HomeMy WebLinkAbout20-27 ResolutionRESOLUTION NO. 20-27
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE
PERMIT DRC2017-00194, APPROVING A REQUEST FOR THE
OPERATION OF A PROPOSED 12,350 SQUARE FOOT CHURCH AND
18,033 SQUARE FOOT SOCIAL BUILDING ON A 3.28 ACRE (143,053
SQUARE FOOT) PROJECT SITE LOCATED AT THE SOUTHWEST
CORNER OF EAST AND WILSON AVENUES IN THE VERY LOW (VL)
RESIDENTIAL DISTRICT OF THE ETIWANDA SPECIFIC PLAN; AND
MAKING FINDINGS IN SUPPORT THEREOF - APN: 0225-123-05.
A. Recitals
1. George Botros filed an application for the approval of Design Review DRC2017-00194,
as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional
Use Permit request is referred to as "the application."
2. On the 22nd day of April 2020, the Planning Commission of the City of Rancho
Cucamonga conducted a noticed public hearing on the application and continued said hearing to
May 20, 2020.
3. 1. On the 27th day of May 2020, the Planning Commission of the City of Rancho
Cucamonga conducted a noticed public hearing on the application and concluded said hearing on
that date.
4. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above -
referenced public hearing on May 27, 2020, including written and oral staff reports, together with
public testimony, this Commission hereby specifically finds as follows:
a. The project site is comprised of a parcel totaling 3.28 acres of land located at the
southwest corner of East and Wilson Avenues; and
b. The existing General Plan Land Use and Zoning Designations for the project site
and adjacent properties are as follows:
PLANNING COMMISSION RESOLUTION NO. 20-27
DR DRC2017-00194 — GEOGE BOTROS
May 27, 2020
Page 2
Land Use
General Plan
Zoning
Site
Vacant Land
Very Low
Very Low (VL) Residential District
Etiwanda Specific Plan
North
Vacant Land
Very Low
Very Low (VL) Residential District
Etiwanda Specific Plan
South
Single -Family
Very Low
Very Low (VL) Residential District
Residences
Etiwanda Specific Plan
East
Vacant Land
Neighborhood
Neighborhood Commercial (NC) District
Commercial
Etiwanda Specific Plan
West
Single -Family
Very Low
Very Low (VL) Residential District
Residences
Etiwanda Specific Plan
C. The proposed project includes the construction of a 12,350 square foot church and
18,033 square foot social building. The two buildings will face each other and will be separated by a
common courtyard. The east (rear) elevation of the church will face East Avenue; and
d. The church will hold services on Sundays between the hours of 12:00 p.m. and
2:00 p.m., followed by a social gathering/meal in the adjacent social hall. The applicant estimates
that attendance for church services, based on their current church attendance in the city of Upland,
will be approximately 150 persons along with 75 children, with increased attendance for religious
holidays and other special events. The church operation will also include monthly family nights,
youth meetings and senior citizen gatherings. Additionally, church members may use the church
and social building for weddings, funerals and other related events. These special events currently
occur no more than once monthly; and
e. Access to the project will be from a single driveway from East Avenue with a
separate emergency access gate at the terminus of Rolling Pasture Place.; and
f. The proposed church provides 167 parking spaces, 28 parking spaces over the
minimum requirement; and
g. The project includes Design Review DRC2017-00193 for the operation of the
church.
3. Based upon the substantial evidence presented to this Commission during the above -
referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above,
this Commission hereby finds and concludes as follows:
a. The proposed use is allowed within the applicable zoning district and complies with
all other applicable provisions of this zoning code, Municipal Code, General Plan, and any
applicable specific plans or city regulations/standards. The subject property has a General Plan
land use designation of Very Low and a zoning designation of Very Low (VL) Residential District.
Churches are permitted in the Very Low (VL) Residential District subject to the approval of a
Conditional Use Permit. Additionally, the project complies with the City's building height, setback,
parking, landscape, and architectural standards.
b. The site is physically suited for the type, density, and intensity of the proposed use
including access, utilities, and the absence of physical constraints and can be conditioned to meet
all related performance criteria and development standards. The project site is located in an area
dominated by residential land uses. The project site will provide vehicle access from a public street
PLANNING COMMISSION RESOLUTION NO. 20-27
DR DRC2017-00194 — GEOGE BOTROS
May 27, 2020
Page 3
and public utilities are located on or adjacent to the project site. The attached standard conditions
include conditions of approval related to parking, noise and light glare to reduce potential impacts
on the surrounding residential land uses.
