUCAMONGA
-D(Z(2oIl - C)o Y/7
Review Timeline
• Planning Commission Workshop: March 9, 2016
• Initial Submittal: May 17, 2016
• Completeness Determination: March 28, 2017
• Committees Review: May 2, 2017
• Planning Commission: May 24, 2017
The area of the project site is .37 acres
S
Commercial Retail Center ' >
oothill Boul
M
_7
T
`A:
> `y
Foothill Boulevard
:116miL Community
Commercial
District -
Aerial Overview
J1
9
AL
AV
W
iW
Design Review
DRC2016-00417
• The applicant proposes to construct a
story office building with a floor
approximately 4,250 square feet.
• Parcel is approximately .37 acres
• 4 tenant spaces are proposed
one, 2-
area of
�
g
0)
annany a�nj�ejey�
Design Review
DRC2016-00417
(Continued)
• Wood frame construction painted with a palette of
two colors and finished with stucco.
• Added materials include matte metal wall panels,
corrugated metal, and glazing.
• Roof line varies and a tower element is proposed
on the north side of the building.
• Details include: metal storefront door frames,
metal awnings, metal parapet caps, and metal
hardware.
• Second floor facing Foothill Boulevard is recessed
creating a small deck.
.�� CITY OF RANCHO CUCAMONGA
I IIIIIIIIIIII \ �
�,,�'plzil��l �
��ii�llli�ll�il III` � I'
Floor Plan
Second Fl" Plan
Landscape Plan
_M1
Uniform Sign Program
• The Uniform Sign Program was reviewed by staff and
meets all current Development Code requirements and
guidelines.
• The
four
tenants
will
be allowed
two non -illuminated
wall
signs
each
on
the
north,
west
or east elevations.
• No monument signs are proposed.
Environmental Assessment
• The applicant submitted environmental
including an air quality and noise study;
studies
• Staff reviewed the studies and concluded that there
would not be any significant effect on the environment;
• Pursuant
staff has
Exempt
Projects).
to the California Environmental Quality Act,
determined that the project is Categorically
under Section 15332 (In -Fill Development
Public Notification
• The item was
hearing and no
Staff in response
duly advertised as a public
comments were received by
to the public notifications.
Conclusion
Staff Recommends Approval of:
• Design Review DRC2016-00417
• Uniform Sign Program DRC2016-01036
through the adoption of the Resolutions of Approval.
'•'•• CITY OF RANCHO CUCAMONGA
Creative Placemaking
and Public Art
Wca0►7- 60137
Purpose
Cultural
Development
• Focus on enhancing
Community enviromentfor Asset -based
Development cultural expression orientation
• Focus on improving • Focus on
quality of life developing local
assests
Economic Place -based
Development Creative orientation
• Focus on enhancing Placemaking • Focus on
the standard of onnections, not just
living :2objects
"'•• CITY OF RANCHO CUCAMONGA
l
At }
CITY OF RANCHO CUCAMONGA
Purpose
BEFORE
Purpose
Qualifying Projects
Residential Projects
• Projects of 4 or more
dwelling units
• Density of 4du/acre
or more
Commercial, Office, and
Industrial Projects
• New development with
building valuation over
$170001000
• Exterior remodels with
building valuation over
$110001000
Determining the Art Value
• Residential
• $750 per unit
• Commercial, Industrial & Office
• $1 per square foot
• Mixed use projects will be valued based on the use
Art Options
• Install art within the development (Preferred
Option)
• Donate artwork to the City to be installed on public
property
• Pay an in -lieu fee into the City's Public Art Trust
Fund
Review and Installation
• Development Review for art installed within a
development
• Same review process as the entire entitlement
• No additional reviews required
• Art is part of the proposed project
• Consideration for phased developments
• Conditions of Approval
• Bonds or other surety to ensure completion
•;;:,•. CITY OF RANCHO CUCAMONGA
Iconographic Art
CITY OF RANCHO CUCAMONGA
CITY OF RANCHO CUCAMONGA
�a. a
'P ^ .19
.1
r.'
4 y i V
1 4
L
CITY OF RANCHO CUCAMONGA
CITY OF RANCHO CUCAMONGA
Functional
w
4
CITY OF RANCHO CUCAMONGA
.1
wit
CITY OF RANCHO CUCAMONGA
w �
_ r -.,A
Aw
CITY OF RANCHO CUCAMONGA
Public Art Committee
• Form an Art in Public Places Committee
• 1 Members of the Planning Commission
• 1 Member of Parks and Recreation Commission
• 1 Member of Community Arts Foundation
• 2 Members of the Public
• Goals of the Committee
• Selection, placement & maintenance of art of City
Property
• Expenditures from the City's Public Art Trust Fund
CITY OF RANCHO CUCAMONGA
Environmental Review
• Exempt from CEQA
• General Rule 15061(B)(3)
• No physical change to the environment
• Revision to existing land use regulation to require
a rt
Recommendation
• Recommend to the City Council approval of
Municipal Code Amendment DRC2017-00177
• Final action to be taken by City Council
®South coast
Air Quality Management District
21865 Copley Drive, Diamond Bar, CA 91765-4178
(909) 396-2000 - www.agmd.gov
SENT VIA USPS AND E-MAIL:
domi n ick.perezOc itvo fre.us
Dominick Perez, Assistant Planner
City of Rancho Cucamonga
10500 Civic Center Dr.,
Rancho Cucamonga, CA 91730
CITY OFRANCHO CUCM May 24, 2017
MAY 14 1017
RECEIVED - pIANNNG
Mitieated Neeative Declaration (MND) for the Pronosed
Desian Review DRC2016-00670, Specific Plan Amendment DRC2016-00931
The South Coast Air Quality Management District (SCAQMD) staff appreciates the opportunity
to comment on the above -mentioned document. The following comments are meant as guidance
for the Lead Agency and should be incorporated into the Final MND.
Proiect Description
The Lead Agency proposes to construct and operate a 232,058-square-foot, high -cube warehouse
with unknown occupants on an approximately 11.84-acre site ("project"). The project is
bounded by commercial uses to the north and east, residential dwellings to the south, and a
vacant commercial lot to the west. The residential dwellings are within '''A mile of the project.
Air Quality and Health Risk Assessment (HRA) Analyses
The MND estimates approximately 396 total vehicle trips, including approximately 151 daily
diesel truck trips. In the Air Quality Section, the Lead Agency quantified the proposed project's
construction and operation air quality impacts and compared those impacts with SCAQMD's
regional and localized air quality CEQA significance thresholds. The Lead Agency found that
regional and localized construction and operational emissions would be less than significant.
Additionally, the Lead Agency performed an HRA and found that "all offshe diesel emissions
concentrations were [... j below the 10.0 in a million cancer risk threshold (...) for all age groups
examined" (see Page Rev 3-1-16 of the MND).
SCAQMD staff has concerns about the health risk analysis in the MND. The HRA analysis
performed for this project was based on improper assumptions which has likely underestimated
the project's health risk impacts. Additionally, SCAQMD staff finds that the MND is not clear
with respect to meteorological data that was used in the air quality analysis. Details are included
in the attachment. The attachment also includes a list of recommended mitigation measures
which the Lead Agency should implement and include in the Final MND, if the revised health
risks from the project are found to be significant.
Pursuant to the CEQA Guidelines Section 15074, prior to approving the project, the Lead
Agency shall consider the MND for adoption together with any comments received during the
public review process. Please provide SCAQMD staff with written responses to all comments
contained herein prior to the adoption of the Final MND. SCAQMD staff is available to work
with the Lead Agency to address the issues raised in the letter and any other air quality and HRA
�10-leI�Z--
Dominick Perez 2 May 24, 2017
questions that may arise. Please contact Jack Cheng, Air Quality Specialist — CEQA IGR
Section, at (909) 396-2448, if you have any questions regarding these comments.
Sincerely,
.Ce#a Scut
Lijin Sun, J.D.
Program Supervisor, CEQA IGR
Planning, Rule Development & Area Sources
Attachment
J W :LS:1C
SBC170425-07
Control Number
Dominick Perez
ATTACHMENT
May 24, 2017
Air Ouality and Health Risk Assessment (HRA) Analyses
1. SCAQMD staff is concerned that the Health Risk Assessment (HRA) has likely
underestimated the cancer risk from the project. In the HRA, the Lead Agency used the
AERMOD dispersion model to estimate DPM concentrations from the diesel vehicles
generated by the project and used the 2015 revised OEHHA guidelines to estimate the health
risks to sensitive receptors in the project vicinity. SCAQMD staff recommends that the Lead
Agency revise the HRA based on the following comments.
a. In the HRA, the Lead Agency used a 70-year average DPM emissions rate for the 30
years of exposure to estimate health risks. This is not an appropriate methodology to
estimate emissions based on the 2015 revised OEHHA guidelines. The 2015 revised
OE14HA guidelines acknowledge that children are more susceptible to the exposures
to air toxics and have revised the way cancer risks are estimated to take this into
account. Since the emissions from the project -generated trucks get cleaner with time
due to existing regulations, it would not be appropriate to average out the emissions
over a 70-year exposure duration since this would underestimate the health risks to
children who would be exposed to higher DPM concentrations during the early years
of project operation. Therefore, SCAQMD staff recommends that the DPM
emissions for each year of operation be applied to each of the corresponding age bins
(i.e. emissions from Year l of project operation should be used to estimate cancer
risks to the third trimester to 0 year age bin; Year 1 and 2 of project operation should
be used to estimate the cancer risks to the 0 to 2 years age bins; and so on).
b. Dock loading idling emissions were modeled as individual point sources at four idling
locations along the planned loading docks (STCKI — 4). SCAQMD staff
recommends that the Lead Agency revise the HRA using a line volume source that
spans the entire dock area to ensure that impacts are properly analyzed.
c. Some of the receptors were placed within the volume source exclusion zone, and the
results at these locations might not be accurate. This has likely caused the risk results
for these receptors not be captured. Therefore, SCAQMD staff recommends that the
Lead Agency revise the HRA by using a greater number of smaller volume sources to
avoid receptors within the volume source exclusion zone.
d. The Lead Agency performed the HRA modeling on July 17, 2016 using EMFAC2011
to calculate emission factors. EMFAC2014 is the most recent available version
(approved on December 30, 2014t) and was available at the time of analysis.
Therefore, SCAQMD staff recommends that the Lead Agency use EMFAC2014
when revising the HRA.
EMFAC2014. Available at: httr)s://www.arb.ca.eov/emfac/2014/.
Dominick Perez 4 May 24, 2017
2. Based on a review of Section 8.3.3 Meteorological Data of the Air Quality Study, three
different air monitoring stations were discussed. However, it is unclear which air monitoring
station or stations provided meteorological data. Therefore, SCAQMD staff recommends
that the Lead Agency clarify which station or stations were used in the Final MND.
Siting Warehouses near Residences
3. Based on the project description, the nearest sensitive receptors are approximately 1.4 mile to
the south of the project. While SCAQMD staff recognizes that there are many factors Lead
Agencies must consider when making local planning and land use decisions, there are
concerns about the proximity of a warehouse to the existing residences and the potential
long-term air quality impacts to the people living near the warehouse and along the truck
routes as a result of increased truck activities. SCAQMD staff recommends that the Lead
Agency use the California Air Resources Board's (CARB) Air Quality and Land Use
Handbook as a general reference guide for evaluating and reducing air pollution impacts
associated with new projects that go through the land -use decision making process. In
CARB's Air Quality and Land Use Handbook, CARB recommends a buffer of at least 1,000
feet between land uses that will have 100 or more trucks per day2.
4. CEQA requires that all feasible mitigation measures that go beyond what is required by law
be utilized during project construction and operation to minimize or eliminate these impacts.
in the event that the Lead Agency, after revising the HRA analysis based on the comments
provided above, finds that the project would result in significant health risk impacts,
SCAQMD staff recommends incorporating the following on -road mobile -source truck
related mitigation measures in the Final MND, in addition to the mitigation measures 1)
through 24). For more information on potential mitigation measures as guidance to the Lead
Agency, please visit SCAQMD's CEQA Air Quality Handbook website3.
• Require the use of 2010 compliant diesel trucks, or alternatively fueled, delivery trucks
(e.g., food, retail and vendor supply delivery trucks) at commercial/retail sites upon
project build -out. In the event that that 2010 model year or newer diesel trucks cannot be
obtained, provide documentation as information becomes available and use trucks that
meet EPA 2007 model year NOx emissions requirements'. Additionally, consider other
measures such as incentives, phase -in schedules for clean trucks, etc.
• Have truck routes clearly marked with trailblazer signs, so that trucks will not enter
residential areas.
• Limit activities to the amounts analyzed in the MD.
2 CARB Air Quality and Land Use Handbook: httv:Hwww.arb.ca.gov/ch/handbook.pd Guidance is for siting new sensitive land
uses within 1,000 feet of a distribution center, Page 4. The buffer is a neutral mitigation measure provided to minimize truck
activity emission impacts to sensitive receptors. Additionally, in April 2017, ARB published a technical advisory, Strategies to
Reduce Air Pollution Exposure Near Nigh -Volume Roadways: Technical Advisory, to supplement ARB's Air Quality and Land
Use Handbook: A Community Health Perspective. This Technical Advisory is intended to provide information on strategies to
reduce exposures to traffic emissions new high -volume roadways to assist land use planning and decision -making in order to
protect public health and promote equity and environmental justice. Available at: httos:H/ .arb.ca.gov/ch/lmduse.htm
r South Coast Air Quality Management District. hny:H/ .aQmd.izov/home/regulations/cecialair-quality-analysis-handbook.
4 Based on a review of the California Air Resources Board's diesel truck regulations, 2010 model year diesel haul trucks should
have already been available and can be obtained in a successful manner for the project construction California Air Resources
Board. March 2016. Available at: httn://% w truckload.ora/tca/files/ceLibraryFiles/Filename/000000003422/California-Clean-
Truck-and-Trailer-Uodale.odf(See slide #23).
Dominick Perez
May 24, 2017
Promote clean truck incentive programs (see the discussion above regarding Cleaner
Operating Truck Incentive Programs).
Provide electric vehicle (EV) Charging Stations (see the discussion below regarding EV
charging stations).
5. In addition to the mobile source mitigation measures identified above, the Lead Agency
should incorporate the following onsite area source mitigation measures below as guidance to
further reduce the project's operational air quality impacts.
• Maximize use of solar energy including solar panels; installing the maximum possible
number of solar energy arrays on the building roofs and/or on the project site to generate
solar energy for the facility.
• Maximize the planting of trees in landscaping and parking lots.
• Use light colored paving and roofing materials.
• Utilize only Energy Star heating, cooling, and lighting devices, and appliances.
• Install light colored "cool" roofs and cool pavements.
• Limit the use of outdoor lighting to only that needed for safety and security purposes.
• Require use of electric or alternatively fueled sweepers with HEPA filters.
• Use of water -based or low VOC cleaning products.
Conditions of Approval
Community Development Department
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planning Department
Standard Conditions of Approval
1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or
projections shall be screened from all sides and the sound shall be buffered from adjacent
properties and streets as required by the Planning Department. Such screening shall be
architecturally integrated with the building design and constructed to the satisfaction of the Planning
Director. Any roof -mounted mechanical equipment and/or ductwork, that projects vertically more
than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed
enclosure which exhibits a permanent nature with the building design and is detailed consistent with
the building. Any roof -mounted mechanical equipment and/or ductwork, that projects vertically less
than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of
the building. Details shall be included in building plans.
2. The applicant shall agree to defend at his sole expense any action brought against the City, its
agents, officers, or employees, because of the issuance of such approval, or in the alternative, to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees,
for any Court costs and attorney's fees which the City, its agents, officers, or employees may be
required by a court to pay as a result of such action. The City may, at its sole discretion, participate
at its own expense in the defense of any such action but such participation shall not relieve
applicant of his obligations under this condition.
3. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of
Approval, and all environmental mitigations shall be included on the plans (full size). The sheet(s)
are for information only to all parties involved in the construction/grading activities and are not
required to be wet sealed/stamped by a licensed Engineer/Architect.
4. The applicant shall be required to pay California Department of Fish and Wildlife Notice of
Exemption fee in the amount of $50.00. All checks are to be made payable to the Clerk of the
Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing or
within 5 days of the date of project approval.
5. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for Planning Director review and approval prior to the issuance of Building Permits for the
development or prior final map approval in the case of a custom lot subdivision. For development
occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by
Fire Construction Services.
6. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking
stalls.
www.CityofRC. us
Printetl: 4/26/2017 7 f
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planninq Department
Standard Conditions of Approval
7. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in
the required landscape plans and shall be subject to Planning Director review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Services Department.
8. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree
per 30 linear feet of building.
9. All walls shall be provided with decorative treatment. If located in public maintenance areas, the
design shall be coordinated with the Engineering Services Department,
10. Landscaping and irrigation shall be designed to conserve water through the principles of water
efficient landscaping per Development Code Chapter 17.82.
11. The applicant shall comply
with all
Santa Ana Regional Water Quality Board
and Federal EPA water
requirements.
12. The applicant shall contact
the U.S.
Postal Service to determine the appropriate
type and location of
mailboxes. Multi -family
residential
developments shall provide a solid
overhead structure for
mailboxes with adequate
lighting.
The final location of the mailboxes
and the design of the
overhead structure shall be
subject
to Planning Director review and approval
prior to the issuance of
Building Permits,
13. All parking lot landscape islands
shall have
a minimum outside dimension of 6 feet.
14. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a
curb stop).
15. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and
exits shall be striped per City standards.
16. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided
throughout the development to connect dwellings/units/buildings with open spaces/plazas/
recreational uses.
17. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any
signs proposed for this development shall comply with the Sign Ordinance and shall require
separate application and approval by the Planning Department prior to installation of any signs.
18. A Uniform Sign Program for this development shall be submitted for Planning Director review and
approval prior to issuance of Building Permits.
19. Approval of this request shall not waive compliance with all sections of the Development Code, all
other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in
effect at the time of Building Permit issuance.
20. The developer shall submit a construction access plan and schedule for the development of all lots
for Planning Director and Engineering Services Department approval; including, but not limited to,
public notice requirements, special street posting, phone listing for community concerns, hours of
construction activity, dust control measures, and security fencing.
www.CityofRc.us
Printed : 426/2017 Page 2 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Planning Department
Standard Conditions of Approval
21. The site shall be developed and maintained in accordance with the approved plans which include
Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and
grading on file in the Planning Department, the conditions contained herein and the Development
Code regulations.
22. All ground -mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of concrete or
masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For
single-family residential developments, transformers shall be placed in underground vaults.
23. All parkways, open areas, and landscaping shall be permanently maintained by the property owner,
homeowners' association, or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for Planning Director and Engineering Services Department review
and approved prior to the issuance of Building Permits.
24. A detailed on -site lighting plan, including a photometric diagram, shall be reviewed and approved by
the Planning Director and Police Department (909-477-2800) prior to the issuance of Building
Permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as
not to adversely affect adjacent properties.
25.Occupancy of the facilities shall not commence until such time as all California Building Code and
State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be
submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services
Department to show compliance. The buildings shall be inspected for compliance and final
acceptance granted prior to occupancy.
26. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building,
etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has
commenced, whichever comes first.
27. Prior to any use of the project site or business activity being commenced thereon, all Conditions of
Approval shall be completed to the satisfaction of the Planning Director.
28. Revised Site Plans and building elevations incorporating all Conditions of Approval shall be
submitted for Planning Director review and approval prior to the issuance of Building Permits.
Engineering Services Department
Please be advised of the following Special Conditions
Printed: 4/26/2017 w .CityofRC.us
Page 3 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Engineering Services Department
Please be advised of the following Special Conditions
1. Development impact fees will be due prior to issuance of a building permit. Impact Fees include:
Transportation
Police
Note:
1. A credit will be given for the current use
2. Fees are subject to change annually
3. Drainage impact fees already paid with the existing building.
2. Foothill Boulevard frontage improvements to be in accordance with City "Major Divided Arterial"
standards including:
A. Protect or repair existing curb and gutter, sidewalk, street lights, signing and striping as required.
B. Remove existing drive approaches and replace with curb and gutter.
C. Reconstruct access ramp on the southeast corner of Malachite Avenue at Foothill Boulevard. All
improvements including access ramps shall be in accordance with the latest ADA standards.
Revise striping for pedestrian path of travel for reconstructed access ramp.
3. Malachite Avenue frontage improvements to be in accordance with City 'Collector" standards and
including:
A. Remove and replace existing curb and gutter, sidewalk, street lights, signing and striping as
required.
B. Dedicate right-of-way for Malachite and remove and reconstruct improvements to City "Collector"
standards.
4. Amount of parking spaces to be in accordance with Development Code Section 17.64.
Standard Conditions of Approval
5. Corner property line cutoffs shall be dedicated per City Standards.
6. Dedication shall be made of the following rights -of -way on the perimeter streets (measured from
street centerline):
33 total feet on Malachite Avenue
60 total feet on Foothill Avenue
7. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall
be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at
least 50% of all wastes generated during construction and demolition are diverted from landfills, and
appropriate documentation is provided to the City. Permits issued on or after June 2, 2014, must
complete the reimbursement process through the City's Accelerate online portal within 60 days
following the completion of the construction and/or demolition project or the deposit will be forfeited.
Permits issued before June 2, 2014, require the following when applying for a deposit
reimbursement: a completed CD-2 form, a copy of the cashier's receipt showing the deposit
amount, and all weight tickets. Instructions and forms are available at the City's web site,
www.CityofRC.us, under City Hall; Engineering; Environmental Programs.
w .CityofRC.us
Printed. 4/2612017 Page 4 of 13
Project #:
DRC2016-00417
Project Name:
FOOTHILL TERRACE
Location:
9533 FOOTHILL BLVD - 020826114-0000
Project Type:
Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
Engineerina Services Department
Standard Conditions of Approval
6. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
9. The developer shall be responsible for the relocation of existing utilities as necessary.
10. Add the following note to any private landscape plans that show street trees: "All improvements
within the public right-of-way, including street trees, shall be installed per the public improvement
plans." If there is a discrepancy between the public and private plans, the street improvement plans
will govern.
11. Construct the following perimeter street improvements including, but not limited to:
Curb & Gutter
A.C. Pvmt
Side -walk
Drive Appr.
Street Lights
Street Trees
Comm Trail
Median Island
Bike Trail
Other
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction
and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear
per Standard 114. (d) If so marked, an in -lieu of construction fee shall be provided for this item.
12. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of
energy, fuel or power to any building or structure which is regulated by technical codes and for
which a permit is required unless, in addition to any and all other codes, regulations and ordinances,
all improvements required by these conditions of development approval have been completed and
accepted by the City Council, except: that in developments containing more than one building,
structure or unit, the development may have energy connections made in equal proportion to the
percentage of completion of all improvements required by these conditions of development
approval, as determined by the City Engineer, provided that reasonable, safe and maintainable
access to the property exists. In no case shall more than 95 percent of the buildings, structures or
units be connected to energy sources prior to completion and acceptance of all improvements
required by these conditions of development approval.
Printed 412612017 www.CityofRC.us
Page 5 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Enlaineerina Services Department
Standard Conditions of Approval
13. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection safety lights on
future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall
be submitted to and approved by the City Engineer. Security shall be posted and an agreement
executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of
the public and/or private street improvements, prior to final map approval or the issuance of Building
Permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction
permit shall be obtained from the Engineering Services Department in addition to any other permits
required.
c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR,
ECR, or any other locations approved by the City Engineer.
Notes:
1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart,
unless otherwise specified by the City Engineer.
2) Conduit shall be 3-inch galvanized steel with pull rope or as specified.
e. Access ramps for the disabled shall be installed on all corners of intersections per City Standards
or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with adequate
detours during construction. Street or lane closure permits are required. A cash deposit shall be
provided to cover the cost of grading and paving, which shall be refunded upon completion of the
construction to the satisfaction of the City Engineer.
g. Concentrated drainage Flows shall not cross sidewalks. Under sidewalk drains shall be installed
to City Standards, except for single-family residential lots.
h. Street names shall be approved by the Planning Manager prior to submittal for first plan check.
www.CityofRC.us
Printed: 4/26/2017 page 6 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Enaineerina Services Department
Standard Conditions of Approval
14.Install
street trees per City street tree design guidelines
and standards as follows. The completed
legend
(box below) and construction notes shall appear
on the title
page of the street improvement
plans.
Street improvement plans shall include a line
item within
the construction legend stating:
"Street
trees shall be installed per the notes and legend
on Sheet
_ (typically Sheet 1)." Where
public
landscape plans are required, tree installation
in those
areas shall be per the public
landscape improvement plans.
Street Name
Botanical Name
Common Name
Min. Grow Space
Spacing
Size
Qty.
Construction Notes for Street Trees:
1) All street trees are to be planted in accordance with City standard plans.
2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the
City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments,
as determined by the City inspector.
3) All street trees are subject to inspection and acceptance by the Engineering Services
Department.
Street trees are to be planted per public improvement plans only.
15. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement,
drive approaches, sidewalks, street lights, and street trees.
Buildina and Safety Services Department
Please be advised of the following Special Conditions
1. When the Site Development Review is approved submit complete construction drawings including
structural calculations and energy calculations to Building and Safety for plan review in accordance
with the current edition of the CA Building and Fire Codes. an additional staircase appears to be
required to satisfy the maximum travel distance from the second floor an Elevator may be required
based on the proposed use of the second floor. The architect must justify the design in accordance
with current building codes at the time of plan check submittal. The new structure is not required to
be equipped with automatic fire sprinklers, but a lack of fire sprinklers may limit the use of the
building. A soils report is required for new structures. Disabled access improvements must be made
in accordance with current regulations.
www.CityofRC.us
Pnntetl: 4/262017 Page 7 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
1. Grading of the subject property shall be in accordance with current adopted California Building Code
and/or the California Residential Code, City Grading Standards, and accepted grading practices.
The Grading and Drainage Plan(s) shall be in substantial conformance with the approved
conceptual Grading and Drainage Plan.
2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform
such work. Two copies will be provided at grading and drainage plan submittal for review. Plans
shall implement design recommendations per said report.
3. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be
completed, submitted, and approved by the Building and Safety Official prior to the issuance of
building permits.
4. A separate Grading and Drainage Plan check submittal is required for all new construction projects
and for existing buildings where improvements being proposed will generate 50 cubic yards or more
of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet
signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit.
5. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a
dust control sign on the project site prior to the issuance of a grading permit. All dust control sign (s)
shall be located outside of the public right of way.
6. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for
review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading
and Drainage Plan/Permit.
7. The Preliminary Water Quality Management Plan (WQMP) has been deemed "Acceptable". Prior to
the issuance of a grading permit a final project -specific Water Quality Management Plan shall be
submitted for review and approval by the Building Official.
8. Prior to the issuance of a grading permit the applicant shall obtain written permission from the
adjacent property owner(s) to construct wall(s) on property line(s) or provide a detail(s) showing the
perimeter wall(s) to be constructed offset from the property line.
9. Prior to issuance of a grading permit the Final Grading and Drainage Plan shall show the
accessibility path from the public right of way and the accessibility parking stalls to the building
doors in conformance with the current adopted California Building Code. All accessibility ramps
shall show sufficient detail including gradients, elevations, and dimensions and comply with the
current adopted California Building Code.
10. The Grading and Drainage Plan shall implement City Standards for on -site construction where
possible, and shall provide details for all work not covered by City Standard Drawings.
11. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall
be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private
property. All slope offsets shall meet the requirements of the current adopted California Building
Code.
12. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum
parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the,
current adopted California Building Code.
www.CiryofRC.us
Pnntetl: 4/26/2017 Page 8 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
13. The Preliminary Water Quality Management Plan (WQMP) has been deemed "Acceptable". Prior to
the issuance of a grading permit a final project -specific Water Quality Management Plan shall be
submitted for review and approval by the Building Official.
14. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum
parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the,
current adopted California Building Code.
15. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond
project boundary.
16. This project shall comply with the accessibility requirements of the current adopted California
Building Code.
17. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format
provided in the City of Rancho Cucamonga handout 'Information for Grading Plans and Permit".
18. Grading Inspections:
a) Prior to the start of grading operations the owner and grading contractor shall request a
pre -grading meeting. The meeting shall be attended by the project owner/representative, the
grading contractor and the Building Inspector to discuss about grading requirements and preventive
measures, etc. If a pre -grading meeting is not held within 24 hours from the start of grading
operations, the grading permit may be subject to suspension by the Building Inspector;
b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety
Department at least 1 working day in advance to request the following grading inspections prior to
continuing grading operations:
i) The bottom of the over -excavation;
ii) Completion of Rough Grading, prior to issuance of the building permit;
iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit
Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to
be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of
Record;
iv) The rough grading certificates and the compaction reports will be reviewed by the Associate
Engineer or a designated person and approved prior to the issuance of a building permit.
19. All roof drainage flowing to the public right of way (Malachite Avenue) must drain under the sidewalk
through a parkway culvert approved by the Engineering Department. This shall be shown on both
the grading and drainage plan and Engineering Services Department required plans.
20. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site
plan) set shall show in each of the typical sections and the plan view show how the separations
between the building exterior and exterior ground surface meet the requirements of Sections
CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of
the current adopted California Building Code/Residential Code.
Printed: 4/26/2017 www.CltyofRC.us
Page 9 of 13
Project #:
DRC2016-00417
Project Name:
FOOTHILL TERRACE
Location:
9533 FOOTHILL BLVD - 020826114-0000
Project Type:
Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
21. Prior to issuance of a grading permit, the applicant shall obtain a signed and notarized letter from
the adjacent property owner(s) for ALL work proposed on the adjacent property. The letter shall be
scanned and pasted onto the permitted grading plan set. The letter shall show on either the title
sheet or a detail sheet of the grading and drainage plan set.
22. Prior to approval of the project -specific storm water quality management plan, the applicant shall
submit to the Building Official, or his designee, a precise grading plan showing the location and
elevations of existing topographical features, and showing the location and proposed elevations of
proposed structures and drainage of the site.
23. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be
prepared and submitted to the Building and Safety Official for review and approval for on -site storm
water drainage prior to issuance of a grading permit. The report shall contain water surface profile
gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be
wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study
shall provide inlet calculations showing the proper sizing of the water quality management plan
storm water flows into the proposed structural storm water treatment devices.
24.It shall be the responsibility of the applicant to acquire any required off -site drainage easements
prior to the issuance of a grading permit.
25. Roof water is not permitted to flow over the public parkway and shall be directed to an under
parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a grading permit.
26. Private sewer, water, and storm drain improvements will be designed per the latest adopted
California Plumbing Code. Private storm drain improvements shall be shown on the grading and
drainage plan.
27. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the
engineer of record shall certify the functionality of the storm water quality management plan
(WQMP) storm water treatment devices and best management practices (BMP).
28. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy
of the project Conditions of Approval.
29. The Preliminary Water Quality Management Plan (PWQMP) has been deemed "Acceptable". Prior
to the issuance of a grading permit a final project -specific Water Quality Management Plan shall be
submitted for review and approval by the Building Official.
30. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of
Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval
by the Building Official and recorded with the County Recorder's Office.
31. The land owner shall provide an inspection report on a biennial basis for the structural storm water
treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga
Environmental Program Manager. The land owner shall maintain on a regular basis as described in
the Storm Water Quality Management Plan prepared for the subject project. All costs associated
with the underground infiltration chamber are the responsibility of the land owner.
v .CityofRC.us
Printed 426/2017 Page 10 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
32. The land/property owner shall follow the inspection and maintenance requirements of the approved
project specific Water Quality Management Plan and shall provide a copy of the inspection reports
on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager.
33. A final project -specific Storm Water Quality Management Plan (WQMP) shall be approved by the
Building and Safety Director, or his designee, and the City of Rancho Cucamonga's "Memorandum
of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading
permit or any building permit.
34. Prior to the issuance of a building permit or Engineering Services Department issued right of way
permit, the applicant shall submit to the Building Official, or his designee, a final project specific
water quality management plan for review and approval, and shall have said document recorded
with the San Bernardino County Recorder's Office.
35. Prior to the start of landscaping operations, the landscape architect and the landscape contractor
shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga
Planning Department. The weed barrier shall be permeable.
36. Prior to issuance of a grading permit and approval of the project specific water quality management
plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of
concern as addressed in the in the final project -specific water quality management plan (WQMP). At
a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert
filters shall be maintained on a regular basis as described in the "Inspection and Maintenance
Responsibility for Post Construction BMP" section of the final project -specific water quality
management plan.
37. Prior to issuance of a grading permit the Final Project -Specific Water Quality Management Plan
shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet"
located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety
Recommendations, of the San Bernardino County Technical Guidance Document for Water
Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations
for Appendix D, Table VI1.3: Suitability Assessment Related Considerations for Infiltration Facility
Safety Factors".
38. Prior to approval of the final project -specific water quality management plan the applicant shall have
a soils engineer prepare a project -specific infiltration study for the project for the purposes of storm
water quality treatment. The infiltration study and recommendations shall follow the guidelines in the
current adopted "San Bernardino County Technical Guidance Document for Water Quality
Management Plans".
39. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil
engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm
Water Treatment Devices As -Built Certificate with the Environmental Programs Coordinator, City of
Rancho Cucamonga Engineering Services Department.
~.CityofRC.us
Printed 4/26/2017 Page 11 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
40. The subgrade for the permeable paver storm water treatment devices shall have a level subgrade.
Prior to issuance of the grading permit and approval of the final project -specific
water quality
management plan (WQMP) the engineer of record shall provide a pad elevation for
the permeable
paver subgrade on the grading plan and shall provide a detail on the WQMP site and
drainage plan
showing the permeable paver subgrade as level.
41. NONRESIDENTIAL MANDATORY MEASURES — CALIFORNIA GREEN BUILDING
STANDARDS
CODE — Prior to the issuance of any building permit the applicant shall comply
with Section
5.106.10 (Grading and paving) of the current adopted California Green Building Standards Code:
Construction plans shall indicate how site grading or a drainage system will manage all surface
water flows to keep water from entering buildings. Examples of methods to manage
surface water
include, but are not limited to, the following:
1. Swales.
2. Water collection and disposal systems.
3. French drains.
4. Water retention gardens.
5. Other water measures which keep surface water away from buildings and aid in
groundwater
recharge.
Exception: Additions and alterations not altering the drainage path.
vMnv.CityofRC.us
Printed. 4/26/2017 Page 12 of 13
Project #: DRC2016-00417
Project Name: FOOTHILL TERRACE
Location: 9533 FOOTHILL BLVD - 020826114-0000
Project Type: Design Review
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT:
Grading Section
Standard Conditions of Approval
42. NONRESIDENTIAL MANDATORY MEASURES — CALIFORNIA GREEN BUILDING STANDARDS
CODE — Prior to the issuance of any building permit the applicant shall comply with Section 5.106.1
(Storm water pollution prevention) of the current adopted California Green Building Standards Code:
Newly construction projects and additions which disturb less than one acre of land shall prevent the
pollution of stormwater runoff from the construction activities through one or more of the following
measures:
1.106.1.1 Local Ordinance — Comply with a lawfully enacted stormwater management and/or
erosion control ordinance.
1.106.1.2 Best Management Practices (BMP) — Prevent the loss of soil through wind or water
erosion by implementing an effective combination of erosion and sediment control and good
housekeeping BMP.
1. Soil loss BMP that should be considered for implementation as appropriate for each project
include, but are not limited to, the following:
a. Scheduling construction activity.
b. Preservation of natural features, vegetation and soil.
c. Drainage swales or lined ditches to control stormwater flow.
d. Mulching or hydroseeding to stabilize disturbed soils.
e. Erosion control to protect slopes.
f. Protection of storm drain inlets (gravel bags or catch basin inserts).
g. Perimeter sediment control (perimeter silt fence, fiber rolls).
h. Sediment trap or sediment basin to retain sediment on site.
i. Stabilized construction exits.
j. Wind erosion control.
k. Other soil loss BMP acceptable to the enforcing agency.
2. Good housekeeping BMP to manage construction equipment, materials and wastes that should
be considered for implementation as appropriate for each project include, but are not limited to, the
following:
a. Material handling and waste management.
b. Building materials stockpile management.
c. Management of washout areas (concrete, paints, stucco, etc.).
d. Control of vehicle/equipment fueling to contractors staging area.
e. Vehicle and equipment cleaning performed off site.
f. Spill prevention and control.
g. Other housekeeping BMP acceptable to the enforcing agency (City of Rancho Cucamonga).
�wwi.CityofRC.us
Printed: 4/26/2017 Page 13 of 13
STAFF REPORT
DATE: May 24, 2017
TO: Chairman and Members of the Planning Commission
FROM: Candyce Burnett, City Planner
INITIATED BY: Dat Tran, Assistant Planner
SUBJECT: TIME EXTENSION DRC2017-00238 — WESTERN STATES DEVELOPMENT,
INC. - A request to allow for a one (1) year time extension of a previously
approved 11 lot Tentative Tract Map (SUBTT17769) on 2.98 acres of land in
the Low Residential (L) District (2-4 dwelling units per acre), located at the
southwest corner of Beryl Street and 19th Street — APN: 0202-461-62,-63, and
-65. On June 11, 2008, a Mitigated Negative Declaration of environmental
impacts was adopted by the Planning Commission for Tentative Tract Map
SUBTT17769 under Resolution 08-29. Staff finds the project to be within the
scope of the prior Mitigated Negative Declaration. The California Environmental
Quality Act provides that no further environmental review or Negative
Declaration is required for subsequent projects or minor revisions to the projects
within the scope of the previous Mitigated Negative Declaration.
CONTINUANCE REQUESTED
RECOMMENDATION:
Due to an error in the public noticing process, staff recommends the Planning Commission
continue the public hearing for Time Extension DRC2017-00238
to the jURe 14,20" meeting an unspecified date.
CB:TG/Is
is
BLUM COLLINS LLP
May 22, 2017
Dominick Perez, Associate Planner
City of Rancho Cucamonga
Planning Department
10500 Civic Center Dr.
Rancho Cucamonga, CA 91730
dominick.perez(alcitvofrc.us
Via Finail & U.S. Mail
Ann Center
707 Wilshire Boulevard
Suite 4880
Los Angeles. California
90017
213.572.0400 phone
21M72.0401 fax
CITY OF RANCHO CUCAMONGa
MAY 11 1017
RECEIVED - PLANNING
Re: California Environmental QaaliI3, Act Comments on Ora and Utica
Miligated Negative Declaration
Dear Mr. Perez and the City of Rancho Cucamonga:
On behalf of the Golden State Environmental & Social Justice Alliance, a California
Social Purpose Corporation, Entity #C4017878, this is to comment under the California
Environmental Quality Act ("CEQA") upon the Mitigated Negative Declaration
("MND") for the above -captioned proposed distribution center for the lot at the northeast
corner of 4" Street and Utica Avenue in the City of Rancho Cucamonga ("the Project").
The Project is a 232,058-square-foot warehouse logistics building containing 26,500
square feet of office space and 205,358 square feet dedicated to the warehousing use on a
property comprising five (5) parcels with a combined area of 515,690 square feet (11.84
acres) which contains an abandoned parking lot and a vacant pad within Planning Area 5
of the Empire Lakes Specific Plan at. Our comments appear in the order in which
matters appear in the MND, and are supplemented by the comments of Soil Water Air
Protection Enterprise ("S WAPE"), submitted herewith.
The California Environmental Quality Act ("CEQA") requires an Environmental Impact
Report ("EIR") "whenever it considers approval of a proposed project that `may have a
significant effect on the environment."' Quail Botanical Gardens Found, Inc. v. City of
Encinitas (1994) 29 Cal. App. 4th 1597, 1601, quoting Pub. Resources Code § 21100.
