Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout99-146 - Resolutions RESOLUTION NO. 99-146
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, ESTABLISHING
A NEW COMPREHENSIVE FEE SCHEDULE FOR
PERMITS AND SERVICES PROVIDED BY ALL CITY
DEPARTMENTS, THE RANCHO CUCAMONGA FIRE
PROTECTION DISTRICT AND THE RANCHO
CUCAMONGA POLICE DEPARTMENT, BY MODIFYING
CERTAIN FEES ESTABLISHED IN RESOLUTION 97-170
A. RECITALS.
(i) The Government Code requires that prior to levying a new fee or increasing
an existing fee or service charge, local agencies shall hold a public meeting at
which oral or written presentations may be made; and
(ii) Notice of the time and place of the hearing has been properly provided; and
(ill) No valid request for mailed notice is on file with the City, and
(iv) Copies of the required data were made available in the City Clerk's office to
the public on May 28, 1999
(v) All legal prerequisites to adoption of this Resolution have occurred.
B, RESOLUTION.
NOW, THEREFORE, the City Council of the City of Rancho Cucamonga does
hereby resolve that the following fees are established:
SECTION 1:
BUILDING AND SAFETY FEES
1.0 Buildin.q Permit Fees
A fee for each building permit or service shall be paid to the
Building Official as set forth in the following Schedule of Fees:
Total Valuation of Work Fees
$1 .oo to $1,000.°° $25.00
$1,001 .oo to $2,000.°° $25.°° for the first
$1,000.°° plus $2? for
each additional $100.°°
or fraction thereof, to
and including $2,000.oo
Resolution No. 99-146
Page 2
Total Valuation of Work Fees
$2,001.0o to $25,000.® $45.00 for the first
$2,000.® plus $7.~° for
each additional
$1,000.00 or fraction
thereof, to and
including $25,000.®
$25,001 .s0 to $50,000.® $217.50 for the first
$25,000.® plus $5.50
for each additional
$1,000.® of fraction
thereof, to and
including $50,000.°°.
$50,001.°° to $100,000.00 $355.so for the first
$50,000.00 plus $4.00
for each additional
$1,000.00 or fraction
thereof, to and
including $100,000.®.
$100,000.°° and over $555.00 for the first
$100,000.® plus $2.50
for each additional
$1,000.® or fraction
thereof.
1.1 Plan Review Fees
(a) When the valuation of proposed construction exceeds
one thousand dollars, and a plan is required to be
submitted, a plan review fee shall be paid to the Building
Official at the time of plan submittal.
(b) Plan review fees for buildings and structures shall be
equal to seventy-five percent (75%) of the building permit
fees set forth in Section 1.0 herein.
(c) Plan review fees for electrical, mechanical and plumbing
work shall be equal to 25% of the total permit fee as set
forth under the pertinent Section 1.7, 1.8 and 1.9 herein.
(d) Plan review fees for grading shall be as set forth in the
following schedule:
Resolution No. 99-146
Page 3
Quantity of Cut and Fill Fees
50 - 100 yards $50.®
101 - 500 yards $100.®
501 - 1,000 yards $200.®
1,001 - 2,000 yards $250.00
2,001 - 3,000 yards $300.00
3,001 - 4,000 yards $350.00
4,001 - 5,000 yards $400.00
5,001 - 10,000 yards $500.®
10,001 - 50,000 yards $600.00
50,001 - 100,000 yards $700.00
100,001 - and up $900.®
The sum of Cut and Fill Yardage shall be used in computing
Grading Permit and Plan Checking Fees.
(e) Additional Plan Checking made necessary due to
changes in plans or incomplete plan submission, $55.®
per hour for the estimated time of checking revisions.
1.2 Com~Jli_aq_c,f~ Inspections/Re-inspections
Inspections to determine compliance of existing construction with
applicable codes when not included in an active, valid building
permit or inspections made necessary due to work not being
ready at time specified, or work not corrected after prior written
correction notice ....................................... $30.®
1.3 Chanqe of Occupancy
Change of Occupancy Inspection .......................... $50.®
1.4 Relocated Buildinqs
Fees for inspection of a structure to be relocated into or within
the City, shall be $100.® when located within 25 miles of City
offices, plus $2.® per mile, round trip, when located more than
25 miles from City offices.