C. Granting the permit would not be detrimental to the public interest, health, safety,
convenience, or welfare, or materially injurious to persons, property, or improvements in the vicinity
in which the project is located. Environmental studies were prepared by the applicant's consultants
reviewing the projects potential impact on the environment related to air quality/greenhouse gasses,
biological resources, noise, and traffic. The reports determined that the project would not have a
negative impact on the surrounding land uses.
4. The Planning Department staff has determined that the project is categorically
exempt from the requirements of the California Environmental Quality Act (CEQA) and the City's
CEQA Guidelines. The project qualifies under a Class 32 exemption under State CEQA Guidelines
Section 15332 - In -Fill Development Projects for the following reasons: (1) the project is consistent
with the applicable General Plan designations and all applicable General Plan policies as well as
with the applicable zoning designation and regulations, (2) the proposed development occurs within
the City limits on a project site of no more than five acres substantially surrounded by urban uses,
(3) the project site has no value as a habitat for endangered, rare or threatened species, (4)
approval of the project would not result in any significant effects relating to traffic, noise, air quality,
or water quality, and (5) the site can be adequately served by all required utilities and public
services.
The General Plan land use designation is Very Low and the zoning designation is Very Low (VL)
District, which permits the development and operation of a church subject to a conditional use
permit. The project complies with the City's development standards and design guidelines, including
setbacks, height, lot coverage, and design requirements. The project site is located within the City
limits, is under five acres, and is surrounded by existing residential development and City
infrastructure. The following are the five environmental factors that need to be analyzed to
determine that the project qualifies for the Categorical Exemption:
a) Traffic: A Trip Generation Memo (Birdseye Planning Group) was prepared for the project
which determined that the number of trips generated by the project would not create a
significant impact. The proposed church use will create an estimated 27 peak hour trips
on weekdays and 86 peak hour trips on Sundays. The project's peak hour trips are on
Sundays when there is generally minimal vehicle traffic. The proposed church will not
negatively impact the operation of the nearest intersections.
b) Noise: A Noise Impact Analysis (Birdseye Planning Group) was prepared for the project.
The analysis determined that the project's construction phase could potentially create a
significant or adverse impact. The analysis included three mitigations measures to reduce
construction noise levels. With the implementation of these measures, the analysis
determined that the project would have a less than significant impact. Conditions of
approval to implement these mitigation measures have been added to Conditions of
Approval for the project.
c) Air Quality: Separate Air Quality and a Green House Gas Analysis (Birdseye Planning
Group) were prepared for the project. The analysis determined that emissions associated
with construction and operation of the project would be below South Coast Air Quality
Maintenance District (SCAQMD) thresholds for both Air Quality and Green House Gases.
PLANNING COMMISSION RESOLUTION NO. 20-27
DR DRC2017-00194 — GEOGE BOTROS
May 27, 2020
Page 4
d) Water Quality: A Water Quality Control exhibit (Plumb Engineering) was prepared for the
project. It was also determined through the review of the project's preliminary water quality
plan that the project would not result in a significant impact related to the water quality of
the site or surrounding properties.
e) Biological: A Biological Assessment Report (Advantage Environmental Consultants) was
prepared for the project site. No critical habitat was recorded on the project site. No
drainage features occur on the project site and no USFWS designated critical Habitat is
located on the project site. Based on the onsite conditions, the project is not anticipated to
result in any impact to federally or State -listed plants or animals listed as endangered or
threatened or to any non -listed special -status species. No natural communities will be
affected by the project and the project is not within a Habitat Conservation Plan area. The
Biological Assessment Report does recommend burrowing owl surveys and a nesting bird
survey prior to grading. The requirement to perform these surveys has been added to
Conditions of Approval for the project.
The Planning Commission has reviewed the Planning Department determination of exemption, and
based on its own independent judgment, concurs in the staffs determination of exemption.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the attached standard conditions incorporated herein by this reference.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 27TH DAY OF MAY 2020.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: z 27
To Guglielmo, Chairman
ATTEST: dzenL A `&kttL
Anne McIntosh, AICP, Secretary(L/�y
I, Anne McIntosh, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 27th day of May 2020, by the following vote -to -wit:
AYES: COMMISSIONERS: GUGLIELMO, OAXACA, DOPP, MORALES, WILLIAMS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS: