HomeMy WebLinkAbout2020-103- Resolution RESOLUTION NO. 2020-103
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, STATE OF CALIFORNIA, ADOPTING
THE MEASURE "I" FIVE YEAR CAPITAL PROJECT NEEDS
ANALYSIS FOR FISCAL YEARS 2021/2022 THROUGH
2025/2026
WHEREAS, San Bernardino County voters approved passage of Measure "I" in
November 2004, authorizing the San Bernardino County Transportation Authority to impose a
one-half of one percent retail transactions and use tax applicable in the incorporated and
unincorporated territory of the County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation improvement and
traffic management programs authorized in the Expenditure Plans set forth in Ordinance No. 04-
1 of the Authority; and
WHEREAS, the Strategic Plan requires each local jurisdiction applying for revenue from
certain Measure "I" Programs to annually adopt and update a Five-Year Capital Project Needs
Analysis.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA,
CALIFORNIA, HEREBY RESOLVES to adopt the Measure "I" Five-Year Capital Project Needs
Analysis for Fiscal Years 2021/2022 through 2025/2026, a copy of which is attached to this
resolution.
Resolution No. 2020-103 — Page 1 of 2
PASSED, APPROVED, and ADOPTED this 161h day of September 2020.
L. Den i ael, M yor
ATTEST:
lig&- e. A�
J ice C. Reynolds, Cit Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO ) ss
CITY OF RANCHO CUCAMONGA )
I, Janice C. Reynolds, City Clerk of the City of Rancho Cucamonga, do hereby certify
that the foregoing Resolution was duly passed, approved, and adopted by the City Council of
the City of Rancho Cucamonga, at a Regular Meeting of said Council held on the 16th day of
September 2020.
AYES: Hutchison, Kennedy, Michael, Scott, Spagnolo
NOES: None
ABSENT: None
ABSTAINED: None
Executed this 17th day of September, 2020, at Rancho Cucamonga, California.
4Q9i -e- 4�a—�
nice C. Reynolds, City Clerk
Resolution No. 2020-103 — Page 1 of 2
. 2020-103N Resolution o
NO. ISTREET&LIMITS JIMPROVEMENT COST ESTIMATE FY STARTS STATUS
Vallev Arterial Sub-Proaram
1 lWilson Ave from East Ave to Wardman Bullock Rd new street $ 7,434,218 06/07 Post Construction
2 JVictoria St from Etiwanda High School to 1-15(ECL) 1widening, sidewalk and rehabilitation 1 $ 412,341 13/14 Post Construction
3 lCarnelian St at Banyan St install new traffic signal $ 600,297 14/15 Post Construction
4 16th St at Utica Ave install new traffic signal $ 595,946 1 14/15 Post Construction
5 16th St at Rochester Ave linstall new traffic signal $ 738,737 1 16/17 Post Construction
6 Rochester Ave at Jersey Blvd linstall new traffic signal $ 738,737 16/17 Post Construction
7 East Ave at Miller Ave install new traffic signal $ 738,737 16/17 Post Construction
8 IMilliken Ave at 5th St install new traffic signal $ 738,737 16/17 Post Construction
1 1
9 16th St at Hellman Ave linstall new traffic signal 1 $ 709,133 20/21 Construction
Total: $ 12,706,883
Note: See individual work sheets for funding years
Note: Measure"I"Financial Public Share responsibility shall be 71.3%of actual cost for eligible expenditures
Contact: Gianfranco Laurie, Senior Civil Engineer (909) 774-4037
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Widen Wilson Ave from East Ave to Wardman/Bulloch from 0 to 4 lanes
Agency Project Name: Wilson Ave Extension
Agency reported Total Project Cost: $7,434,218
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PA&ED MI ART I 117,6501 OI OI OI OI OI 01 117,650
(All phases):
DEV FEE 1 47,350 0 01 01 01 01 01 47,350
6,000,000
Total) .165_1766 I-Vi0� - 0' 01 01 0
Total Presented Funding PS&E MI ART I 528,0071 0 OI OI OI OI 0 ;.526"007
(Prior ) DEV FEE I 212,5341 OI OI OI OI OI 01 212,534
7,434,218 � 740,541 , .' 0 0 01 0
Total Measure I Request ROW MI ART .�: 44,4511 OI OI 563,9881 OI OI 01 608,439
(Prior-FY25/26): 5,399,271 DEV FEE I 17,6571 OI OI 227,019I OI OI OI 244,676
MI LOCAL 2471 01 01 01 01 01 01 247
STREET
Total OI 0� 9 ,007� 0) OI 0
CONST MI ART I2,508,990I 794,8561 621,5821 121,0731 01 01 0
DEV FEE I 999,6101 319,9491 162,093I 48,7351 OI OI OI' 1,5 of-387
STREET
L 10,3181 01 88,1091 01 01 01 01 98,427
Total) 3 _ ;86tJ 871,784I 169,8081 , 0� OI ors,
Total .. . 1,4 ,80q 871,71 980, '}d� : #..,.�°� 0� 0� �3���
"Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:38:06 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Widen Victoria Ave from EHS to 1-15
Agency Project Name: Victoria Ave Street Improvements
Agency reported Total Project Cost: $412,341
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PA&ED Totall 1 1 I 1 >rr
(All phases):
305,000
Total Presented Funding PS&E MI ART I 11,8641 01 01 01 01 01 01 11,864
(Prior-FY25/26):
MI LOCAL I 4,3051 01 01 01 01 01 01 4,306
412,341 STREET
DEV FEE I 471 I 01 01 01 01 01 01 4"71'
Totall 16,64Q htN 0 o Y 0) 01
Total Measure I Request ROW Totall
(Prior- FY25/26): .. .. ;° .
411,870
CONST MI ART 1 282,1351 01 01 01 01 01 01 282,135
MI LOCAL 1 113,5661 01 01 01 01 01 01 118,566
STREET
Totall 395,7011 01 Ol Ol O) 0
Total 1= 412,3411 0. Ol 10 01 0'
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:56:24 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of Rochester and Jersey
Agency Project Name: Rochester and Jersey Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PA&ED
(All phases):
350,000
Total Presented Funding PS&E MI ART I 9,8041 01 01 01 01 01 01 9,804
(Prior-FY25/26): DEV FEE I 3,9461 01 01 01 01 01 01 3,946
738,737
tall 13750' 4 01 0 OI 01 01. 1 '
Total Measure I Request ROW 7otall '
(Prior- FY25/26): = ._.
626,720
CONST MI ART I 516,9161 01 01 01 01 01 01 516,916
DEV FEE I 208,0711 01 01 01 01 01 01 208,071
total l 72" =0 .:' 01 01 0' 01 0I; 72419pd
r w
Total I 7303t] 0 0 0 0 0 0 r
1,
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:50:48 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of Milliken and 5th
Agency Project Name: Milliken and 5th Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,OOOs)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PASED fiirtl t $t I
(All phases):
350,000
Total Presented Funding PS&E MI ART I 9,804I OI OI OI OI OI 01 9,804
(Prior-FY25/26): DEV FEE I 3,9461 OI OI OI OI OI OI 3,946
738,737
' Total ,75t 131 '; 0 01 0 01
Total Measure I Request ROW "�`wr Total `>.
(Prior-FY25/26):
526,720
CONST MI ART I 516,9161 OI OI OI OI OI OI 516,916
DEV FEE I 208,0711 OI OI OI OI OI OI 208,071
7 0 5t. 01 01 01 01 0 724,
7 Total 738,73 0:r,.
p I 01 01, 0
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:51:34 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of East and Miller
Agency Project Name: East and Miller Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,OOOs)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PASSED T I .
(All phases):
350,000
Total Presented Funding PS&E MI ART I 9,804I 01 01 01 01 01 01 9;$04I
(Prior-FY25/26): I sr I . 1 I I I „ :n.;. I Is � a
DEV FEE 3,946 0 0 0 0 0 0 3,946
738,737
Total) 3,7501 0 �t °) �, ... QI ;: 01, _
M
Total Measure I Request ROW �`til rr
(Prior- FY25/26):
526,720
CONST MI ART I 516,9161 01 01 01 01 01 01 516,916
DEV FEE I 208,0711 01 01 01 01 01 01 208,07,
., 01 01 01 0
- ,
Total I 37Li
0� 01 0#, 0' 01 38,737
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:52:17 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of Camelian and Banyan
Agency Project Name: Carnelian at Banyan Traffic Signal Improvement
Agency reported Total Project Cost: $600,297
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,OOOs)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior l FY 21/22 I FY 22/23 I FY 23/24 l FY 24/25 I FY25/26 I Future I Total
Nexus Total Project Cost PA&ED Totall M G r 1 l '
(All phases):
363,000
Total Presented Funding PS&E MI ART l 8,7491 01 01 01 01 01 01 8,749
(Prior- FY25/26): DEV FEE I 3,5221 Ol 01 01 01 O1 01 3,522
600,297 Total2271 l _ 01 01 OI 0' 2..e
Total Measure I Request ROW Totall 111 1
(Prior-FY25/26):
428,012
CONST MI ART l 419,2631 01 01 01 01 01 01 419,263
DEV FEE l 168,7631 01 01 Ol 01 01 01 168,763
Total 588,0261 01 01 01' 01. 01 0 fi 158
Total 1 600,2971 :, 01 01 01 0 .,
01 0
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:53:49 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of 6th and Utica
Agency Project Name: 6th St at Utica Traffic Signal Improvement
Agency reported Total Project Cost: $595,946
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PA&ED
(All phases): .,.
i>
363,000
Total Presented Funding PS&E MI ART I 5,6471 01 01 01 01 01 01 ,647I
(Prior-FY25/26): DEV FEE I 2,2731 01 01 01 01 01 01 2,273
595,946 ;, F 7,92b �. 1 0� 01 01 0
Total Measure I Request ROW T '` v ��° w,
(Prior-FY25/26):
424,910
CONST MI ART I 419,2631 01 01 01 01 01 01 419,263
DEV FEE I 168,7631 01 01 01 01 01 01 168,763
t 588,0 0[11 _. 01 01 01 0 ,
Total 595'946 0� QI 01 pl prrc
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:54:29 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of 6th and Rochester
Agency Project Name: 6th and Rochester Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor(%):
000s
Actual Prior Year dollars and escalated costs in subsequent years(not in 1 ) i
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/25 I FY 25/26 I Future I Total
Nexus Total Project Cost PAGED Total , `" FT
(All phases): m a
350,000
Total Presented Funding PS&E MI ART I 9,8041 01 01 01 01 01 01 9,804
(Prior-FY25/26): DEV FEE I 3,9461 01 01 01 01 01 01 3,946
738,737
Total 0� 13,1 0I Or 0� 0) 7 ..
Total Measure I Request ROW
(Prior-FY25/26):
526,720
CONST MI ART I 516,9161 01 01 01 01 01 01 516,916
DEV FEE I 208,0711 01 01 01 01 01 01 208,071
Total 724,987 0 0 0. 7 y .
Total I 738,11 �-, � k III �..; 0�{ >';'..,�:�� 01-. . 01 01,
0� 7
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:55:06 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of 6th and Hellman
Agency Project Name: 6th and Hellman Traffic Signal Improvement
Agency reported Total Project Cost: $709,133
Escalation Factor(%):
Actual Prior Year dollars and escalated costs in subsequent years not in 1 000s
Public Share: 71.30% 1 Dev. Share: 28.70%
I Funding I Prior I FY 21/22 I FY 22/23 I FY 23/24 I FY 24/26 I FY 25/26 I Future I Total
Nexus Total Project Cost PAGED otal I I `
(All phases):
350,000
Total Presented Funding PS&E MI ART I 35,032I 01 01 01 01 01 0 35,032
(Prior- FY25/26): DEV FEE I 14,1011 01 01 01 01 01 01 14,161
709,133
Total 49,133( 0l 01 01 01 01 0 33
Total Measure I Request ROW Total 11
(Prior-FY25/26):
505,612
CONST MI ART I 470,5801 01 01 01 01 01 01 470,680
DEV FEE I 189,4201 01 01 01 01 01 01 189,420
Total l 660k(I l OI OI ...` 01
01 01
33 0 .. 0 0 z ylJ,1
Total I ,,... � ( I _ I 0 l- 0 0 1.,.
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 20/21 expenses.
Project Comments: Project Comments
Last Update: 9/3/2020 4:55:45 PM
Reference: Measure I Policy 40006
Resolution No. 2020-103
Wnsm
VA m .._
g "WAN ST, UNTO ST
WIN
• ♦ AV,Gy _. QLe -AVE
FCm AVE
;
HNHJRPAA K L�N•-• _ l- - �G
� DRL-AE0�- ` a
1944,ST VWTQ VXTWA
/
�..
li• IgfF vrsTAliT� Xpm V$TA ST. Z
UPLAND ,y FONTANA
Ave S USE L.flE R}�AD
s S
�' o
Y� 41111:T
ARRRV ROUTE '4
.,ERseT
• � F t
.. ....... _Y, _ - F6
,_..
.�
TM STREET _.
• 6th STREET
g
Ith STIM ..
Gi Pw I-RI FRWl 1T
ONTO
MAJOR STREET ARTERIAL PROGRAM
O WILSON AVE FROM EAST AVE TO WARDMAN BULLOCK RD
O VICTORIA ST FROM ETIWANDA AVE TO ECL (I-15)
O CARNELIAN ST AT BANYAN ST
O 6TH ST AT UTICA AVE
O 6TH ST AT ROCHESTER AVE
© ROCHESTER AVE AT JERSEY BLVD
O EAST AVE AT MILLER AVE
MILLIKEN AVE AT 5TH ST
O 6TH ST AT HELLMAN AVE
CITY OF RANCHO CUCAMONGA
MEASURE I FIVE-YEAR CPNA FY 2021/22 TO 2025/26 ,
R NCNu
CUCAMONGA
PROJECT LOCATIONS