As you also know, CEQA requires the preparation of an EIR "whenever it can be fairly
argued on the basis of substantial evidence that the project may have significant
environmental impact." No Oil, Inc. v. City of Los Angeles (1974) 13 Cal. 3d 68, 75
(emphasis added); see also Laurel Heights Improvement Assn. v. Regents of University of
Califm•nia (1993) 6 Cal. 4th 1112, 1123. There is a fair argument that the Project may
have a significant impact on air quality, biological resources, and greenhouse gases.
Dominick Perez, City of Rancho Cucamonga
May 22, 2017
Page 2
Air Ouality
Our comments are supplemented by those of SWAPE, submitted herewith, which are
incorporated by reference and which should be responded to during the City's process on
the MND. See Attachment A (including letter from SWAPE with CaIEEMod and
AERSCREEN output files).
Subtopic b. Would the Project violate any air quality standard or contribute
substantially to an existing or projected air quality violation? As you note, the South
Coast Air Basin is non -attainment for ozone, PM10 and PM2.5.
Construction Emissions. The MND concedes that cumulative impacts from construction
emissions will be significant as to N%, ozone and both PM10 and PM2.5, but these
impacts will be reduced to less than significant levels based on implementing certain
mitigation measures. There is no substantial evidence these mitigation measures will
reduce impacts to less than significant levels. In particular, we note that regarding these
measures, there is no substantial evidence that emissions will be reduced to less than
significant levels:
6. All construction equipment will be maintained in good operating condition:
There is no requirement for Tier 4 or even Tier 2 construction equipment here.
There is no substantial evidence this measure will reduce emissions to less than
significant levels.
7. Construction contractors must show that they're using low -emission equipment or
that doing so isn't feasible: What assumptions did RK Engineering use in its air
quality and HRA modeling regarding this equipment? Again, there is not even a
Tier 2 requirement here, there are no standards for what is "feasible," and there is
no substantial evidence this measure will reduce emissions to less than significant
levels.
8. Construction contractors shall use electric or clean fuel equipment "where
feasible. " See our comment above regarding feasibility. There is no evidence
this measure as drafted or implemented will reduce emissions to less than
significant levels.
9. Construction crews shall, according to a statement in the construction grading
plans, shut off equipment when not in use: A statement in the construction
grading plans is not enforceable by the City, and there is no evidence this measure
will reduce emissions to less than significant levels.
10. All asphalt must meet the performance standards of South Coast Air Quality
Management District ("SCAQMD') Rule 1108: this is required anyway, and
there is no evidence this measure will reduce emissions.
11. Paints and coatings shall meet the standards in SCAQMD Rule 1113, and shall be
applied by hand or by high -volume, low-pressure spray. This would reduce
VOCs. We don't see how it will reduce emissions of NOx, ozone, PM1o, or PM2.5.
Dominick Perez, City of Rancho Cucamonga
May 22, 2017
Page 3
Measures 12, 13 and 14 are also required anyway, and would only reduce PM to or
possibly PM2.5 emissions, and there is no evidence they would do so even for these
pollutants to a level of less than significant.
Operational Emissions. You concede cumulative impacts from the buildout of the
General Plan will be significant but that they are subject to a Statement of Overriding
Considerations from the Final Program EIR ("FPEIR"), and that several measures will
make cumulative impacts insignificant. This is not based on substantial evidence for the
reasons discussed below:
15. Preferential parking for HOVs and shuttle services. There is no actual provision
for how many preferential parking spaces are to be provided, if any. There is no
substantial evidence this measure will reduce emissions. The bulk of the
emissions from the Project will come from trucks, not cars, HOVs or shuttle
services accessing the site.
16. Schedule truck deliveries during off-peak hours. There is no provision for how
this is to happen, and it is doubtful that a distribution center will be able to limit
truck deliveries to off-peak hours. Any conclusion this measure will reduce
emissions to less than significant levels is not based on substantial evidence.
17. Improve thermal integrity of buildings. There is no concrete provision for the
logistics center meeting any insulation standard here. Any conclusion this
measure will reduce emissions to less than significant levels is not based on
substantial evidence.
21. All industrial and commercial facilities shall post signs requiring that trucks shall
not be left idling for prolonged periods (1. e., in excess of 10 minutes). This
violates a California Air Resources Board ("CARB") rule, which prohibits idling
for over five minutes. See 13 CCR § 2485. There is no substantial evidence this
measure will reduce emissions to less than significant levels.
Subtopic d. Would the Project expose sensitive receptors to substantial pollutant
concentrations? The answer, according to a properly done Health Risk Screening
Assessment, is yes, as SWAPE's analysis shows. Therefore, an EIR with a full-blown
Health Risk Assessment, using proper parameters and SCAQMD and Office of
Environmental Health Hazard Assessment ("OEHHA") guidance, should be prepared.
The MND is improper because there is a fair argument that the Project may have a
significant impact on humans, which is relevant both for this subtopic as to Air Quality
and as to subtopic c under CEQA's Mandatory Findings of Significance, "Does the
Project have environmental effects that will cause substantial adverse effects on human
beings, either directly or indirectly?"
Dominick Perez, City of Rancho Cucamonga
May 22, 2017
Page 4
Biological Resource
Subtopic a. Would the Project have a substantial adverse effect, either directly or
through habitat modifications, on any species identified as a candidate, sensitive or
special status species in local or regional plans, policies, or regulations, or by the
California Department of Fish and Wildlife or the U.S. Fish and Wildlife Service? The
site contains Delhi sands, and is therefore potential habitat to the endangered Delhi Sands
Flower -loving Fly. Your consultant has concluded that the fly would not be present
because the area is covered by gravel and cement and the nearest fly was detected over 3
miles away. This is a fly. There are all sorts of reasons it may be present without having
been detected. The entire area this fly covers is 40 square miles, and the Delhi sands
formation is 97% destroyed. Any appearance of these sands, and covering over of them,
is therefore significant.
Regarding the burrowing owl, you did no protocol -level survey for them, so the fact that
it was not detected is not dispositive. While your mitigation measures call for a survey
according to the California Department of Fish & Wildlife ('CDFW') Staff Report, you
do not provide for qualified biologists until owls are discovered onsite. Surveys during
the non -breeding season are not adequate, and you have not provided for breeding season
surveys. See Staff Report at 6, second paragraph (surveys during non -breeding season
are"typically inconclusive.''
You also define the avian nesting season as lasting from February 1 to August 31, which
isn't accurate according to CDFW, which considers it to run from January 1 (due to
raptors) to September 1. See Attachment B hereto.
Subtopic e. Will the Project conflict with any local policies or ordinances protecting
biological resources, such as a tree preservation policy or ordinance? Your Arborist
Report acknowledges there are 128 mature trees which will all be removed under the
Project. Of these mature trees, 4 are heritage trees meaning they are 20 inches or greater
in diameter at 4.5 feet. You propose to remove these trees, even though three are on the
edge of the Project site. You say that as mitigation, each tree removed will be replaced
with a tree of minimum 15-gallon size.
Your approach violates the City Municipal Code in at least three ways. First, Municipal
Code § 17.16.080.I requires that the Planning Director consider several factors in
deciding whether to allow removal of over 5 trees. Among those factors are (iii) the
number of trees existing in the neighborhood and the impact of removal on the existing
character of the area and property values, and (vi) whether the trees constitute a
significant natural resource of the City. Subsection J then requires the Planning Director
to make the finding that "For a development project every effort has been made to
incorporate the trees into the design of the project and the only appropriate alternative is
I The CDFW Staff Report should be part of your administrative record for this Project since you
have relied upon it.
Dominick Perez, City of Rancho Cucamonga
May 22, 2017
Page 5
the removal of the tree." There is simply no indication that any effort has been made to
incorporate the trees into the design of the Project — not even the heritage trees.
Second, Municipal Code § 17.80.040.13 provides that on heritage trees, "relocation to
another location on the site is the preferred alternative subject to a written report by a
landscape architect or arborist on the feasibility of transplanting the tree." There was no
feasibility finding in the Arborist Report.
Third, if relocation was impossible — a finding you cannot make at this point — Code §
17.80.040.B requires "replacement with the largest nursery -grown trees available as
determined by the planning director or planning commission." There is no evidence in
the record that the largest trees available are 15-gallon size, and we sincerely doubt this is
the case.
Greenhouse Gas Emissions
We incorporate SWAPE's comments, attached, as our own. We also note that the 3,000
MTCO2e threshold you have adapted from the SCAQMD was developed under AB 32.
The Legislature has since passed SB32 calling for further greenhouse gas ("GHG")
reductions, and the 3,000 MTCOae standard may be too lenient. You have not addressed
SB32 or Executive Order S-3-05 targets in your Negative Declaration, and the State must
comply with them during the life of the Project. You have no demonstration on how this
will be feasible.
We also note that among the mitigation measures you should have considered but did not
was providing electric charging capabilities for trucks at the distribution center.
Noise
Construction Noise : Subtopics a. and d.
You claim the impact from construction noise will not be significant based on your
consultant's statements that (1) noise levels will diminish from the construction site at 6
dBA per doubling of distance, and (2) the City's construction noise is exempted by
ordinance. The first assertion does not provide substantial evidence for a conclusion that
noise impacts will be less than significant: your consultant notes that some pieces of
construction equipment you undoubtedly will use have a noise level of 92 or 95 dBA at
50 feet (see Noise Impact Analysis, Table 6); therefore, at 200 feet the noise can still
reach 80 dBA, and as you note, the nearest apartments are 170 feet away. The second
statement does not provide substantial evidence for a conclusion that construction noise
will have a less than significant impact either: Municipal Code § 17.66.050(D)(4) says
construction noise is exempt from regulation when noise levels do not exceed the noise
standard of 65 dBA when measured at the adjacent residential property line. Noise levels
will reach 80 dBA or higher when only one of many pieces of construction equipment is
in use. There is therefore substantial evidence to support a fair argument there will be a
significant impact, and an EIR is required.
Dominick Perez, City of Rancho Cucamonga
May 22, 2017
Page 6
Operational Noise: Subtopic a.
On operational noise, your consultant apparently modeled sound inputs from "the trucks'
diesel engines, exhaust systems, braking, and forklifts." This excludes major sources of
noise that come from distribution centers, such as hitching and unhitching of trailers,
trash compactors, and back-up beepers: noises known to be disturbing to residents
hundreds of feet away from distribution centers. See Attachment C (combined comments
of multiple residents on the potential noise from the Sycamore Canyon Business Park
Buildings 1 and 2 E1R, based on their experience of existing noise from distributions
centers hundreds of feet away).
Conclusion
Please advise us when the City will be taking action on this Project (via the Planning
Commission or the City Council or both), at collins("ia blumcollins.com and
bentlui blumcollins.com, and add us to your notification list for all future CEQA
actions under Public Resources Code § 21092.2 Thank you for your consideration.
1�e Coed 00//
ORDINANCE NO.
ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA AMENDING THE
RANCHO CUCAMONGA MUNICIPAL CODE REGARDING
CREATIVE PLACEMAKING AND PUBLIC ART
A. Recitals.
1. Placemaking and public art enhances the quality of life for individuals living
in, working in, and visiting Rancho Cucamonga by enhancing the physical beauty of the
community; providing gathering places for residents who live in the community;
encouraging the development and appreciation of art; and enhancing the quality of
development projects and the image of the community.
2. This Ordinance will promote the general welfare by encouraging pride in the
community, build vibrant and distinctive spaces through placemaking, increasing property
values, enhancing the quality of life through artistic opportunities, uniting the community
through shared cultural experiences, and creating a cultural legacy for future generations
through the collection and exhibition of high -quality art in unique public spaces which
reflects diverse styles that will acknowledge the past, usher in the future and create
programs and activities that will further these goals.
3. On May 24, 2017, the City of Rancho Cucamonga Planning Commission
held a duly notice public hearing regarding this Ordinance, and thereafter adopted
Planning Commission Resolution 17-48 setting forth its recommendation regarding this
Ordinance.
4. On May 24, 2017, the City of Rancho Cucamonga Planning Commission
held a duly noticed public hearing regarding this Ordinance.
5. All legal prerequisites to the adoption of this Ordinance have occurred.
B. Ordinance.
NOW, THEREFORE, THE CITY COUNCIL HEREBY ORDAINS AS FOLLOWS:
SECTION 1. The City Council finds that the facts set forth in the Recitals, Part A,
of this Ordinance are true and correct.
SECTION 2. The City Council finds further based the facts found to be true and
correct in the preceding Section 1 and substantial evidence presented during its public
hearing on this Ordinance as follows:
1. This Ordinance is consistent with the City's General Plan. This Ordinance
meets General Plan Land Use Goal LU-14 by supporting public art as an important
amenity of a beautiful City. This Ordinance also meets City Council Goal A11 by
13
developing a public art ordinance and funding mechanism to support art within publicly
accessible spaces.
2. Adoption of this Ordinance is exempt from the requirements of the California
Environmental Quality Act ("CEQA") pursuant to Title 14, Chapter 3, California Code of
Regulations (CEQA Guidelines), Section 15061(b)(3) because it can be seen with
certainty that there is no possibility that this Ordinance will have a significant effect on the
environment. This Ordinance does not propose any physical change to the environment
itself, but instead revises existing land use regulations to require certain development
projects that require discretionary review to include publicly accessible art and creates a
process for administering a public art program. Pursuant to CEQA, the City will review
the potential significant impacts of all development applications that are subject to the
public art requirement and any discretionary action by the City to install public art pursuant
to this Ordinance. Therefore, this Ordinance will not have a significant effect on the
environment.
SECTION 3. A new Chapter 2.26, entitled "Public Art Committee," is hereby added
to the Rancho Cucamonga Municipal Code to read as follows:
"Chapter 2.26 - Public Art Committee
2.26.010 Public Art Committee.
A. There is established a Public Art Committee to advise the Council
regarding the selection, purchase, placement, and maintenance of
art installed by the City or on City property, and expenditures from
the City of Rancho Cucamonga Public Art Trust Fund.
B. The Public Art Committee shall consist of five members appointed
by the Council as follows: (i) one member of the Planning
Commission; (ii) one member of the Parks and Recreation
Commission; (iii) one member of the Community and Arts
Foundation; and (iv) two members of the public to be appointed
based on relevant work experience, trade, industry, or expertise.
C. The City Council shall prescribe by resolution the duties, terms of
service, qualifications, and compensation of committee members.
D. The City Manager or his or her designee shall assist the Public Art
Committee in fulfilling its duties.
2.26.020 Meetings.
Regular meetings of the Public Art Committee shall be held at such time
and place as is determined by resolution of the City Council."
SECTION 4. A new Chapter 3.72, entitled "Public Art Trust Fund," is hereby added
to the Rancho Cucamonga Municipal Code to read as follows:
"Chapter 3.72 - Public Art Trust Fund
3.72.010 Creation of Public Art Trust Fund.
There is hereby created a special fund to be known as the "City of Rancho
Cucamonga Public Art Trust Fund."
3.72.020. Use of Funds
A. All money received by the City from endowments or gifts to the City
of Rancho Cucamonga designated for the arts or pursuant to Section
17.124.020.D.2 shall be placed in the Public Art Trust Fund. All
money shall be deposited, invested, accounted for, and expended as
follows:
The City of Rancho Cucamonga Public Art Trust Fund shall
only be utilized for the following purposes:
a. The design, acquisition, installation, improvement,
maintenance, and insurance of public art work
displayed by the City or on City property.
b. Art education programs for the community conducted
on City property; provided, that not more than five (5%)
percent of the fund's annual budget shall be used for
this purpose.
Administrative costs reasonably related to either of the
preceding purposes.
Money deposited in the Public Art Trust Fund shall be held in
a manner to avoid any commingling with other revenues and
funds of the City of Rancho Cucamonga, except for temporary
investments, and all funds shall be expended solely for the
purposes for which they were collected. Any interest income
earned by the money in the Public Art Trust Fund shall be
deposited in the Public Art Trust Fund and shall be expended
only for the purpose for which the money was originally
collected.
B. The City Council shall establish procedures for selecting art work to
be purchased using funds found in the Public Art Trust Fund, which
may include but shall not be limited to the following: (1) open
competition; (2) limited competition; (3) invitation; (4) direct
purchase; (5) donation; or (6) any combination of the above.
3.72.030 Return of Fees Paid In Lieu of Providing Public Art
A. A project developer or its successor, may submit a written request to
the City for the return of any fees paid pursuant to Section
17.124.020.D.2 in lieu of providing public art work that are not
committed within ten years of payment, together will all interest
earned thereon. The request shall be verified and shall include the
date of payment; the amount paid and method of payment; the
location of the development project for which the fee was paid; and
a statement that the project developer or its successor is the payer
of the fees and/or the current owner of the development project.
B. The City Council shall review the request and determine if return of
the then uncommitted portion of the fees and interest is appropriate
and, if so, the method of refund. No refund shall be appropriate if the
City Council determines that the fee is still needed for the purposes
of the Public Art Trust Fund."
SECTION 5. A new Chapter 17.124, entitled "Design Provisions for Public Art," is
hereby added to the Rancho Cucamonga Municipal Code to read as follows:
"Chapter 17.124 - Design Provisions for Public Art
17.124.010 Purpose.
The purpose of this chapter is to promote the general welfare and enhance
the quality of life for City residents, workers, and visitors by improved public
placemaking which will require certain developments to include or provide
for public art or architecture that qualifies as art.
17.124.020 Public Art Required.
A. The requirements of this chapter shall apply to any development
subject to site development review, minor design review, or design
review that meets one or both of the following criteria:
1. All residential development projects that propose to develop
four (4) or more dwelling units.
2. All commercial, office, or industrial development projects with
a project valuation or valuations exceeding one million dollars
($1,000,000) in the aggregate, based on most recent
International Code Council building valuation data.
B. Notwithstanding anything else in this section, the requirements of
this chapter shall not apply to:
1. Residential projects with a density equal to or less than 4
dwelling units per acre.
2. Residential projects that contain income restricted affordable
housing units where the value of the restricted unit(s) equals
or exceeds the minimum value of the art work that would
otherwise be required.
3. Remodeling, addition to, or both of existing residential
buildings or accessory structures.
4. Remodeling of existing commercial, office, or industrial
buildings that do not include any exterior modifications to the
building.
5. Remodeling, addition to, or both of existing commercial,
office, or industrial buildings for which artwork was previously
installed, donated, or for which an in lieu fee was paid
pursuant to the requirements of this Chapter, regardless of
whether such remodeling, addition to, or both includes interior
modifications, exterior modifications, or both.
6. Public school facilities.
7. Places of worship.
8. Reconstruction of buildings that have been damaged by fire,
flood, wind, earthquake, or other natural disaster, where the
reconstructed buildings are substantially similar to the original
buildings.
9. Wireless Communication Facilities.
C. All development projects subject to this chapter must include art work
that has a minimum value that meets or exceeds an amount equal to
the sum of: $750 per residential unit developed: and $1 per square
foot of commercial, office, or industrial development.
D. In lieu of providing the art required by the preceding paragraph C,
the applicant may do either of the following:
1. Donate to the City art work that meets or exceeds the
minimum value of the art work; subject to the provisions of
section 17.124.030 below.
2. Prior to the issuance of a building permit, pay on a per unit
basis, an in -lieu fee into the City's Public Art Trust Fund, equal
to the minimum value of the art work that would otherwise be
included in the development project.
E. No final approval, such as a final inspection or a certificate of
occupancy, for any development project subject to this chapter shall
be granted or issued unless and until the requirements of this chapter
have been met. For purposes of this requirement, compliance shall
be measured in light of the conditions of approval for the project,
including but not limited to any approved phased development plan.
In furtherance of any phasing plan or project completion schedule,
the City may accept bonds or other surety to assist in the completion
of the project, provided they are in a form and manner acceptable to
the Planning Director and City Attorney.
17.124.030 Donated Art Work
A. Art work donated to the City pursuant to this chapter must meet the
design standards in section 17.124.040 of this chapter and shall be
subject to the final approval and acceptance by the City Council,
upon recommendation of the Public Art Committee. Upon final
acceptance by the City Council, the donated art work shall be the
sole property of the City.
B. If a developer elects to donate art work to the City in lieu of providing
art work as required by section 17.124.020.C, the donation shall be
secured by a cash deposit in an amount that meets or exceeds the
required minimum value of the art work or a performance bond for
the same amount and in a form approved by the City Attorney. The
security, regardless of the form, shall become payable to the City and
deposited into the City's Public Art Trust Fund in the event the
developer fails to donate art work acceptable to the City as required
by this chapter.
17.124.040 Public Art Design Standards
A. For purposes of this chapter, "art work" means original or limited
edition artistic creations, and may include, but is not limited to,
sculptures, paintings, monuments, water features, glasswork,
lighting, ceramics and in exceptional circumstances, landscaping
elements.
B. Media may include but are not be limited to, steel, bronze, wood,
stone, tile, concrete, lighting, any other durable materials able to
withstand outdoor conditions, or any combination of these, including
in exceptional circumstances, plant materials. For these purposes,
"durable" means lasting, enduring and highly resistant to
deterioration due to weather or the passage of time.
C. Art work must be of a scale and setting as to complement the
adjacent physical building, improvements, and property.
D. Art work must be installed in a public place, which means any exterior
area on public or private property that is easily accessible to the
general public or clearly visible to the general public from adjacent
public property, such as a street or other public thoroughfare or
sidewalk.
F Art work must be accompanied by a plaque identifying the name of
the art work, the artist(s), and the date of installation. The plaque
must be installed in close proximity to the art work.
I Art work installed on private property shall qualify towards the
minimum landscaping requirements of Chapter 17.56.
G. Art work may be combined with functional elements of the
development project (such as bike racks, shade structures, bus
shelters, trash receptacles) only if, when the elements are viewed as
a whole, the expressive design elements predominate over utilitarian
concerns.
H. The following shall not count towards meeting the public art
requirement of this chapter:
1. Landscaping, unless substantially comprised of durable
elements that otherwise qualify as art work.
2. Mass-produced or "off the shelf' decorative or ornamental
items.
3. Historical or memorial markers or statuary.
Art work must meet the minimum required valuation for the project.
1. The project developer may claim the following expenses in
satisfaction of the minimum value of the required art work:
a. Artist's fees;
b. Art materials;
C. Fabrication or manufacturing of the art work;
d. Transportation of the art work;
e. Base, mounting, or pedestal for the art work;
f. Building permits for installation of the art work;
g. Identification plaque for the art work;
h. Lighting instruments specifically lighting the art work;
i. Installation of the art work;
j. Structural engineering for the art work;
k. Motors or subterranean equipment directly necessary
for the installation of the art work;
I. Water related costs for the art that includes artist
designed water features not to exceed thirty (30%)
percent of the total value of the art work;
M. Art consultant fees (if applicable) not to exceed a
maximum of fifteen (15%) percent of the value of the
art work; and
n. Any fees paid to public art experts (such as art
conservators, qualified appraisers, etc.) that are
required by the City.
2. The following expenses shall not be counted toward the
minimum value of the required art work:
a. Expenses related to locating the artist, including but not
limited to, airfare, hotel, taxi fares and other travel
related expenses;
b. Architect, landscape architect, or other design
professional fees;
C. Site preparation for public art installation, including but
not limited to grading, demolition or removal of items or
structures and installation of utilities to the site;
d. Landscaping surrounding the art;
e. Items around the public art that is not conceptualized,
designed, and fabricated by the selected artist;
f. Utility fees associated with activating electronic or
water generated art;
g. Lighting elements not integral to the illumination of the
art;
h. Publicity, public relations, photographs, educational
materials, business letterhead or logos bearing the
sculpture's image; or
i. Dedication ceremonies, including art unveilings or
grand openings.
J. Architecture and/or Landscape Architecture may be considered art
work on a case -by -case basis based on factors that may include, but
shall not be limited to:
1. Whether the architect/landscape architect is recognized by
the professional or artistic community as demonstrated by a
substantial record of artistic recognition in shows, museums,
professional or industry awards or publications.
2. Whether, when the building or landscape architecture is
viewed as a whole, the expressive architectural design
elements predominate over utilitarian concerns.
3. Whether the architecture/landscape architecture was
designed in collaboration with an artist who has:
(a) experience with monumental scale sculpture; (b) major
design control of the portions of the architecture to be
considered as art; and (3) been involved in development of
the project from early on in the design process.
K. Commercial signage and/or artistic lighting may be considered art
work on a case -by -case basis based on factors that may include, but
shall not be limited to:
1, Whether the sign or lighting is an original work, based on a
unique and original design.
2. Whether the designer is recognized by the artistic community
as demonstrated by a substantial record of artistic recognition
in shows, museums, or publications.
3. Whether, when the sign or lighting is viewed as a whole, the
expressive design elements predominate over the
commercial message or utilitarian concerns.
4. Whether the sign or lighting was designed in collaboration
with a designer who has: (a) experience designing signs that
are unique and original; (b) substantial control over those
portions of the sign to be considered as art; and (3) been
involved in design of the sign from early on in the design
process.
17.124.050 Submittals.
The project developer shall submit, on a form or forms provided by the City,
an application for installation of art work on private property or donation of
art work to the City that contains the following information as applicable to
the project in addition to any other information as may be required by the
City to adequately evaluate the proposed the art work.:
A. The architect, landscape architect, designer or artists' name(s),
qualifications and examples of past work.
B. Preliminary sketches, photographs or other documentation of
sufficient descriptive clarity to indicate the nature of the proposed art
work and an artist warranty as to the originality of title to the art work.
C. An appraisal or other evidence of the value of the proposed art work,
including acquisition and installation costs, that demonstrates
satisfaction of the minimum required value of the art work.
D. A written agreement executed by the artist or artists who created the
art work that expressly waives all rights that may be waived under
the California Art Preservation Act, the Visual Artists Rights Act, or
other applicable state and federal laws.
E. Preliminary plans containing such detailed information as may be
required by the City to adequately evaluate the location of the art
work and its compatibility with the proposed development project
and/or with the character of adjacent developed parcels and the
existing neighborhood.
F. A written statement executed by the property owner and approved
by the City Attorney that requires the landowner or his or her
successors and assigns to defend, indemnify, and hold the City
harmless against any liability, loss, damage, costs or expenses
(including reasonable attorneys' fees and court costs) arising from
any claim, action or liability related to the art work.
G. If the project developer proposes to satisfy the public art requirement
with architecture, it must before its application can be deemed
complete submit to the approving authority at a pre -application
review: (a) a maquette and other materials that satisfactorily illustrate
the proposed conceptual development; and (b) a statement
explaining why the architecture should be considered an art work,
including but not limited to an explanation of the ideas, meaning,
cultural significance, or conceptual complexity expressed in the
architecture. Nothing in this paragraph shall be deemed to require
the reviewing authority's approval of the submittal at the pre -
application review before the application is deemed complete.
17.124.060 Applications to Donate Art Work to the City
Applications for art work donated to the City shall be subject to additional
review by the Public Art Committee, which shall make a recommendation
to the City Council regarding whether the proposed donation is consistent
with the purposes of this chapter.
17.124.070 Ownership and Maintenance of Art Work Placed on
Private Property.
A. All art work installed pursuant to this chapter on the site of a
development project shall remain the property of the owner of the
site for which the final building permit or certificate of occupancy
related to the development project was obtained and the owner's
successors and assigns, which owner must provide all maintenance
necessary to preserve and maintain the art work in good condition
and in the manner approved by the City.
B. The obligation to maintain the art work shall be enforced as follows
1. Prior to the installation of the art work on a development
project, the property owner shall record a document with the
county recorder setting forth a description of the art work and
acknowledging the obligation of the property owner to repair
and maintain it. This document and the underlying covenant
shall run with the land and provide notice to future property
owners of the obligation to repair and maintain the art work
and of certain limitations related to any federal, state or local
laws governing the rights of the artists including but not limited
to rights regarding the alteration, modification or relocation of
subject art work. The City shall be a signatory party to this
document, and its final form and content shall be approved by
the City Attorney.
2. The obligation to maintain the art work shall include, without
limitation, preserving the art work in good condition to the
satisfaction of the City of Rancho Cucamonga, protecting,
repairing, restoring, or replacing the art work in the event of
physical defacement, mutilation, alteration or destruction, and
securing and maintaining insurance coverage in an amount to
be approved by the City for: (a) fire; (b) flood, wind,
earthquake, or other natural disaster; (b) vandalism; and (c)
extended liability.
3. Any time the City determines that art work has not been
maintained in substantial conformity with the manner in which
it was originally approved, the City shall require the current
property owner to either:
a. Maintain, repair, restore, or replace the art work; or
b. After reasonable notice: (i) pay the lesser of either the
costs estimated by the City to be required to maintain,
repair, restore, or replace the art work and/or secure
and maintain insurance for the artwork; and (ii) provide
the City or its representatives reasonable access to the
property to perform any necessary to maintain, repair,
restore, or replace the art work.
C. If an owner wishes to replace art work required by this chapter for
any reason, including but not limited to theft, destruction, removal, or
personal preference, the replacement art work shall be subject to the
review and approval of the original approving authority, which shall
determine whether the replacement art work meets the criteria set
forth in this chapter."
SECTION 6. The City Council declares that, should any provision, section,
paragraph, sentence, or word of this Ordinance be rendered or declared invalid by any
final court action in a court of competent jurisdiction, or by reason of any preemptive
legislation, the remaining provisions, sections, paragraphs, sentences, and words of this
Ordinance shall remain in full force and effect.
SECTION 7. The City Clerk shall certify as to the adoption of this Ordinance.
PASSED, APPROVED, AND ADOPTED this day of
2017.
Dennis Michael
Mayor
I, JANICE REYNOLDS, City Clerk of the City of Rancho Cucamonga, do hereby
certify that the foregoing Ordinance was introduced at a regular meeting of the City
Council of the City of Rancho Cucamonga held on the day of ,
2017, and was finally passed at a regular meeting of the City Council of the City of Rancho
Cucamonga held on the day of , 2017, by the following vote:
AYES: COUNCILMEMBERS:
NOES: COUNCILMEMBERS:
ABSENT: COUNCILMEMBERS:
ABSTAINED: COUNCILMEMBERS:
ATTEST:
Janice Reynolds
City Clerk
zo17/zoi8
Improvement Program
Presented by:
of Rancho Cucamonga
Engineering
Department
10500 Civic Center Drive
Rancho Cucamonga, California 91730
Fax: 909.477.2741
www.cityofrc.us
General
zo171zo18
Improvement Program
STAFF REPORT
DATE: May 24, 2017
TO: Chairman and Members of the Planning Commission
FROM: Jason C. Welday, Director of Engineering Services/City Engineer
INITIATED BY: Jerry A. Dyer, Principal Civil Engineer
SUBJECT: CONSIDERATION OF THE CITY OF RANCHO CUCAMONGA CAPITAL
IMPROVEMENT PROGRAM FOR FISCAL YEAR 2017/18
RECOMMENDATION:
Staff recommends that by minute action the Planning Commission find the Capital Improvement Program
for Fiscal Year 2017/18 in conformity with the adopted General Plan.
BACKGROUND:
The Capital Improvement Program (CIP) as attached as Exhibit B is required per Government Code 65401,
Exhibit A, to be adopted by the City Council. The Planning Commission is required to find the CIP in
conformity with the adopted General Plan. The CIP document includes a General Plan Policies section that
evidences the specific policy references found in the General Plan.
The CIP is a vital piece of the City's Annual Operating Budget as it dictates major capital expenditures
obligated in any given year. The CIP consists of a multi -year plan for citywide infrastructure improvements.
Each year, the City budgets for funded projects which will occur during said fiscal year. The list of projects
contained in the CIP addresses both the City's long and short-term capital needs. It identifies projects that
reflect the desires of the community, as well as projects that serve operational and maintenance needs.
ANALYSIS:
The projects have been categorized by type of project (Beautification, Drainage, Facilities, etc.), which are
in alphabetical order within each category. The individual project sheets include a short summary, cost, year
funded, and a map showing the project location.
FISCAL IMPACT:
Projects are funded from a variety of sources including Development Impact Fees, Measure I, Gas Tax, and
miscellaneous grants. There are 62 projects totaling just over $51,000,000 to be executed in the upcoming
fiscal year. Apart from the 62 projects previously identified, 22 projects just under $46,000,000 are identified
as future and unfunded.
COUNCIL GOAL(S) ADDRESSED:
The City's Engineering staff works with all Departments within the City to develop and implement an
economically feasible CIP that embodies the City's public infrastructure needs. The CIP is the product of
joint planning, taken from the City's General Plan, local residents, the business community, the local
development community, and external government agencies.
EXHIBITS:
Exhibit A - Government Code 65401
Exhibit B - Fiscal Year 2017/2018 Capital Improvement Program (distributed under separate cover)
Exhibit C - General Plan Policies (distributed under separate cover)
Government Code
66401. If a general plan or part thereof has been adopted, within such time as may be
fixed by the legislative body, each county or city officer, department, board, or
commission, and each governmental body, commission, or board, including the
governing body of any special district or school district, whose jurisdiction lies wholly or
partially within the county or city, whose functions include recommending, preparing
plans for, or constructing, major public works, shall submit to the official agency, as
designated by the respective county board of supervisors or city council, a list of the
proposed public works recommended for planning, initiation or construction during the
ensuing fiscal year. The official agency receiving the list of proposed public works shall
list and classify all such recommendations and shall prepare a coordinated program of
proposed public works for the ensuing fiscal year. Such coordinated program shall be
submitted to the county or city planning agency for review and report to said official
agency as to conformity with the adopted general plan or part thereof.
zo17/zo18
Improvement Program
Presented by:
Engineering
Cucamonga
es Department
10500 Civic Center Drive
Rancho Cucamonga, California 91730
Fax: 909.477.2741
www.cityofrc.us
Cateqories
A. Beautification.......
B. Drainage ..............
C. Facilities ...............
D. Miscellaneous......
CITY OF RANCHO CUCAMONGA
COMMUNITY DEVELOPMENT DEPARTMENT
ENGINEERING SERVICES DEPARTMENT
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEAR 2017/18
SUMMARY
Budgeted Unfunded General Plan: Policy Reference
............... (3)
$
700,000
$
............... (2)
$
3,950,000
$
.............. (16)
$
16,205,240
$
............... (8)
$
1,974,160
$
E. Municipal Utility ....................
(9)
F. Parks .......................................
(5)
G. Railroad Crossings ..................
(2)
H. Streets .....................................
(10)
I. Traffic ......................................
(7)
TOTAL ...............................
(62)
J. Future & Unfunded Projects.... (22)
$ 19,194,930 $ -
$ 1,093,890 $ 1,890,000
$ 125,000 $ 45,000,000
$ 5,927,000 $ 3,600,000
$ 2,238,750 $ -
$ 51,408,970 $ 50,490,000
GP: CM-3.11,PS-12.7
GP: CM-4.4
GP: ED-3.1, PF-1.1, PF-1.4, PF-1.5
GP: CM-1.4, CM-2.1, CM-3.7, CS-6.3,
LIJ-11.2, PS-12.4
GP: PF-1.4, RC-4.2
GP: CS-1.8, PF-1.4
GP: CM-1.2, CM-4.4
GP: CM-1.1, CM-2.1, CM-4.4, ED-4.3
GP: CM-4.1, CM-4.2
$ 45,881,600 GP: CM-1.1, CM-4.4, ED-3.1, PS-12.4
Index
CITY OF RANCHO CUCAMONGA - CAPITAL IMPROVEMENT PROGRAM - FISCAL YEAR 2017/18
No. Project
A. Beautification
1 Haven Ave from Wilson to Vivienda - Community Trail West Side
2 LMD 2 Water Conservation and Landscape Renovations
(Mufti -Phased Project)
3 LMD 4R Water Conservation and Landscape Renovations
(Mulb-Phased Project)
B. Drainage
1 Cucamonga Storm Drain Upper Phase 3 -East of Hellman Ave,
Amethyst to 19 St
2 McKinley St at Ramona Ave Storm Drain Repair
C. Facilities
i Archibald Library -Ofice Re -design
2 Central Park- Emergency Backup Power (Design Only)
3 City Facilities - Roofing Replacement 8 Repairs
4 Civic Center- Carpet and Reconfiguration
5 Civic Center - Parking Deck Maintenance
6 Civic Center- Waterproofing 8 Planter Box Repair
7 Cultural Center -Celebration Hall Air -Wall Replacement
8 Cultural Center- Courtyard Redesign
9 Cultural Center - Loading Bay
10 Energy Efficiency Facility Improvements
11 Fire District - Jersey Station If 74) Data Center (Bldg 1)
12 Fire District- Jersey Station (174) Training Facility
13 Fire District - San Bernardino Station (172) Relocation/Police Station
14 Fire District - Water Conservation Landscaping 8 Emerg. Vehicle Circulation
Driveway Improvements
15 Public Works Services Department- Warehouse Expansion
16 Sports Complex - Removal of Soccer Field Lighting Fixtures and Pales at
Goals Site
D. Miscellaneous
1 9th St along north side west of Vineyard Ave - Sidewalk Improvements
fund Account Amount(5)
Beaunfcatlon 1110316565011829110-0 150,000
LMD 2 11313035650 1787131-0 110,000
LMD 4R 11343035650/1787134-0 440,000
Beautification UnFunded Total: 0
Beautification Funded Total: 700,000
General Drainage 1112303565011928112-0 800,000
Measure) 11763035650/1928176-0 400,000
Citywide Infrastructure 11983035650/1928198-0 2.700.000
3,900,000
Unknown 1198303565011954198-0 50,000
Drainage UnFunded Total: 0
Drainage Funded Total: 3,950,000
Library Reserve
1329601-5606
135,350
Fire Capital Projects
32885015650/1914288-0
75,000
Capital Reserve
1025001-5602
250,000
Capital Reserve
1025001-5602
219,000
Capital Reserve
1025001-5607
30,000
Capital Reserve
10250015650/1950025-0
50,000
Capital Reserve
1025001-5602
389,500
Park Development
11204015650/1894120-0
200,000
Park Development
11204015650/1895120-0
40,000
Capital Reserve
10250015650/1975025-0
71,390
Fire Capital Projects
32885015650/1971288-0
215001000
Fire Capital Projects
328MI5650/1735288-0
25,000
Fire Capital Projects
3288501565011733288-0
9,420,000
Fire Capital Projects
3288501-5607
600,000
Capital Reserve
1025D015650/1927025-0
2,140,000
LMD 1
1130303-5607
30,000
PD 85
1848303-5607
30000
60,000
Facilities UnFunded Total:
0
Facilities Funded Total:
16,205,240
Citywide Infrastructure
11983035650/1808198-0
43,000
Safe Route To School
12343035650/1808234-0
901800
133,800
Index - 1
CITY OF RANCHO CUCAMONGA - CAPITAL IMPROVEMENT PROGRAM - FISCAL YEAR 2017118
No.
Project
Fund
Account
Amount l$)
2
ADA Ramps at Various Locations
Measure 1
11773035650/1150177-0
100,000
3
Arrow Rte and Rochester Ave, N/E Corner - Animal Exercise Yard Improv.
Park Development
11204015650/1955120-0
80,000
4
Community Trail Drainage Improvements
LMD 1
1130303-5607
10,500
5
Green Bike Lanes 8 Safety Enhancements
AB 2766 Air Quality Impry
11052085650/1952105-0
725,500
6
Pacific Electric Trail - Block Wall East of Victoria Park Lane
LMD 2 Victoria
1131303-5604
13,200
7
Paseo Lighting Retrofit
LMD 2 Victoria
11313035650/1716131-0
290,000
8
Southwest Cucamonga Class I Bike Trail Project
AB 2766 Air Quality Impry
11052085650/1953105-0
621,160
Miscellaneous UnFunded Total:
0
Miscellaneous Funded Total:
1,974,160
E.
Municipal Utility - Electrical
1
6th Street from Utica Avenue to The Vine - Electric Line Extension
Municipal Utility
17053035650/1967705-0
885,000
2
Citywide Safety Light LED Retrofit
SLD 1
1151303-565011974151-0
369,200
3
Citywide Street Light Acquisition
SLD 1
1151303-5650/1969151-0
2,701,720
SLD 2
1152303-5650/1969152-0
3,237,210
SLD 3
1153303-5650/1969153-0
1,245,870
SLD 4
1154303-5650/1969154-0
648,460
SLD 5
1155303-5650/1969155-0
283,380
SLD6
1156303-5650/1969156-0
439,760
SLD 7
1157303-5650/1969157.0
901,850
SLD 8
1158303-565011969158-0
321.040
9,779,290
4
Citywide Street Light LED Retrofit
SLD 1
1151303-5650/1973151.0
1,164,080
SLD 2
1152303-5650/1973152-0
1,394,800
SLD 3
1153303-5650/1973153-0
539,800
SLD 4
1154303-5650/1973154-0
279,400
SLD 5
1155303-565011973155-0
122, 100
SLD 6
1156303-5650/1973156-0
189,480
SLD 7
1157303-565011973157-0
388,580
Municipal Utility
1705303-5650/1973705-0
46.2
4,121,440
5
Commercial Smart Meter Replacement
Municipal Utility
17053035650/1938705-0
100,000
6
Haven Avenue at 6th St- Street Light Installation
Municipal Utility
17053035650/1948705-0
25,000
7
Haven Ave from Foothill Blvd to Church Street - Electric Line Extension
Municipal Utility
1705303565011966705-0
585,000
Fire Capital Projects
32885015650/1966288-0
460,_000
1,045,000
8
Rancho Cucamonga Fiber Optics Network
Fiber Optic Network
1711303565011910711-0
2,050,000
9
Utica Ave from 4th Street to 6th Street- Electric Line Extension
Municipal Utility
17053035650/1968705-0
800,000
Municipal Utility UnFunded Total:
0
Municipal Utility Funded Total:
19,194,930
F.
Parks
1
Central Park - Phase II Design Study
Park Development
11204015650/1660120-0
250,000
2
Central Park - Trail Head Improvements
Park Development
11204015650/1871120-0
180,890
(Design with Construction TBD)
Park Development
11204015650/1871120-0
1,890.000
2,070,890
3
Etiwanda Creek Park - Phase II
Park Development
11204015650/1664120-0
538,000
4
Heritage Park - Handicap Parking Stalls and Pavement Rehabilitation
Park Development
11204015650/1961120-0
55,000
PD 85
18483035650/1961848-0
55000
110,000
Index - 2
CITY OF RANCHO CUCAMONGA - CAPITAL IMPROVEMENT PROGRAM - FISCAL YEAR 2017118
No. Project Fund Account
5 Rubberized Surface Replacement
G. Railroad Crossings
1 Arrow Route at Railroad Spur - New Concrete Panels
2 Etiwanda Ave Grade Separation at Metrolink Tracks
H. Streets
1 Sth St from Milliken to Charles Smith -Pavement Rehabilitation
2 Civic Center and Courthouse Pavement Rehabilitation
(Construction cost share with San Bernardino County)
3 Foothill Blvd from Grove Ave to San Bernardino Rd - Street Improvements
(Design)
4 Foothill Blvd from Haven Ave to Milliken Ave - Pavement Rehabilitation
5 Hermosa Ave from Arrow to Foothill - Pavement Rehabilitation
6 Hermosa Ave north of Foothill Boulevard to Church St - Street Widening
7 Highland Ave from Archibald Ave to Haven Ave -Pavement Rehabilitation
(Design with Construction funded FY 18/19)
8 Jersey Blvd from Haven to Rochester - Pavement Rehabilitation
9 Local Street Pavement Rehabilitation at Various Locations
(Design and Construction)
10 Youngs Canyon Road from Koch Place to Cherry Ave -Street Extension
(Environmental, Design and Flood Control Review)
I. Traffic
1 6th at Hellman Ave - Traffic Signal Installation
2 Base Line Rd at Lion St- Pedestrian Hybrid Beacon (HAWK)
3 Day Creek Boulevard- Upgrade Left Turn Phases
4 East Ave at Highland Ave - Traffic Signal Installation
5 Freeway and Arterial Signal Synchronization Phase I
6 Intelligent Transportation System Upgrade - Citywide
LIAD9
Gas Tax R&T 7360
Citywide Infrastructure
Unknown
1139303-5607
Parks UnFunded Total:
Parks Funded Total:
1174303565011819174-0
1198303565011922198-0
xx�000c000a11922xxx-0
Railroad Crossings UnFunded Total:
Railroad Crossings Funded Total:
Gas Tax R&T 7360 11743035650/1930174-0
Citywide Infrastructure 11983035650/1930198-0
Law Enforcement Reserve 10177015650/1959017-0
Citywide Infrastructure 11983035650/1964198-0
Measure) 11773035650/1932177-0
Measure) 11773035650/1934177-0
Beautification 11103165650/1976110.0
Gas Tax 11743035650/1976174-0
Gas Tax R&T 7360 11743035650/1960174-0
Unknown 1xxxxxx565011960xxx-0
Gas Tax R&T 7360 11743035650/1929174-0
Fire Capital Projects 32885015650/1929288-0
Gas Tax R&T 7360 11743035650/1022174-0
Road Maint & Rehab 11793035650/1022179-0
Citywide Infrastructure 11983035650/1022198-0
AD 88-2 Etiwanda/Highlnd 18133035650/1601813-0
AD 88-2 Etiwanda/Highlnd 1813303565011601813-0
Streets UnFunded Total:
Streets Funded Total:
Amount ($)
15,000
1,890,000
1,093,890
75,000
50,000
45.000.000
45,050,000
45,000,000
125,000
500,000
402,_000
902,000
150,000
50,000
850,000
250,000
350,000
25�_000
600,000
25,000
450 000
475,000
815,000
35_,000
850,000
450,000
1,000,000
77✓0_000
2,200,000
50,000
3,150,000
3,200,000
3,600,000
5,927,000
Transportation
11243035650/1957124-0
546,000
Citywide Infrastructure
11983035650/1921198-0
80,000
Transportation
11243035650/1956124-0
63,750
Transportation
11243035650/1958124-0
469,000
AB 2766 Air Duality
11052085650/1900105-0
112,810
Transportation
11243035650/1900124-0
207190
320,000
Transportation
11243035650/1831124-0
650,000
Index - 3
CITY OF RANCHO CUCAMONGA - CAPITAL IMPROVEMENT PROGRAM - FISCAL YEAR 2017118
No.
Project
Fund
Account
Amount (S)
7
Tema Vista Parkway at Spruce -Safety Lighting Installation
SLU 4
11543035650/1902154-0
110,000
Traffic UnFunded Total:
0
Traffic Funded Total:
2,238,750
J.
Future & Unfunded Projects
1
6th St at BNSF Spur Crossing west of Etiwanda Avenue
Unknown
xxrpoxxlooW1839xxx-0
16,953,000
(Future Grade Separation)
2
Archibald Ave from Church to Palo Alto - Storm Drain
Unknown
*00000000ad1805xxx-0
1,215,000
3
Arrow Route along the s/s Soo to 1300' e/o 1-15 freeway - Widening
Unknown
1xIor303565011907xxx-0
300,000
(Right -of -Way is needed and not part of cost)
4
Cultural Center - Exterior Joint Replacement and Exterior Painting
Capital Reserve
10250015650/1890025-0
500,000
5
Distribution System Automation
Municipal Utility
1705303565011916705-0
250,000
6
East Ave from Chickasaw, west side, north 370 feet- Widen and Sidewalk
Unknown
w0000000wd1931xxxA
110,000
(Right -of -Way is needed and not part of cost)
7
Etiwanda Ave from Sth St to Arrow Route - Street Widening Improvements
Transportation
11243035650/1076124-0
450,000
8
Etiwanda Ave Line Extension
Municipal Utility
17053035650/1885705-0
602,500
9
Fire District- Central Station 178 (New Fire Station)
Fire Capital Projects
32885015650/1645288-0
11,850,000
10
Haven Ave from Banyan to Wilson along the East side - sidewalk
Unknown
)00000 0000x/1864xxx-0
264,000
(Seeking Grant with City match)
11
Haven Ave from Foothill to Base Line - Pavement Rehabilitation
Measure 1
11773035650/1933177-0
850,000
12
Heritage Park - Bridge Replacements
PD 85
1848303565011963848-0
50,000
(Design with Construction funded by phases)
Unknown
1xxxxxx5650/1963xxx-0
TBD
50,000
13
Hermosa Ave from Banyan to Wilson - Pavement Rehabilitation
Citywide Infrastructure
11983035650/1815198-0
250,000
Related to Hermosa storm drain
14
Hermosa Ave from the Alta Loma Basin to Wilson - Storm Drain
General Drainage
11123035650/1810112-0
500,000
Related to Hermosa pavement rehabilitation
Citywide Infrastructure
11983035650/1810198-0
1,750.000
2,250,000
15
La Grande from Hellman Avenue to Amethyst Avenue - Street Improvements
Comm Dev Block Grant
12043035650/1965204-0
853,100
16
Lemon Ave from Archibald to Haven - Pavement Rehabilitation
Unknown
xr00000 000c11793xxx-0
560,000
Related to Lemon storm drain
17
Lemon Avenue from Haven to 1300 feet west - Storm Drain
Unknown
x 0000000cal1791xxx-0
1,700,000
Related to Lemon pavement rehabilitation
18
LoanMart Stadium - Field Renovation
Capital Reserve
1025001-5607
160,000
19
LoanMart Stadium - Scoreboard and Production Rm Equipment Replacement
EquipNeh Replacement
17120015650M951712-0
1.100,000
20
Paul A. Biane Library - Second Floor Rancho KIDS Project
Unknown
x 00000 oDcdl867xxx-0
4.250,000
21
Rochester Ave and Arrow Route, North East Corner - Street Widening
Unknown
lo0000000000000000c-0
414.000
and Sidewalk Improvements
22
Rochester Ave from Base Line to Banyan - Pavement Rehabilitation
Measure 1
11773035650/1935177-0
950,000
Future & Unfunded Total: 45,881,600
Index - 4
Beautification
Typical Beautification projects include parkway landscape, median islands, plant material replacement, community trail
landscape and open space preservation. The City strives to plan and budget for projects that exemplify Rancho
Cucamonga's aesthetic standards, particularly in areas of the City that are older and undergoing rehabilitation. Many
Beautification projects bring these areas into alignment with the rest of the City.
The City adheres to a Xeriscape policy in all of its plant material selection, ensuring current water conservation
standards, as well as the adaptability of plants, trees, flowers and shrubs to Southern California's warm and dry
climate. This practice helps to reduce ongoing maintenance and irrigation costs. The Beautification Fee Program was
discontinued in 2014 and fees are no longer being collected. Current and future projects will utilize these funds until
the remaining fund balance has been depleted.
Project List & FY 2017-18 Expenditures
1 Haven Ave from Wilson to Vivienda- $ 150,000
Community Trail
2 LIVID 2 Water Conservation $ 110,000
3 LMD 4R Water Conservation $ 440,000
$ 700,000
Sources of Funding for FY 2017-18
$150,000
• Beautification ■ LMD 4R ,„ LMD 2
$110,000
A
Project Number: 800-2016-08
JL Key: 1829
Object: 5650
Haven Avenue from Wilson Avenue to Vivienda Street - Community Trail West side
Project Location:
Haven Avenue - From Wilson
Avenue to Vivienda Street, west
side
ECT
Est. Construction Start/End:
TBD
Project Status:
Design
Department:
Engineering
Project Manager:
Romeo David
Description: Construction of an equestrian trail on Haven Avenue, west side. Project includes installation of 2 rail PVC fence, installation of
decomposed granite and installation of mow curbs.
Justification: This stretch will complete and connect missing sections of the existing community trail on the west side of Haven Avenue as part
of the trail master plan. It will also improve the appearance of the west side of Haven Avenue.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$o
Design/Plan Review
$0
$10,000
$0
$0
$0
$0
$10,000
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$o
$100,000
$0
$o
$0
$0
$100,000
Inspection & Administration
$0
$30,000
$0
$0
$0
$0
$30,OD0
Contingency
$0
$10,000
$0
$0
$0
$0
$10,000
Total Costs:
$0
$150,000
$0
$0
$0
$0
$150,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Beautification Fund (110)
$0
$150,000
$0
$0
$0
$0
$150,000
Total Costs:
$0
$150,000
$o
$0
$0
$0
$150,000
Impact on Operations:
This stretch will add an additional quarter mile to the City's trail inventory, requiring trash removal, weed
abatement, and routine maintenance.
Al
Project Number:
JL Key: 1787
Object: 5650
LMD 2 Water Conservation / Landscape Renovation
Project Location:
LMD 2
Est. Construction Start/End:
07/2017 — 06/2O18
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Dean Rodia
�
B
IL
n
xo. <fMmy�
" o ��•
n
I�
Wz
Description: Continuation of previous year's project on Victoria Park Lane, just east of Day Creek Boulevard and includes the removal of turf in
parkways and tract inlets, along with converting existing planter sections with low water use landscape plants and materials.
Justification: Reduce water
usage and labor costs to irrigate
and maintain landscaping in LMD 2.
Demonstrate to
public that drought tolerant
landscaping is
aesthetically pleasing
and easy to
maintain.
Project Cost Estimate ($):
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$38,680
$ ADD
$0
$0
$0
$0
$48,680
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$246,070
$100,000
$0
$0
$0
$0
$346,070
Inspection & Administration
$0
$0
$0
$0
$0
$o
$0
Contingency
$0
$0
$0
$0
$0
$0
$0
Total Costs:
$284,750
$110,000
$0
$0
$0
$0
$394,750
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
LMD 2 (131)
$294,750
$130,=
$0
$0
$0
$0
$394,750
Total Costs:
$284,750
$110,000
$0
$0
$0
$0
$394,750
Impact on Operations: Reduced water usage by 3O% in this area as well as some reduction in maintenance costs
A
Project Number:
1L Key: 1787
Object: 5650
LMD 4R Water Conservation / Landscape Renovation
Project Location:
LMD4R
Est. Construction Start/End
07/2017—06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Dean Rodia
Description: Continuation of previous year's turf removals and replacement with drought tolerant landscaping. Work will be done mostly in
parkways and paseos along Base Line Road towards the east from Haven Avenue on the south side of Base Line Road.
Justification: Reduce water usage and labor costs to irrigate and maintain landscaping in LMD-4R. Demonstrate to public that drought tolerant
landscaping is aesthetically pleasing and easy to maintain.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
50
$0
$0
So
$0
$0
s0
Design/Plan Review
$70,450
$0
$0
$0
$0
$0
$70,450
Right -of -Way
$0
$0
$0
$o
$0
5o
So
Construction
$548,080
$440.000
$0
$0
$0
$0
$988,080
Inspection & Administration
$1,780
$0
$o
50
$0
$0
$1,780
Contingency
$o
$0
$o
50
$0
$0
5o
Total Costs:
$620,310
$440,000
$0
$0
$0
$o
$1,060.310
Project Funding:
Funding Source
Prior years
201711
2018119
2019 20
2020 21
TBD
TOTAL
LIVID 4R/Tern Vista (134)
$620,310
$440,000
$0
$0
$0
$o
$1.060,310
Total Costs:
$620,310
$440.000
50
$o
$0
$o
$1,060,310
Impact on Opentlons:
Reduced water usage by 30% in this
area as well as some reduction in
maintenance costs.
A
Drainage
Drainage projects include the construction of new storm drains, storm drain lateral connections, flood control channels, catch basins,
debris racks and other forms of infrastructure that protect the public right-of-way from hazards caused by flooding and severe
weather events.
Drainage projects are scheduled and planned due to the availability of funding, safety concerns, new development, and
weather/emergency events. In extreme circumstances, inadequate drainage can prevent development from taking place.
The City consults with many other agencies when constructing new drainage improvements, including utility companies, the
Cucamonga Valley Water District, the San Bernardino Flood Control District and the Army Corps of Engineers, as needs dictate.
Drainage projects are typically funded from Drainage Funds and eligible street funding sources such as Measure I or Gas Tax.
Prolect List & FY 2017-18 Expenditures
1 Cucamonga SD Upper Ph3 - e/o Hellman, $ 3,900,000
Amethyst- 19th St
2 McKinley St at Ramona Ave Storm Drain $ 50,000
Repair
$ 3,950,000
Sources of Funding for FY 2017-18
$2,750,1)
■General Drainage ■ Measure I
400,000
Citywide Infrastructure
Project Number: 800-2016-01
JL Key: 1928
Object: 5650
Cucamonga Storm Drain Upper Phase 3, e/o Hellman Avenue, Amethyst Street to 19th Street
Project Location:
East of Hellman Avenue, Amethyst
Street to 19th Street
Est. Construction Start/End:
04/2018—10/2018
Project Status:
Under Design
Department:
Engineering
Project Manager:
Romeo David
ECT LO
(]ON,
.,�aues r euc.,,,—
� r.xcnieu
ewn J�''2q'
C
Description: Construct the Master Plan Storm Drain, install storm drain mainline, install catch basins, manholes, Laterals, curb and gutter,
sidewalks and overlay the entire road with asphalt rubber hot mix.
Justification: This project will improve the drainage problems within the area and enhance the traffic circulation, including the improvement of
pedestrian safety.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
$150,000
$0
$0
$0
$0
$150,D00
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$3,200,000
$0
$0
$0
$0
$3,200,000
Inspection & Administration
$0
$230,000
$0
$0
$0
$0
$230,000
Contingency
$0
$320,000
$0
$0
$0
$0
$320,000
Total Costs:
$0
$3,900,000
$0
$0
$0
$0
$3,900,000
Project Funding:
Funding Source
Prior years
2017 18
2018 19
201912
2020 21
TBD
TOTAL
General Drainange Fund(112)
$0
$800,000
$0
$0
$0
$0
$800,000
Measure I Fund (176)
$0
$400,000
$0
$0
$0
$0
S400,000
Infrastructure Fund (198)
$0
$2,700,000
$0
so
so
$0
$2,700,000
Total Costs:
$0
$3,900,000
$0
$0
$0
$0
$3,900,000
Impact on Operations:
Less routine maintenance thus freeing
up maintenance
crews to attend to other needed areas.
In addition, the
storm drain will allow for the flood
zone designation
to be changed
for the residents and businesses in the area,
and relieving the need for additional
flood insurance.
B1
Project Number:
JL Key: 1954
Object: 5650
McKinley Street at Ramona Avenue Storm Drain Repair
Project Location:
McKinley Street at Ramona
Avenue
Est. Construction Start/End:
10/2017 - 11/2017
Project Status:
Construction
Department:
Engineering
Project Manager:
Jerry Dyer
Description
This project involves the removal of an existing catch basin and construction of a new catch basin and some drainage pipe.
Justification: This project will elimate the existing failed corrigated metal pipe and divert the drainage flows to the existing open channel to
handle the flows more efficiently.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 2
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
$0
50
$0
$0
$0
$0
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
50
$42,250
$0
$0
$0
$0
$42,250
Inspection & Administration
$0
$3,500
$0
$0
$0
$0
$3,500
Contingency
$0
$4,250
$0
$0
$0
$0
$4,250
Total Costs:
$0 MA00
$0
$0
$0
$0
$50,000
Project Funding:
Funding Source
Prior years 2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Infrastructure Fund (198)
$0 $50,000
$0
$0
$0
s0
$50,000
Total Costs:
$0 $50,000
$0
$0
$0
$0
$50,000
Impact on Operations:
Less routine maintenance during storm events like
sand bags and debris clean-up, thus freeing up maintenance
crews to attend to other needed areas.
a
Facilities
� 414
JO �; r►
iiWill
Projects that construct new buildings or that either improve, add on to, or renovate existing buildings and ancillary structures are
typically classified as Facilities Projects. These projects ultimately result in new structures being added to the City's fixed facility
inventory; however, some projects placed in this category are considered capital rehabilitation as they focus on the
remodeling or restoration of existing facilities.
The majority of these projects are funded via City Reserve funds. Major projects may qualify for state, federal and/or grant funding.
Typical operating expenses for facilities include increases in staffing, building and systems maintenance costs, overhead expenses and
utilities.
Project List & FY 2017-18 Exoenditures
1 Archibald Library - Office Re -design
$
135,350
2 Central Park - Emergency Backup Power
$
75,000
3 City Facilities - Roofing Rplcmnt & Rprs
$
250,000
4 Civic Center - Carpet & Reconfiguration
$
219,000
5 Civic Center - Parking Deck Maintenance
$
30,000
6 Civic Center - Waterproofing & Planter
$
50,000
Box Repair
7 Cultural Center- Celebration Hall Air -Wall
$
389,500
Replacement
8 Cultural Center - Courtyard Redesign
$
200,000
9 Cultural Center - Loading Bay
$
40,000
10 Energy Efficiency Facility Improvement
$
71,390
11 Fire District - Jersey Station (174) Data
$
2,500,000
Center (Bldg 1)
12 Fire District - Jersey Station (174)
$
25,000
Training Facility
13 Fire District - San Bernardino Station
$
9,420,000
(172) Relocation
14 Fire District - Water Conserv.
$
600,000
Landscaping & Emerg Veh Ciruclation
Driveway Improv
15 Public Works Services Dept- Warhouse
$
2,140,000
Expansion
16 Sports Complex - Removal of Soccer
$
60,000
Field Lighting Fixtures and poles @ Goal
Sites
$
16,205,240
Sources of Fundine for FY 2017-18
$12,62(
■ Capital Reserve
■PD 85
■ Park Development
$3,149,890
f30,000
$135,350
$240,000
$30,000
LMD 1
■ Library Reserve
■ Fire Capital Projects
Project Location:
Archibald Library staff areas: first
floor (Circulation staff area) and
second floor (staff area and
literacy office)
Est. Construction Start/End:
TBD
Project Status:
Design and Build
Department:
Library
Project Manager:
Brian Sternberg
Project Number:
JL Key:
Object: 5606
Archibald Library - Office Redesign
ljulij�,i: r
y _� Y -= T
s I
_ I_
.N• �� UA9L l INF Fin
cE7 eek yl F� <-
JI .Jt
e r
YI ITT
MtiiiA3J 9T
13
s 13
exccx.
V v3 5,� 33
m A R
-J LRJOI
1-
Description: Redesign and new furniture for staff areas at the Archibald Library, including first floor staff office and area in Circulation, second
floor administration area, staff room, and offices; and second floor literacy offices. Most of the work will be cosmetic. The
redesign will be done in two phases. Phase I will include first Floor staff office and area in Circulation, Passport Office and second
floor literacy offices. Phase 11 will include the second floor administration area, staff room and offices.
Justification: Existing staff area is over 20 years old and contains all original furniture, with the exception of the chairs. Limited storage space
and functional cubicles has led to boxes, carts, and library materials crowding staff areas. Creating a more efficient and ergonomic
space will allow for better workflow, better working conditions, as well as more inviting for the public into admin area.
Project Cost Estimate ($):
Expenditure/Cateaory Prior Years 2017 18 2018119 2019 20 2020 21 T80 TOTAL
Environmental/NPDES $0 $0 50 So $0 $0 $0
Design/Plan Review $2,500 $2,500 $0 $0 $0 50 55,000
Right-of-way $0 SO $0 $0 So $0 So
Construction $67,150 $132,850 $0 $0 $0 $0 5200,000
Inspection & Administration $0 $0 $0 $0 $0 So $0
Contingency $0 5o 5o So 5o $0 $0
Total Costs:
$69,650
$135,350
$0 $0
$0
$0
$205,000
Project Funding:
Funding Source
Prior Years
201718
201819 201912
202021
TBD
TOTAL
Library Reserve (329)
$69,650
$135,350
$0 is
$0
$0
$205,000
Total Costs:
$69,650
$135,350
$0 $0
$0
$0
$205,000
Impact on Operations:
No impact on operations. Overall space remains the same.
C1
Project Number: 8OD-2017-16
JL Key: 1914
Object: 5650
Central Park - Emergency Backup Power
Project location: Iyl� / /)
Central Park � �LLi
Est. Construction Start/End
TBD
Project Status:
Design
Department:
Eng/Fire/PW
Project Manager:
C Billings/M. Courtney/Ty Q.
Description: To design an
emergency backup power system that will provide 100%
power for Central Park which is to
be used as an evacuation
center.
Justification: The emergency
back up power will be
used during
emergency situations where Central Park is used as an
evacuation
center.
Project Cost Estimate ($):
Expenditure/Category
Prior Years
2017 18
2 18 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
so
Design/Plan Review
s0
$75,000
$5,000
$0
so
s0
$80,000
Right -of -Way
$0
$0
$0
$0
$0
$o
so
Construction
$0
so
$0
$0
$o
$0
so
Inspection & Administration
$0
$0
$0
$0
$0
so
so
Contingency
$0
$0
$0
$0
$0
$0
so
Total Costs:
$0
$75,000
$5,000
$0
$0
$0
$80,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Fire Fund (288)
$0
$75,000
$5,000
$0
$0
$0
$80,000
Total Costs:
$0
$75,000
$5,000
$o
$0
$0
$80,000
Impact on Operations:
None
C2
Project Number.
1L Key:
Object: 5602
City Facilities - Roof Replacement and Repair
Project Location:
Animal Care and Adoption Center,
Cultural Arts Center, Lion East and ' �`- r
Lion West
Est. Construction Start/End:
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Ty Quaintance
Description:
Repair roof systems at Animal Care and Adoption Center, Cultural Arts Center and Lions East. Replace roofing system at Lions
West,
Justification: During Fiscal Year 15/16 a consultant performed an evaluation of the roofing systems at all City facilities, with the exception of the
Civic Center.
The results of the roofing survey recommended that
the roofs at these noted facilities need to be replaced
and/or
repaired.
Project Cost Estimate ($):
Expenditure/Category
Prior Year
2017 18
2018 19
2019 20
2020 21
T8D
TOTAL
Environmental/NPDES
so
$0
$0
$0
$0
$0
$0
Design/Plan Review
$30,000
$0
$0
$0
$0
$0
$30,000
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$200,000
$0
$0
$0
$0
$200,000
Inspection & Administration
$0
$50,000
$0
$0
$0
$0
$50,000
Contingency
$0
$0
$0
$0
$0
$0
$0
Total Costs:
$30,000
$250,000
$0
$0
$0
$0
$280,000
Project Funding:
Funding Source
Prior Years
2 7 1
2018 19
2019 20
2020 21
TEID
TOTAL
Capital Reserve (025)
$30,000
$250,000
$0
$0
$0
$0
$280,000
Total Costs:
$30,000
$250,000
$0
$0
$0
$0
$280,000
Impact on Operations: Replacement or repair of roofing systems will reduce roof maintenance requirements at these facilities
C3
Civic Center - Carpet and Reconfiguration
Project Location:
Civic Center
Est. Construction Start/End;
7/2017 — 6/2018
Project Status:
Design/Construction
Department:
PW/CSD/Finance/CMO
Project Manager:
Jeff Geith/Noah Daniels/Elisa Cox
Project Number:
JL Key:
Object: 5602
Description: Design and construction of various interior improvements including replacement of carpet in the upper level rotunda area and on
the main staircase; reconfiguration of the Community Services Department's break and mail rooms (design only); reconfiguration
of the Finance Department's offices to accommodate the relocation of Special District's staff; and reconfiguration of the
Communications Division's offices to accommodate key Department staff.
Justification: The existing carpet in the rotunda area was installed in 1990 and has reached the end of its useful life. The reconfiguration of the
Finance Department and Communications Division offices will provide space for key staff members to be more efficiently located
to better serve internal and external customers. Reconfiguration of
the Community
Services Department's
break and mail rooms
will create dedicated work and break spaces for staff.
Project Cost Estimate ($):
Expenditure/Category
Prior Years 2017 18
2018119
2019 20
2020 21
TRD
TOTAL
Environmental/NPDES
$0 $0
$0
$0
$0
$0
$0
Design/Plan Review
$0 $74,000
$0
$0
$0
$0
$74,000
Furnishings
$0 $10,000
$0
$0
$0
$0
$10,000
Construction
$0 $130,000
$600,000
$0
$0
$0
$730,000
Inspection & Administration
$0 $0
$0
$0
$0
$0
$0
Contingency
$0 $5,000
$0
$0
$0
$0
$5,000
Total Costs:
$0 $219,000
$600,000
$0
$0
$0
$819,000
Project Funding:
Funding Source
Prior Years 2017 18
2018 19
2019120
2020 21
TED
TOTAL
Capital Reserve (025)
$0 $219,000
$600,000
$0
$0
$0
$819,000
Total Costs:
$0 $219,1300
$600,000
$0
$0
$0
$819,000
Impact on Operations:
Replacement of the carpet in the upper level rotunda
will reduce
maintenance required for this flooring. The
reconfigurations will result in providing
additional and more efficient space for key Department
staff.
C4
Project Location:
Civic Center
Est. Construction Start/End:
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Jeff Geith
Project Number:
A Key:
Object: 5607
Civic Center - Parking Deck Maintenance
_ � l FOb�ILl—ELV�
Description: Remove and repair joints then apply sealant to parking deck.
Justification: The existing membrane was installed in 2009 and requires a maintenance and repair to extend the integrity of the system. A
maintenance on the membrane system should be performed every 5 yrs.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
202012
TED
TOTAL
Environmental/NPOES
$0
$0
$0
$0
$0
$0
$o
Design/Plan Review
$0
$10,000
$0
$0
$0
$0
$10,000
Right-of-way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$20,000
$0
$0
$o
$o
$20,000
Inspection & Administration
$o
$0
$0
$0
$o
$0
$o
Contingency
$0
$0
$0
$0
$0
$0
$0
Total Costs:
$0
$30,000
$0
$0
$0
$0
$30,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 2
2020 21
TT�
TOTAL
Capital Reserve (025)
$0
$30,000
$0
$0
$o
$o
$30,000
Total Costs:
$0
$30,000
$o
$0
$0
$0
$30,000
Impact on Operations:
None
C5
Project Number:
1L Key: 1950
Object: 5650
Civic Center - Waterproofing & Planter Box Repair
Project Location
Civic Center
Est. Construction Start/End
07/2017 — 06/2018
Project Status:
Design
Department:
Public works Services
Project Manager:
Jeff Geith
Description: Waterproof and repair all existing exterior joints at the Civic Center.
Also include resealing of the upper level planters and
complete weather proofing of the exterior brick.
Justification: The existing elastomeric caulking and exterior joints at the Civic Center are in need of repairs. Along with all the exterior joints,
the exterior brick face of the Civic Center needs to have a weather proofing brick seal applied to prevent the brick from absorbing
moisture.
Project Cost Estimate (S):
Expenditure/Category Prior years 2017 18 2018 19
2019 20 2020 21 TBD TOTAL
Environmental/NPDES $0 $0 $0
$0 50 50 $0
Design/Plan Review $0 $50.000 50
$0 $0 50 $501000
Right -of -Way $0 $0 $o
$0 So 50 $0
Construction $0 $0 $1,750,000
$0 50 50 $1,750,000
Inspection & Administration $0 $0 $50,000
$0 50 $0 $50,000
Contingency $0 $0 5175,000
$0 $0 So $175,000
Total Costs:
$0
$50,000
51,975,000
$0
$o
$0
$2,025,000
Project Funding:
Funding Source
Prior Year
2 17 1
2018/19
2019 20
2020 21
TTM
TOTAL
Capital Reserve (025)
SO
$50,000
51,975,000
so
So
$0
$2,025,000
Total Costs:
$0
$50,000
$1,975,000
$0
50
$0
52,025,000
Impact on Operations:
None
C6
Project Number:
A Key:
Object: 5602
Cultural Center - Celebration Hall Air -Wall Replacement
Project Location
Cultural Center
Est. Construction Start/End:
07/2017—06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Neil Plummer
Description: Replace existing air -wall system with new system.
Justification: The existing air -wall system is 12 years old and obsolete. Replacement parts for it are no longer made and are difficult to find
When the air -wall breaks down, there are long delays waiting for repairs/parts.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$o
$0
Design/Plan Review
$0
$10,000
$0
$0
So
$0
510,000
Right -of -Way
$o
So
So
$0
50
So
$0
Construction
$0
$345,000
So
So
$0
$0
$345,000
Inspection & Administration
$0
$0
$0
$0
$0
$o
$0
Contingency
$0
$34,500
$0
So
$0
5o
$34,500
Total Costs:
$0
$389,500
$o
$0
$0
$0
$389,500
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Capital Reserve (025)
$0
$389,500
$0
$0
$0
$0
$389,500
Total Costs:
$0
$389,500
$0
$0
$0
$0
$389,500
Impact on Operations:
None
C7
Project Location:
12505 Cultural Center Drive
Est. Design Start/End:
0812017 10/2017
Project Status:
Design
Department:
Community Services/Parks
Project Manager:
Ehsa Cox
Project Number:
JL Key: 1894
Object: 5650
Cultural Center -Courtyard Redesign
VICTORY. C OR=TCRPAVDIANEL• Rvy W Mo.
cote F.
vEMINAIL Le:9J— c
PROJECT LOCATIO�
i L
Description: The Cultural Center Courtyard Redesign project is intended to take a Primarily passive, outdoor space with little shade or seating
areas and redesign it to encourage greater pedestrian access and use. Amenities will include shade and lighting as well as a
permanent outdoor stage to facilitate outdoor events, concerts and rentals as well as improvements to spectator comfort.
Improvements will also include repainting of the Cultural Center as well as possible relocation of the box office and Friends of the
Library Bookstore.
Justification: The improvements will reduce staff time for set up and take down and improve flow and continuity with the rest of Victoria
Gardens. Relocation of the box office will increase visibility and relocation of the Friends of the Library Bookstore will improve
visibility and customer access. The redesign project will open up new opportunities for rentals and increase ticket sales at the
Lewis Family Playhouse.
Project Cost Estimate ($):
Expenditure/Category
Prior Years
2017 18
2018 19
201912
2020 21
TBD
TOTAL
Environmental/NPDES
$0
5o
$o
$0
5o
so
5o
Design/Plan Review
$14,580
$200,000
$0
$0
s0
s0
$214,580
Right -of -Way
$o
So
So
So
So
50
So
Construction
$0
$0
$2,000.000
$0
5o
50
$2,000,000
Inspection & Administration
$0
s0
so
so
50
5o
$0
-ontingency
$o
$0
so
$0
$0
So
so
Total Costs:
$14,580
$200,000
$2,000,000
so
so
$o
$2,214,590
Project Funding:
Funding Source
Prior Years
2017 18
2018119
2019 20
2020121
TBD
Park Development Fund (120)
$14,580
$200,000
$0
$0
s0
$0
$214.580
Unknown
$0
5o
$2,000,000
$0
$0
$0
$2,000,000
Total Costs:
$14,580
$200,000
$2,000,000
$0
so
$0
$2,214,580
Impact on Operations:
This project may require a change
in the type and frequency of maintenance as well as increasing landscape and
irrigation. It will also reduce existing time for set up and take down of
equipment for special events.
C8
Project Location:
12505 Cultural Center Drive
Est Construction Start/End:
08/2017-10/2017
Project Status:
Design/Construction
Department:
Community Services/Parks
Project Manager:
Elisa Cox
Project Number:
1L Key: 1895
Object: 5650
Cultural Center - Loading Bay
V P
CNVflCNBI YJ� � V [� ,I�E,w�;
' w clo AL Nrewo� 5
�,II °JU VICTORIA A ENS ULNRAL J 1TERt�PAU 51MEL• ��' wNO
J�
51
NN U.t jagy
vEMsp'L`rR:l-V? sA L2l I I-
VI T fl N PROJECT LOCATION
a
W
a
s
Description: This project involves the design to cover a portion of the Service/Loading gay at the Victoria Gardens Cultural Center.
justification: Unlike most venues who produce theatre productions, the Lewis Family Playhouse was built without a shop space, therefore
requiring technical/carpentry staff to work outside in the loading bay when set pieces and prop items need to be built for a
production. There is no shelter to protect the staff or the items being constructed from inclement weather. Currently much of the
Playhouse's set construction is contracted out to a commercial shop, which increases costs significantly. Having a sheltered area
outside of the stage doors would allow the tech staff better working conditions for these construction projects than simply working
outside in the often unpleasant or sometimes unsafe elements.
Project Cast Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
so
$0
$o
$o
Design/Plan Review
$0
$40,000
$o
$o
$o
$0
$40,000
Right -of -Way
So
so
5o
5o
$0
$0
$0
Construction
$0
$0
$175,000
s0
$0
s0
$175,000
Inspection & Administration
$0
$o
$0
$0
so
s0
$0
Contingency
$0
$0
$0
$0
$0
so
$0
Total Costs:
$0
$40,000
$175,000
So
So
$0
$215,000
Project Funding:
Funding Source
Prior years
2017 18
2018119
2019 20
2020 21
TBD
TOTAL
Park Development Fund (120)
$0
$40.000
$175,000
$0
So
$0
S215,000
Total Costs;
$0
s40,000
$175,000
5o
$0
$0
5215,000
Impact on operations: Improvements will require maintenance of the structure and added light fixtures, as well as minimal electric cost for
light useage. The City could save substantial funds by building some sets internally
C9
Project Location:
Central Park, Archibald Library,
and Corporate yard
Est. Construction Start/End:
07/2017 - 06/2018
Project Status:
Design/Construction
Department:
City Manager's Offfice/Public
Works Services
Project Manager:
Deborah Allen & Ty Quaintance
Project Number.
A Key: 1975
Object: 5650
Energy Efficiency Facility Improvements
f.
>fe�y �* .
IF
OJECC CATIONS
r
�I f'-"I.r� iae1r_i j„a};l� �' 3s�•_a.
a�
Description: Replace existing high pressure sodium lighting fixtures at Central Park and Archibald Library with new energy efficient LED lighting
fixtures for reduced energy costs. Implement various retrocomissioning tasks (HVAC, Heat Pumps) at Central Park, Archibald
Library, and Corporate yard. These measures are currently eligible for SCE customized incentives ($14,507).
Justification: These energy efficient improvements were identified in recent energy audits as having maximum return on investments. LED
lighting fixtures have a longer service life along with lower maintenance and energy costs. The retrocommisioning tasks will
optimize the existing equipment and reduce energy costs.
Project Cost Estimate ($):
Expenditure/Cateaory Prior years 2017 18 2018 19 2019 20 2020 21 TIED TOTAL
Environmental/NPDES $0 50 $0 $0 $0 $o $0
Design/Plan Review $0 $0 $0 $0 $o $0 $0
Right -of -Way $0 s0 50 $0 $o $o $0
Construction $0 $71,390 $0 $0 $0 $o $71,390
Inspection & Administration 50 $o $0 $0 $o $o $0
Contingency $0 5o $0 $0 $o $0 $0
Total Costs:
$0
$71,390
$0
$0
$0
$o
$71,390
Project Funding:
Funding Source
Prior Year
2 17 18
2 18 19
2019 20
2020 21
TBD
TOTAL
Capital Reserve Fund (025)
$o
$71.390
$0
$o
$0
$o
$71,390
Total Costs:
$o
$71,390
$0
$0
$0
$o
$71,390
Impact on Operations:
The City will realize
maintenance savings and Improved lighting while
reducing utilitycosts by 2% at each facility.
C t0
Project Number:
JL Key: 1971
Object: 5650
Fire District - Jersey Station (174) Data Center (Bldg 1)
Project Location:
Behind Jersey Fire Station (174)
and the Fire Maintenance Facility
on Jersey Boulevard,
Est. Construction Start/End
2017/18-2018/19
Project Status:
Design complete and a portion of
the building completed
Department:
Fire Protection District
Project Manager:
i
Don Cloughesy/Pamela Pane
Description: Data Center built at the Jersey Fire Station/Training Center project.
