Loading...
HomeMy WebLinkAbout2020-105 - Resolution RESOLUTION NO. 2020-105 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, AUTHORIZING THE ATTESTATION OF VERACITY FOR THE RANCHO CUCAMONGA MUNICIPAL UTILITY 2019 POWER SOURCE DISCLOSURE ANNUAL REPORT AND POWER CONTENT LABEL WHEREAS, the Rancho Cucamonga Municipal Utility (RCMU) is a publicly-owned utility in the state of California and is therefore subject to Senate Bill 1305, as amended by Assembly Bill 162, requiring retail suppliers of electricity to disclose sources of energy being used to the California Energy Commission (CEC)and to consumers in the form of the Power Source Disclosure Annual Report and the Annual Power Content Label; and WHEREAS, the 2019 Power Source Disclosure Annual Report and Annual Power Content Label has been submitted to the CEC, and the Annual Power Content Label has been posted on the City's website for customers to review; and WHEREAS, the 2019 Power Source Disclosure Annual Report includes an attestation from an authorized agent of the City, under penalty of perjury, confirming the accuracy of the information provided. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, HEREBY RESOLVES, Section 1.: The City Council hereby certifies the 2019 Power Source Disclosure Program Report and Annual Power Content Label. Section 2.: The City Clerk shall certify to the adoption of this Resolution. Section 3.: This Resolution shall take effect immediately upon its adoption. Resolution No. 2020-105 - Page 1 of 2 PASSED, APPROVED, and ADOPTED this 7th day of October 2020. D Lyt4 B. Kennedy, Mayor Pro&em ATTEST: Opugi e. 4mq4& , ice C. Reynolds, Ci y Clerk STATE OF CALIFORNIA ) COUNTY OF SAN BERNARDINO ) ss CITY OF RANCHO CUCAMONGA ) I, Janice C. Reynolds, City Clerk of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by the City Council of the City of Rancho Cucamonga, at a Regular Meeting of said Council held on the 7th day of October 2020. AYES: Hutchison, Kennedy, Scott, Spagnolo NOES: None ABSENT: Michael ABSTAINED: None Executed this 8th day of October, 2020, at Rancho Cucamonga, California. J ce C. Reynolds, City Clerk Resolution No. 2020-105 - Page 2 of 2 AML Version:May 8,2020 SCHEDULEANNUAL REPORT TO THE CALIFORNIA ENERGY COMMISSION:Power Source Disclosure • • RETAIL SALES For the Year Ending December 31,2019 City of Rancho Cucamonga PORTFOLIO Instructions:Enter information about power procurements underlying this electricity portfolio for which your company is filing the Annual Report.Insert additional rows as il 79 4P8 needed.All fields in white should be filled out.Fields in grey auto-populate as needed and should not be filled out. For firmed-and-shaped imports,provide the EIA ID of the substitute power,not the generator ID of the RECs.For EIA Oster unspecified power or specified system mixes from asset-controlling suppliers,enter"unspecified', "BPA,""Powerex,",or'Tacoma"as applicable.For specified procurements of ACS power,use the ACS Procurement Calculator to calculate the resource breakdown 23$28 comprising the ACS system mix.Procurements of unspecified power must not be entered as line items below;unspecified power will be calculated automatically in cell L9.Unbundled RECs must not be entered on Schedule 1;these products must be entered on Schedule 2.At the bottom portion of the schedule,provide the other 8� electricity end-uses that are not retail sales including,but not limited to transmission and distribution losses or municipal street lighting.Amounts should be in megawatt- hours. 23 828 ProcuredState or Gross MWh Net MVVh Adjusted Net Facility Name FuelType Province WREGIS ID RPS ID NIA ELA ID Resold Procured Procured RE Astoria Solar CA W4931 70537 59977 17,223 7•' �3 17223 Ci of Rancho Cucamo a-City Hall Solar CA 74859 63210A 172 ,_,_•,-,_ �172 172 Ci of Rancho Cucamo a-Animal Center Shelter Solar CA 75017 63221A 410 410 410 Ci of Rancho Cucamo a-Epicenter Solar CA W5425 63220A 990 990 990 EIA ID of EtA ID of Eligible far ProcuredState REC Substitute Gross MWh Net MVVh Adjusted Not G m ndfathered Fac,fity Name Fuel Type Province WREGIS ID RPS ID Source Power Procured MWh Resold Procured VVVh Procured Emissions? SPECIFIED NON-RENEWABLE PROCUREriENTS State or Gross MWh Net MWh Adjusted Net Facility Name FuelType Province N/A N/A NIA EIA ID Procured MWh Resold Procured _MVVh Boulder Canyon Project Large hydro NV 466 5,033 5,033 51033 Version: i p4 ANNUAL REPORT TO THE CALIFORNIA ENERGY COMMISSION: Power Source SCHEDULE 3: ANNUAL POWER CONTENT LABEL DATA for the year ending December 31, 2019 Instructions: No data input is needed on this schedule. Retail suppliers should use these auto-populated calculations to fill out their Power Content Labels. City of Rancho Cucamonga (ELECTRICITY PORTFOLIO NAME) Adjusted Net18,7915 Percent of Total Procured h) Retail Sales Renewable Procurements ' Biomass & Biowaste ��®- ' Geothermal ®0 Eligible Hydroelectric Solar Wind " r% Coal ® ® e', Large Hydroelectric5,033 °% Natural gas ®� ® � � Nuclear e Other ® ® n Unspecified Power ®® r L�iox% e'. Total Retail Sales (MWh) 11111 rcentage 11101111111fillff bundled "� ASSET CONTROLLING SUPPLIER RESOURCE MIX CALCULATOR Powerex Resource Mix Resource-Specific Net MWH Procured N/A Resource Type Factors Procurements from ACS ..s Fm • • • - 1 • 1 1 1 11. • 1 1 Bonneville Power Administration Resource Mix Resource-Specific Net MWH Procured N/A Resource Type Factors Procurements from ACS •.p 1 • Tacoma Power Resource Mix Resource-Specific Net MWH Procured N/A Resource Type Factors Procurements from ACS • . - • . 7911 1 1. • Version: May 8, 2020 REPORTANNUAL • THE CALIFORNIA • • ATTESTATION • - for the year ending December 31, 2019 (RETAIL SUPPLIER NAME) PORTFOLIO I, (print name) Fred Lyn , Deputy Director of Engineering-Utilities ,declare under penalty of perjury,that the statements contained in this report including Schedules 1 and 3 are true and correct and that I, as an authorized agent of City of Rancho Cucamonga, have authority to submit this report on the company's behalf. I further declare that the megawatt-hours claimed as specified purchases as shown in these Schedules were,to the best of my knowledge,sold once and only once to retail customers. Name: Fred Lyn Representing(Retail Supplier): City of Rancho Cucamonga Signature: Dated: July 27,2020 Executed at: Rancho Cucamonga k !e �