Justification: Provide for redundancy of services to strenghten our City's IS infrastructure and disaster resilency.
Project Cost Estimate ($):
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020/21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
50
$0
$0
$0
$0
So
Right -of -Way
$0
$0
$0
$0
$0
$0
50
Construction
$0
$2,500,000
$0
$0
$0
$0
$2,500,000
Inspection & Administration
$0
$0
$0
$0
$0
$0
$0
Contingency
50
$0
$0
So
50
$o
$0
Total Costs:
$O
$21500=0
$0
$o
So
$0
$2,500,000
Project Funding:
Funding Source
Prior Years
2017 18
2019 19
2019120
2020 21
TIED
TOTAL
Fire Capital Projects (288)
so
$2,500,000
$0
$0
50
$0
$2,500,000
Total Costs:
$0
$2,500,000
$0
$0
$0
50
$2,500,000
Impact on Operations:
Fire District operations
and maintenance cost will
increase.
The cost will be better determined after the
construction is complete.
C 11
Project Location:
Behind Jersey Fire Station (174)
and the Fire Maintenance Facility
on Jersey Boulevard.
Est. Construction Start/End:
2015/16 - 2017/18
Project Status:
Construction - Phase I and 11
Department:
Fire Protection District
Project Manager:
Chief Cloughesy/Pamela Pane
Project Number:
J L Key: 1735
Object 5650
Fire District - Jersey Station (174) Training Facility
OCATI
Description: Phase I and Phase II are under construction. Anticipated substantial completion by February 2018.
Justification: A training facility has been part of the Jersey Station Master Plan since its inception. Several multistory hotels have been
constructed and additional mid -rise professional offices are proposed in the future necessitating this training tower. It will include
expanded classrooms, a live burn building, multi -story training building and other props that will simulate construction features in
present and future developments. Will include a Data Center (Phase III) that will provide for redundancy of services to strengthen
our City's IS infrastructure. Will also include the FIRE DOC and centralized storage for the District. Other driving forces for this All
Risk Training Center are population growth, increased need to train with regional cooperating agencies and provison of a realistic
facility our PO parners can utilize for local training and coordination.
Project Cost Estimate ($)
Expenditure/Cateeory
Prior Years
2017 18
2018119
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$15,990
so
$0
$0
s0
$o
$15,980
Design/Plan Review
$1,653,220
$0
$0
$o
s0
So
$1,653,220
Construction Management
$2,262,310
$0
$0
$0
$0
$0
$2,262,310
Construction
$20,983,930
$25,000
$0
$0
$0
$0
$21,009,930
Inspection & Administration
$164,440
$0
$o
$0
$0
$0
$164,440
Contingency
$o
So
$0
$0
So
$o
$0
Total Costs:
$25,079,980
$25,000
$0
$o
$0
s0
$25,104,880
Project Funding:
Funding Source
Prior Years
2017118
2018 19
2019 20
2020 21
TBD
TOTAL
Fire Capital Projects(288)
$25,073,030
$25,000
$0
s0
$0
s0
$25,098,030
Total Costs:
$25,073,030
$25,000
$0
$0
$0
s0
$25,098,030
Impact on Operations:
Fire District operations and maintenance cost will increase. The cost will be better determined after the
construction
is complete. Opportunities may exist for regional partnerships that could help effect operational
costs.
C, 12
Fire District - San Bernardino
Project Location:
At the northwest corner of San
Bernardino Road and Vineyard
Avenue
Est. Construction Start/End:
2017/18 - 2018/19
Project Number:
JL Key: 1733
Object: 5650
ROJECT LOCATION
C
Project status:
W
Contracting an Architect and i
a Construction Manager u
i _ o
Department: >: coop
Fire Protection District — � �- i
Project Manager:
Chief Don Cloughesy/Pamela Pane
Description: New Fire Station construction at a new location, to include a Police substation. Property has already been acquired for this new site
location.
Justification: Rebuilding and relocating a 50. year old fire station. This station serves the southwestern portion of the Rancho Cucamonga community.
Project Cost Estimate 1$):
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
$30,000
s0
s0
$0
$0
$30,000
Design/Plan Review
$699,000
$501000
$0
so
$0
$0
$739.000
Land Acquisition
$2,596.420
$0
$o
$0
$o
$0
$2,596,420
Construction
$101,460
$8,700,000
$0
$0
$0
$0
$8.901,460
Inspection & Administration
$0
$0
s0
s0
$0
$0
$o
Construction Management
$0
$640,000
$0
s0
so
$0
$640,000
Total Costs:
$3,386,980
$9,420,000
$0
$o
$0
$0
$12,806,880
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020121
TM2
TOTAL
Fire Capital Projects (288)
$3,386,980
$9,420,000
$0
$0
$0
$0
$12,806,880
Total Costs:
$3,386,880
$9,420,000
$0
$0
$0
$0
$12,806,880
Impact on Operations:
No additional personnel costs - current San Bernardino Station personnel will move
to the new
station when
complete. Larger station design could create an increase in maintenance costs, but greater efficiency in station
equipment could make it a wash.
C13
Project Number:
1L Key:
Object: 5607
Fire District - Water Conservation Landscaping and Emgergency Vehicle Circulation Driveway
Improvements
Project Location:
Banyan Fire Station (175)
<NAFF
COLLIQ
Est. Construction Start/End:
07/2017-06/2018
Los oe W
Mica
Project Status: - `o
nwr,uvwr
Design - Q a�"` �" n n
Ky Department: LOCA ! eox.y
Fire Protection District
L - e FY L �uanrrF nx:c
Project Manager:
Chief Cloughesy/Pam Pane ,1, Y-� �"H"A.SII'l �U (1� q fFi9
Description: Removal of high water use turf and replace with drought tolerant landscape plant materials with drip system retrofit. This includes
hardscape improvements for vehicular circulation and perimeter gate/fencing modification. This will enhance parking as well as
protection of vehicles from sun exposure and provide more direct paths for emergency vehicles to leave the property reducing the
amount of turnout time.
Justification: Executive order from the State of California to take measures to reduce water consumption.
Project Cost Estimate ($):
Expenditure/Category Prior years 2017 18 2018 19 2019 20 2020 21 TBD TOTAL
Environmental/NPDES so so So s0 So $0 $o
Design/Plan Review $166,350 s0 So So $0 $0 5166,350
Right -of -Way $0 $0 so $0 $0 $0 50
Construction $15,760 5600,000 $0 $0 $0 5615,760
Inspection & Administration So $0 So $o 5o So $o
Contingency So $0 So so so $0 $0
Total Costs: $192,110 $600,000 $0 $0 $0 s0 $782,110
Project Funding:
Funding Source Prior years 2017 18 2018 19 2019 20 2020 21 TBD TOTAL
Fire Capital Fund (288) $182,110 S600,000 s0 $0 $0 $0 $782,110
Total Costs: $192,110 $600,000 $o So $0 So $782,110
Impact on Operations: Decrease in maintenance and operations. Will not know the full impact until we have a design.
C14
Project Location:
Public Works Services Center
Est. Construction Start/End:
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Neil Plummer
Project Number:
1L Key: 1927
Object: 5650
Public Works Services Department - Warehouse Expansion
�U
1
DROJECT LOCATION
Description: Construct second warehouse similar in size to original warehouse. Notable difference is that the second warehouse will have solar
panels on the roof.
Justification: The original warehouse has reached capacity. Public Works equipment and supplies must be stored in cargo containers. Staff has
had to operate equipment within the containers (using extension cords for power). Likewise, even locked, the containers are not
very secure (they have been broken into several times). The additional storage capacity provided by the new warehouse can be
used by all city departments. The most notable use will be providing a home for the Animal Shelter's kitten nursery.
Project Cost Estimate ($):
Expenditure/Cateaory Prior years 2017 18 2018 19 2019 20 2020 21 TED TOTAL
Environmental/NPDES $0 $0 $0 $0 $0 $0 $0
Design/Plan Review $170,000 $0 $0 $0 s0 $0 $170,000
Right -of -Way $0 $0 $0 s0 $0 $0 $0
Construction $0 $1,750,000 $0 $0 $0 $0 $1,750,000
Inspection & Administration $0 $200,000 $0 SO $0 $0 $200,000
Contingency $0 $190,000 $0 $0 $0 $0 $190,000
Total Costs:
$170,000
$2,140,000
$0
$0
$0
$0
$2,310,000
Project Funding:
Funding, Source
Prior years
2017 18
201811
201912
202012
TBD
TOTAL
Capital Reserve (025)
$170,000
$2,140,000
$0
$0
$0
$0
$2,310,000
Total Costs:
$170,000
$2,140,000
$0
$0
$0
$0
$2,310,000
Impact on Operations:
A second warehouse would put equipment
and supplies (currently
scattered among multiple containers) into a
centralized location.
C15
Project Number:
JL Key:
Object: 5607
Sports Complex - Removal of Soccer Field Lighting Fixtures and Poles at Goals Site
Project Location:
Sports Complex
Est. Construction Start/End:
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Andy Miller
waaCtKlQU �ULT OwT.CWeLC%
sewwa:un�
PROJECT LOC ION
we •rxrw� we axownaw wtxw
•
i k
s p'
Description: Remove and salvage existing soccer field light fixtures and associated light Poles from the site of the new Goals Soccer Complex.
Justification: Goals Soccer Complex is to be constructed on site of existing soccer field. As a result, existing sports lighting for the soccer field is
no longer needed.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
$0
50
$o
$o
$0
$0
Design/Plan Review
$0
$0
5o
$0
$0
So
$0
Right -of -Way
$0
$0
$0
$o
So
50
$0
Construction
$0
$60,000
$0
$0
$0
s0
$60,000
Inspection & Administration
$0
$o
$0
$0
$0
$0
$o
Contingency
$0
$0
50
$0
So
$0
$0
Total Costs:
$0
$60,000
$0
$0
$0
$0
$60,000
Project Funding
Funding Source
Prior Years 2 7 201 19 201 20 2020121 TBD TOTAL
LIVID 1(130)
$0 $30,000 $0 50 So s0 $30,000
PD 85 (848)
$0 $30,000 $0 $0 50 $0 $30,000
Total Costs:
$O $60,000 $0 50 $0 $0 $60,ODO
Impact on operations:
With existing soccer field replaced by Goals Soccer Complex and existing field lights/poles removed, City staff will
no longer need to maintain site. Lights and poles will be stored at the Public Works Services Center until they can
be used (as needed) in other parks such as Old Town Park (fixtures).
C16
Miscellaneous
Miscellaneous projects are the capital undertakings that do not qualify for classification into the other project categories. These
are often one-time projects that are prompted by factors such as:
- State or Federal Mandates
- Community Health and Safety Issues
- Council Goals and Priorities
- Regional Needs Assessments
- Interagency Agreements
- External Funding Arrangements
These projects may or may not have maintenance obligations and they are typically funded from a variety of special funding
sources; they are rarely funded via the General Fund.
Project List & FY 2017-18 Expenditures
1 9th St along north side west of Vineyard $ 133,800
Ave - Sidewalk Improvements
2 ADA Ramps at Various Locations
3 Arrow Rte and Rochester Ave, North
East Comer - Animal Exercise Yard
Improvements
4 Community Trail Drainage
Improvements
5 Green Bike Lanes & Safety
Enhancements
6 Pacific Electric Trail - Block Wall East of
Victoria
7 Paseo Lighting Retrofit
8 Southwest Cucamonga Class I Bike
Trail Project
$ 100,000
$ 80,000
$ 10,500
$ 725,500
$ 13,200
$ 290,000
$ 621,160
$ 1,974,160
Sources of Funding for FY 2017-18
<on oM $10,500
■LMD1
Park Development
■ A82766
■ Safe Routes to School
$1,346,660
■ Citywide Infrastructure
■ Measure I
■LMD2
D
Project Number: 800-2012-20
A Key: 1808
Object: 5650
9th Street, North side, West of Vineyard Avenue - Sidewalk Improvements
Project Location:
9th Street, North side, From 100
feet west of Vineyard Avenue to
800 feet west of Vineyard
Avenue.
BEAR
Est. Construction Start/End
01/2018 - 02/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
PROJECT
Description: Project to construct 700' of sidewalk on the north side of 9th Street.
Justification: To provide students a safe and
direct route walking to
and from school.
The goal of this project is to reduce the need for bus
services and
benefits will be measured by student surveys taken both before and
after the project. The
City was awarded a
federal Safe
Routes To School grant to fund 75%of the
project construction costs.
Project Cost Estimate ($):
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$7,850
$0
$0
$0
$0
$0
$7,850
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$107,800
$0
$0
$0
$0
$107,800
Inspection & Administration
$0
$15,000
$0
$0
$0
$0
$15,000
Contingency
$0
$11,000
$0
$0
$0
$0
$11,000
Total Costs:
$7,850
$133,800
$0
$0
$0
$0
$141,650
Project Funding:
Funding Source
Prior Years
201718
201819
201920
202021
TBD
TOTAL
Citywide Infrastructure (198)
$7,850
$43,000
$0
$0
$0
$0
$50,850
Safe Route School Fund (234)
$0
$90,800
$0
$0
$0
$0
$90,800
Total Costs:
$7,950
$133,800
$0
$0
$0
$0
$141,650
Impact on Operations: Reduction in parkway maintenance costs
D1
Project Number:
JL Key: 1150
Object: 5650
ADA Ramps at Various Locations
Project Location:
Various locations City Wide
Est. Construction start/End:
02/2018 - 04/2018
Project status:
Design/Construction
Department:
Engineering
Project Manager:
Curt Billings
Description: Construct ADA compliant ramps at various locations citywide. Locations for ramp installations come from the ADA Transition Plan,
which is updated annually. This capital project encompasses all ADA compliance issues that cannot be incorporated into other
improvement projects, but still must be addressed in a timely fashion,
Justification: Meets the City's ongoing commitment to install ADA ramps where they are missing and required by law
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
201912
2020 21
TRD
TOTAL
Environmental/NPDES
$o
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
$0
$o
$o
$0
$o
$o
Right -of -Way
$o
$o
$0
$o
$0
$o
50
Construction
$200,000
$90,000
$90,000
$90,000
$90,000
$0
$560,000
Inspection & Administration
$0
$0
$0
$0
5o
$o
$0
Contingency
$0
$10,000
$10,000
$10,000
$10,000
$0
$40,OW
Total Costs:
$200,000
$100,000
$100,000
$100,000
$100,OW
$0
$600,000
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 21
TOD
TOTAL
Measure l Fund(177)
$200,000
$100,000
$100,000
$100,000
$100,000
$0
$600,000
Total Costs:
$200,000
$100,000
$100,000
$100,000
$100,000
$0
$6W,000
Impact on Operations: None
D2
Project Number: 800-2017-19
J L Key: 1955
Object: 5650
Arrow Route and Rochester Avenue, North East Corner - Animal Exercise Yard Improvements
Project Location:
Arrow Route and Rochester
Avenue, North East Corner -
Animal Exercise yard
Improvements
Est Construction Start/End
TBD
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Curt Billings
-Al� L�J f ^J 2
J %
T �/
`MIFFINNIUMF.i �--
EP ICENT A/SPORTS CJ� PLE%
RANCHO CDCAM AD D TS ORTB COMPLEX
U K:e ENNY-O
RC ANIMAL CARE a. ADOP IO
--�ARRO W_RTE
e
f3 N PROJECT LOCATION
iESTATIO M /
174 >
AL
N .�
Description: This project will install 850 linear
feet of chain link
fencing and
gates for a animal
exercise yard associated with
the Rancho
Cucamonga Animal Care Center.
Justification: The fencing improvements will provide three chain link fenced enclosures to exercise
animals housed
at the nearby
animal care
center.
Project Cost Estimate ($):
Expenditure/Category Prior years
2017 18
2018 19
2019120
2020 21
TBD
TOTAL
Environmental/NPDES $0
90
$0
$0
50
So
$0
Design/Plan Review $0
$0
90
$0
$0
so
$o
Right -of -Way So
$0
So
so
$0
$0
$0
Construction $0
$80,000
so
$o
so
$0
S80,000
Inspection & Administration $0
$0
$0
So
$0
$0
90
Contingency so
$0
$o
$o
$0
$0
$0
Total Costs;
so
$80,000
s0
So
$0
$0
$80,000
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Park Development Fund (120)
$0
$80,000
s0
so
$0
so
S80,000
Total Costs:
$0
$80,000
$0
$0
$0
$0
S80,000
Impact on Operations:
This project will reduce maintenance and weed abatement costs to a 1 acre portion of the 2-1/2 acre parcel and add
refuse collection costs.
D3
Project Number:
JL Key:
Object: 5607
Community Trail Drainage Improvements
Project Location:
Hermosa Avenue N/O Banyan
Street plus Almond Trail &
Laramie GF sites.
Est. Construction Start/End:
07/2017-06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Dean Rodia
Description: Install 1,200 square feet of Flatwork on Hermosa Ave n/o Banyan Street to direct water runoff and eliminate soil erosion at this
location. Install 175 linear feet of water bars on Almond Trail and Laramie GF sites to eliminate soil erosion and direct water Rows
away from the trail.
Justification: Flatwork and water bars will stop erosion/wash outs at these sites. This will reduce liability impacts by minimizing potential
hazards.
Project Cost Estimate ($):
Ezoenditure/Category Prior Year 2017 18 2018 19 201912 2020121 TBD TOTAL
Environmental/NPDES $0 $0 $0 50 $0 50 $o
Design/Plan Review $0 $o $0 $0 $0 $0 $0
Right -of -Way $0 $0 50 50 $0 $0 $0
Construction $0 $10,500 $0 $0 So $0 $101500
Inspection & Administration $o $0 $0 $0 $o $0 $0
Contingency $0 $o $0 $0 $0 $0 $0
Total Costs:
$0 $10,500 $0
$0
$0
$0
$10,s00
Project Funding:
Funding Source
Prior Years 2017 18 2018 19 2019 20
202012
TBD
TOTAL
LMD 1 (130)
$0 510,s0o $0
$0
$0
50
$10,500
Total Costs:
$0 $10,500 $0
$0
$0
$0
510,500
Impact on Operations:
New flatwork and water ban will reduce erosion/wash outs.
As a result,
reduced maintenance
needed
at those
sites. Reduce liability from potential hazards.
D4
Project Number:
Object:
Green Bike Lanes & Safety Enhancements
Limits to Milliken Avenue; Foothill
Boulevard from Westerly City
- andWWI
Limits to Haven Avenue,
1 rL 1'iT�Le`fPacific Electric (PE) Trail
1
R11'"unut,ria�`�r3 PJEf4L",i �itirlt�i'"' y.`,�n��
Est. Construction Start/End-
IfI j'
11
10/2019 IW1 MIS "I I.
Projectstatus:
Design/Construction
Department:
Engineering
Project Manager:
Natalie Avila
Description: Enhance Existing Class It Bike Lanes an approximate 2.6-mile segment of existing Class II bicycle lanes along Base Line Road and
Foothill Boulevard. Installation of Safety Enhancements along approximately 7-mile segment of the PE Trail in order to Increase
motorist yielding. Public Outreach and Education element designed to encourage and promote alternatives to motorized
transportation.
Justification: This project is funded by the Clean Transportation Funding Grant from the Mobile Source Air Pollution Reduction Revie Committee
(MSRC) Contract Number ML14070, helping to reduce vehicle emissions in the South Coast Air Quality Management District.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2017118
2018 19
2019 20
2020 21
TBD
TOTAL
Education Outreach
$5,000
$0
55,000
$0
SO
$0
510,000
Design/Plan Review
$0
$5,000
$0
$0
$0
$0
$5,000
Right -of -Way
$0
$0
s0
SO
$0
$0
$0
Construction
SO
$600,417
$0
$0
$0
$0
$600,417
Inspection & Administration
$0
$60,042
$0
$0
$0
$0
$60,042
Contingency
SO
$60,042
$0
$0
$o
$0
$60,042
Total Costs:
$5,000
$725,500
$5,000
SO
$0
$0
$735,500
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
AB 2766 Air Qual lmpry Fund(105)
SS,o0o
$725500
$5,000
$0
So
$0
$735,500
Total Costs;
$5,000
$725,500
$5,000
$0
$0
$0
$735,500
Impact on Operations: This project will add a few miles to the City's street striping maintenance, requiring routine maintenance. Traffic
maintenance is anticipated to be impacted with possibility of additional equipment
D5
Project Number:
1L Key:
Object: 5607
Pacific Electric Trail - Block Wall E/0 Victoria Park Lane
Project Location: s�
Pacific Electric Trail east of
Victoria Park Lane � I � � n �n4PrF•zFR'". �a ���` �.
Est. Construction Start/End:
07/2017-06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Dean Rodia
Description:
Justification:
MI.
OP
ON
Install missing section of block wall at end of the paseo (VW-6) located between Atwood Street and Farrington Street, along the
Pacific Electric Trail. This wall will be installed between two existing walls and will conform to City Standard design.
Residents are concerned about the continual use and private property access, along with the potential of injury due to sloped
conditions. Site has temporary K-rail installed.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
$0
$0
$0
$0
$0
$0
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$12,000
$0
$0
$0
$0
$12,000
Inspection & Administration
$0
$0
$0
$0
$0
$0
$0
Contingency
$0
$1,200
$0
$0
$0
$0
$1,200
Total Costs:
$0
$13,200
$0
$0
$0
$0
$13,200
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
LMD 2 Victoria (131)
$0
$13,200
$0
$0
$0
$0
$13,200
Total Costs:
$0
$13,200
$0
$0
$0
$0
$13,200
Impact on Operations:
Once block wall is constructed, the need
for staff operations in area will be minimized, private property access
eliminated and risk of injury reduced.
a
Project Number:
A Key: 1716
Object: 5650
y Palseol Lighting Retrofit
Project Location: 2v (( I? l l�nnKl�,e.un, r=�,rc—snn/sytnioS.�eI f�s
LMD2 I ) �+ /I
GRAPELANO
ELEMENTARY
Est. Constmction Start/End:
07/2017-06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Dean Rod,a
Description: Replace existing light fixtures, poles, wire, and underground connections in pawn VW-2, Victoria Park lane west to Etiwanda
Avenue and north of Dunmore Place, with new energy efficient LED light fixtures for better security and reduced energy costs.
This is a single year project for this location, but other areas have been identified.
Justification: LED lighting fixtures have a longer service life along with lower maintenance and energy requirements. The current system in this
area has had many failures due to deteriorated wire runs and declining integrity of the existing fixtures. Maintenance to keep
these existing lights up and running has increased to meet the constant concerns of the residents located around this location.
Project Cost Estimate ($)
Expenditure/Cateaory
Prior Years
2017 18
2 18 1
2019 2
2020 21
TED
TOTAL
Environmental/NPDES
$0
so
so
so
so
so
So
Design/Plan Review
$0
so
so
s0
$0
so
50
Right -of -Way
$0
$0
$o
so
so
so
$0
Construction
$0
$261,000
$0
so
$0
s0
5261,000
Inspection & Administration
$0
$o
$o
$0
$0
so
so
Contingency
$0
$29,000
$0
s0
$0
so
$2%000
Total Costs:
s0
$290,000
so
So
so
so
$290,000
Project Funding:
Funding Source
Prior Year
2 71
201819
2019
202 2
TBD
TOTAL
LMD 2 Vittoria (131)
$0
$290,000
so
$0
$0
so
$290,OD0
Total Costs:
$0
$290,000
$0
$0
$0
So
$290,000
Impact on Operations: Reduced maintenance labor and cost, while reducing utility costs by 3096 in this area
D7
Project Number:
jL Key: 1953
Object: 5650
Southwest Cucamonga Class I Bike Trail Project
Project Location: rf�irr�• +m+^g
Cucamonga Creek Channel from
a *� i e5 ew "oa ce"9e Foothill Boulevard to 4[h Street r. ° I � a 6. e
u 1�
and Deer Creek Channel from .�.r' a
Church Street to 4th Street ,. , lea i"""". � . e _ � or x •"ro t• nw 4°T_C.._..''" M
Est. Construction Start/End:
10/2016 - 10/2019
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Natalie Avila
Description:
Construction of approximately 2.46 miles (12, 990
LF) of Class I shared -use path improvements along the Cucamonga
Creek Channel
from Foothill Boulevard to 4th Street. Construction of 1.85 miles (9,750 LF) along the Deer Creek
Channel shared
-use path from
Church Street to 4th Street, Public Outreach
and Education element designed to encourage and promote alternatives to motorized
transportation.
Justification:
Clean Transportation Funding Grant
from the Mobile Source Air Pollution Reduction Revie Committee
(MSRC) Contract Number
ML16052, helping to reduce vehicle emissions in the South Coast Air Quality Management District.
Project Cost Estimate ($):
Expenditure/Category Prior years
2017 18
2018 19 2019 20 2020 21
TBD
TOTAL
Education Outreach
$5,000
$5,000
$5,000 $0 $0
$0
$15,000
Design/Plan Review
$5,000
$10,000
$0 $0 $0
50
$15,000
Right -of -Way
$o
$o
$o $o $0
$o
Sp
Construction
50
$505,133
$0 $0 $0
$0
$505,133
Inspection & Administration $0
$50.513
$0 $0 $0
$0
$50,513
Contingency
$0
$50,513
$o $0 $0
$0
$50,513
Total Costs:
$10,000
$621,160
$5,000
$0
$0
$0
$636,160
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
AB 2766 Air Qual lmpry Fund(105)
$10,000
$621,160
$5.Wo
$0
$0
$0
$636,160
Total Costs:
$10,000
$621,160
$5,000
$0
$0
$0
$636,160
Impact on Operations:
None
a
Municipal Utility
The Rancho Cucamonga Nfunicipal Utility (RCNfU) was forted by the City Council in 2001. RCivfU served its first customers in 2003
and finished construction of the Victoria Arbors substation in 2004. Currently, RCMU services over 900 customers in its service
area. Annually, more than 78,000 megawatt-hoursof electricity are distributed to our customers via 20 circuit miles of wire spread across
the roughly 4-square miles of service territory. RCMU's historical peak demand is 17.5 megawatts, set in August 2011.
RCMU capital projects are related to the maintenance, expansion and improvement of the RCMU distribution system. RCMU's
distribution system was designed to minimize maintenance and operating costs and ensure maximum reliability of service.
Proiect List & FY 2017-18 Expenditures
1 6th Street from Utica Avenue to The Vine
$
885,000
- Electric Line Extension
2 Citywide Safety Light LED Retrofit
$
389,200
3 Citywide Street Light Acquisition
$
9,779,290
4 Citywide Street Light LED Retrofit
$
4,121,440
5 Commercial Smart Meter Replacement
$
100,000
6 Haven Avenue at 6th St - Street Light
$
25,000
Installation
7 Haven Ave from Foothill Blvd to Church
$
1,045,000
Street - Electric Line Extension
8 Rancho Cucamonga Fiber Optics
$
2,050,000
Network
9 Utica Ave from 4th Street to 6th Street -
$
800,000
Electric Line Extension
$
19,194,930
Sources of Fundine for FY 2017-18
$460,000
$2,441,200
$2,050,000
■ fiber Optic Network
■ SLD 2
■ SLD 4
■ SLD 6
SLD 8
■ Municipal Utility
$4,25S,000
$4,632,010
■SLD 1
■ SLD 3
■SLD5
■ SLD 7
■ Fire Capital Projects
Project Number:
J L Key: 1967
Object: 5650
6th Street from Utica Avenue to The Vine - Electric Line Extension
Project location:
RCMU Electric Line Extension - 6th
Street from Utica Avenue to The
Vine
Est. Construction Start/End:
05/2018 - 01/2019
Project Status:
Design
Department:
Engineering
Project Manager:
Fred Lyn
J
STA
07
OJEC LOCATI N
"s
L
Description: Extend approximately 2,500' of Distribution Line Extension (trench
and cabling) from the corner of Sixth street and
Utica Avenue to
The Vine and Cabling service south
of the Vine to service The Resort
(Empire Lakes) with
RCMU electricity and Fiber Conduit.
Justification: Line extension is needed to extend
power service to a
new commercial
development shopping center. The
City paid
SCE exit fees for
the right to service any load associated
with a newly
constructed facility that has never been interconnected with
Edison; this falls
under that category.
Project Cost Estimate ($):
Expenditure/Category, Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES $0
$o
$0
$o
$0
$o
$0
Design/Plan Review 50
$5,000
$0
$0
$0
$o
$5,000
Right -of -Way So
$0
$0
$0
$0
$0
$0
Construction $0
$800,000
$200,000
$0
$o
$o
$1,000,000
Inspection & Administration $0
$0
$0
$0
$0
$0
$0
Contingency $0
$80,000
$20,000
So
$0
So
$100,000
Total Costs:
$0
$885,000
$220,000
$0
$0
$0
$1,105,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Municipal Utility (Fund 705)
$0
$885,000
$220,000
$0
$0
So
$1,105,000
Total Costs:
$0
S885,000
$220,000
$0
So
$o
$11105,000
Impact on Operations:
The increased electricity load will provide additional revenue
to RCMU.
E1
Project Number:
JL Key: 1974
Object: 5650
Citywide Safety Light LED Retrofit
Project Location:
'a a
3,081 citywide safety lights in city
lighted intersections
Est. Construction Start/End:
July 1, 2017
Project Status:
Design/Pre-Construction
Department:
Engineering
Project Manager:
Fred Lyn
Description:
in
The City has 1,081 safety lights at citywide intersections and 31 bridge lights that it owns and maintains. The retrofit of these
existing HPS lights to LED will allow the City's SLD's to realize maintenance savings, additional energy savings and cost savings to
the City.
Justification: SCE's rebate incentive is slated to be discontinued at the end of 2017. The expected rebate amount for the LED incentive will be
around $117,426. The retrofit of the existing LED Safety lights will realize maintenance savings, additional
energy savings and cost
savings to the City's SLDs.
Project Cost Estimate j$j:
Expenditure/Category Prior Years
201711
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES $0
So
$0
$0
$0
$o
$o
Design/Plan Review So
$0
So
$o
$o
so
$0
Right -of -Way So
$0
$0
$o
$o
$o
$0
Construction $0
$389,200
$0
$0
$0
$0
$389,200
Inspection 8 Administration $0
so
so
s0
so
so
$o
Contingency So
so
so
so
$o
$o
so
Total Costs:
s0 $399,200
$0
$0
$0
$0
$399,200
Project Funding:
Funding Source
Prior Years 201718 201819
201920
202021
TBD
TOTAL
SLD 1 (151)
$0 5389,200
So
$0
$0
$o
$389,200
Total Costs:
$0 $389,200
$0
$0
So
$0
$389,200
Impact on Operatlons:
The City will realize maintenace savings and
better lighting, as well as energy efficiency through the use
of new LED
technologies and savings to the City's SLDs.
•Interfund
Loan from Capital Reserves Fund 025
E2
Project Location:
15,260 Streetlights will be
acquued from SCE via a Purchase
and Sale Agreement
Est. Construction Start/End:
July 1, 2017
Project Status:
Pre -Acquisition
Department
Engineering
Project Manager:
Fred Lyn
Description:
Citywide Street Light Acquisition
Project Number:
JL Key: 1%9
Object: 5650
9
The City Council approved a Purchase and Sale agreement with SCE for the acquisition of 15,260 streetlights citywide. The
ownership transition is expected to occur at or acrund 7/1/2017, depending an haw long it take for the CPUC to approve SCE's
filing.
Justification: Advantages of acquiring the streetlights: 1) Reduced street light costs and expenditures Induced LS-2 rate), 2) Improved system
maintenance and reliability, 3) Local control of streetlight assets, 6) Improved customer service, 5) Future LED: Maintenance
savings & additional energy savings, 6) Future opportunities —'Smart City"
Project Cost Estimate ($j:
Expenditure/Categary
Prior Years
2017/18
2019119
20 9 0
2020121
TBD
TOTAL
Environmental/NP DES
$0
50
5o
So
$0
$0
50
Design/Plan Review
$1D,000
so
50
50
5o
W
$10,000
Right -of -Way
$0
$0
50
$o
$0
$0
$0
Construction
$0
$9,629,290
So
$0
$0
$0
59.629.290
Inspection & Administration
$0
$5Q000
$0
5o
so
So
5501000
Contingency
$0
$100.000
$0
$o
$0
So
51oo.D0o
Total Cosa:
$10.000
59,779,290
$0
5o
SD
$0
59.189.2%
Project Funding:
Funding Sours
Prior Years
2017/18
201811
2019/20
2020121
im
TOTAL
SLD 1(151)
50
52,701,720
so
50
$o
$o
S4701,120
SLID 2(152)
$o
$3,237,210
5o
so
$0
so
$3,237,210
SLD3(153)
$0
$1,245.870
50
50
$0
5o
51,245,970
SLD 4(254)
$0
$648,960
50
$0
$0
5o
S6a&a60
SLD 5 (155)
$o
$283,380
$0
50
$0
s0
$283,380
SLD 6(156)
So
S439,760
So
$0
$0
$0
$439.760
SLD 71157)
$0
$901,850
50
$D
$0
s0
5901AW
SLD 8(158)
$0
$321,040
so
$0
$0
$0
5321,040
Total Cobb:
$0
$9,7M,290
$0
50
$0
s0
$9.779,290
The City will realize maintenance savings and better
lighting, as well
as energy efficiency through the
use of new
Impect on Operations'
LED technologies and savings to the
City's SLDs.
'Interfund Loan from Capital Reserves Fund 025
E3
Project Location:
14,780 street lights citywide
Est. Construction Stort/End:
July 1, 2017
Project Status:
Design/Pre-Construction
Department:
Engineering
Project Manager.
Fred Lyn
Project Number:
JL Key: 1973
Object: 5650
Citywide Street Light LED Retrofit
9
Description: The City has approximately 14,780 High Pressure Sodium (HPS) street lights citywide that it will own and maintain once the SCE
purchase has been approved by the CPUC. RCMU also currently owns & maintains 168 HP5 street lights as well. The retrofit of these
existing HPS lights to LED lights will allow the City's SLD's to realize maintenance savings, additional energy savings and cost savings
to the City.
Justification: SCE's rebate incentive is slated to be discontinued at the end of 2017. The expected rebate amount for the LED incentive will be
around $1.15 million. The retrofit of these existing lights to LED lights will realize maintenance savings, additional energy savings and
cost savings to the City's SLDs (1-7). SLD 8 is already on LEDs.
Project Cost Estimate (S)
Expenditure/Categpry
Prior Years 2017118
2018 19
2019 20
2020121
7BD
TOTAL
Environmental/NPDES
So so
So
$0
So
$0
so
Design/Plan Review,
so $0
So
$o
so
$0
so
Right -of -Way
$0 50
So
5o
so
50
50
Construction
$0 54,121,440
$0
50
So
W
$4,121,440
Inspection & Administration
So so
so
s0
50
$0
$0
Contingency
So So
$0
5o
So
So
So
Total Costs:
So $4,121,440
$0
So
$0
s0
$4.121.440
project Funding:
Funding Source
Prior Year 2017 18
201811
201912
2020121
TBD
TOTAL
SLD 1(151)
so $1.164,080
50
5o
So
So
51,164,080
SLD 2 (1S2)
$o 53,394,800
$0
$o
So
so
51.394,800
SLD 3 (153)
So 5536,800
$o
So
So
So
$536,800
SLD 4(154)
$o $279,400
so
So
So
So
$279,400
SU)5(15S)
$0 $122,100
5o
so
So
$o
$122,100
SLD6(156)
$0 $189,480
$o
So
So
s0
$199,490
SLD 7 (157)
$0 $388,580
$0
$o
$0
so
5388,580
Municipal Utility (705)
So 546,200
$o
So
$0
$0
S46.200
Total Costs:
So 54,121,440
$o
$0
so
$o
54,121,440
The City will realize maintenace savings and better lighting, as well as energy efficiency through the use of new LED
Impact on Operations:
technologies and savings to the City's
SLOB.
'Interfund Loan from Capital Reserves Fund 025
E4
Project Location:
Various locations throughout the
RCMU Service Area where electric
meters are located
Est. Construction Start/End:
4/1/17-12/30/17
Project Status:
Deployment
Department:
Engineering
Project Manager:
Fred Lyn
Description:
Project Number:
A Key: 1938
Object 5650
Commercial Smart Meter Replacement
ns
9)
Approximately 600 old commercial electric meters will be replaced with new 2 way ERT "smart" meters, which allows RCMU the
ability to pick up reads and connect/reconnect meters remotely from City Hall offices.
Justification: The meter technology that is being currently used is over 30 years old. Though there is nothing wrong with the existing meters, it
still requires that a meter technician go out and probe the meter to download the data. A significant amount of time and labor is
involved in this effort. A lot of utilities are switching over to this new AMI (2 way meter) for the ease of meter reading and local
control of reconnecting and disconnecting meters. Utilizing this new method could potentially save RCMU money in metering
reading expenditures.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TRD
TOTAL
Environmental/NPDES
$o
$0
$o
$0
$0
$0
$o
Design/Plan Review
SO
$0
$0
5o
$o
$0
$o
Right -of -Way
$0
$o
$o
$o
$o
$0
SO
Construction
$375.000
$100,000
5250,000
$0
So
$0
$725,000
Inspection & Administration
$0
So
$0
$o
$o
$o
$o
Contingency
$0
$o
$0
$o
$0
$0
$0
Total Cods:
$375,000
$100.000
$250,000
$0
$0
$o
$725,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Municipal Utility (Fund 70S)
$375,000
$100,000
$250,000
$0
$0
$0
$725,000
Total Costs:
$375,000
$100,000
$250,000
SO
$0
$o
$725.000
Impact on Operations:
The potential to bring meter reading and reconnect/disconnects in house will significantly reduce expenditures on
existing contract meter reading services.
E5
Project Number:
1 L Key: 1948
Object: 5650
Haven Avenue at Sixth Street - Street Light Installation
Project Location: i
Haven Avenue at Sixth Street ��J �J�--�
ews
Est. Construction Start/End
0712016 - 08/2016
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Fred Lyn
Description: Installation of 3 new streetlights as part of the new planned Residence Inn's street improvements.
Justification: 3 new streetlights will need to be installed as part of the Street Improvements required for the planned Residence Inn on the corner
of Haven Avenue and Sixth Street. RCMU is the electricity provider to this site.
Project Cost Estimate j$)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TOD
TOTAL
Environmental/NPDES
$o
$o
50
$0
$0
So
$0
Design/Plan Review
$o
$0
90
$o
$0
$0
$o
Right -of -Way
$0
$0
$o
$o
50
$0
$0
Construction
$o
$25,000
$o
$o
$0
$0
$25,000
Inspection & Administration
$0
$0
$o
$0
$0
5o
50
Contingency
$o
$0
$o
$0
So
$0
$0
Total Costs:
$0
$25,000
$o
$0
So
$0
$25,000
Project Funding:
Funding Source
Prior years
2017118
2018 19
2019 20
2020 21
TRD
TOTAL
Municipal Utility(Fund 705)
$0
$25,000
$o
$0
$0
$0
$25,000
Total Costs:
$0
$25,000
$o
$0
$0
$0
$25,000
Impact on Operations: The increased electricity load will provide additional revenue to RCMU
E6
Project Number:
1L Key: 1966
Object: 5650
Haven Avenue from Foothill Boulevard to Church Street - Electric Line Extension
Project Location:
RCMU Electric Line Extension -
Haven Avenue from Foothill
Boulvard to Church Street
Est Construction Start/End:
07/2017 - 10/2017
Project Status:
Design
Department:
Engineering, Fire District
Project Manager:
Fred Lyn, Pamela Pane
v t \�
N- u..
Pi
PRgJ T LOCATION.
C
Description: Extend approximately 2,500' of Distribution Line Extension (trench and cabling) and fiber conduit extension from the corner of
Haven Avenue and Foothill Boulvard to the Deer Creek Channel and Church Street and to the intersection of Town Center/Terra
Vista to service a new Residential development and the future RCFD Station 8 with RCMU electricity and City fiber.
Justification: Line extension is needed to extend power service to a new commercial development shopping center. The City paid SCE exit fees for
the right to service any load associated with a newly constructed facility that has never been interconnected with Edison; this falls
under that category.
Project Cost Estimate ($)
Expenditure/Cateaory
Prior Years
2017118
2018 19
2019 20
2020 21
TSD
TOTAL
Environmental/NPDES
$o
So
so
$o
$0
so
so
Design/Plan Review
$0
$5,000
$0
$0
$0
$0
$5,000
Right -of -Way
$0
$o
$o
$0
$o
$0
$0
Construction
so
$970,000
$0
$0
so
$0
$970,000
Inspection & Administration
$0
So
50
$o
So
So
$0
Contingency
$0
$70,000
$0
SO
$0
So
$70,000
Total Costs:
$o
$1,045,000
$0
$0
$0
$D
$1,045,000
Project Funding
Fundina Source
Prior Year
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Municipal Utility (Fund 705)
$0
S585,000
SO
$0
SO
$0
$$85,000
Fire Capital Project (Fund 288)
$0
$460,000
$0
$0
$0
$0
$460000
Total Costs:
s0
$1,045,000
$0
$o
So
$0
$1,065,000
Impact on Operations:
The increased electricity load will provide additional revenue to RCMU.
E7
Project Location:
Various locations throughout the
City where existing fiber optics
conduits are located
Est. Construction Start/End:
TBD
Project5tatus:
Design
Department:
Engineering
Project Manager:
Fred Lyn
Project Number:
JLKey: 1910
Object: 5650
Rancho Cucamonga Fiber Optic Network
9
Description: Phase 1 completion of the Fiber Optic master plan by Magellan Advisors in February 2017 resulted in the recommendation that the
City's provide the next steps in utilizing the existing fiber optics system towards network buildout using both existing traffic conduit
and building a new network to -tie-in- existing segments in order to provide municipal broadband to commercial and industrial
areas throughout the City.
Justification: Now is the time to consider laying the groundwork regarding Broadband opportunities and RCMU. Providing fiber optics
broadband to commercial customers is a business opportunity that we are missing because we have not been systemic enough in
our approach over the past few years. Completing a report on all our dark fiber so we can start looking at how we could monetize
that asset and selling broadband as a commodity would fit well with the Smart City initiative, as well as promote a high tech
economy and economic development within the City.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017118
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
5o
$0
$0
$o
$0
Design/Plan Review
$85,000
$0
$0
$0
$0
$0
$85,000
Right -Of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$2,000.000
$2,000,000
$2,000,000
$2,000,000
52,000,000
$101000,000
Inspection & Administration
$0
$50,000
$0
so
$0
$o
$50,000
Contingency
$0
So
$0
$0
$o
$0
So
Total Costs:
$85000
$2,050,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$10,135,000
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Municipal Utility (Fund 705)
$85,000
$0
$0
SO
$o
$0
$85,000
Fiber Optic Network (Fund 711)
$0
$2,050,000
$2,000,000
$2,000,000
$2,000,000
$2,000,000
$10,050,000
Total Costs:
$85,000
$2,050,000
$2,000,000
52,000,000
52,000,000
52.000,000
$10,135,000
Impact on Operations:
The potential to bring
in high speed
broadband as a commodity will provide additional
revenue to RCMU.
E8
Project Number:
JL Key: 1968
Object: 5650
Utica Avenue from 4th Street to 6th Street - Electric Line Extension
Project location: AlaI u -.
RCMU Electric Line Extension
Utica Avenue from 4th Street to I`�II
6th Street I
PROJECT LOCATION
07/2017?ru01/2018tart/End: ' } 11 7
Project Status
Design
Department:
Engineering
Project Manager:
Fred Lyn
Description
Approximately 2,200' of Distribution Line Extension to service a new planned commercial development (4 large parcels) on the NWC
and NEC of Utica Avenue and Fourth Street and the future corner of Haven Avenue and Fourth Street with RCMU electricity.
Justification: Line extension is needed to extend
power service to a
new commercial development shopping center. The
City paid SCE
exit fees for
the right to service
any load associated with a newly
constructed facility that has
never been interconnected with Edison; this falls
under that category.
Project Cost Estimate ($1:
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
s0
$0
$o
so
$0
$0
Design/Plan Review
$10,000
$0
so
$0
$0
$0
S10,000
Right -of -Way
so
$0
s0
so
$0
s0
$0
Construction
$0
$800.000
s0
So
$0
$0
$800,000
Inspection &Administration
s0
$0
so
$0
s0
$0
s0
Contingency
s0
so
so
$0
s0
$0
so
Total Costs:
$10,000
S800,000
so
so
$o
so
S810,000
Project Funding:
Funding Source
Prior Year
2017 18
2018 19
201912
2020 21
TBD
TOTAL
Municipal Utility(Fund 705)
$10,000
58001000
$0
$o
$o
$0
S810,000
Total Costs:
$10,Doo
S800,o00
So
$0
$o
So
S810,000
Impact on Operations:
The increased electricity load will provide additional revenue to RCMU.
E9
Parks
Any capital project that is located in, on, or adjacent to a park or community center facility is classified as a Park Project. These
include the construction of new park facilities, as well as the expansion or rehabilitation of existing park facilities. Improvements
include playing fields, play ground equipment, park landscaping, other miscellaneous recreational amenities, restroom facilities and
parking lot improvements.
Many of these projects require ongoing maintenance, and all field rehabilitation projects and renovations are
performed on an annual or biannual basis due to extensive wear from local league play.
The majority of Park Projects are funded via the Park Development Fund (120), which is collected via residential development fees
(i.e. new single family, town home, condo and senior housing). Some projects qualify for grants and Special District funds.
Project List & FY 2017-18 Expenditures
1 Central Park - Phase II Design Study $ 250,000
2 Central Park - Trail Head
Improvements
3 Etiwanda Creek Park - Phase II
q Heritage Park - Handicap Parking
Stalls and Pavement Rehabilitation
5 Rubberized Surface Replacement
180,890
538,000
110,000
S 15,000
$ 1,093,890
Sources of Funding for FY 2017-18
$15,000 $55,000
IF
$1,023,890
■ Captial Reserve ■ PD 85 Park Development ■ LMD 9
Central Park - Phase II Design Study
Project Location:
11200 Base Lne Road
Est. Design Start/End:
07/2017 - 1012017
Project Status:
Environmental/NPDES
Department:
Community Services
Project Manager:
Michelle Keith
Project Number:
1L Key: 1660
Object: 5650
Description: This is to update the conceptual plans for Central Park so the City can continue to pursue funding opportunities for future park
development. Given the history of fluctuating economic conditions, redirecting the Central Park Master Plan from large 20— 30 acre
per phase projects into smaller 5 —10 acre phased elements will likely provide more funding opportunities. A new public outreach
and design process will create an up-to-date plan to guide staff when funding is identified. This will also fund the required
Envrionment Review Report.
Justification: There is approximately 70 acres of undeveloped parkland at Central Park. The prior Master Plan needs to be updated taking into
consideration the loss of the Redevelopment Agency, construction costs and ongoing maintenance and programming costs of any
future improvements. Furthermore, elements of the original Master Plan like the aquatics center, gym, and fire station are either no
longer feasible or required.
Project Cost Estimate ($):
Expenditure/Cateaory Prior years 2017 18 2018 19 2019 20 2020 21 TBD TOTAL
Environmental/NPDES $0 $0 $0 $0 $0 $o 5o
Design/Plan Review $130,000 $250.000 $0 $0 So 5o $380,000
Right-of-way $0 so $o $0 $0 50 So
Construction $o So So $o so 50 $0
Inspection & Administration $0 $0 $0 $0 50 50 $o
Contingency $o $0 $0 $0 5o So $0
Total Costs: $130,000 $250,000 $0 $0 5o So $380,000
Project Funding:
Funding Source Prior years 2017 18 2018 19 201912 2020 21 TBD TOTAL
Park Development(120) $130,000 $250,000 $0 $0 50 5o $380,000
Total Costs:
Impact an Operations:
S130,000 $250.000 $0 $0 $0 $o S380,000
Completion of this project could possibly add new amenities to the City's inventory which will require operational
expenditures for maintenance, staffing, overhead and utilities.
F1
Project location:
11200 Base Line Road
Est. Construction Start/End:
08/2017-0112017
Project Status:
Design
Department:
Community Services
Project Manager:
Michelle Keith
Description:
Justification:
Project Number:
1L Key: 1871
Object: 5650
Central Park - Trail Head Improvements
This project will provide the next phase of development for Central Park, which will Include the design for approximately 2.5 acres
north of the interior road, between the PE Trail and the Community Center. Included will be additional parking and a restroom
facility for trail users.
Responds to requests from residents for further improvements to Central Park and provides ADA accessibility between the
Community Center and the PE Trail.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
201912
2020121
TBD
TOTAL
Environmental/NPDES
$o
$0
$0
$0
$o
$o
$0
Design/Plan Review
$14.030
$180,890
$0
$0
$0
$o
$194,920
Right-of-way
$o
$o
$0
$0
$o
$o
$o
Construction
$0
$0
$1,530,000
$0
$0
$0
$1,530,000
Inspection & Administration
$0
$0
$55,000
$0
50
$0
$55,000
Contingency
so
$0
$305,000
$0
$0
$0
$305,000
Total Costs:
$14,030
$180,890
$1,890,000
so
$0
$0
$2,094,920
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Park Development(120)
$14,030
$180,890
51,890,000
$0
$o
$0
$2,094,920
Total Costs:
$14,030
$1go,890
$1,890,000
$o
$0
$0
$2,084,920
Impact on Operations:
This project, will require maintenance such as cleaning and replacing
any damaged portions
of the
equipment, as
well as landscape irrigation
and maintenance
as needed.
F2
Project Number:
A Key: 1664
Object: 5650
Etiwanda Creek Park - Phase II
Project Location:
5939 East Avenue
Est. Design 5tart/End:
10/2016-01/2018
Project Status:
Design
Department:
Community Services/Parks
Project Manager:
Michelle Keith
Description:
- � CTMYIO. CYLpiT
CL[YCNLNY
o4e r
:NL
IVYMT MTCR DAM
IYNI°N N
YJ
e
L. _
d
yTgi
r 5w.
Nau Ynn.eT
�,4�l
PROJECT LOCATION
N u� 6HWJ
This project involves the initial design of park expansion, which may include additional athletic/recreation multi -use fields, tennis
courts and additional parking. Required environmental and biological studies are also being completed as part of the design.
Justification: The City Council identified this project as a goal for Fy2007-08.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$50,000
$o
$o
$0
5o
$0
$50,000
Design/Plan Review
$409,230
$538,000
$0
$0
so
$o
$947,230
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$5,000,000
$0
$0
$o
$5,390,000
Inspection & Administration
$0
$0
$0
$0
$0
$0
$0
Contingency
$0
$o
$o
$o
so
$0
$0
Total Costs:
$459,230
$539,000
55,000,000
$0
$0
$0
$6,377,230
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Park Development(120)
$459,230
$538,000
$5,000,000
$0
$0
$0
$5,997,230
Total Costs:
$459,230
$538,000
$5,000,000
$0
$0
$0
$5,997,230
Impact on Operations: Initial estimates place the cost of maintaining two additional fields at $300,000-$450,000 per year
F3
Project Number: 800-2017-08
JL Key: 1961
Object: 5650
Heritage Park - Handicap Parking Stalls and Pavement Rehabilitation
Project Location:
Heritage Park
Est. Construction Start/End
11/2017-12/2017
Project Status:
Design
Department:
Engineering
Project Manager:
Romeo David
P OJECL�. ION
u
!✓-.TMEIGA T�
e�
R a� II�II—/��fl FIRE
�:' Hi:R1'RIL1T I (S r
Y
SW HERITAGE Cr. AMUNITY PARK
gZd Q K-SIP
rr!ys PItM9
,7 a
+T—
P 7<
s 'j1
WI SONAV �l
yVN �
0
—awdt'f —j If �; �Irnw
Ll
Description: This capital project encompasses all ADA compliance issues and includes an asphalt concrete mix overlay, cold planing, and utility
adjustment.
Justification: Meets the City's ongoing commitment to install ADA ramps where they are missing and required by law. This project also will
restore the existing pavement surface to a substantially new condition, extending pavement life, use and rideability
Project Cost Estimate ($):
Expenditure/Category Prior Years 2017 18 2018 19 2019 20 2020 21 TED
TOTAL
Environmental/NPDES $0 $0 $0 $0 $0 $0
$0
Design/Plan Review $0 $10,000 $0 $0 $0 $0
$10,000
Right -of -Way $0 $0 50 $o So So
50
Construction $0 $85,000 $0 $0 $0 $0
$85,000
Inspection & Administration $0 $6,500 $0 $0 $0 $0
$6,500
Contingency $0 $8,500 $0 $0 $0 $0
$8,500
Total Costs:
$0 $110,000
$0
$0
$0
$0
$110,000
Project Funding:
Funding Source
Prior Years 2017 18
201819
201 20
2020 21
TBD
TOTAL
Park Development Fund (120)
50 $55,000
$0
$0
So
$0
$55,000
PD 85 Redemption Fund (848)
$0 $55,000
$0
$0
$0
$o
$55,000
Total Costs:
$0 $110,000
So
$0
$0
$0
$110,000
Impact on Operations:
Less routine maintenance like pothole
repairs, weed
abatement and
crack seal, thus freeing
up maintenance crews
to attend to other needed areas.
F4
Project Number:
1L Key:
Object: 5607
Rubberized Surface Replacement
Project Location: `•��
LIVID qy_ J�.-,L���{,E�E,,,.�SUMNYTIN3EI1NCj11A�1EJ
11e1v...
Est. Construction Start/End:
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager: I I�
Dean Rodia
Description: Replace the worn out rubberized surface under exercise equipment.
Justification: This will complete the replacement of rubberized surfacing throughout the playground and exercise circuit areas within LMD 9, as
well as reduce any current liability issues associated with damaged and deteriorating surfacing.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPOES
$0
$0
$0
$0
50
So
$0
Design/Plan Review
$0
$0
$0
$0
$0
$0
$0
Right -of -Way
$0
$0
$o
$0
$0
$0
$o
Construction
$o
$15,000
$0
$0
$0
$0
$15,000
Inspection & Administration
$o
so
$0
$o
so
So
$0
Contingency
$o
$0
$0
$o
$0
$0
$o
Total Costs:
So
515,000
50
$o
$0
$0
$15,0100
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
LMD 9 Lower Etiwanda (139)
$o
$15,000
$0
$0
$0
$o
$15,000
Total Costs: $o $15,000 $o So $0 $0 $15,000
Impact on Operations: Reduce the amount of maintenance needed for repairs and to keep the area safe.
F5
Railroad Crossing
Railroad Crossings are extremely expensive and infrequent projects, requiring large funding commitments, lengthy construction
schedules and inevitably causing some inconvenience to the local community during the construction period. They are, however,
also one of the best ways to ensure the safety of drivers, pedestrians and rail users by providing two separate crossings, thereby
minimizing the possibility of train versus automobile, or train versus pedestrian accidents.
Railroad Crossings are identified in the City's General Plan document, and they are also frequently illustrated in regional planning
documents held by the County of San Bernardino, SANBAG and Caltrans.
Proiect List & FY 2017-18 Expenditures
1 Arrow Route at Railroad Spur -New $ 75,000
Concrete Panels
2 Etiwanda Ave Grade Separation @ $ 50,000
Metrolink Tracks
$ 125,000
Sources of Funding for FY 2017-18
$75,000
■ Citywide Infrastructure ■ Gas Tax R & T 7360
G
Project Location:
Arrow Route at Railroad Spur west
of Milliken Avenue
Est. Construction Start/End
01/2018 - 03/2018
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Romeo David
Project Number: 800-2017-14
A Key: 1819
Object: 5650
Arrow Route at Railroad Spur - New Concrete Panels
y � W jI
W I1II
F�YS.Tr}1LT-
N W
b� R �
MILL{NNIUM�T
ENT RI ACT LOCAON
q,13Lg70tyl 1'lc
4pi-mAAcx==
Il
7crnMcnxIUf1'fT= It-.SOLVU
l
3
a
Description: Replace existing uneven rubber panels to concrete panels.
Justification: The existing rubber panels are uneven and damaged due to heavy traffic use.
Replacing with concrete panels will provide a
smoother and will be safer for vehicles.
Project Cost Estimate ($):
Expenditure/Category Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES so
$o
$0
$0
So
$o
so
Design/Plan Review So
$0
$0
So
So
$o
$o
Right -of -Way $0
So
$0
So
5o
So
$o
Construction $0
560.000
$o
So
$0
$0
S60,000
Inspection & Administration s0
S9,000
so
so
s0
$0
$9,000
Contingency So
$6,000
$0
$0
$o
$0
$6,000
Total Costs:
so
$75,000
$o
so
So
$0
$75,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Gas Tax RT7360 Fund (174)
90
$75,000
$0
so
So
$0
$75,000
Total Costs:
$0
$75.000
So
s0
50
$0
$75,000
Impact on Operations:
Uneven rubber
creates damage along
the edges
of the existing
asphalt pavement.
This project will
reduce
maintenance for
asphalt replacement.
G1
Project Number: 800-2015-25
1L Key: 1922
Object: 5650
Etiwanda Avenue - Grade Separation at Metrolink Tracks
Project Location: y
Etiwanda Avenue from 6[h Street --¢' - - -
to Arrow Route .'4i / „
Est. Construction Start/End:
To be determined
Project Status
Design
Department:
Engineering
Project Manager:
Curt Billings
Description
PROJECT LOCATION-
ATV RAl.goAD
Prepare preliminary design drawings for a future grade separation on Etiwanda Avenue at the Metrolink Railroad Crossing south of
Whitram Avenue.
lustlflcallon: This project will improve safety and traffic circulation on Etiwanda Avenue.
Project Cost Estimate ($):
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$o
$o
s0
So
s0
Design/Plan Review
$o
$50,000
s0
$o
$0
$1,000,000
$1,050,000
Right -of -Way
$0
$0
s0
so
s0
$3.500,000
S3,500,000
Construction
$0
$0
so
so
$o
$36.000,000
$36,000,0D0
Inspection & Administration
$0
$o
s0
$0
so
$500,000
$500,000
Contingency
s0
$0
so
$0
So
$4,000,000
$4,000,000
Total costs:
so
$50,000
so
$0
so
$45,000,000
$45,050,000
Project Funding:
Funding Source
Prior Year
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Infrastructure Fund (198)
s0
$50,000
so
$0
$0
s0
$50.000
Unknown
$0
$0
$o
so
$o
S45,000,000
$45,000,000
Total Costs:
$0
$50,000
$0
s0
$o
$45,000,000
$45,050,000
Impact on Operations: Added maintenance costs for a new bridge will be determined during design phase
G2
Streets
Streets projects are the most common type of project undertaken by the City. The City receives annual funding from gasoline sales
taxes for use on resurfacing projects for local arterial and residential streets in order to extend pavement life and improve driving
conditions. Besides street rehabilitation projects, the City also undertakes many widening and extension projects as need dictates
via new development, community needs and the City's General Plan.
Project List & FY 2017-18 Expenditures
1 6th St from Milliken to Charles Smith -
$ 902,000
Pavement Rehabilitation
2 Civic Center and Courthouse Pavement
$ 150,000
Rehabilitation
3 Foothill Blvd from Grove Ave to San
$ 50,000
Bernardino Rd - Street Improv
4 Foothill Blvd from Haven Ave to Milliken
$ 850,000
Ave - Pavement Rehabilitation
5 Hermosa Ave from Arrow to Foothill -
$ 250,000
Pavement Rehabilitation
6 Hermosa Ave north of Foothill Blvd to
$ 600,000
Church St - Street Widening
7 Highland Ave from Archibald Ave to
$ 25,000
Haven Ave - Pavement Rehabilitation
8 Jersey Blvd from Haven to Rochester -
$ 850,000
Pavement Rehabilitation
9 Local Street Pavement Rehabilitation at
$ 2,200,000
Various Locations
10 Youngs Canyon Road from Koch Place
$ 50,000
to Cherry Ave - Street Extension
$ 5,927,000
$1,10
Sources of Funding for FY 2017-18
<cn nm <1 cn nnn <t mn no0
■ Road Maint & Rehab
,v Measure
■ Beautification
■ AD 88-2
3,040,D00
■ Gas Tax R & T 7360
■ Citywide Infrastructure
■ Fire Capital Projects
■ Law Enforcement Reserve
J
Project Number; 800-2016-15
R Key: 1930
Object: 5650
6th Street from Milliken Avenue to Charles Smith Avenue - Pavement Rehabilitation
Project Location:
6th Street from Milliken Avenue to
Charles Smith Avenue
Est Construction Stan/End:
04/2018 - 06/2018
Project Status:
Design /Construction
Department:
Engineering
Project Manager:
Curt Billings
LwrdBiitln
�atYIIN"N,� /J
PI JECT OCATION
a
z
0
Description:
This project involves storm drain, localized asphalt repair, crack sealing, asphalt rubber hot mix overlay, video detection signal
upgrades, ADA ramp upgrades, utility adjustments and pavement striping.
Justification:
This project will restore the existing road surface to a substantially new condition, extending pavement life,
use and rideability. The
project is using asphalt rubber and is approved for a Cal ltecycle rebate.
Project Cost Estimate ($):
Expenditure/Category
Prior years 2017 18 2018119 2019 20
2020121
TBD
TOTAL
Environmental/NPDES $0 $o $0 s0
$0
so
$0
Design/Plan Review
$o $o So $0
$o
$o
$o
Right -of -Way
$o $0 $0 So
$o
$o
$o
Construction
$0 $803,000 $0 $0
$0
$0
$803,000
Inspection & Administration 50 $20,000 $0 $0
$o
$0
$20,000
Contingency
$0 $79,000 $0 $0
$0
$0
$79,000
Total Costs:
$0 $902,000
$0
$0
$0
$0
$902,000
Project Funding:
Funding Source
Prior years 2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Gas Tax R&T 7360 Fund(174)
$0 $500,000
$o
$0
$o
50
$50o,o00
City Infrastructure(198)
$0 $402,000
$0
$0
$0
50
S402,000
Total Costs:
$0 5902,000
s0
$0
$0
$0
$902,000
impact on Operations:
Reduction of routine maintenance
activities for pothole repair, weed
abatement and
crack seal, thus
freeing up
maintenance crews for other needed areas.
H1
Project Number: 800-2017-05
R Key: 1959
Object: 5650
Civic Center and Courthouse Pavement Rehabilitation
Project Location: ��_OYYY1 w
10500 Civic Center Drive, Rancho
Cucamonga-1
Est Construction Start/End:
09/2017 - 11/2017
Project Status
Construction
Department:
Engineering
Project Manager:
Romeo David and County
Description:
This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt concrete mix overlay, utility
adjustments and pavement striping. San Bernardino County is the lead agency with the City sharing the cost.
Justification:
This project will restore the existing pavement surface to a substantially new condition, extending pavement life,
use and
rideability.
Project Cost Estimate ($):
Expenditure/Category
Prior years 2017 18 2018119 2019 20 2020121
TBD
TOTAL
Environmental/NPDES $0 $0 $0 $0 $0
$0
$0
Design/Plan Review
$0 $0 $0 $0 $0
$0
$0
Right -of -Way
$0 $0 $0 $0 $0
$0
$0
Construction
$0 $120,000 $0 $0 $0
$0
5120,000
Inspection & Administration
So $18,000 $0 $0 $0
$0
$13,000
Contingency
$0 $12,000 $0 $0 $0
$0
$12,01D0
Total Costs:
$0 $150,000
$0
$0
$0
$0
$150,000
Project Funding:
Funding Source
Prior Years 2017 18
2018 19
2019120
2020 21
TBD
TOTAL
Law Enforcement Reserve (017)
$0 $150,000
$0
$0
$D
$0
$150,000
Total Costs:
$0 $150,000
$0
$0
$0
$0
$150,000
Impact on Operations:
Less routine maintenance like pothole repairs, weed
abatement and crack seal, thus freeing up maintenance crews
to attend to other needed areas.
H2
Project Number: 800-2012-29
A Key: 1964
Object 5650
Foothill Boulevard from Grove Avenue to San Bernardino Road - Street Improvements
Project Location:
Foothill Boulevard from Grove
Avenue to San Bernardino Road
Est. construction Start/End:
08/2018 - 10/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
/ / ����� ,,��rr� Yyt.Ig1LCL,�Kw•
P ECT WC 7ION
LIE
LC
r-
rre�[rr-• • S i t I
Description: This project involves street improvements with curb & gutter, sidewalk, street lights and a potential median island, as well as
pavement rehabilitation consisting of cold planing, localized asphalt removal and replacement, crack sealing, asphalt pavement
overlay, traffic signal loop replacement, utility valve and manhole cover adjustments, and pavement striping,
Justification: This project will enhance pedestrian and vehicular safety through the area and restore the existing road surface to a substantially
new condition, extending pavement life, use and rideability.
Project Cost Estimate ($):
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$o
So
$0
$o
50
$o
Design/Plan Review
$0
S50,000
$0
$0
$0
$0
S50,000
Right -of -Way
$0
So
So
So
50
So
$0
Construction
$0
$0
So
So
$0
so
$0
Inspection & Administration
So
$0
$0
$0
$o
5o
$0
Contingency
$0
So
$0
$0
$0
$0
$0
Total Costs:
$0
$50,000
$0
$o
So
$0
$so,000
Project Funding;
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Citywide Infrastructure(198)
$o
S50,000
$0
So
$o
$0
$50,000
Total costs:
So
$50,000
So
So
$0
$0
$50,000
Impact on Operations:
Reduced street maintenance costs for pothole repairs
and crack seal, thus
freeing up maintenance
crews
to attend to
other needed areas.
H3
Project Number: 800-2017-06
JL Key: 1932
Object: 5650
Foothill Boulevard from Haven Avenue to Milliken Avenue - Pavement Rehabilitation
Project Location:
Foothill Boulevard - From Haven
Avenue to Milliken Avenue
Est. Construction Start/End:
05/2018 - 06/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Romeo David
N
C `� pP CT LOC TION
crnu
RdRaiee sr�noR
OR
Description: This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, traffic
signal loop replacement, utility valves and manhole adjustments and pavement striping.
Justification: This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability, In
addition, the project is using asphalt rubber and is therefore eligible and will be submitted for a CalRecycle rebate.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$o
$o
$0
$0
$0
$0
$0
Design/Plan Review
$50,000
$0
$0
$0
$0
$0
$50,000
Right -of -Way
$0
90
$0
$0
$0
$0
$0
Construction
$0
$700,000
$0
$0
$0
$0
$700,ppo
Inspection & Administration
$0
$30,000
So
$0
$0
$0
$80,000
Contingency
$0
$70,000
$0
$0
$0
$0
$70,000
Total Costs:
$50,000
$8501000
$0
$0
$0
$0
$900,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Measure I Fund (177)
$50,000
$850,000
$0
$0
$0
$0
$900,000
Total Costs:
Impact on Operations:
$50,000 $850,000 $0 $0 $0 $0 $900,000
Less routine maintenance like pothole repairs, weed abatement and crack seal, thus freeing up maintenance crews
to attend to other needed areas.
C[!
Project Number: 8OD-2017-09
A Key: 1934
Object: 5650
Hermosa Avenue from Arrow Route to Foothill Boulevard • Pavement Rehabilitation
Project Location:
Hermosa Avenue - From Arrow
Route to Foothill Boulevard
Est. Construction Start/End
05/2018 - 07/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Romeo David
Spec LED
AM, OUR
PROJECT LOCAT N
Description: This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, traffic
signal loop replacement, utility valves and manhole adjustments and pavement striping.
Justification: This project will restore the existing road surface to a substantially new condition, extending
pavement life, use and rideability. In
addition, the project is using asphalt rubber and is approved for a CalRecycle rebate.
Project Cost Estimate ($):
Expenditure/Category Prior Years 2017 18 2018 19 2019 20
2020121 TBD TOTAL
Environmental/NPDES $0 $0 $0 $0
$0 $0 $0
Design/Plan Review $35,000 $0 $0 $0
$0 $o $35,000
Right -of -Way $0 $0 $0 $0
$0 $o $0
Construction $0 $200,000 $0 $0
$0 $0 $200,000
Inspection & Administration $0 530,000 $0 $0
$0 $0 $30,000
Contingency $0 $20,000 $0 $0
$o $o $20,000
Total Costs:
$35,000 $250,000
$0
$0
$0
$0
$285,000
Project Funding:
Funding Source
Prior Years 2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Measure I Fund (177)
$35,000 $250,OW
$0
$0
$0
$0
$285,000
Total Costs:
535,000 $250,000
$0
$0
$0
$0
$285,000
Impact on Operations:
Less routine maintenance like pothole repairs, weed
abatement and
crack seal, thus
freeing up maintenance crews
to attend to other needed areas.
H5
Project Number: 800-2017.10
1L Key: 1976
Object 56SO
Hermosa Avenue north of Foothill Boulevard to Church Street • Street Widening
Project Location:
Hermosa Avenue from north of
Foothill Boulevard to Church
Street
Est. Construction Start/End
0512018 06/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Romeo David
Description: This project involves street widening, sidewalk and some pavement rehabilitation
JECT LOCATION
I (I�
Justification: This project will improve the traffic circulation and pedestrian safety due to wider road and sidewalks
Project Cost Estimate ($)
Expenditure/Cateaory
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
s0
$0
Design/Plan Review
$0
$0
$0
$o
$0
$0
$0
Right -of -Way
$0
So
$0
$0
$0
5o
$o
Construction
$0
$525,000
$0
$0
$0
$0
$525,000
Inspection & Administration
$0
$18,000
$o
$0
$0
$o
$18,000
Contingency
$0
$57,000
$0
So
$0
$0
$57,000
Total Costs:
$0
$600,DD0
$0
$o
$o
so
$600,000
Project Funding:
Funding Source
Prior Years
21718
201819
201920
202021
TBD
TOTAL
Beautification Fund (110)
$0
$350,000
$0
$0
$0
$0
$350,D00
Gas Tax R&T 7360 Fund(174)
$0
$250,000
$0
$a
$0
$o
$250,000
Total Costs:
$0
S6D0,000
$0
$0
$0
$0
$600,000
Impact on Operations:
Less routine maintenance
like weed
abatement and repair of existing
rock wall, thus freeing up maintenance
crews
to attend to other needed areas.
H6
Project Number: 800-2017•11
A Key: 1960
Object: 5650
Highland Avenue from Archibald Avenue to Haven Avenue - Pavement Rehabilitation
Project location:
Highland Avenue Avenue - From
Archibald Avenue to Haven
Avenue
Est. Construction Start/End:
08/2018 - 10/2018
Project Status
Design
Department:
Engineering
Project Manager:
Romeo David
Description
Justification:
F-1
vuiv-so
,uxiaa max
This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, traffic
signal loop replacement, utility valves and manhole adjustments and pavement striping.
This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability. In
addition, the project is using asphalt rubber and is therefore eligible and will be submitted for a CalRecycle rebate.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2017 18
2018 19
2019 20
202012
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
$25,000
$0
$0
$0
$0
$25,000
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$395,500
$0
$0
So
$395,500
Inspection & Administration
$0
$0
$14,950
$0
$0
$0
$14,950
Contingency
$0
$0
$39,550
$0
$0
$0
$39,550
Total Costs:
$0
$25,0D0
$450,000
$0
$0
$0
$475,000
Project Funding:
Funding Source
Prior Year
201718
201819
201920
202021
TBD
TOTAL
Gas Tax R&T 7360 Fund (174)
$0
$25,000
$0
SO
$0
$0
S25,000
Unknown
$0
$0
$450,000
$0
SO
$0
$450,000
Total Costs:
$0
$25,000
$450,0D0
$0
$0
$0
$475,000
Impact on operations:
Less routine maintenance like pothole
repairs, weed
abatement and
crack seal, thus freeing
up maintenance
crews
to attend to other needed areas.
H7
Project Number: 800-2017.12
JL Key: 1929
Object: 5650
Jersey Boulevard from Haven Avenue to Rochester Avenue - Pavement Rehabilitation
Project Location:
Jersey Boulevard - From Haven
Avenue to Rochester Avenue
Est. Construction Start/End:
04/2018 - 06/2019
Project Status:
Construction
LAKES OOLF
Department:
Engineering
Project Manager:
Romeo David
RANCHOCUCRMI w/.
RC ANIMAL CA [CCE
LOCATION
Description: This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, traffic
signal loop replacement, utility valves and manhole adjustments and pavement striping.
Justification: This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability. In
addition, the project is using asphalt rubber and is approved for a CalRecycle rebate.
Project Cost Estimate ($):
Expenditure/Category,
Prior Years
2017 18
2018119
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$50,000
$0
$0
$0
$0
$0
$50,000
Right -of -Way
$0
So
$0
$0
$0
$0
$0
Construction
$0
$760,000
$0
$0
$0
$0
$760,000
Inspection & Administration
$0
$10,000
$0
$0
$0
$0
$10,000
Contingency
$0
$80,000
$0
50
50
$0
$80,000
Total Costs:
$50,000
$850,000
$0
$0
$0
$0
$900,000
Project Funding:
Funding Source
Prior Year
201718
201819
201920
202021
TBD
TOTAL
Gas Tax R&T 7360 Fund (174)
$50,000
$815,000
$0
$0
$0
$0
$865,000
Fire Capital Projects (288)
$0
$35,000
$0
50
$0
$0
$35,000
Total Costs:
$50,000
$850,000
$0
$0
$0
$0
$900,000
Impact on Operations:
Less routine maintenance like pothole repairs, weed
abatement and crack seal, thus freeing up maintenance crews
to attend to other needed areas.
a
Project Number: 800-2017-13
JL Key: 1022
Object: 5650
Local Street Pavement Rehabilitation at Various Locations
Project Location:
Various Locations
Est. Construction Start/End
5/2018 — 7/2018
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Romeo David
Description: This project involves slurry seals and overlays.
Justification: This project if a slurry seal will seal the street thus extending the pavement life and if a pavement overlay will restore the existing
road surface to a substantially new condition, extending pavement life, use and rideability.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$50,000
$30,000
$0
$0
s0
$0
$80,000
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
$727,000
$119401000
$0
$0
$0
$0
$2,667,000
Inspection & Administration
$50,000
$35,000
$0
$0
$0
$0
$85,000
Contingency
$73,600
$195,000
$o
$0
$0
$0
$268,600
Total Costs:
$900,600
$2,200,000
$0
$0
$0
$0
$3,100,600
Project Funding:
Funding Source
Prior Years
201711
2018 19
2019 20
2020 21
TBD
TOTAL
Gas Tax R&T 7360 Fund (174)
$850,000
$450,000
$0
$o
$0
$0
$1,300,000
Road Maint & Rehab (179)
$0
$1,000,000
$0
$0
$0
$0
$1,0D0,000
Infrastructure Fund (198)
$50,000
$750,000
$o
$0
$0
$0
$W01000
Total Costs:
$900,000
$2,200,000
so
$0
$0
$0
$3,100,000
Impact on Operations:
Less routine maintenance like pothole repairs, weed
abatement and crack seal, thus freeing up maintenance crews
to attend to other needed areas.
H9
Project Number: BDD-2012-22
A Key: 1601
Object 5650
Youngs Canyon Road - Extension from Koch Place to Cherry Avenue
Project Location:
Youngs Canyon Road - Koch Place
to Cherry Avenue
Est. Construction Start/End:
To be determined
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
PARK
' - I ASSIA ST j i�vpSVM ON a
PROJECT LOCATION
Description: The extension of Youngs Canyon Road between Koch Place and Cherry Avenue will construct a 4lane road across a flood control
basin and master plan its extension to Cherry Avenue.
Justification: This extension of Youngs Canyon Road will construct 1,100 foot segment across an existing Rood control basin enabling future
development east of the basin to complete the remaining 400 foot extension to Cherry Avenue. When completed the new road will
relieve traffic
congestion on Wilson Avenue to the north.
Project Cost Estimate (51�
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
So
so
$100,000
$0
$0
$o
$100,000
Design/Plan Review
$300,000
$50,000
$70,000
$0
$0
$o
$420,000
Right -of -Way
$0
$0
$50,000
$o
$o
$o
$50,000
Construction
$o
$0
$2.600,000
$o
$o
so
$2,600,000
Inspection & Administration
so
$0
$50,000
$o
$0
So
$50,000
Contingency
$0
$o
$280,000
$0
$o
$0
$290,000
Total Costs:
$300,000 $50,0D0 $3,150,D00
s0
$o
$0
$3,500,000
Project funding:
Funding Source
Prior Years 2017 18 2018 19
201912
2020121
TBD
TOTAL
AD 88-2 Etiw/Highlnd Impm (813)
$300,000 $50,000 $3,150,000
$0
$o
so
$3,500,000
Total Costs:
$300,000 $50,DD0 $3,150,000
$0
$0
$0
$3,500,000
Impact on Operations:
Adds 1,100 feet of roadway to the City's street maintenance program.
A more detailed cost estimate will be available
after the preliminary design phase is complete.
H10
Traffic
Projects included in this section are typically those that will promote safe and efficient traffic circulation per State and local
design standards. Planned projects include two new signals, and upgrades at three intersections, synchronization at three
freeway interchanges, and preparation of an ITS master plan.
Traffic Projects are typically funded via Transportation Development Funds (124), Measure 1 (177), Gas Tax Funds (170, 172,
and 174), Street Lighting Districts and some grant funding.
Project List & FY 2017-18 Expenditures
1 6th at Hellman Ave - Traffic Signal
$
546,000
Installation
2 Base Line Rd at Lion St- Pedestrian
$
80,000
Hybrid Beacon (HAWK)
3 Day Creek Boulevard - Upgrade
$
63,750
Left Turn Phases
4 East Ave at Highland Ave - Traffic
$
469,000
Signal Installation
5 Freeway and Arterial Signal
$
320,000
Synchronization Phase 1
6 Intelligent Transportation System
$
650,000
Upgrade - Citywide
7 Terra Vista Parkway at Spruce -
$
110,000
Safety Lighting Installation
$
2,238,750
Sources of Funding for FY 2017-18
$112,810$110,000 $80,000
40 $1,935,940
■ Citywide Infrastructure ■ Transportation AB 2766 ■ SLID 4
Project Location:
6th Street and Hellman Avenue
ESL Construction Start/End:
3/2018 — 6/2018
Project Status:
Design/Constructior
Department:
Engineering
Project Manager:
Natalie Avalla
Description
Project Number: 800-2017-03
A Key: 1957
Object: 5650
6th Street at Hellman Avenue - Traffic Sienal Installation
The scope of work to be performed in general consists of, but is not limited to, installation of traffic signal, fiberoptic interconnect
and related equipment at Hellman Avenue and Sixth Street.
Justification: The installation of traffic signals will improve traffic safety and reduce traffic congestion.
Project Cost Estimate j$)
Expenditure/Cateeory
Prior years
2017 18
2018 19
2019 20
2020 2021
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$o
$o
$0
Design/Plan Review
$0
$30,000
$o
$0
$0
$o
$30,000
Right -of -Way
$0
$0
$0
$0
$0
$0
$0
Construction
s0
$430,000
$0
$o
$o
$0
$430,000
Inspection & Administration
$0
$43,000
$o
$0
$0
$o
$43,000
Contingency
$o
$43,000
$0
$0
$o
50
$43,000
Total Costs:
$0
$546,000
$0
$0
$o
$0
$546,000
Project funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 2021
TBD
TOTAL
Transportation (124)
$0
$546,000
$0
$0
$0
$0
$546,000
Total Costs:
$0
$546,000
$o
$0
$o
$0
$546,000
Impact on Operations:
The City will be responsible to pay
for the cost of electricity and maintenance.
The estimated
cost of
electricity and
maintenance for a traffic
signal is $2,500 per year.
Project Number: 800-2015-24
1L Key: 1921
Object 5650
Base Line Road at Lion Street - Pedestrian Hybrid Beacon (HAWK) Installation
Project location:
Base Line Road at Lion Street
Est. Construction Start/End:
4/2018 — 5/2018
Project Status:
Construction
Department:
Engineering
Project Manager:
Natalie Avila
�J R LECT LOCATION
Rn11eRn9 9T
N
Pra.
EASE LINE RO
LIONS PARK
� arv110. nR
0
ALDER ST i )
O
Description: The scope of work to be performed in general consists of, but is not limited to, installation of a pedestrian hybrid beacon (HAWK)
and related equipment at Base Line Road and Lion Street.
Justification: The project will improve pedestrian safety.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
So
90
So
Design/Plan Review
$20,000
$o
$o
$0
So
$0
520,000
Right -of -Way
$0
$o
So
$o
So
$o
$0
Construction
So
580,000
$0
$0
$0
$o
$80,000
Inspection & Administration
$0
$0
$0
$0
So
So
So
Contingency
So
$o
So
$0
$0
$o
$0
Total Costs:
$20,000
S80,000
$o
$o
$o
$o
5100,000
Project Funding:
Funding Source
Prior Years
2017118
2018 19
2019 20
2020 21
TBD
TOTAL
Citywide Infrastructure lmprv(198)
$20,000
$80,000
$o
$0
$0
$o
$100,000
Total Costs:
$20,000
$90,000
$0
$0
$0
$o
$100,000
Impact on Operations:
The City will be responsible for the cost of electricity
and maintenance. The estimated cost of electricty and
maintenance fora pedestrian hybrid
beacon is $1,500
per year.
12
Project Location:
Day Creek Boulevard at Wilson
Avenue, Day Creek Boulevard at
Banyan Street and Day Creek
Boulevard at Vintage Drive
Est. Construction Start/End
12/2017 — 2/2018
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Natalie Avila
Project Number: 8OD-2017-04
1L Key: 1956
Object: 5650
Day Creek Boulevard - Upgrade Left Turn Phases
1; AN.
�� M.yMkl RY!
xtl k� f
\qc
coueq �
R � l0„gq y
qN
4-
'PRdAi!T LQ
�j �Rt uo f i � J ow\ aRV
Description: The scope of work to be performed in general consists of, but is not limited to, removing protected -permissive left turn phasing and
replacing with flashing yellow arrow left turn phasing for the traffic signals on Day Creek Boulevard.
Justification: The project will improve safety and efficiency for vehicles and pedestrians by providing flashing yellow arrow left
turn vehicle
movements.
Project Cost Estimate ($):
Expenditure/Category Prior Years 2017118 2018 19 2019 20 2020 21
TBD
Environmental/NPDES $0 $0 So 50 $o
$0
so
Design/Plan Review $o S7,500 So $0 $0
$0
S7,500
Right -of -Way $0 So $0 So So
So
$0
Construction $0 $45,000 $0 so So
5o
$45,000
Inspection & Administration SO $6,750 s0 s0 SO
$0
$6,750
Contingency So $4,500 $0 So $0
$o
$4,500
Total Costs:
$0
$63,750
s0
$o
so
$0
$63,750
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Transportation(124)
so
$63,750
$o
$0
$0
$o
$63,750
Total Costs:
$0
$63,750
s0
$0
$0
$0
$63,750
Impact on Operations:
After installation
and configuration
of the protected left turn traffic
signal equipment,
no additional
impacts on
operations will be
present.
13
Project Number 800-2017-03
JL Key: 1958
Object: 5650
East Avenue at Highland Avenue -Traffic Signal Installation
Project Location:
Last Avenue and Highland Avenue
Est. Construction Start/End:
3/2018 — 6/2018
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Natalie Avila
PROJECT LOCATION
I —
Description: The scope of work to be performed in general consists of, but is not limited to, installation of traffic signal, fiberoptic interconnect
and related equipment at East Avenue and Highland Avenue.
Justification: The installation of traffic signals will improve traffic safety and reduce traffic congestion.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017119
2018 19
2019 20
2020 2021
TBD
TOTAL
Environmental/NPDES
$o
$0
So
90
$0
$0
So
Design/Plan Review
$0
S30,000
s0
so
$0
so
S30,0110
Right -of -Way
$0
$0
$0
$0
$0
s0
$0
Construction
so
$390,0D0
so
$0
s0
s0
s390,000
Inspection & Administration
$0
$10,000
$0
$0
so
so
$10,000
Contingency
s0
$39,000
s0
s0
s0
$0
$39,000
Total Costs:
so
$469,000
$o
s0
s0
$0
$469,000
Project Funding:
Funding Source
Prior years
2017 18
2018 19
201912
2020 2021
TBD
TOTAL
Transportation(124)
so
$469,000
s0
so
so
so
$469,000
Tel Costs:
$0
$469,000
$0
s0
$0
s0
$469,000
Impact on Operations:
The City will be responsible to pay for the cost of electricity and maintenance.
The estimated cost of electricity
and
maintenance for a traffic signal is $2,500
per year.
14
Project Number: 800-2015-16
JL Key: 1900
Object: 5650
Freeway and Arterial Signal Synchronization - Phase I
Project Location:
SR-210 at Haven Avenue; 1-15 at
Base Line Road; and 1-15 at
Foothill Boulevard
Est. Construction Start/End:
9/2017 - 3/2018
Project status:
Construction
Department:
Engineering
Project Manager:
Natalie Avila
Description: The scope of work to be performed in general consists of, but is not limited to, installation of traffic signal communication systems on
City local arterials and State Route, Interstate on -ramps and off -ramps and updated coordination timing along the local arterials.
Justification: The project will provide communication and coordination to enable monitoring, re -timing and coordination of the City's traffic signals
with the State Route and Interstate for improved traffic flow and safety. These improvements equate to reduced fuel consumption and
vehicle emissions.
Project Cost Estimate ($):
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
so
$o
$o
so
so
Design/Plan Review
S85,000
$0
$o
$0
$0
$0
$85,000
Right -of -Way
$0
50
So
$0
so
50
$0
Construction
$0
$290,000
$0
$0
$0
$0
$290,000
Inspection & Administration
$0
so
$0
$0
$0
$o
$o
Contingency
s0
S30,000
50
5o
50
$0
$30,000
Total Costs:
$85,000
$320,000
$0
$0
$0
$0
$405,000
Project Funding:
Fundina Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
AB 2766 Air Quality Impmmnt Fund (105) $12,000
$112,910
$0
$o
5o
$0
$124,810
Transportation(124)
$73,000
$207,190
so
$0
$0
So
$280,190
Total Costs:
$85,000
$320,000
s0
$0
$0
$0
$405,000
Impact on Operations:
Communication and coordination
with the State Route and Interstate with City Streets will improve
maintenance staff
efficiencies and reduce related costs.
These systems will
also provide substantial improvements In system -wide
signal
timing and coordination, improving operational efficiencies, while also resulting in fewer citizen complaints.
15
Project Number: 800-2012-17
1 L Key: 1831
Object 5650
Intelligent Transportation System Upgrade - Citywide
Project Location: rFv�—�1
City -Wide f _ _ j� I
Est. Construction Start/End:
T131)
Project Status:
Design
Department:
Engineering
Project Manager:
Natalie Avila
Description: Construct conduit, fiberoptic cable, and networking devices to connect the City's traffic signals into the City's Intelligent
Transportation System.
Justification: Implementation of this project will improve monitoring, retiming and coordination of the City's traffic signal system.
Project Cost Estimate ($j:
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBO
TOTAL
Consultant Services
$20,652
$1501000
$150,000
$1501000
$150,000
$0
$620,652
Staff Training
$595
$0
So
So
So
$o
$595
Design/Equipment Specifications
s0
So
$0
$0
$0
so
so
Procurement/Construction
$351,534
$500,000
$500,oD0
$500,000
$500,000
$5,433.350
$7,784,884
System Testing and Integration
So
$0
90
$0
$0
$0
$0
Contingency
$0
$0
$o
$0
$0
$0
$0
Total Costs:
$372,781
$650,000
$650,000
$650,000
$650,000
S5,433,350
$8,406,131
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Transportation (124)
$372,781
$650,000
$650,000
$650,000
$650,000
$5.433,350
$9,406,131
Total Coats:
$372,781
$650,000
$650,000
$650,000
$650,000
$5,433,350
$8,406,131
Impact on Operations:
Development of the
City's ITS will improve maintenance,
staff efficiencies and reduce
related costs.
These system
upgrades will also provide substantial improvements in system -wide
signal timing
and coordination,
Improving
operational efficiencies,
while also resulting in fewer citizen complaints.
a
Project Location:
Terra Vista Parkway at Spruce
Avenue
Est. Construction Start/End
7/2017 - 9/2017
Project5tatus:
Construction
Department:
Engineering
Project Manager:
Natalie Avila
Project Number: 800-2015-17
JL Key: 1902
Object: 5650
Terra Vista at Spruce - Safety Lighting Installation
Ao �o
,leave-
o� o
iieiwc
roweeMwar Pn
LMe
�fHr R:1\ T LOCATI
ALPM M. LIWMM ��
Description: The scope of work to be performed in general consists of, but is not limited to, installing safety lighting at the existing all -way stop -
controlled intersection.
Justification: The project will upgrade the lighting for vehicles and pedestrians by enhancing the visibility at the intersection.
Project Cost Estimate ($):
Expenditure/Cateeory
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$20,000
$0
$0
$0
$0
$o
$20,000
Right -of -Way
$0
$0
$o
$0
$0
$0
$0
Construction
$0
$100,000
$0
$0
$0
$0
$100,000
Inspection & Administration
$0
$0
$0
$0
$0
$0
$0
Contingency
$0
$10,000
$0
$o
$0
$0
$10,000
Total Costs:
$20,000
$110,000
$0
$0
$0
$0
$130,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
SLD4(154)
$20,000
$110,000
$0
$0
$0
$0
$130,000
Total Costs:
$20,000
$110,000
$0
$0
$0
$0
$130,000
Impact an Operations:
The project will increase the cost for
electrical service, and maintenance
to replace lamps will occur approximately
every 5 years.
17
Future & Unfunded
Projects included in this section are those that have been identified as being a priority project, but lack dedicated funding for the
upcoming fiscal year. Projects designated as 'Unfunded' could be waiting on grant approval, or perhaps until new special fund
monies become available. Projects showing dedicated funding sources, but which are slated to occur in future fiscal years have
mostly likely been delayed due to issues with the future funding of operating expenses.
We have included this section to illustrate those priority projects that did not make it into the FY 2017/18 budget for either of
these reasons. Staff is actively pursuing grant or other fundraising opportunities for several of the projects in this section.
Project List & FY 2017-18 Expenditures
1 6th St at BNSF Spur Crossing west of $ 16,953,000
Etiwanda Avenue
2 Archibald Ave from Church to Palo Alto - $ 1,215,000
Storm Drain
3 Arrow Route along the s/s 500 ft to 1300 $
ft e/o 1-15 freeway - Widening
4 Cultural Center - Exterior Joint Rplcmnt $
and Exterior Painting
5 Distribution System Automation $
6 East Ave from Chickasaw, west side, $
north 370 feet - Widen and Sidewalk
7 Etiwanda Ave from 6th St to Arrow Route - $
Street Widening Improvements
8 Etiwanda Ave Line Extension from Arrow $
to Foothill
9 Fire District - Central Station 178 (New $
Fire Station)
10 Haven Ave from Banyan to Wilson along $
the East side - Sidewalk
11 Haven Ave from Foothill to Base Line - $
Pavement Rehab
12 Heritage Park - Bridge Replacements $
13 Hermosa Ave from Banyan to Wilson - $
Pavement Rehab
14 Hermosa Ave from Alta Loma Basin to $
Wilson - Storm Drain
15 La Grande from Hellman Ave to Amethyst $
- Street Improvements
16 Lemon Ave from Archibald to Haven - $
Pavement Rehab
17 Lemon Avenue from Haven to 1300 feet $
west - Storm Drain
Pro*ect List & FY 2017-18 Expenditures
18 LoanMart Stadium - Field Renovation $ 160,000
19 LoanMart Stadium - Scoreboard/Prod $ 1,100,000
Rm Equipment Rplcmnt
300,000 20 Paul A. Biane Library - Second Floor $
Rancho KIDS Project
500,000 21 Rochester Ave and Arrow Route, North $
East Corner - Street Widening
250,000 22 Rochester Ave from Base Line to $
Banyan - Pavement Rehab
110,000
450,000
602,500
11,850,000
264,000
850,000
50,000
250,000
2,250,000
853,100
560,000
1,700,000
4,250,000
414,000
950,000
$ 45,881,600
Sources of Funding for FY 2017-18
$660,000
118810$50,000 $853,100
$2,00,00
$852,500
$500,000
$25,766,000
160
$1,100,000
$1,800,000
■ PD 85
■ CDBG -: Unknown
■ City Infrastructure
■ Equip/Veh Rplcmt ■ Measure I
■ General Drainage
■ Municipal Utility Fire Capital Projects
■Capital Reserve
Transportation
J
Project Number: 800-2015-18
JL Key: 1839
Object: 5650
Gth Street at BNSF Sour Crossing west of Etiwanda Avenue
Project Loa tion:
5th Street at the BNSF spur track,
west of Etiwanda Aven,e.
Est. Construction Start/End:
To be determined
Project Status
Design
Department:
Engineering
Project Manager:
Curt Billings
Dewiption
Justification:
_!4r .AOfI� L
R0JEqAXOhOCATION
N
n !slurs
I
j arm 6TN ST
/ Twa
swazniN"
'tJ-
4 y k
z
481pFWfT� 6
4TH sT
Prepare preliminary design drawings and cost estimates for a grade crossing at 6th Street and the BNSF Railroad Spur.
This project, if constructed, would complete 6th Street, between Santa Anita Avenue and Etiwanda Avenue, and provide better
traffic circulation for the area.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
So
$o
$0
$0
$o
So
50
Design/Plan Review
S74,360
50
$0
$0
5o
$960,000
$1,034,360
Right -of -Way
$0
$0
$0
$0
$0
$893,000
$893,000
Construction
$0
$0
$0
SO
$0
$12,100,000
$12,100,000
Inspection &Administration
$0
$0
$0
$0
$0
$1,200,000
$1,200,000
Contingency
$0
$0
$0
$0
$0
$1,800,000
$1,800,000
Total Costs:
$74,360
$0
$0
so
$0
516,953,000
517,027,360
Project Funding:
Funding Source
Prior years
2017 18
2018119
2019 20
2020 21
TBD
TOTAL
Unknown
s0
$0
$0
$0
$0
$16,953,ODO
$16,953,000
Transportation Fund(124)
$74,360
$0
$0
$0
$o
$0
$74,360
Total Costs:
$74,360
$o
$0
$0
$0
$16,953,000
$17,027,360
Impact on Operations: None at this time
J1
Project Number: 800-2012-14
JL Key: 1805
Object: 5650
Archibald Avenue from Church Street to Palo Alto Street - Storm Drain
Project Location: 1 I
Archibald Avenue from Church Street
to 41
S[reet to Palo Alto Street „�a„�,,, u
Est. Construction Start/End
To be determined
Project Status:
Design
Department: -
Engineering Ill_
EXYRCX Sr
Project Manager:
Romeo David ux�
Description: Construct a Master Planned Storm Drain, install catch basins, manholes, and laterals.
Justification: This project will improve drainage within the area.
Project Cost Estimate ($j
E_xp�egenditure/Cateaorv/Cateaory
Prior Years
2017118
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$0
50
$0
$0
So
$0
$0
Design/Plan Review
s0
$0
$0
50
50
$35,000
S35,000
Right -of -Way
$0
$0
$o
$0
$0
$0
$0
Construction
$0
$0
$0
$0
$o
$1,000,000
$1,000,DD0
Inspection & Administration
$o
5o
50
$0
$0
$80,D00
$80,000
Contingency
$0
$0
$0
$0
$o
$100,000
$100,DD0
Total Costs:
$0
$0
50
$0
$0
$1,215,000
$1,215,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019120
2020121
TBD
TOTAL
Unknown
$0
$0
$0
$0
so
$1,215.000
S1,215,000
Total Costs:
$0
$0
$0
s0
$0
$1,215,000
$1,215,0D0
Impact on Operations:
Less routine maintenance, potholes,
sand bags for storm
water protection and storm water cleanup, thus freeing up
maintenance crews
to attend to other needed areas.
J2
Project Number: 800-2015-14
JL Key: 1907
Object: 5650
Arrow Route along the South side 500 feet to 1300 feet e/o the Interstate 1-15 freeway - widening
Project Locatlon: , `f r '+
I I W c �'�
Arrow Route along the South side - rt6r-o •ar o ' /`�
500 feet to 1300 feet e o the I-15 sua -+ c
freeway / �< I 3^� 71
Est. Construction Start/End
TBD
Project Status
Design
Department:
Engineering
Project Manager
Curt Billings
Description: This project involves 800 feet of asphalt pavement widening and striping.
Justification: This project will improve traffic circulation and safety with the addition of a second lane and paved shoulders.
Project Cost Estimate ($):
Expenditure/Cateeory
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$o
$0
$o
$o
So
$o
$0
Design/Plan Review
So
$0
so
$0
$o
$0
$0
Right -of -Way
$o
So
$0
$0
$o
$0
$o
Construction
s0
$0
so
$0
$0
$268,000
$268.000
Inspection & Administration
s0
So
$0
$0
$0
$S1000
$5,000
Contingency
SO
$o
$o
So
$0
$27,000
$27,000
Total Costs:
s0
s0
$0
$0
$0
$300,000
$300,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Unknown
$0
$0
so
So
$o
$300,000
$300,000
Total Costs:
$o
$o
$0
So
$o
$300,000
$300,000
Impact on Operations: None
J3
Project Number:
1L Key: 1890
Object: 5650
Cultural Center - Exterior Joint Replacement and Exterior Paintine
Project Location
Cultural Center
Est. Construction Start/End
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
PWS/Eng/CSD
Project Manager:
T. Quaintance/j Dyer/CSD
Description: Remove and replace exterior building joints of the Victoria Gardens Cultural Center and paint entire exterior of building
justification: Exterior building joints are showing signs of deterioration and must be replaced to protect building. Also, the exterior of the
building has not been repainted since the facility opened in 2006.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2 17 18
2018 19
2019 20
202012
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$510W
$0
$0
$0
$0
$0
$5,000
Right -of -Way
$o
$0
$0
$0
$0
$0
$0
Construction
$0
$0
$500,000
$0
$0
$0
$500,000
Inspection & Administration
$0
$o
$0
$0
$o
$0
$0
Contingency
$0
$0
$0
$o
$0
$0
$0
Total Costs:
$5,000
$0
5500.000
so
$0
$0
$505,000
Project Funding:
Funding Source
Prior years
2017 18
2018129
2019 20
2020121
TBD
TOTAL
Capital Reserve (025)
$5,1)K0
$0
$500,000
$0
50
$0
5505,000
Total Costs:
$5,000
$o
$500,000
$0
$0
$0
$505,000
Impact on Operations:
None
J4
Project Number:
JL Key: 1916
Object: 5650
Distribution System Automation
Project tuaton: B I
Various key RCMU Switch - _ 7I
locations in RCMU Service Area it
Est Construction Start/End:
TBD
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Fred Lyn
Description
Deployment of remotely and/or automatically controlled devices within RCMU's Distribution System.
Justification: Placement of automated equipment in key asset infrastructure within RCMU's distribution system would allow for improvement in
system reliability and efficiency in quickly identifying outages. The ability to remotely monitor distribution system conditions and
and possibly control switches would reduce customer outage duration and improve restoration time. A SCADA system with a
communication network such as wireless or existing fiber optic will be required.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
so
50
$0
so
$0
s0
$o
Design/Plan Review
$0
50
So
$0
So
$50,000
$50,000
Right -of -Way
50
$0
so
$0
so
$0
$o
Construction
$o
$0
$0
50
$o
5300,000
$100,000
Inspection & Administration
$o
$0
$0
$0
$0
50
$0
Contingency
$0
$0
50
$0
so
$100,000
$100,000
Total Costs:
$0
$0
$0
$o
$o
$250,000
5250,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Municipal Utility (Fund 705)
$0
$0
$0
$0
$0
$250,000
$250,000
Total Costs:
$0
$0
$0
s0
$o
5250,000
$250,000
Impact on Operations:
The increased reliability
will provide
better customer
service in identifying potential outages
and restoring
power as
quickly as possibly in
RCMU's service
area.
J5
Project Number: 800-2016-16
JL Key: 1931
Object: 5650
East Avenue from Chickasaw Road to 370 feet north - Street Widening and Sidewalk
Improvements
Project Avenue
--.�'""""'� _
East Avenue from Chickasaw Road—���� V0UST,AV F `
to 370 feet north, along the west \< L 17 I r
side. �� At` ? v^RNF3y.-tea n II
Est. Construction Start/End
TED
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
FIRE STA
176
ETIWANDA OLONYETIWAMDA CR. EEK COMMUNI PARK
ELEMENTARY ��-+�
LV SU MIT INTERMED ATE
JUNIOR HIGH
aT�
3 n`eIR CI o 6o:ATION z
ARFIA ST z
GYPSUM nR
Description: This project will install 310 feet of sidewalk and street widening improvements along the west side to close a gap between two
existing sections of sidewalk.
Justification: The sidewalk and widening improvements will improve pedestrian and vehiclecirculation.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
So
So
to
SO
$0
$0
$o
Design/Plan Review
50
$0
$o
SO
$0
S5,000
$5,000
Right -of -Way
So
$0
$0
$0
So
$0
So
Construction
$0
$0
$o
So
$0
$93,000
$93,000
Inspection & Administration
$o
$0
$0
SO
$0
$3,000
$3,000
Contingency
so
$0
$0
$0
$0
$9.000
59,000
Total Costs:
$0
$0
so
$0
$0
$110,000
$110,000
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Unknown
$o
$0
so
$0
$o
$110,000
$110,000
Total Costs:
$0
$0
so
$0
$0
$110,000
$110,000
Impact on Operations: This project will reduce maintenance and weed abatement costs
J6
Project Number: 800-2010-15
1L Key: 1076
Object: 56SO
Etiwanda Avenue from 6th Street to Arrow Route - Street Widening Improvements
Project Location:
Etiwanda Avenue from 6th Street
to Arrow Route eMra-off
Est. Construction Start/End:
TBD
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
—oy �Igll� Y r Curt Billings 3 N
Description: Widen Etiwanda Avenue to two lanes in each direction, from 6th Street to Whittram Avenue including bike lanes from 6th Street to
Arrow Route.
Justification: Widening Etiwanda Avenue will improve traffic circulation.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020121
TBD
TOTAL
Environmental/NPDES
$o
$0
$0
$o
SO
90
$o
Design/Plan Review
$0
$o
$0
$o
$0
$20,000
$20,000
Right -of -Way
So
$0
$0
$0
$0
$0
$0
Construction
SO
$0
$0
$0
$o
$390,000
$390,000
Inspection & Administration
$0
$0
$0
$o
$0
$10.000
$10,000
Contingency
$0
$0
$0
$0
$0
$30,000
$30,000
Total Costs:
$0
$0
$0
$o
$0
$450,000
$450,000
Project Funding:
Fundin_g_Source
Prior years
2017 18
2018119
2019 20
2020 21
TBD
TOTAL
Transportation Fund (124)
$0
$0
$0
$0
$0
$450,000
$450,000
Total Costs:
$0
$0
$0
$0
$0
$450,000
$450,000
Impact an Operations:
Reduction of routine maintenance
activities for pothole repair, weed abatement and
crack seal, thus
freeing up
maintenance crews
for other needed areas.
J7
Project Location:
Etiwanda Avenue Electric Line
Extension - from Arrow Route to
Foothill Boulevard
Est. Construction Start/End
TBD
Project Status:
Design
Department:
Engineering
Project Manager:
Fred Lyn
Project Number:
A Key: 1885
Object: 5650
Etiwanda Avenue Line Extension
PROJECT LOCATION
Description: Distribution Line Extension east of the 1-15 freeway to service vacant parcels on the corner of Foothill Boulevard and Etiwanda
Avenue with RCMU electricity.
Justification: Line extension is needed to extend power service on Etiwanda Avenue to service vacant parcels on the corner Etiwanda Avenue and
Foothill Boulevard. The City paid SCE exit fees for the right to service any load associated with a newly constructed facility or
undeveloped parcels that has never been interconnected with Edison; this falls under that category.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2019 19
2019120
2020 21
TBD
TOTAL
Environmental/NPDES
90
$o
$0
$0
$0
$0
$0
Design/Plan Review
$0
$0
$0
$0
$0
$2,500
$2,500
Right -of -Way
$0
$0
$0
$p
$0
$0
$0
Construction
$0
$0
$0
$0
$0
$500,000
$500,000
Inspection & Administration
$0
$0
$o
$0
$0
50
$0
Contingency
$0
$0
$0
$0
so
$100,000
$100,000
Total Costs:
$0
$0
$0
$0
50
$602,500
$602,500
Project Funding:
Funding Source
Prior years
2017 19
2018 19
2019 20
2020121
TBD
TOTAL
Municipal Utility(Fund 705)
$0
$0
$0
$0
$0
$602,500
$602,500
Total Costs:
$0
$0
$0
$0
$0
$602,500
$602,500
Impact on Operations: The increased electricity load will provide additional revenue to RCMU
J8
Project Number:
JL Key: 1645
Object: 5600 / 5650
Fire District - Central Station (178)
Project location:`�° /�(
South Side of Town Drive, E/O '�—� l l BRAS IN RD �
Haven Avenue ? 'S I }r-� �ja, Tom-'-1 aza"rsvtcw,pn
Est. Construction Start/End:
Unknown
Project Status:
Property Purchased
Department:
Fire Protection District
U15TT
Project Manager:
Chief Mike Costello/Pamela Pane
Description: Property acquired for a future fire station.
TH
Justification: This station will serve the center of the Rancho Cucamonga community. It will provide the area with emergency services for fire suppression
and life safety. The project will begin when the population and call volume trigger the need.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
So
$0
$0
SO
S50,000
$50,000
Design/Plan Review
So
$0
$o
$0
$o
51,000,000
S3,000,000
Land Acquisition
$3,320,000
5o
50
$0
SO
$0
S3,320,000
Construction
$0
so
$0
$0
$0
$10,000,000
$30,000,000
Inspection & Administration
$0
$0
SO
$o
SO
SO
$0
Construction Management
SO
$o
so
$0
$o
$8o0,000
$900,000
Total Costs:
$3,320,000
50
so
$0
$0
$11.850,000
$15,170,000
Project Funding:
Funding Source
Prior Years
2017118
2018 19
2019120
2020 21
TBD
TOTAL
Fire Capital Projects (288)
$3,320,000
So
So
$0
$o
$11,8501000
$15,170,000
Total Costs:
$3,320,000
so
$0
$0
$0
S11,850,000
$15,170,000
Impact on Operations:
Annual station operations and maintenance costs will
depend on the station size and staffing costs at the time of
construction. Designs with greater
active/passive energy conservation and greater xeriscape will
cost less to
operate. Capital equipment purchase of an engine.
a
Project Number: 800-2013-32
A Key: 1864
Object: 5650
Haven Avenue from Banyan Street to Wilson Avenue along the East side - Sidewalk
Project Location:
East side of Haven Avenue from
Banyan Street to Wilson Avenue
Est. Construction Start/End
Tb be determined
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
Description: The proposed sidewalk along east sideof Haven Avenuewill fill a gap where sidewalks aremissing and provide improved ADAaccess
to Chaffey College.
Justification: This project is part of the City Master Plan. The improvements will improve pedestrian circulation and ADAcompliance.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
90
$0
$o
$0
$0
$0
$0
Design/Plan Review
$3,950
So
So
$0
$0
$0
53,950
Right -of -Way
$0
$0
so
50
$0
$0
$0
Construction
So
$0
$0
$0
$0
$230,000
$230,000
Inspection & Administration
$0
$0
$o
$0
$0
S11,000
$11,000
Contingency
$o
$0
$0
$0
So
$23,000
$23,000
Total Costs:
$3,950
$0
so
$0
So
$264,000
$267,950
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Gas Tax R&T 7360 Fund(174)
$3,950
$0
$o
$0
$0
$o
$3,950
Unknown
$0
$0
$0
$0
$0
$264,000
$264,000
Total Costs:
$3,950
$0
$0
$0
$o
$264,000
$267,950
Impact on Operations: None
J10
Project Number: BM2017-07
1L Key: 1933
Object: 5650
Haven Avenue from Foothill Boulevard to Base Line Road - Pavement Rehabilitation
Project Location:
Haven Avenue - From Foothill
Boulevard to Base Line Road
Est. Construction Start/End:
05/2018 - 06/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Romeo David
(( ASE LINEd Rp CT
�o OJ T CATIO
Description: This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, traffic
signal loop replacement, utility valves and manhole adjustments and pavement striping.
Justification: This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability. In
addition, the project is using asphalt rubber and is therefore eligible and will be submitted for a CalRecycle rebate.
Project Cost Estimate ($):
Expenditure/Category Prior years 2017 18 2018 19 2019 20 2020 21 TBD TOTAL
Environmental/NPDES $0 $0 $0 $0 $0 $o $o
Design/Plan Review $50,000 $0 $0 $0 $0 $0 $5o,000
Right -of -Way $0 $0 $0 $0 $0 $0 $0
Construction $0 $0 $700,000 $0 $0 $0 $700,000
Inspection & Administration $0 $0 $80,000 $0 $0 $0 $80,000
Contingency $0 $0 $70,000 $0 $o $0 $70,000
Total Costs:
$50,000 $o
$850,000
$0
$0
So
$900,000
Project Funding:
Funding Source
Prior years 201718
201819
201920
202021
TBD
TOTAL
Measure I Fund (177)
$50,000 $0
$850,000
$0
$0
$0
$900,000
Total Costs:
$50,000 $0
$850,000
$0
$0
$0
$900,000
Impact on Operations:
Less routine maintenance like pothole
repairs, weed
abatement and
crack seal, thus freeing
up maintenance crews
to attend to other needed areas.
Project Number: 800-2017-17
1L Key: 1963
Object: 5650
Heritage Park - Bridge Replacements
Project Location:
Heritage Park - Multi Use trail
bridge replacements
Est. Construction Start/End
TBD
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
Description: This project will replace the multi use wood bridges that span the Demers Creek at various locations around Heritage Park
Justification: This project will replace 5 aged bridges constructed
of wood with more long lasting structural steel and
concrete bridges to maintain
access to the
park and existing trails
Project Cost Estimate ($):
Expenditure/Catecory
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
5o
$0
$0
50
$0
$0
$o
Design/Plan Review
$0
$0
$0
$0
$o
$50,000
$50,000
Right -of -Way
$0
$o
so
$o
$0
$o
$0
Construction
So
$o
$o
$o
$0
$o
$o
Inspection & Administration
$0
so
$0
$o
$0
$0
$0
Contingency
$o
so
$o
$0
$o
$0
$0
Total Costs:
$0
so
$o
$0
$0
$50,000
$50,000
Project Funding:
Funding Source
Prior Years
2017 18
2019 19
2019 20
2020 21
TBD
TOTAL
PD 85 Redemption Fund(848)
$o
$0
$0
$o
$o
$50,000
$50,000
Total Costs:
$0
$0
5o
$0
50
$50,000
$50,000
Impact on operations:
This project will reduce bridge maintenance costs and
improve safety.
J12
Project Number: 800-2012-29
JL Key: 1815
Object: 5650
Hermosa Avenue from Banyan Street to Wilson Avenue - Pavement Rehabilitation
Project Location:
Hermosa Avenue from Banyan
Street to Wilson Avenue
Fst Construction Stan/End:
08/2018 - 10/2018
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
LOCATION
at31
Description: This project involves cold planning and localized asphalt removal and replacement, crack sealing, asphalt pavement overlay, traffic
signal loop replacement, utility valve and manhole cover adjustments, and pavement striping.
Justification: This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability.
Project Cost Estimate ($)
Expenditure/Category
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$o
$o
s0
s0
50
s0
Design/Plan Review
so
$0
so
s0
s0
50
$o
Right -of -Way
s0
$o
$0
$0
50
50
$0
Construction
$o
$0
5227,000
s0
s0
$0
$227,000
Inspection & Administration
$0
$o
s0
50
50
s0
$0
Contingency
$0
$0
$23 000
50
50
s0
$23,000
Total Costs:
$0
$0
$250,000
So
so
$0
$250,000
Project Funding:
Funding Source
Prior years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Citywide Infrastructure(198)
$0
$0
$250,000
$o
s0
$0
$250,000
Total Costs:
$o
s0
$250,000
$0
$0
$o
$250,000
Impact on Operations:
Reduced street maintenance costs for pothole repairs
and crack seal, thus
freeing up maintenance crews
to attend to
other needed areas.
J13
Project Number: 800-2012-28
A Key: 1810
Object: 5650
Hermosa Avenue from the Alta Loma Basin to Wilson Avenue - Storm Drain Improvements
Project Location:
Hermosa Avenue from the Alta
Loma Basin to Wilson Avenue
Est. Construction Start/End:
0412018 - 09/2018
Project Status:
Design
Department:
Engineering
Prawn manager.
Curt Billings
Description:
Justification:
ALTA LOMA BASIN
!CT LOCATION
HEFT
ALTA LOMA BASIN
Construct a master planned storm drain, install mainline, catch basins and manholes. The entire street from the Alta Basin to
Wilson Avenue will be resurfaced upon completion (see Hermosa rehabilitation project JL 1815).
This project will improve drainage and extend pavement life, use, and rideability. Also, during rain events it will provide improved
pedestrian access to the Hermosa Intermediate School at Wilson Avenue and Hermosa Avenue.
Project Cost Estimate ($)
Expenditure/Cateeory
Prior years
2017 18
2018 19
2019 20
2020 21
TBO
TOTAL
Environmental/NPDES
$o
$o
So
$o
So
$0
$0
Design/Plan Review
$0
5o
So
So
So
$o
$0
Right -of -Way
$o
So
$0
So
So
so
$0
Construction
$0
$0
$2,050,000
$o
$o
$0
$2,050,000
Inspection & Administration
$o
$0
So
5o
so
$o
SO
Contingency
$0
$0
S200,000
So
$o
So
$200,000
Total Costs:
$0
so
52,250,000
$0
So
So
$2,250,000
Project Funding:
Funding Source
Prior years
20 7 18
2018 19
2019 20
2020 21
in
TOTAL
Drainage General Fund(112)
$o
$o
SS00i
$0
$0
$o
$500,000
Citywide Infrastructure(198)
$0
$0
S1,750,000
SO
$0
$0
$1,750,000
Total Costs:
$o
$0
$2,250,000
$o
$0
$o
$2,250,000
Impact on Operations:
Elimination of storm water protection
costs for placing sand bags and
cleanup, and a
reduction of
street repair
maintenance costs for pothole and crack repairs, thus
freeing up maintenance crews for other areas.
J14
Project Number: 800-2017-18
R Key: 1965
Object: 5650
La Grande Street Improvements from Hellman Avenue to Amethyst Avenue
Project Location: l
La Grande Street from Hellman ---JL�I 1_ a
Avenue to Amethyst Avenue u 7r�c.�
Est. Construction Start/End
To be determined
Project Status:
Design/Construction
Department: ' I IL —
Engineering ,T�-"j--(((-000JIII{ ." I�o:�_JI{ U
Project Manager: 8
A r ��c�.,:
Curt Billings I E Q I��� �CXeY sj '}�'9'}•q
Description: This project adds sidewalks, street lights, curb and gutter and drainage improvements to provide a pedestrian access route from the
west to the Alta Loma Elementary School,
Justification: This project will improved safety and provide ADA accessible access route to the Alta Loma Elementary School.
Project Cost Estimafe ($):
Expenditure/Catecory
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
so
50
so
so
50
Design/Plan Review
$0
50
$0
So
SO
$o
$0
Right -of -Way
$o
$0
So
$0
$0
$0
$o
Construction
$o
$0
So
So
So
$723,100
$723,300
Inspection & Administration
$0
$0
So
So
$0
S63,000
$63,000
Contingency
50
$o
So
So
$0
$67,000
567,000
Total Costs:
$o
$0
$0
$0
s0
$853,100
$953.100
Project Funding:
Funding Source
Prior Years
2017 18
2018 19
2019120
2020121
TBD
TOTAL
Community Dev Block Grant (204)
SO
SO
$o
So
So
$853.100
$853,100
Total Costs:
$0
$0
$0
$o
$0
$853,100
$853,100
Impact on operations: This project adds nine street lights to Street Light Maintenance Districts SLD 1 and SLD 2
J15
Project Number: 800-2012-24
jL Key: 1793
Object: 5650
Lemon Avenue from Archibald Avenue to Haven Avenue - Pavement Rehabilitation
Project Location:
Lemon Avenue from Archibald
Avenue to Haven Avenue
Est. Construction Start/End:
TBD
Project Status:
Design
Department:
Engineering
Project Manager:
Curt Billings
Description: This project involves cold planning and localized asphalt removal and replacement, crack sealing, asphalt pavement overlay, traffic
signal loop replacement, utility valve and manhole cover adjustments, and pavement striping.
Justiflution: This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability.
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
90
So
$0
So
50
$0
$0
Design/Plan Review
$10,000
$0
$0
$0
$0
So
$10,000
Right -of -Way
so
so
$0
$o
So
$0
SO
Construction
$0
$o
$0
$0
$0
$500,000
$500,000
Inspection & Administration
$0
$o
$0
$0
$o
$10,000
$10,000
Contingency
So
So
$0
$0
s0
$50,000
$50,000
Total Costs:
$10,000
$0
$0
SO
SO
$560,000
$570,000
Project Funding:
Funding Source
Prior Years
2017 18
2018119
2019 20
2020 21
TBD
TOTAL
Prop 42 Fund(190)
$10,000
$o
$0
$0
$0
$0
S10,o00
Unknown
SO
SO
SO
$0
$0
$560,000
$560,000
Total Costs:
$10,000
SO
$0
$0
$0
$560,000
$570,000
Impact on Operations:
Reduced street maintenance costs for pothole repairs
and crack seal,
thus freeing up maintenance crews
to attend to
other needed areas.
J16
Project Number: 800-2011-08
JL Key: 1791
Object 5650
Lemon Avenue from Haven Avenue to 1,300 feet west - Storm Drain Improvements
Project Location:
Est. Construction Start/End:
TBD
Project Status
Design
Department:
Engineering
Project Manager:
Curt Billings
Description
Justification:
W
Construct a master planned storm drain, install mainline, catch basins and manholes. The entire street from Archibald Avenue to
Haven Avenue will be resurfaced upon completion (see Lemon rehabilitation project JL 1793).
This project will improve drainage and extend pavement life, use and rideability. Also, during rain events it will provide improved
pedestrian access.
Project Cost Estimate ($)
Expenditure/Category
Prior Year
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPOES
$o
$0
$0
$0
$0
$0
$o
Design/Plan Review
$2,0oo
SO
So
$0
so
$0
$2,000
Right -of -Way
SO
so
$0
$o
$o
$o
s0
Construction
$0
$0
$0
$0
$0
$1,520,000
$1,520,000
Inspection & Administration
$0
$0
so
$0
$0
$10,000
$10,000
Contingency
$0
$0
$0
$o
$0
$170,000
$170,000
Total Costs:
$2,000
$0
SO
SO
$o
S1,700,000
$1,702,000
Project Funding:
Funding Source
Prior Years
2 7 18
2018 19
2019 20
2020 21
TBD
TOTAL
Drainage General Fund(112)
$2,000
$0
so
$o
$0
$o
$2,000
Unknown
$o
$0
$0
so
so
$1,700,000
$1,700,000
Total Costs:
$2,000
$0
$0
$0
$0
S1,700,000
$1,702,000
Impact on Operations:
Elimination of storm water protection
costs for placing sand bags
and cleanup, and
a reduction of
street repair
maintenace costs for pothole and crack repairs, thus
freeing up maintenance crews for other areas.
J17
Project Location:
Loan Mart Stadium
Est. Construction Start/End:
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services
Project Manager:
Dean Rodia
Project Number:
1L Key:
Object: 5607
LoanMart Stadium • Field Renovation
e 3
ROJECT LOCATI01�
RMCMO COCxMp map VSFORle GOrltexAR
HRi
M
k
y
in
Description: Demolition, stripping existing grass to a depth of 1", removal of all waste from site, till existing soil, import sand to create a level
surface, laser grading, compaction and resetting of irrigation heads. New sod grown to City specifications. Pre -plant fertilizer will
be applied before sod installation. Sod to be rolled with a 1 ton smooth double drum roller. No design is necessary to complete
this work it will be based upon current field standards.
Justification: Existing playing field has deteriorated from years of use. Staff maintenance of field is constant
Project Cost Estimate ($)
Expenditure/Category
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
50
$0
50
$0
$o
Design/Plan Review
$0
$0
$0
$0
s0
$o
$0
Right -of -Way
$0
$0
50
$0
So
So
$0
Construction
$0
$0
$160,000
$0
So
$0
$160,000
Inspection&Administration
$0
$0
$0
50
5o
$0
$0
Contingency
$o
$o
$0
$o
So
50
$0
Total Costs:
$0
$0
$160,000
$0
s0
50
$160,000
Project Funding:
Funding Source
Prior Years
2 17 18
2018 19
2019 20
2020 21
TBD
TOTAL
Capital Reserve Fund (025)
j0
$0
$160,000
$0
$0
$0
$160,000
Total Costs:
$0
$0
$160.000
$0
$0
$o
$160,000
Impact on Operations:
Renovations will reduce the maintenance requirements for the field and allow for
better water
penetration,
resulting In lower water usage.
118
Project Number:
JL Key: 1951
Object: 5650
Loan Mart Stadium - Scoreboard/Production Room Equipment Replacement
Project Location
Loan Mart Stadium
Est Construction Start/End
07/2017 — 06/2018
Project Status:
Design/Construction
Department:
Public Works Services/1301T
Project Manager:
Bill W./Darryl P.
Description: Replace scoreboard and production room equipment at LoanMart Stadium.
��
5
PROJECT LOCATION
Justification: The existing scoreboard system and production room equipment are obsolete. Repair/replacement parts are no longer made for
this system.
Project Cost Estimate ($)
Expenditure/Category
Prior Yea n
2017 18
2018 19
2019 20
2020 21
TBD
TOTAL
Environmental/NPDES
$0
$0
$0
$0
$0
$0
$0
Design/Plan Review
$0
$0
$90,000
$0
$0
$0
$90,000
Right -of -Way
$0
$0
$0
$o
$0
$0
$0
Construction
$0
$0
$900,000
$o
$0
$0
$900,000
Inspection & Administration
$o
So
S20,000
$0
$0
$0
$20,000
Contingency
$o
50
$90.000
$0
$0
$0
$90,000
Total Costs:
$0
$0
$1,100,000
$o
$0
$0
$1,100,000
Project Funding:
Funding Source
Prior Years
2017 18
2 18 19
2019/20
2020121
TBD
TOTAL
Equip/Vehicle Replacement(712)
$0
$0
51,100,000
$0
$0
$0
$1,100,000
Total Costs:
$o
$0
$1,100,000
$0
$0
$0
$1,100,000
Impact on Operations:
None
119
Project Number:
1L Key: 1867
Object: 5650
Paul A. Biane Library- Second Floor Rancho KIDS Project
Project Location:
12505 Cultural Center Drive �� - z ,�J
Est. Construction Start/End:
TBD
Project Status:
Installation
Department:
Library
Project Manager:
Brian Sternberg
Description: Rancho KIDS is a project that will build out the second floor of the Paul A. Biane library at Victoria Gardens. Rancho KIDS is
envisioned as an interactive children's museum combined with traditional library services to create a new type of learning
experience. Design and cost estimates of the second Floor has been established as a City Council goal for FY 2014-15.
Justification: Demand for library services in the community continues to increase, particularly for the ages 0-7. Rancho KIDS is being designed
to provide anew, unique service model that will combine the features of interactive children's museum exhibits with traditional
libraryservices.
Rancho KIDS should also be a regional draw that will
provide additional visitors to both the Victoria Gardens
Shopping District and the Lewis Family Playhouse.
Project Cost Estimate ($):
Expenditure/Category
Prior Years 2017 18
201811
2019 20
2020 21
TBD TOTAL
Environmental/NPDES
$0 $0
s0
s0
s0
so $0
Design/Plan Review
$250,000 so
So
so
so
$750,000 $1,000,000
Right -of -Way
$0 so
$0
so
$0
$0 so
Construction
$2,400,000 $0
$0
so
$o
$3.500,000 $5,900,000
Inspection & Administration
$0 s0
$0
$0
$0
s0 So
Contingency
$0 so
so
$0
s0
$0 so
Total Costs:
$2,650,000 $0
$0
So
5o
S4,250,000
56.900.000
Project Funding:
Funding Source
Prior Year 2017 1
201 19
2019 2
2020121
TBD
TOTAL
Library Capital Fund (329)
$2,650,000 s0
$0
$0
s0
$0
$2,650,000
Unknown
$0 s0
$0
s0
s0
$4,250,000
54,250,000
Total Costs:
$2,650,000 $0
$0
$0
$0
54,Z50,000
$6,900,000
Impact on Operations:
Feasibility study projects an approximate $300,000 per year cost for
operations and
maintenance.
(The project is
designed to be revenue -generating.)
J 20
Project Number: 800-2016-18
1L Key:
Object: 5650
Rochester Avenue and Arrow Route, North East Corner - Street Widening and Sidewalk
Improvements
Project Location:
Rochester Avenue and Arrow
Route, North East Corner - Street
Widening and Sidewalk
Improvements
Est. Construction Start/End:
78 D
Project Status:
Design/Construction
Department:
Engineering
Project Manager:
Curt Billings
u
it
ERANCHOCUCAM
1�PICEN R/SPORTS C PLEX
40
���ORTS COMPLEX
WSENN•CD
MAL CA E&ADOP 10
RRROW_RTE
H PROJECT LOCATION
RE-STAT10
174
A 8
I nr..
Description: This project will install SOO linear feet of street widening aimprovements, relocate 2 utility poles, underground utilites, Install street
lighting, and upgrade a traffic signal with video detection.
Justification: The sidewalk and widening improvements will improve pedestrian and vehicle circulation.
Project Cost Estimate ($):
Expenditure/Categwv
Prior Years
2017 18
2018 19
2019 20
2020121
TEO
TOTAL
Environmental/NPDES
$0
$0
$0
$o
$0
$2,000
$2.000
Design/Plan Review
$0
SO
$0
$0
$0
So
$0
Right -of -Way
$0
$0
$o
$0
So
5o
$0
Construction
$0
$0
$0
$o
50
5238,000
$239,000
Inspection&Administration
$0
$0
$0
5o
So
5150,000
$150,000
Contingency
$0
$0
$0
so
5o
$240Un
$24,000
Total Costs:
$o
$0
$o
$o
$0
$414,000
S414,o00
Project Funding:
Funding Source
Prior Years
201718
201819
201920
202021
TBD
TOTAL
Unknown
So
$o
$0
$0
So
$414,000
$414,000
Total Costs:
$0
So
So
$0
$0
$414,000
$414,000
Impact on Operations: This project will reduce maintenance and weed abatement costs and increase lighting costs
J21
Project Number: 800-2016-02
1L Key: 1935
Object SGS0
Rochester Avenue from Base Line Road to Banyan Street - Pavement Rehabilitation
Project Location: > �r're',Ts x ^ o1r eexrot er ci�t•
a�� Smwu n s. oo x
Rochester Avenue - From Base lrne oUU�xz CI
Road to Banyan Street ,� (� 4{I r
Est. Construction Start/End
06/2019-08/2019
Project Status:
Construction
Department:
Engineering
Project Manager:
Curt Billings
A
i
rrs
Description: This project involves cold planing, localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, traffic
signal video detection, utility valves and manhole adjustments and pavement striping.
Justification: This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability. In
addition, the project is using asphalt rubber and is therefore eligible and will be submitted for a CalRecycle rebate.
Project Cost Estimate (S)
Expenditure/Catexory
Prior Years
2017 18
2018 19
2019 20
2020 21
TBD
T
Environmental/NPDES
so
So
so
so
50
$0
$0
Design/Plan Review
$50,000
$0
So
$0
$0
so
$50,000
Right -of -Way
s0
$0
$0
So
$0
$0
$0
Construction
s0
$0
$845,000
$0
$0
$0
$945,000
Inspection & Administration
$0
$0
$20,000
so
so
$0
$20,000
Contingency
50
$0
$85 000
$0
$0
$o
$95,000
Total Costs:
550,000
$0
S950,000
so
50
$0
51,000,000
Project Funding:
Fundine Source
Prior Years
201718
201819
201920
202021
TBD
TOTAL
Measure I Fund (177)
$50,000
$0
5950,000
$0
$0
$0
$1,000.000
Total Costs:
$50,000
so
$950,000
$0
$0
$0
$1,000,0D0
Impact on Operations:
Less routine maintenance like pothole
repairs, weed abatement
and crack seal, thus freeing up maintenance aews to
attend to other needed areas.
J 22
General
Policies
2017/2018
Improvement Program
V"JNOWHD[lD
OH DNV'd
NoilvDIAULIVAU
Action
2'
Ty pe
a
m
d
General Plan Policy
y
u
c
L
3:
>
m
C.
7
w
N
'r'
'c
W
M L
O
N
d
0:
K
c .N
C
0
Y
01
.�
Implementation Action(s)
E
o
a
c
c
+�
o
.a
°
o
`
uai
m
a
rn
a
N o:
U.
a`
CM-
Continue to provide pedestrian amenities on sidewalks on major
O
streets that are key pedestrian routes, Including the provision of
311
benches, shade trees, and trash cans.
Identify key pedestrian travel corridors citywide, and prepare a Citywide
Pedestrian Circulation Study to determine pedestrian amenity needs,
capital and operating funding sources, and a phased implementation
program. Develop a program for gradually installing public amenities
A B
such as streetlights, benches, trash containers, art, drinking fountains,
ENG
PL
C D
5
landscaping, etc. that will enhance the pedestrian environment and
encourage increased use of transit. Use both the CIP process and other
funding sources, including a program whereby businesses or residents
may sponsor street furniture and/or landscaped areas.
CM-
Continue to require that the siting and architectural design of new
312
O
development promote safety, pedestrian -friendly design, and
access to transit facilities.
Develop standards to be applied to development projects along transit
PL
ENG
1
4
corridors that require transit and pedestrian accessibility.
Establish a number of bike hubs in the City (centralized locations
CM-
O
with convenient bike parking for trip destinations or transfer to
3.13
other transportation modes), at key transit nodes, and at
commercial nodes.
Conduct a study to determine the best locations for bike hubs in the City,
and develop a plan, wayfinding program, and implementation process for
ENG
PL. RD
A, B,
4
providing bike hubs that provide secure bicycle lockers, bike racks, and
C, D
connections to transit at key locations in the City.
CM-
O
Enhance pedestrian and bicycle access to local and regional
3.14
transit, including facilitating connections to transit.
Same action as identified for CM-3.7.
ENG
PL
1
4
CM-
Coordinate the provision of the non -motorized networks (bicycle
3,15
O
and pedestrian) with adjacent jurisdictions to maximize sub -
regional connectivity.
Same action as identified for CM-3.7.
ENG
PL
A, E. F
4
CM-
O
Establish fixed -route local circulator bus service connecting major
3.16
activity centers.
Explore development of a fixed -route local circulator bus system, station
ENG
PL
A, E. H
5
location, and funding mechanisms.
Continue to implement traffic management and traffic signal
CM-4.1
O
operations measures along the arterial roadway to minimize delay
and congestion for all modes, without adversely impacting transit,
bicycles, and pedestrians.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-25
Action
Ty
pe
a
d
u
General Plan Policy
m
N
N
Y
N
O G
Ch
C
�+
T
c
X
Implementation Action(s)E
a m
e
o
LL
a
a)
a
to W
ri
a
PL, AS,
A, B.
Same actions as identified for RC-4.1 to RC4.5.
ENG
ENG,
C, E,
3
CM, BS,
G, I
PW, FIN
Encourage development of transit -oriented and infill development,
PS-12.3
O
and encourage a mix of uses that foster walking and alternative
transportation.
Same action as identified for RC-4 4.
PL
ENG
A. 1
3
Provide enhanced bicycling and walking infrastructure, and support
PS-12.4
O
public transit, Including public bus service, the Metrolink, and the
potential for Bus Rapid Transit (BRT).
Same action as identified for RC4.4.
PL
ENG
A, 1
3
Provide green building Incentives, assess green building
techniques as a formal stage of project review, and develop a green
PS-12.5
O
building ordinance or program that addresses both new and
existing buildings. Adaptation strategies will also include increased
water efficiency in buildings.
Same actions as identified for RC-6 1 to RC-6 4
PL
BNB
A, I, K
4
Encourage efforts to reduce waste generation and re -use and
PS-12.6
O
support increased recycling and composting opportunities with a
focus on large commercial and industrial waste producers.
Same action as identified for PF-7.1
ENG
PL
A
3
PS-127
O
O
Support tree planting, planting more vegetation (including native
and drought -resistant planting), and preservation of open space.
Same actions as identified for RC-1.1, RC-8.1 to RC-8.7.
PL
EN
A, I
4
PS-12.8
O
Develop green procurement plans and ensure energy savings in
City operations and maintenance.
Same actions as identified for RC-5.1 to RC-5.3.
AS
CM. FIN,
A,B. C.
4
PW
E, K
Develop energy- or climate change-themed publications and
workshops, facilitating energy audits for residents, and establishing
PS-12.9
O
partnerships to reduce greenhouse gas emissions. Increase public
awareness about climate change, and encourage residents and
businesses to become involved in activities and lifestyle changes
that help reduce greenhouse gas emissions.
Same action as identified for RC-5.1.
CM
ENG
A, K
4
Consider the compatibility of proposed land uses with the noise
environment when preparing or revising community and/or specific
PS-13.1
O
plans and when reviewing development proposals. The contour
map depicting future noise levels (Figure PS-10) should be used by
the City as a guide to land use/noise compatibility.
Appendix A: Implementation Plan
RANCHO CUCAMONGA G EN E RAL PLAN A-57
OH DNVN
Action
A
TV
pe
a
a
General Plan Policy
N
d
;
ry
N
F
0
W
IY
p
N
K
T
Y
0
=
m
0
C
J
.o
o.
Implementation Action(s)
C m
Q.
Ill.
to
a
w Iz
U.
a
Complete intersection capacity improvements, coordinate traffic signals
utilizing Intelligent Transportation Systems (ITS), and improve striping
and signage. Striping shall maximize room for bike lanes where feasible
and consistent with the Bicycle Plan. Modernize traffic signal equipment
as necessary, and continue to update traffic signal timing and
ENG
PW
A. D
3
synchronization plans to optimize traffic Flow along the key arterial
corridors, taking into account the needs of transit, bicyclists, and
pedestrians as well. Invest in the communications infrastructure
necessary to operate a Citywide traffic signal control system.
Continue to design and operate arterials and intersections for the
CM4.2
O
safe operation of all modes, including transit, bicyclists, and
pedestrians.
Same action as identified for CM4.1.
ENG
A, D
3
CM4.3
O
Continue to implement Intelligent Transportation System Measures
and advanced traffic management technologies where appropriate.
Same action as identified for CM-4.1.
ENG
PW
A, D'
3
Maintain the City's transportation infrastructure in good condition;
CM4.4
O
O
develop and maintain adequate funding sources for It's ongoing
maintenance and upkeep.
Continue to implement and follow the schedule for resurfacing streets
ENG
A' D.
4
and streets improvements per the CIP.
E, F
Continue to require that new development participates in the cost of
CM-5.1
O
transportation mitigation and improvements necessitated by new
development, including non -automobile solutions.
Require payment of Traffic Impact Fees as approved by the City Council,
used to finance specific improvements made necessary by new
development. The relationship between the fees, the cost of the
ENG
PL
D
4
improvements, and new development has been established in fee
analyses approved by the City Council. These fees shall be reviewed
from time to time and adjusted as needed.
Require evaluation of potential traffic and transportation Impacts
CM-5.2
O
associated with new development prior to project approval, and
require adequate mitigation measures, including non -automobile
solutions, prior to, or concurrent with, project development.
Require applicants to prepare traffic and transportation impact
assessments consistent with adopted City guidelines and standards.
Continue to require sidewalks, pedestrian paths, and connections to be
ENG
D
4
provided as part of new development projects to improve and enhance
access between neighborhoods, and from neighborhoods to schools,
parks, trails, commercial centers, and other activity centers.
Appendix A: Implementation Plan
A_26 RANCHO CUCAMONGA GENERAL PLAN
VDNOWVDfID
OH DNVN
SAI.LI'II7F'3
Action
D
Ty pe
a
d
d
General Plan Policy
d
N
y
0
j
N
N
O O
C
0
Implementation Action(s)
`o
0.
Expand recreation and cultural attractions to enhance
ED-2.3
O
tourismfvisitor potential and to boost sales and transient
occupancy tax.
Develop brochures or links from the City's web site to showcase the
various recreational and cultural venues to attract visitors to the City.
Enhancement of cultural amenities, including regional entertainment
RD
CS
A
7
options, recreation, and historic preservation, will help to embellish the
City's reputation as a destination for a wide range of visitors.
Expand lodging choices in the City through the recruitment and
ED-2.4
O
placement of full -service hotels that will complement the existing
select -service hotel portfolio.
Review and update marketing strategies (land surveys, infrastructure
availability, and modes of transportation) to solicit the development of a
RD
PL
A. G
4
full -service lodging facility. Make sure that zoning regulations can
accommodate a full -service hotel at desired locations.
ED3.1
O
O
Continue to make public safety a priority.
Use the annual budgeting process to allocate funding for public safety
services, equipment, and facilities commensurate with the City's service
CM
PD, FD
A
6
objectives.
ED-3.2
O
Provide community and cultural amenities.
Same action as identified for ED-2.3.
CS
CM, RD
A
4
ED-3.3
O
Maintain a healthy fiscal balance.
Use the annual budgeting process to check that revenues from all
CM
AS, FIN
A, G
1
sources continue to more than match projected spending.
ED-3.4
O
O
Improve internal circulation for all modes of transportation,
consistent with the concept of "Complete Streets".
Same action as identified for LU-3.1 to 3.8
ENG
PL
A' G'
4
ED-3.5
O
Facilitate development of additional local and regional
entertainment venues.
Focus a special economic development team on the task of working
towards attracting developers and investors interested in responding to
RD
PL
A, G
6
local and regional demand for new entertainment options.
ED-3.6
O
Leverage the City's quality of Iffe amenities to attract more
knowledge -based workers.
Expand the Economic Development Strategy to market Rancho
Cucamonga's civic assets, including parks, recreation and community
RD
PL, CS
A. G
4
enrichment facilities and programs, trails, and quality school districts.
Appendix A: Implementation Plan
A-30 RANCHO CUCAMONGA GENERAL PLAN
Action
L
Ty
pea
General Plan Policy
e
e
r
ry
o
Z
`
12
01
m
LL'
C
d
K
rna
C m
o
N
'?
c
d
Implementation Action(s)
E
a n
e
o
oo
a
m
a
m 0:
i
a
RC-6.7
O
O
Support protection of natural habitat areas for ecological,
educational, and other scientific study purposes.
Same action as identified for RC-6.3.
PL
ENG
A, 1
4
PF-1.1
O
Continue to Implement high -quality standards for new public
facilities and Improvements to existing buildings.
Design and build all City buildings to serve as a model for quality
architectural treatment and green building design in all new and
PL
ENG
A, B, C
5
remodeled civic facilities.
PF-1.2
O
Promote community facilities as focal polirl for gatherings, events,
and celebrations.
Maintain all public facilities and buildings to address the needs of the
various neighborhoods within the City. Advertise the availability of civic
PW
CS, LIB
A. B, C
3
facilities to community groups.
PF-1.3
O
Locate new community facilities in neighborhoods and centers
where they will serve populations with the greatest needs.
Review and assess the needs for the location of community facilities as
CS
ENG, PL
A
6
neighborhoods evolve.
PF-1.4
O
O
Maintain public facilities and optimize their usefulness during their
lifespan.
Continue with proper maintenance programming and funding levels for
PW
CS, LIB,
A, B. C
4
existing public facilities.
AC
PF-1.5
O
O
Continue to incorporate low -maintenance features Into public
facilities consistent with the City's sustainabllity plan.
Replace features of public facilities with lower maintenance types as part
PW
PL, CS,
A. B, C
3
of the on -going maintenance program.
BS
PF-1.6
O
Maintain multi -functional, Flexible, and complementary space at
community facilities.
Same action as identified for PF-1.2.
CS
PW
A, B, C
3
Maximize public facility use by sharing with nonprofit
organizations, school districts, and community organizations. Look
PF-1.7
O
for opportunities to create joint -use community space at facilities
owned by private organizations such as faith -based groups and
service clubs.
Same action as identified for CS-2.5.
CS
A
4
Consult with local school districts to enhance the development of
PF-2.1
O
O
joint -use agreements, allowing for optimum use of school facilities,
to provide broad community benefits such as public safety and
education.
Continue and expand joint use of facilities to achieve even greater
CS
SD
optimization of school facilities to service the entire community.
Appendix A: Implementation Plan
A-411 RANCHO CUCAMONGA GENERAL PLAN
Vf)NOWVDfID
OH DNVN
5110INt'"I'I:IJSIIV
Action
Ty pe
a
U
o General Plan Policy
v
0
N
y
3
K
u
�?
N
O O
C
Z
:
.�
Implementation Action(s)
E
a Q.
e
o
Q.
.
a
N
Q.
N K
li
d
Continue to provide a safe and efficient street system in the City, to
CM-1.1
O
support mobility goals, all transportation modes, and the goals of
Managing the Land Use, Community Design, and Historic
Resources Chapter.
Add the intersection improvements listed below to the Capital
Improvement Program (CIP) or appropriate equivalents identified and
approved by the City Engineer in the future that would offset the
identified impacts; implement the improvements as funding becomes
available. Prepare a report on the need for the improvements and their
relationship to the impacts caused by new development in Rancho
Cucamonga.
• Work with Caltrans and SANBAG to implement a new freeway
interchange at 1-15 and Arrow Highway.
• Complete Wilson Avenue between Milliken Avenue and Day
Creek Boulevard.
ENG
A, D. 1
7
• Complete Rochester Avenue between Banyan Street and
Wilson Avenue.
• Pursue Federal funds for a grade separation of the SPRR at
Etiwanda Avenue.
• Complete storm drain and widening of Hellman Avenue from
Foothill Boulevard to Cucamonga Creek.
• Complete Wilson Avenue from East Avenue to Wardman
Bullock.
• Improve the Base Line Road at 1-15 Freeway Interchange.
• Complete Youngs Canyon from Cherry Avenue to Banyan
Street.
Provide an integrated network of roadways that provides for
CM-1.2
O
convenient automobile, transit, bicycle, and pedestrian circulation
movement around the City.
Same actions as identified for CM-2.1 and CM-3.7.
ENG
PL
A, D, 1
4
Complete the circulation system by constructing new roadway
CM-1.3
O
facilities and freeway interchanges pursuant to the Circulation Plan
(Figure CM-2).
Identify in the CIP future projects and new roadways based on available
ENG
PL
A, D. I
4
funding.
CM-1.4
O
O
Provide access for seniors and those with physical disabilities in all
elements of the transportation system.
Continue to operate the Silver Fox Express. Consult with Omnitrans
regarding providing ACCESS transportation services.
A E'
Require that all new future transportation facilities have appropriate and
ENG
CS
F, H, I
4
adequate access for seniors and people with physical disabilities.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-19
Action
L
TV pe
a
3
d
>_
d
General Plan Policy
j
m
0
N
C
S
R
C
N
T
O
_
A
N
O p
C
o
m
m
Implementation Action(s)
E
n m
6
`o
o
a
°
a
a
N
-
a`
= w
N a-'
_
0-
Implement street design standards per this General Plan, except
that modified standards may be applied where appropriate on
CM-1.5
O
arterial corridors relating to transit, bicycle facilities, sidewalks, and
on -street parking to be context sensitive to adjacent land uses and
districts, and to all roadway users, including transit, bicycles, and
pedestrians.
Integrate into the CIP process the planning of modified standards for
Foothill Boulevard to accommodate BRT and for other arterials as
ENG
PL
A, D, I
4
appropriate to reflect the bikeway plan and pedestrian improvements
necessary to s pport Mixed Use districts.
CM-1.6
O
Pursue a railroad grade separation at Etiwanda Avenue and the
BNSF Railway line.
Grade separations currently exist at Haven and Milliken Avenues. Due to
truck traffic associated with the southeast industrial area, the City
ENG
PL
A, E, I
4
supports creating a railroad grade separation at Etiwanda Avenue and
the BNSF Railway line.
CM-2.1
O
O
Facilitate bicycling and walking citywide.
Implement the Bicycle Master Plan included in the Community Mobility
Chapter.
Require that pedestrian facilities and connections be provided as part of
all development projects, with an emphasis on connections within Mixed
Use districts. Implement all bicycling and walking policies and Mobility
ENG
PL, RD
A, D, 1
4
Element components.
Preparation and distribute bike route maps and bike facilities information.
Publish and make readily available pedestrian route maps and
pedestrian facilities information.
Encourage all feasible measures to reduce total vehicle miles
CM-2.2
O
traveled by automobiles, including enhanced transit access and
land use approaches that provide compact and focused
development along major transit corridors.
Same actions as identified for LU-2.1, LU-5.4, LU-5.6, and CM-2.1.
ENG
PL
A, D, 1
4
CM-2.3
O
Support the use of hybrid, electric, and low/zero emission vehicles.
Continue to maintain the Green Team Sustainability Action Matrix that
identifies current and proposed efforts that procure vehicles that includes
providing gas -efficient vehicles.
CM
PL AS
A, E, F
7
Amend the Development Code as appropriate to accommodate
alternative fuel service stations and charging facilities.
CM-2.4
O
Replace City vehicles with energy -efficient and alternative fuel
source models when replacing vehicles or adding to the City's fleet
Appendix A: Implementation Plan
A-20 RANCHO CUCAMONGA GENERAL PLAN
Action
L
Ty Pe
a
General Plan Policy
d
c
�N
It
F
C
q
K
c N
O
H
T
u
?
O O
C
e
P
Implementation Action(s)
d
n
w
IL
Hrc
u
-02
a.
Explore the Feasibility of Extending Local Transit Service
Explore the possibility of extending to adjacent jurisdictions in
cooperation with such jurisdictions who could also participate in funding,
if beneficial to the City.
Work with Regional Transit Operators (Omnitrans)
Develop the optimum coordination and integration of bus transit services
between the local City circulator system and the regional service.
Consult with Omnitrans to establish and maintain transit hubs at
CM-3.4
O
Victoria Gardens, Chaffey College, the Metrolink Station, and other
locations as appropriate to facilitate use of transit and transfers
between transit services.
Same action as identified for CM-3 1.
ENG
PL
A
4
Consider and evaluate the possible relocation of the Metrolink
CM-3.5
O
Station to Haven Avenue to provide improved connections to transit
and to support planned transit -oriented land uses along Haven
Avenue.
Work with Metrolink and Southern California Regional Rail Authority
(SCRRA) to study the feasibility of moving the Metrolink Station from its
ENG,
current location to Haven Avenue. Explore options for alternative funding
PL
RD
E. F
6
from sources other than the General Fund, such as grants, and
specifically grants that promote transit -oriented development.
In addition to requiring private development to provide transit
amenities, consult with regional transit operators to provide
CM-3.6
O
attractive and convenient bus stops, including shadehveather
protection, seats, transit information, and bus shelters as
appropriate.
Same action as identified for CM-3.1. Also, develop a program, with
identified funding sources, for providing amenities at bus stops in the
ENG
PL
D
4
City.
Continue to develop and maintain a citywide bicycle network of off-
street bike paths, on -street bike lanes, and bike streets to provide
CM-33
O
O
connections between neighborhoods, schools, parks, civic
center/facilities, recreational facilities, and major commercial
centers.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-23
Action
Ty
pe
a
d
d
General Plan Policy
d
0
d
K
_
o' a
of
>
u
A
O Orr
C
'_'
d
.�
Implementation Action(s)
E a Q.
e
o
ILo
0
a
m
a` V)rc
it
a`
Implement the Bicycle Plan pursuant to Figure CM-6. Update the City's
Bicycle Circulation Plan in a format suitable for obtaining public funding.
Develop the planning, implementation, and design details of the bicycle
facility and amenity elements of the Community Mobility Chapter,
including the setting of implementation priorities and the identification of
both capital and operating funding sources. Implementation should
focus on adding a north -south trail along either Deer Creek or
Cucamonga Creek as a first priority.
Update the City's Trails Implementation Plan to m intain consistency
A D
with the General Plan.
ENG
PL
E, I
4
Review City ordinances to ensure that an adequate mechanism exists to
manage the use of trails only by authorized categories of users.
Implementation of the Bicycle Plan may require traffic signalization at the
crossing of bike paths with arterial roadways to facilitate the safe
crossing of those arterials by bicyclists and pedestrians. Signals should
be convenient to bicyclists with accessible push -buttons to activate the
signal. Provide traffic control push button devices at convenient
locations for bicyclists at signalized intersections on the identified Bicycle
Network
CM3.8
O
O
Continue to encourage the provision of bicycle facilities, such as
bicycle lockers and secure bike parking, throughout the City.
Identify existing locations where bicycle lockers and secure bicycle
parking could be provided at key locations throughout put the City, and
develop a funding and implementation plan.
Encourage/require the provision of bicycle lockers and secure bike
parking for major development projects, as defined in the Development
PL
ENG
A, D,
4
Code.
E, F, H
Modify the Development Code to require provision of bicycle parking
spaces, bicycle lockers, and, as appropriate, showers for bicycle riders at
new buildings providing significant employment, at transit stations, in the
commercial districts, and at recreational destinations in the City.
Identify and implement a dedicated funding source for
CM-3.9
O
implementation and completion of the Bicycle Network as identified
in the Bicycle Plan.
Same action as identified for CM-3.7
ENG
E. F
4
CM-
O
Continue to complete the installation of sidewalks and require new
3.10
development to provide sidewalks.
Use the CIP to identify a schedule for installing new and replacement
sidewalks throughout the City, placing priority on installing missing
ENG
sidewalks near schools and activity centers, and replacing sidewalks that
D.
have been identified as hazardous to public safety.
Appendix A: Implementation Plan
A-24 RANCHO CUCAMONGA GENERAL PLAN
Action
k
Ty
pe
s
3
u
>
m
General Plan Policy c
y
C
2
O
V
O
00
A
t�J
N
O O
C
e
P
Implementation Action(s)
Ic
; 0
=
c
IL
a
to
o.
to 1K
u
0.
Strstegize with Foundation members to increase the range of
CS
A. H
involvement in Foundation events.
Provide a comprehensive, Interconnected off -road trail system that
GS-61
O
provides alternative mobility choices throughout the entire City and
Increases connectivity.
Continue to implement the principles of the Trails Implementation Plan.
PL
CS
ENG
A. I
4
Connect trails In Rancho Cucamonga to traits in the San Bernardino
CS-6.2
O
National Forest and other hillside open space areas. These trails
shall include trailheads with vehicle parking and other amenities.
Coordinate with Federal and Stale agencies to facilitate funding and
CS
acquisition of trail connections from the City to the San Bernardino
PL
ENG
A
5
National Forest. Connect new trails with the North Etiwanda Preserve.
CS-6.3
O
Continue to Incorporate, where feasible, regional and community
trails along utility corridors and drainage channels.
Continue to make trail connections within the City on existing public-
PL
CS,
A
5
agency owned properties.
ENG
Continue to maintain and pursue the development of planned trails
CS-6.4
O
and facilities for equestrian use within the Equestrian/Rural Area
designation.
Continue to ensure that trails accommodate equestrian users through
B
details outlined in the Trails Implementation Plan within north Alta Loma
PL
ENG
C,
4
and Etiwanda.
Improve existing trails by removing barriers, applying sustainability
CS-6.5
O
concepts, improving safety and function, and providing access to
adjacent trails.
Continue to program funding into the CIP for the improvements to
ENG
PL, BS
A
4
deficient equestrian trails, as outlined in the Trails Implementation Plan.
Require new development to provide access to adjacent trails and
CS-6.6
O
provide appropriate trail amenities (e.g., benches, drinking
fountains, hitching posts, bike stands, and other amenities) for all
new projects located adjacent to regional or community trails.
Require new development projects adjacent to Regional or Community
PL
ENG
A. K
4
Trails to provide access to and amenities for trails.
CS-6.7
O
Continue to credit publically accessible trailway acreage towards
meeting parkland dedication standards.
Continue to allow parkland credit for trails within development projects,
PL
ENG
A. K
4
subject to adopted criteria.
Appendix A: Implementation Plan
A-36 RANCHO CUCAMONGA GENERAL PLAN
Action
Z`
Ty pe
c
m
General Plan Policy
c
m
C
d
A
0
m
c
K
c N
of
en
oc
.a
Implementation Action(s)
c
a
a.
a
to
a.
ar rc
u
a
Develop a listing of acceptable fire-resistant plant types to be
PL
PW'
ENG.
A
3
incorporated into new and rehabilitated development sites.
FD
Encourage streetscape design and landscaping programs for
LU-10.4
O
commercial frontages that create vibrant places which support
walking, bicycling, transit, and sustainable economic development.
Same action as identified for LU-3.4.
PL
RNG.
A
4
Consult with and coordinate with the Santa Fe Railway to develop
LU-10.5
O
and install a landscape plan for the enhancement of the railroad
right-of-way.
Inventory and assess the landscaping needs of the rail corridor, and
PL
ENG,
A
6
consult with the rail agency to develop a plan.
RD
Continue to pursue strategies to reduce long -tens operation and
LU-10.6
O
maintenance costs within the City's Landscape Maintenance
Districts and other publicly funded areas.
Inventory and prioritize the removal of turf areas within landscape
medians to be replaced with plantings that reduce long-term operations
PW
ENG
A
5
and maintenance costs.
Continue to implement and update as necessary the City's Sign
LU-11.1
O
O
Ordinance in order to provide for a reasonable system of review
and Incentives for well -designed signs throughout the City.
Establish a periodic review schedule of all City ordinances that govern
aesthetics to determine if industry standards have changed or if other
PL
RD
A, K
4
objectives are desirable that require amendments.
Continue to require the undergrounding of utility lines and facilities
LU-11.2
O
O
wherever feasible to minimize the unsightly appearance of
overhead utility lines and utility enclosures.
Require undergrounding of utilities for new development. Develop a
A B
strategy and prioritization list for the undergrounding utilities in developed
ENG
PL
O,
4
areas.
LU-11.3
O
O
Require communication towers to be located and designed to blend
with the surrounding environment.
Review and update design guidelines for the siting and general
appearance of communication towers to facilitate the least amount of
PL
A
4
visual intrusion. Emphasize use of stealth and architecturally integrated
antenna.
Ensure that streetscape design along roadways creates a strong
LU-12.1
O
landscaped edge, provides a coherent high -quality appearance
along each route, and enhances the image of adjacent
development.
Appendix A: Implementation Plan
RANCHO CUCAMONGA G ENE RAL PLAN A-13
Action
L
Ty
pe
n
m
m
General Plan Policy
y
ie
a
L=
`m
c
e
N
of
p
Im
T
Y
Implementation Action(s)
A
L CL
C
Z+
0
o
Q
n
r.
C
?
0.
a.
m
a
rn z
u-
a
PL, AS,
A. B,
Same actions as identified for RC4.1 to RC4.5.
ENG
ENG,
CM, BS,
C, E,
3
PW, FIN
G, I
Encourage development of transit -oriented and infill development,
PS-12.3
O
and encourage a mix of uses that foster walking and alternative
transportation.
Same action as identified for RC-4.4.
PL
ENG
A, 1
3
Provide enhanced bicycling and walking infrastructure, and support
PS-12.4
O
public transit, including public bus service, the Metrolink, and the
potential for Bus Rapid Transit (BRT).
Same action as identified for RC-4.4.
PL
ENG
A, 1
3
Provide green building incentives, assess green building
techniques as a formal stage of project review, and develop a green
PS-12.5
O
building ordinance or program that addresses both new and
existing buildings. Adaptation strategies will also include increased
water efficiency in buildings.
Same actions as identified for RC-6.1 to RC-6.4
PL
BN'G
A, 1, K
4
Encourage efforts to reduce waste generation and re -use and
PS-12.6
O
support increased recycling and composting opportunities with a
focus on large commercial and industrial waste producers.
Same action as identified for PF-7.1,
ENG
PL
A
3
PS-12.7
O
O
Support tree planting, planting more vegetation (including native
and drought -resistant planting), and preservation of open space.
Same actions as identified for RC-1. 1, RC-8.1 to RC-8.7.
PL
PW ,
A, 1
4
PS-12.8
O
Develop green procurement plans and ensure energy savings in
City operations and maintenance.
Same actions as identified for RC-5.1 to RC-5.3.
AS
CM, FIN,
A,B. C,
4
PW
E, K
Develop energy- or climate change-themed publications and
workshops, facilitating energy audits for residents, and establishing
PS-12.9
O
partnerships to reduce greenhouse gas emissions. Increase public
awareness about climate change, and encourage residents and
businesses to become involved in activities and lifestyle changes
that help reduce greenhouse gas emissions.
Same action as identified for RC-5.1.
CM
ENG
A, K
4
Consider the compatibility of proposed land uses with the noise
environment when preparing or revising community and/or specific
PS-13.1
O
plans and when reviewing development proposals. The contour
map depicting future noise levels (Figure PS-10) should be used by
the City as a guide to land use/noise compatibility.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-57
w
bIUNICIPAL UTILITY
RANCHO
CUCAMONGA
Action
#`Ce� fi+F_:
Ty pea
d
m
General Plan Policy
ma
Z'
o
v
01
y
K
F
C
y
D:
rna
C •y
N
T
V
N
G
G
m
m
Implementation Action(s)
R
E
n m
c
o
o
a
°
a
a
W
o`
w
y 0:
W.
o`
RC-8.7
O
O
Support protection of natural habitat areas for ecological,
educational, and other scientific study purposes.
Same action as identified for RC-8.3.
PL
ENG
A, 1
4
PF-1.1
O
Continue to implement high -quality standards for new public
facilities and improvements to existing buildings.
Design and build all City buildings to serve as a model for quality
architectural treatment and green building design in all new and
PL
ENG
A, B, C
5
remodeled civic facilities.
PF-1.2
O
Promote community facilities as focal points for gatherings, events,
and celebrations.
Maintain all public facilities and buildings to address the needs of the
various neighborhoods within the City. Advertise the availability of civic
PW
CS, LIB
A, B, C
3
facilities to community groups.
PF-1.3
O
Locate new community facilities in neighborhoods and centers
where they will serve populations with the greatest needs.
Review and assess the needs for the location of community facilities as
CS
ENG, PL
A
6
neighborhoods evolve.
PF-1.4
O
O
Maintain public facilities and optimize their usefulness during their
lifespan.
Continue with proper maintenance programming and funding levels for
PW
CS, LIB,
A, B, C
4
existing public facilities.
AC
PF-1.5
O
O
continue to incorporate low -maintenance features into public
facilities consistent with the City's sustainability plan.
Replace features of public facilities with lower maintenance types as part
PW
PL, CS,
A B C
3
of the on -going maintenance program.
BS
PF-1.6
O
Maintain multi -functional, flexible, and complementary space at
community facilities.
Same action as identified for PF-1.2.
CS
PW
A, B, C
3
Maximize public facility use by sharing with nonprofit
organizations, school districts, and community organizations. Look
PF-1.7
O
for opportunities to create joint -use community space at facilities
owned by private organizations such as faith -based groups and
service clubs.
Same action as identified for CS-2.5.
CS
A
4
Consult with local school districts to enhance the development of
PF-2.1
O
O
joint -use agreements, allowing for optimum use of school facilities,
to provide broad community benefits such as public safety and
education.
Continue and expand joint use of facilities to achieve even greater
CS
SD
A, K
5
optimization of school facilities to service the entire community.
Appendix A: Implementation Plan
A-44 RANCHO CUCAMONGA GENERAL PLAN
Action
Ty pe
a
General Plan Policy
o
u
m
B
0
�
>
u
M
.a
a
°1
0
Implementation Action(s)
E
a m
c
`o_
oo
Pursue efforts to reduce energy consumption through appropriate
RC4.1
O
energy conservation and efficiency measures throughout all
segments of the community.
As it becomes economically practical, identify sources and replace
A B
imported, non-renewable energy resources with domestic renewable
PL
ENG,
C. E,
5
energy sources such as solar and wind energy, recycled municipal solid
CM
G
waste, and green waste.
Promote the use of renewable energy and alternative energy
technology, and support efforts to develop small-scale, distributed
energy generation (e.g. solar, wind, cogeneration, and biomass) to
RC4.2
O
reduce the amount of electricity drawn from the regional power grid
and reduce the use of natural gas, while providing Rancho
Cucamonga with a greater degree of energy and economic self-
sufficiency.
Provided that there would not be a decline in services to City residents or
A B
undue tax burden, use of energy efficiency and renewable energy
ENG
AS, CM,
C. D,
6
resources will be employed for approving capital and operational
PL
E, G. I
expenditures.
RC4.3
O
Encourage the use of solar energy systems in homes and
commercial businesses.
Establish design criteria for active and passive solar applications within
PL
ENG,
A
5
development proposals.
BS
Reduce operational energy requirements through sustainable and
RC4A
O
O
complementary land use and circulation planning. Support
implementation of State mandates regarding energy consumption
and greenhouse gas reduction, including AB32 and SB375.
Promote land use and circulation patterns that result in multi -purpose
automobile tdps and that facilitate the use of local and regional transit;
continue to advance land use patterns that provide employment and
PL
ENG
A, 1
3
housing opportunities for City residents in a manner that allows for
practical options for mobility other than by automobile.
Support the development of private sources of sustainable and
RC4.5
O
O
environmentally friendly energy supplies, provided these are
consistent with City aesthetic and public safety goals.
Continue to make the recruitment and retention of "green" industries a
RD
GM'
A, G
4
priority in conjunction with economic development strategies.
PL
Serve as a role model by adopting recognizable standards and
incorporating the use of sustainable strategies for new and existing
RC-5.1
O
public buildings that maximize occupant health and productivity,
minimize operating costs, and provide good environmental
stewardship.
Appendix A: Implementation Plan
A-40 RANCHO CUCAMONGA GENERAL PLAN
PARKS
RANCHO
CUCAMONGA
Action
L
Ty pe
a
m
General Plan Policy
.o
u
c
3
y
m
K
25
•E
rY
N
T
U
a
A
0
O O
C
✓=
Y
0•d
Implementation Action(s)
E
a uai
c
o
o
IL
:
a
a
ro
a
o d
rn R
o
a
Q.
Continue to assess that the recreational needs of the City's residents are
consistent with the City's parkland standard, and determine possible re-
CS
PL, ENG
A
4
use or conversion of infill sites for recreational uses to serve areas within
the City with a disproportionate amount of parkland.
Develop parks that contribute to active and healthy lifestyles, and
CS-1.2
O
allow for a balanced commitment to both organized recreation
activities and passive park environments.
Move forward with plans to continue to develop Central Park, expand
Etiwanda Creek Park, add one new Community park, one new Special
CS
CM,
A
4
Use Facility, and two new Neighborhood parks. Incorporate active and
ENG
passive facilities into new parks.
CS-1.3
O
Continue to develop Central Park as envisioned in the Central Park
Master Plan.
Continue to prioritize implementation of the improvements for Central
CS
ENG, PL
A
4
Park as part of the City's CIP process.
CS-1.4
O
Pursue developing an outdoor special use facility that includes a
multi -field sports complex.
Continue to prioritize development of a sports complex and determine
CS
ENG,
A
4
funding mechanisms, including corporate sponsorships/partnerships.
RD, PL
Continue to require new development to provide needed park
CS-1.5
O
facilities through the various measures and tools available to the
City (e.g., in -lieu fees and/or land dedication).
Continue to make the provision of turn -key park and recreational facilities
PL
ENG,
A, D, I,
4
the first priority over in -lieu fees for new residential development.
CS
K
Pursue and expand joint -use of public lands that are available and
CS-1.6
O
suitable for recreational purposes, including school district
properties and flood control district, water district, and other utility
properties.
Continue to coordinate with other agencies holding public lands for
possible joint -use, trail easements, or re -use to serve park/recreation
PL
ENG
A, K
4
particularly with school district properties.
Encourage public safety and compatibility with adjacent uses
CS-1.7
O
through park location and design, including the location of
buildings, lighting, parking, public transit, emergency access, and
pedestrian/bicycle access.
Continue to utilize the Recreation Needs and System Recommendation
CS
PL, ENG
A, K
4
Study and the park master plan concept in park planning.
CS-1.8
O
O
Continue to build, renovate, and maintain parks in a manner that is
environmentally sustainable.
Appendix A: Implementation Plan
A-32 RANCHO CUCAMONGA GENERAL PLAN
Action
Ty pe
a
d
d
General Plan Policy
d
c
u
ry
0
O
rn
K
Z
0 c
C
eQ
n
Implementation Action(s)
E
n
R
a.
rn
a
rq K
2
S
Continue to provide for maintenance, renovation and new construction of
City parks in compliance with City policies, upgrading wastewater
ENG
CS PL,
A B C
4
systems as needed, and as technology evolves, substitute material that
PW
could reduce maintenance costs and is environmentally friendly.
Develop intermediate sized (10-12 acre) parks with lighted athletic
CS-1.9
O
fields and appropriate parking to accommodate community sports
programs.
Update the City's Recreation Needs and Systems Recommendation
Study to determine the location for intermediate -sized park sites
CS
PL, ENG
A, B, C
7
specifically (developed for athletic field use. This may include joint -use
facilities with a school district.
Integrate Healthy RC activities, classes, and programs with
CS-2.1
O
recreational services that contribute to the health, fitness, and
minds of participants.
Continue to provide City -sponsored recreational programs and classes at
CS
CM
A, 1
4
recreational centers/parks.
CS-2.2
O
O
Provide high -quality Community Services programs that are flexible
and responsive to the community's changing needs.
Continue to provide active recreational opportunities through leagues
CS
CM
A, 1
4
and organized sports.
Plan and conduct community special events that bring residents
CS-2.3
O
together to create an enhanced quality of life and promote
economic development
Plan for community events through the annual budgeting process.
CS
RD, CM
A, 1
4
Continue to consult with non-profit sports organizations and
CS-2.4
O
recreational groups to support their offering of diverse recreational
programs that complement and supplement those of the City.
Continue to serve as a clearinghouse to coordinate among the various
CS
A, 1
4
sport leagues to make fields and facilities available.
Continue to make community facilities and park amenities available
CS-2.5
O
for rental by community residents, non-profit groups and
businesses to meet their recreational and business needs.
Continue to promote the City's various rental facility types by ensuring
that a complete summary of locations, facilities, services, fees, and
CS
A
4
applications are available.
I
Continue broad -based public outreach activities that inform
CS-2.6
O
residents of all available Community Services programs and
services, and obtain input from the community regarding program
and service needs.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-33
Action
i
TV
pe
m
m
c
General Plan Policy
m
y
g
�?
o
n
`
o
m
K
C
C
y
0
N
r
u
=
R
O O
0
Implementation Action(s)
E
a aoi
c
o
ao
a`
m
a`
rn C
RC-8.7
O
O
Support protection of natural habitat areas for ecological,
educational, and other scientific study purposes.
Same action as identified for RC-8.3.
PL
ENG
A. 1
4
PF-1.1
O
Continue to Implement high -quality standards for new public
facilities and improvements to existing buildings.
Design and build all City buildings to serve as a model for quality
architectural treatment and green building design in all new and
PL
ENG
A, B. C
5
remodeled civic facilities.
PF-1.2
O
Promote community facilities as focal points for gatherings, events,
and celebrations.
Maintain all public facilities and buildings to address the needs of the
various neighborhoods within the City. Advertise the availability of civic
PW
CS, LIB
A, B, C
3
facilities to community groups.
PF-1.3
O
Locate new community facilities in neighborhoods and centers
where they will serve populations with the greatest needs.
Review and assess the needs for the location of community facilities as
CS
ENG, PL
A
6
neighborhoods evolve.
PF-1.4
O
O
Maintain public facilities and optimize their usefulness during their
lifespan.
Continue with proper maintenance programming and funding levels for
PW
CS, LIB,
A, B, C
4
existing public facilities.
AC
PF-1.5
O
O
Continue to incorporate low -maintenance features into public
facilities consistent with the City's sustainability plan.
Replace features of public facilities with lower maintenance types as part
PW
PL, CS,
A, B, C
3
of the on -going maintenance program.
BS
PF-1.6
O
Maintain multi -functional, flexible, and complementary space at
community facilities.
Same action as identified for PF-1.2.
CS
PW
A, B, C
3
Maximize public facility use by sharing with nonprofit
organizations, school districts, and community organizations. Look
PF-1.7
O
for opportunities to create joint -use community space at facilities
owned by private organizations such as faith -based groups and
service clubs.
Same action as identified for CS-2.5.
CS
A
4
Consult with local school districts to enhance the development of
PF-2.1
O
O
joint -use agreements, allowing for optimum use of school facilities,
to provide broad community benefits such as public safety and
education.
Continue and expand joint use of facilities to achieve even greater
CS
SD
A, K
5
optimization of school facilities to service the entire community.
Appendix A: Implementation Plan
A-44 RANCHO CUCAMONGA GENERAL PLAN
RAILROAll CROSSINGS
RANCHO
CUCAMONGA
Action
y
TV pe
a
m
General Plan Policy
m
A
N
0
y
F
m
.a
m
0 o
L
c
e
Implementation Action(s)
E
a 0
c
o
a
a.
0
a`
rn K
u
a
Continue to provide a safe and efficient street system in the City, to
CM-1.1
O
support mobility goals, all transportation modes, and the goals of
Managing the Land Use, Community Design, and Historic
Resources Chapter.
Add the intersection improvements listed below to the Capital
Improvement Program (CIP) or appropriate equivalents identified and
approved by the City Engineer in the future that would offset the
identified impacts; implement the improvements as funding becomes
available. Prepare a report on the need for the improvements and their
relationship to the impacts caused by new development in Rancho
Cucamonga.
• Work with Caltrans and SANBAG to implement a new freeway
interchange at 1-15 and Arrow Highway.
• Complete Wilson Avenue between Milliken Avenue and Day
Creek Boulevard.
ENG
A, D, 1
7
• Complete Rochester Avenue between Banyan Street and
Wilson Avenue.
• Pursue Federal funds for a grade separation of the SPRR at
Etiwanda Avenue.
• Complete storm drain and widening of Hellman Avenue from
Foothill Boulevard to Cucamonga Creek.
• Complete Wilson Avenue from East Avenue to Wardman
Bullock.
• Improve the Base Line Road at 1-15 Freeway Interchange.
• Complete Youngs Canyon from Cherry Avenue to Banyan
Street.
Provide an integrated network of roadways that provides for
CM-1.2
O
convenient automobile, transit, bicycle, and pedestrian circulation
movement around the City.
Same actions as identified for CM-2.1 and CM-3.7.
ENG
PL
A, D, 1
4
Complete the circulation system by constructing new roadway
CM-1.3
O
facilities and freeway interchanges pursuant to the Circulation Plan
(Figure CM-2).
Identify in the CIP future projects and new roadways based on available
funding.
ENG
PL
A, D. 1
4
CM-1.4
O
O
Provide access for seniors and those with physical disabilities in all
elements of the transportation system.
Continue to operate the Silver Fox Express. Consult with Omnitrans
regarding providing ACCESS transportation services.
A. E.
Require that all new future transportation facilities have appropriate and
ENG
CS
F H I
4
adequate access for seniors and people with physical disabilities.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-19
Action
I D
TV pe
d
u
General Plan Policy
c
c
d
m
m
m
oa
L
B
o
`y
=
C
u
rna
c •N
Go
O
C
o
Q
Action(s)
_
0
?
0
Q.
IL
Q.Implementation
m
a
H W
i
a
Complete intersection capacity improvements, coordinate traffic signals
utilizing Intelligent Transportation Systems (ITS), and improve striping
and signage. Striping shall maximize room for bike lanes where feasible
and consistent with the Bicycle Plan. Modernize traffic signal equipment
as necessary, and continue to update traffic signal timing and
ENG
PW
A. D
3
synchronization plans to optimize traffic flow along the key arterial
corridors, taking into account the needs of transit, bicyclists, and
pedestrians as well. Invest in the communications infrastructure
necessary to operate a Citywide traffic signal control system.
Continue to design and operate Arterials and intersections for the
CM-4.2
O
safe operation of all modes, including transit, bicyclists, and
pedestrians.
Same action as identified for CIA-4 .1.
ENG
A, D
3
CM-4.3
O
Continue to implement Intelligent Transportation System Measures
and advanced traffic management technologies where appropriate.
Same action as identified for CM-4.1
ENG
PW
E, �'
3
Maintain the City's transportation infrastructure in good condition;
CM-4.4
O
O
develop and maintain adequate funding sources for it's ongoing
maintenance and upkeep.
Continue to implement and follow the schedule for resurfacing streets
ENG
A, D,
4
and streets improvements per the CIP.
E. F
Continue to require that new development participates in the cost of
CM-5.1
O
transportation mitigation and Improvements necessitated by new
development, including non -automobile solutions.
Require payment of Traffic Impact Fees as approved by the City Council,
used to finance specific improvements made necessary by new
development. The relationship between the fees, the cost of the
ENG
PL
D
4
improvements, and new development has been established in fee
analyses approved by the City Council. These fees shall be reviewed
from time to time and adjusted as needed.
Require evaluation of potential traffic and transportation impacts
CM-5.2
O
associated with new development prior to project approval, and
require adequate mitigation measures, including non -automobile
solutions, prior to, or concurrent with, project development.
Require applicants to prepare traffic and transportation impact
assessments consistent with adopted City guidelines and standards.
Continue to require sidewalks, pedestrian paths, and connections to be
ENG
D
4
provided as part of new development projects to improve and enhance
access between neighborhoods, and from neighborhoods to schools,
parks, trails, commercial centers, and other activity centers.
Appendix A: Implementation Plan
A-26 RANCHO CUCAMONGA GENERAL PLAN
Vf)NOWVDflo
OH DNVN
Action
Ty pe
.2y
o
General Plan Policy
d
c
0LD
o
D
W
N
v
a
121
,�,
Implementation Action(s)
E
a
c
o
a
a
y
a
Continue to provide a safe and efficient street system in the City, to
CM-1.1
O
support mobility goals, all transportation modes, and the goals of
Managing the Land Use, Community Design, and Historic
Resources Chapter.
Add the intersection improvements listed below to the Capital
Improvement Program (CIP) or appropriate equivalents identified and
approved by the City Engineer in the future that would offset the
identified impacts; implement the improvements as funding becomes
available. Prepare a report on the need for the improvements and their
relationship to th? impacts caused by new development in Rancho
Cucamonga.
• Work with Caltrans and SANBAG to implement a new freeway
interchange at 1-15 and Arrow Highway.
• Complete Wilson Avenue between Milliken Avenue and Day
Creek Boulevard.
ENG
A, D, 1
7
• Complete Rochester Avenue between Banyan Street and
Wilson Avenue.
• Pursue Federal funds for a grade separation of the SPRR at
Etiwanda Avenue.
• Complete storm drain and widening of Hellman Avenue from
Foothill Boulevard to Cucamonga Creek.
• Complete Wilson Avenue from East Avenue to Wardman
Bullock.
• Improve the Base Line Road at 1-15 Freeway Interchange.
• Complete Youngs Canyon from Cherry Avenue to Banyan
Street
Provide an integrated network of roadways that provides for
Cli
O
convenient automobile, transit, bicycle, and pedestrian circulation
movement around the City.
Same actions as identified for CM-2.1 and CM-3.7.
ENG
PL
A, D, 1
4
Complete the circulation system by constructing new roadway
CM-1.3
O
facilities and freeway interchanges pursuant to the Circulation Plan
(Figure CM-2).
Identify in the CIP future projects and new roadways based on available
ENG
PL
A. D, 1
4
funding.
CM-1.4
O
O
Provide access for seniors and those with physical disabilities in all
elements of the transportation system.
Continue to operate the Silver Fox Express. Consult with Omnitrans
regarding providing ACCESS transportation services.
A. E.
Require that all new future transportation facilities have appropriate and
ENG
CS
F, H, I
4
adequate access for seniors and people with physical disabilities.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-19
Action
L
Ty
pe
3
d
General Plan Policy
C
y
3
R
y
O
w
S
e
ca
h
rr
a
O
T
Y
implementation Action(s)
AE
O
5
`O_
a
a
ur
a`
ur �
LL
a`
Implement street design standards per this General Plan, except
that modified standards may be applied where appropriate on
CM-1.5
O
arterial corridors relating to transit, bicycle facilities, sidewalks, and
on -street parking to be context sensitive to adjacent land uses and
districts, and to all roadway users, including transit, bicycles, and
pedestrians.
Integrate into the CIP process the planning of modified standards for
Foothill Boulevard to accommodate BRT and for other arterials as
ENG
PL
A, D, I
4
appropriate to reflect the bikeway plan and pedestrian improvements
necessary to support Mixed Use districts.
CM-1.6
O
Pursue a railroad grade separation at Etiwanda Avenue and the
BNSF Railway line.
Grade separations currently exist at Haven and Milliken Avenues. Due to
truck traffic associated with the southeast industrial area, the City
ENG
PL
A, E. 1
4
supports creating a railroad grade separation at Etiwanda Avenue and
the BNSF Railway line.
CM-2.1
O
O
Facilitate bicycling and walking citywide.
Implement the Bicycle Master Plan included in the Community Mobility
Chapter.
Require that pedestrian facilities and connections be provided as part of
all development projects, with an emphasis on connections within Mixed
Use districts. Implement all bicyciing and walking policies and Mobility
ENG
PL, RD
A, D, 1
4
Element components.
Preparation and distribute bike route maps and bike facilities information.
Publish and make readily available pedestrian route maps and
pedestrian facilities information.
Encourage all feasible measures to reduce total vehicle miles
CM-2.2
O
traveled by automobiles, including enhanced transit access and
land use approaches that provide compact and focused
development along major transit corridors.
Same actions as identified for LU-2.1, LU-5.4, LU-5.6, and CM-2.1.
ENG
PL
A, D, 1
4
CM-2.3
O
Support the use of hybrid, electric, and low/zero emission vehicles.
Continue to maintain the Green Team Sustainability Action Matrix that
identifies current and proposed efforts that procure vehicles that includes
providing gas -efficient vehicles.
CM
PL,AS,
A, E, F
7
Amend the Development Code as appropriate to accommodate
alternative fuel service stations and charging facilities.
CM-2.4
O
Replace City vehicles with energy -efficient and alternative fuel
source models when replacing vehicles or adding to the City's fleet
Appendix A: Implementation Plan
A-20 RANCHO CUCAMONGA GENERAL PLAN
Action
Ty pe
a
m
General Plan Policy
y
E
v
A
n
d
d
=
w
w
o
r
u
A
�
O p
e
c
o.
Implementation Action(s)
c
°
Q.
a
n
a
?
w�
_
u
•c
a
Complete intersection capacity improvements, coordinate traffic signals
utilizing Intelligent Transportation Systems (ITS), and improve striping
and signage. Striping shall maximize room for bike lanes where feasible
and consistent with the Bicycle Plan. Modernize traffic signal equipment
as necessary, and continue to update traffic signal timing and
ENG
PW
A. D
3
synchronization plans to optimize traffic flow along the key arterial
corridors, taking into account the needs of transit, bicyclists, and
pedestrians as well. Invest in the communications infrastructure
necessary to operate a Citywide traffic signal control system.
Continue to design and operate arterials and intersections for the
CM4.2
O
safe operation of all modes, including transit, bicyclists, and
pedestrians.
Same action as identified for CM-4.1,
ENG
A, D
3
CM4.3
O
Continue to implement Intelligent Transportation System Measures
and advanced traffic management technologies where appropriate.
Same action as identified for CM-4.1.
ENG
PW
A. D
3
E. F
Maintain the City's transportation infrastructure in good condition;
CM-4.4
O
O
develop and maintain adequate funding sources for it's ongoing
maintenance and upkeep.
Continue to implement and follow the schedule for resurfacing streets
ENG
A. D,
4
and streets improvements per the CIP.
E, F
Continue to require that new development participates in the cost of
CM-5.1
O
transportation mitigation and improvements necessitated by new
development, including non -automobile solutions.
Require payment of Traffic Impact Fees as approved by the City Council,
used to finance specific improvements made necessary by new
development. The relationship between the fees, the cost of the
ENG
PL
D
4
improvements, and new development has been established in fee
analyses approved by the City Council. These fees shall be reviewed
from time to time and adjusted as needed.
Require evaluation of potential traffic and transportation impacts
CM-5.2
O
associated with new development prior to project approval, and
require adequate mitigation measures, including non -automobile
solutions, prior to, or concurrent with, project development
Require applicants to prepare traffic and transportation impact
assessments consistent with adopted City guidelines and standards.
Continue to require sidewalks, pedestrian paths, and connections to be
ENG
provided as part of new development projects to improve and enhance
D
4
access between neighborhoods, and from neighborhoods to schools,
parks, trails, commercial centers, and other activity centers.
Appendix A: Implementation Plan
A-26 RANCHO CUCAMONGA GENERAL PLAN
Action
i
Ty pe
a
d
General Plan Policy
c
m
E
m
m
a
u
u
K
_
u
K
C •—
o
H
CD
01,�,
0
I mplementation Action(s)
0.
a`
rn
0.
y 0:
W
a
ED-3.7
O
O
Support access to local and regional educational resources that
provide educational opportunities to local residents and workers.
Coordinate with local and regional centers for higher education to
promote access to and programs for additional educational opportunities.
RD
PL, CM
A
4
ED4.1
O
Encourage high -quality design for infill development and continue
to support new high quality uses.
Same action as identified for LU-5.1 to 5.6.
PL
A. I, K
4
ENG
ED4.2
O
Make green building and green busineri a priority.
Same action as identified for LU-7.1 to 7.3.
PL
RD
A. G
3
ED4.3
O
O
Improve connectivity between development projects to create a
more cohesive atmosphere.
Same action as identified for LU-2.3.
PL
ENG
A
5
ED4A
O
Focus on enhancements to Foothill Boulevard and Haven Avenue.
Same action as identified for LU5.1 to 5.6.
PL
A, I, K
5
ENG
ED4.5
O
Review and understand the fiscal, job creation, and economic
benefits of new proposed uses in the CWs industrial zoned areas.
Focus a special economic development effort on assessing where re -use
or conversion of industrial properties to other uses could occur. Identify
potential conflicts in order to develop a strategy for when such
RD
PL
A, G
5
conversions could be considered a benefit versus a cost.
ED-5.1
O
Engage In regional transit planning efforts.
Continue to be involved in planning efforts to address regional
transportation solutions, particularly those providing transit options. In
PL
ENG
A, K
4
particular, work with Omnitrans in its efforts to establish BRT service in
Rancho Cucamonga.
ED-5.2
O
Continue to capitalize on proximity to Interstate 10, Interstate 15,
State Route 210, and the LA/Ontario International Airport
Review and assess the effectiveness of way -finding signage to ensure
that the City's accessibility to 1-10, 1-15 and SR-210 from major areas of
City commerce hubs is easily ascertained and facilitated. Begin
RD
PL, ENG
A, G
4
programs to improve such signage where it is deficient or confusing.
Maximize the benefits of a major airport just outside of the City's borders.
Provide adequate park and recreational facilities that meet the City
CS-1.1
O
standard of 5.0 acres of parkland (Including trails and special
facilities) for every 1,000 persons.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-31
Vf)NOWVDfID
OHDNH'd
Action
L
Ty pe
a
0
>
m
General Plan Policy
d
m
a
L
m
r
0
a
a
Implementation Action(s)
g'
o
o
a
'
w
`
a
q z
aa
CM-
Continue to provide pedestrian amenities on sidewalks on major
311
O
streets that are key pedestrian routes, including the provision of
benches, shade trees, and trash cans.
Identify key pedestrian travel corridors citywide, and prepare a Citywide
Pedestrian Circulation Study to determine pedestrian amenity needs,
capital and operating funding sources, and a phased implementation
program. Develop a program for gradually installing public amenities
such as streetlights, benches, trash containers, art, drinking fountains,
ENG
PL
C' p
5
landscaping, etc. that will enhance the pedestrian environment and
encourage increased use of transit. Use both the CIP process and other
funding sources, including a program whereby businesses or residents
may sponsor street furniture and/or landscaped areas.
CM-
Continue to require that the siting and architectural design of new
312
O
development promote safety, pedestrian -friendly design, and
access to transit facilities.
Develop standards to be applied to development projects along transit
PL
ENG
I
4
corridors that require transit and pedestrian accessibility.
Establish a number of bike hubs in the City (centralized locations
CM-
O
with convenient bike parking for trip destinations or transfer to
3.13
other transportation modes), at key transit nodes, and at
commercial nodes.
Conduct a study to determine the best locations for bike hubs in the City,
and develop a plan, wayfinding program, and implementation process for
ENG
PL, RD
A, B,
4
providing bike hubs that provide secure bicycle lockers, bike racks, and
C D
connections to transit at key locations in the City
CM-
O
Enhance pedestrian and bicycle access to local and regional
3.14
transit, including facilitating connections to transit.
Same action as identified for CM-3.7.
ENG
PL
1
4
cm-
Coordinate the provision of the non -motorized networks (bicycle
3.15
O
and pedestrian) with adjacent jurisdictions to maximize sub -
regional connectivity.
Same action as identified for CM-3.7.
ENG
PL
A, E, F
4
CM-
O
Establish fixed -route local circulator bus service connecting major
3.16
activity centers.
Explore development of a fixed -route local circulator bus system, station
ENG
PL
A, E. H
5
location, and funding mechanisms.
Continue to implement traffic management and traffic signal
CM-4 1
O
operations measures along the arterial roadway to minimize delay
and congestion for all modes, without adversely impacting transit,
bicycles, and pedestrians.
Appendix A. Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-25
Action
Z�
Ty
pe
e
u
General Plan Policy
c
d
c.
i'
Z
d
M
a.
u
ry
m
m
o o
2^
6
c
o.
Implementation Action(s)
c
=
;_
a
a.
to
a
91 K
U.
a
Complete intersection capacity improvements, coordinate traffic signals
utilizing Intelligent Transportation Systems (ITS), and improve striping
and signage. Striping shall maximize room for bike lanes where feasible
and consistent with the Bicycle Plan. Modernize traffic signal equipment
as necessary, and continue to update traffic signal timing and
ENG
PW
A. D
3
synchronization plans to optimize traffic Row along the key arterial
corridors, taking into account the needs of transit, bicyclists, and
pedestrians as well. Invest in the communications infrastructure
necessary to operate a Citywide traffic signal control system.
Continue to design and operate arterials and intersections for the
CM-4.2
O
safe operation of all modes, including transit, bicyclists, and
pedestrians.
Same action as identified for CM-4.1.
ENG
A, D
3
CM-4
O
Continue to implement Intelligent Transportation System Measures
.3
and advanced traffic management technologies where appropriate.
Same action as identified for CM-4.1.
ENG
PW
E,
3
FD,
Maintain the City's transportation infrastructure in good condition;
CM-44
O
O
develop and maintain adequate funding sources for it's ongoing
maintenance and upkeep.
Continue to implement and follow the schedule for resurfacing streets
A, D,
and streets improvements per the CIP.
ENG
E. F
4
Continue to require that new development participates in the cost of
CM-5.1
O
transportation mitigation and improvements necessitated by new
development, including nonautomobile solutions.
Require payment of Traffic Impact Fees as approved by the City Council,
used to finance specific improvements made necessary by new
development. The relationship between the fees, the cost of the
ENG
PL
D
4
improvements, and new development has been established in fee
analyses approved by the City Council. These fees shall be reviewed
from time to time and adjusted as needed.
Require evaluation of potential traffic and transportation impacts
CM-5.2
O
associated with new development prior to project approval, and
require adequate mitigation measures, including non -automobile
solutions, prior to, or concurrent with, project development
Require applicants to prepare traffic and transportation impact
assessments consistent with adopted City guidelines and standards.
Continue to require sidewalks, pedestrian paths, and connections to be
provided as part of new development projects to improve and enhance
ENG
D
4
access between neighborhoods, and from neighborhoods to schools,
parks, trails, commercial centers, and other activity centers.
Appendix A: implementation Plan
A-26 RANCHO CUCAMONGA GENERAL PLAN
FUTURE & UNFUNDED
RANCHO
CUCAMONGA
Action
Ty
pe
a
c3
General Plan Policy
o
y
m
>
m
N
o:
C •a
p
H
u
o o
E
!'
c
m
Implementation Action(s)
E
a»
c
o
a°
a
rn
a`
in K
U.
a
Continue to provide a safe and efficient street system in the City, to
CM-1.1
O
support mobility goals, all transportation modes, and the goals of
Managing the Land Use, Community Design, and Historic
Resources Chapter.
Add the intersection improvements listed below to the Capital
Improvement Program (CIP) or appropriate equivalents identified and
approved by the City Engineer in the future that would offset the
identified impacts; implement the improvements as funding becomes
available. Prepare a report on the need for the improvements and their
relationship to the impacts caused by new development in (tancho
Cucamonga.
• Work with Caltrans and SANBAG to implement a new freeway
interchange at 1-15 and Arrow Highway.
• Complete Wilson Avenue between Milliken Avenue and Day
Creek Boulevard.
ENG
A, D, 1
7
• Complete Rochester Avenue between Banyan Street and
Wilson Avenue.
• Pursue Federal funds for a grade separation of the SPRR at
Etiwanda Avenue.
• Complete storm drain and widening of Hellman Avenue from
Foothill Boulevard to Cucamonga Creek.
• Complete Wilson Avenue from East Avenue to Wardman
Bullock.
• Improve the Base Line Road at 1-15 Freeway Interchange.
• Complete Youngs Canyon from Cherry Avenue to Banyan
Street.
Provide an integrated network of roadways that provides for
CM-1.2
O
convenient automobile, transit, bicycle, and pedestrian circulation
movement around the City.
Same actions as identified for CM-2.1 and CM-3.7.
ENG
PL
A, D, 1
4
Complete the circulation system by constructing new roadway
CM-1.3
O
facilities and freeway interchanges pursuant to the Circulation Plan
(Figure CM-2).
Identify in the CIP future projects and new roadways based on available
ENG
PL
A, D, 1
4
funding.
CM-1.4
O
O
Provide access for seniors and those with physical disabilities in all
elements of the transportation system.
Continue to operate the Silver Fox Express. Consult with Omnitrans
regarding providing ACCESS transportation services.
A. E.
Require that all new future transportation facilities have appropriate and
ENG
CS
F, H, I
4
adequate access for seniors and people with physical disabilities.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-19
Action
L
Ty pe
a
y
General Plan Policy
y
oo,
N
0
m
C
2
K
m N
rn
o o
c
�'
oc
s
Implementation Action(s)
E
a
a
y
Q.
hrc
v
a
Complete intersection capacity improvements, coordinate traffic signals
utilizing Intelligent Transportation Systems (ITS), and improve striping
and signage. Striping shall maximize room for bike lanes where feasible
and consistent with the Bicycle Plan. Modernize traffic signal equipment
as necessary, and continue to update traffic signal timing and
ENG
PW
A, D
3
synchronization plans to optimize traffic Flow along the key arterial
corridors, taking into account the needs of transit, bicyclists, and
pedestrians as well. Invest in the communications infrastructure
necessary to operate a Citywide traffic signal control system.
Continue to design and operate arterials and intersections for the
CI,1-4.2
O
safe operation of all modes, including transit, bicyclists, and
pedestrians.
Same action as identified for CM-4.1.
ENG
A, D
3
CM4.3
O
Continue to implement Intelligent Transportation System Measures
and advanced traffic management technologies where appropriate.
Same action as identified for CM-4.1.
ENG
PW
A. D'
3
E,
Maintain the City's transportation infrastructure in good condition;
CM-4.4
O
O
develop and maintain adequate funding sources for it's ongoing
maintenance and upkeep.
Continue to implement and follow the schedule for resurfacing streets
ENG
A, D,
and streets improvements per the CIP.
E, F
4
Continue to require that new development participates in the cost of
CM-5.1
O
transportation mitigation and improvements necessitated by new
development, including non -automobile solutions.
Require payment of Traffic Impact Fees as approved by the City Council,
used to finance specific improvements made necessary by new
development. The relationship between the fees, the cost of the
ENG
PL
D
4
improvements, and new development has been established in fee
analyses approved by the City Council. These fees shall be reviewed
from time to time and adjusted as needed.
Require evaluation of potential traffic and transportation impacts
CM-5.2
O
associated with new development prior to project approval, and
require adequate mitigation measures, including non -automobile
solutions, prior to, or concurrent with, project development.
Require applicants to prepare traffic and transportation impact
assessments consistent with adopted City guidelines and standards.
Continue to require sidewalks, pedestrian paths, and connections to be
ENG
D
4
provided as part of new development projects to improve and enhance
access between neighborhoods, and from neighborhoods to schools,
parks, trails, commercial centers, and other activity centers.
Appendix A: Implementation Plan
A-26 RANCHO CUCAMONGA GENERAL PLAN
Action
Ty pe
a
General Plan Policy
d
R
O
N
Ix•C
N
ot
C43
c`y
O
N
a
O
A
A
O O
C
T+
'o
o.
Implementation Action(s)
E
a w
c
o
o
a
a
w
Q.
m at
u.
a
Expand recreation and cultural attractions to enhance
ED-2.3
O
tourismlvisitor potential and to boost sales and transient
occupancy tax.
Develop brochures or links from the City's web site to showcase the
various recreational and cultural venues to attract visitors to the City.
Enhancement of cultural amenities, including regional entertainment
RD
CS
A
7
options, recreation, and historic preservation, will help to embellish the
City's reputation as a destination for a wide range of visitors.
Expand lodging choices in the. City through the recruitment and
ED-2.4
O
placement of full -service hotels that will complement the existing
select -service hotel portfolio.
Review and update marketing strategies (land surveys, infrastructure
availability, and modes of transportation) to solicit the development of a
full -service lodging facility. Make sure that zoning regulations can
RD
PL
A, G
4
accommodate a full -service hotel at desired locations.
ED3.1
O
O
Continue to make public safety a priority.
Use the annual budgeting process to allocate funding for public safety
services, equipment, and facilities commensurate with the City's service
CM
PD, FD
A
6
objectives.
ED-3.2
O
Provide community and cultural amenities.
Same action as identified for ED-2.3.
CS
CM, RD
A
4
ED-3.3
O
Maintain a healthy fiscal balance.
Use the annual budgeting process to check that revenues from all
sources continue to more than match projected spending.
CM
AS, FIN
A, G
1
ED-3.4
O
O
Improve internal circulation for all modes of transportation,
consistent with the concept of "Complete Streets".
Same action as identified for LU-3.1 to 3.8.
ENG
PL
A' G,
4
ED-3.5
O
Facilitate development of additional local and regional
entertainment venues.
Focus a special economic development team on the task of working
towards attracting developers and investors interested in responding to
RD
PL
A. G
6
local and regional demand for new entertainment options.
ED-3.6
O
Leverage the City's quality of life amenities to attract more
knowledge -based workers.
Expand the Economic Development Strategy to market Rancho
Cucamonga's civic assets, including parks, recreation and community
RD
PL, CS
A, G
4
enrichment facilities and programs, trails, and quality school districts.
Appendix A: Implementation Plan
A-30 RANCHO CUCAMONGA GENERAL PLAN
Action
I
Ty
pe
General Plan Policy
a
m
m
a
2
m
`Fy
1
«
c
y
P
C
N _- __ -
0
o
I
u
a
m$
Implementation Action(s)
c
O
a m
e
0.
r'a Ir
ILLA.
PL, AS,
A B
Same actions as identified for RC-4.1 to RC4.5.
ENG
ENG,
C, E,
3
CM, BS,
G, I
PW, FIN
Encourage development of transit -oriented and infill development,
PS-12.3
O
and encourage a mix of uses that foster walking and alternative
transportation.
Same action as identified for RC4.4.
PL
ENG
A, 1
3
Provide enhanced bicycling and walking Infrastructure, and support
PS-12.4
O
public transit, including public bus service, the Metrolink, and the
potential for But Rapid Transit (BRT).
Same action as identified for RC4.4.
PL
ENG
A. 1
3
Provide green building Incentives, assess green building
techniques as a formal stage of project review, and develop a green
PS-12.5
O
building ordinance or program that addresses both new and
existing buildings. Adaptation strategies will also include increased
water efficiency in buildings.
Same actions as identified for RC-6.1 to RC-6.4
PL
BS
A, I, K
4
ENG
Encourage efforts to reduce waste generation and re -use and
PS-12.6
O
support increased recycling and composting opportunities with a
focus on large commercial and Industrial waste producers.
Same action as identified for PF-7,1.
ENG
PL
A
3
PS-12.7
O
O
Support tree planting, planting more vegetation (including native
and drought -resistant planting), and preservation of open space.
Same actions as identified for RC-1.1, RC-8.1 to RC-8.7.
PL
ENGPW '
A, I
4
PS-12.8
O
Develop green procurement plans and ensure energy savings in
City operations and maintenance.
Same actions as identified for RC-5.1 to RC-5.3.
AS
CM, FIN,
A,B, C,
4
PW
E, K
Develop energy- or climate change-themed publications and
workshops, facilitating energy audits for residents, and establishing
PS-12.9
O
partnerships to reduce greenhouse gas emissions. Increase public
awareness about climate change, and encourage residents and
businesses to become involved in activities and lifestyle changes
that help reduce greenhouse gas emissions.
Same action as identified for RC-5.1.
CM
ENG
A, K
4
Consider the compatibility of proposed land uses with the noise
environment when preparing or revising community and/or specific
PS-13.1
O
plans and when reviewing development proposals. The contour
map depicting future noise levels (Figure PS-10) should be used by
the City as a guide to land use/noise compatibility.
Appendix A: Implementation Plan
RANCHO CUCAMONGA GENERAL PLAN A-57