Resolution No. 99-146
Page 4
1 .__5 Appeal of Abatement Notice
An appeal of a notice to abate a substandard or dangerous
building ............................................. $100.®
1.6 Inspection for Temporary Utility Connection or Temporary Occupancy
Inspection ........................................... $ 30.00
1.7 Inspections Outside of Normal Business Hours
(Minimum charge, four hours) ..................... $50.® per hour
1.8 Inspections for Which No Permit Fee Is Specifically Indicated
(Minimum charge, one-half hour) ................... $50.® per hour
1 .__9 Electrical Permit Fees
(a) Permit Issuance
......................... 15 o0
For issuing each permit $ .
For issuing each supplemental permit .............. $ 4.50
(b) System Fee Schedule
NOTE: The following are in addition to permit-
issuing fee.
New Residential Buildings:
The following fees shall include all wiring and
electrical equipment in or on each building, or other
electrical equipment on the same premises
constructed at the same time.
For new residential buildings not including the area of
garages, carports and other noncommercial
automobile storage areas constructed at the same
time, per square foot ........................... $ .035
For new garages, carports and other minor
accessory buildings constructed in conjunction with
a new residential building per square foot ............ $ .02
For other types of residential occupancies and
alterations, additions and modifications to existing
residential buildings, use the Unit Fee Schedule.
Resolution No. 99-146
Page 5
Private Swimming Pools, Spas:
For new private residential, permanently installed
spas, hot tubs or swimming pools for single-family
and multi-family occupancies including a complete
system of necessary branch circuit wiring, bonding,
grounding, underwater lighting, water pumping and
other similar electrical equipment directly related to
the operation of a swimming pool, each ........... $ 30.®
For other types of swimming pools, spas and
alterations to existing swimming pools, use the UNIT
FEE SCHEDULE.
Carnivals and Circuses:
Carnivals, circuses, or other traveling shows or
exhibitions utilizing transportable-type rides, booths,
displays and attractions.
For electric generators and electrically driven rides,
each ....................................... $15.®
For mechanically driven rides and walk-through
attractions or displays having electric lighting,
each ..................................... $4.50
For a system of area and booth lighting, each ......... $4.50
For permanently installed rides, booths, displays and
attractions, use the UNIT FEE SCHEDULE.
Services:
For services of 600 volts or less and not over 200
amperes in rating, each ......................... $18.50
For services of 600 volts or less and over 200
amperes to 1000 amperes in rating, each ........... $37.50
For services over 600 volts or over 1000 in rating,
each ....................................... $75.®
Temporary Power Service:
For a temporary service power pole or pedestal
including all pole or pedestal-mounted receptacle
outlets and appurtenances, each ................. $15.®
Resolution No. 99-146
Page 6
For a temporary distribution system and temporary
lighting and receptacle outlets for construction sites,
decorative light, Christmas tree sales lots, firework
stands, etc., each .............................. $7.50
(c) Unit Fee Schedule:
NOTE: The following are in addition to permit
issuing fee.
Receptacle, Switch and Lighting Outlets:
For receptacle, switch, lighting or other outlets at
which current is used or controlled, except services,
feeders and meters. First 20, each ................. $ .75
Additional outlets, each .......................... $ .45
NOTE: For multi-outlet assemblies, each 5 feet
or fraction thereof may be considered as
one outleL
Lighting Fixtures:
For lighting fixtures, sockets or other lamp-holding
devices. First 20, each .......................... $ .75
Additional fixtures, each ......................... $ .45
For pole or platform-mounted lighting fixtures, each . .. $ .75
For theatrical-type lighting fixtures or assemblies, each . $ .75
Residential Appliances:
For fixed residential appliances or receptacle outlets for
same, including wall-mounted electric ovens; counter-
mounted cooking tops; electric ranges, self contained
room, console, or through-wall air conditioners; space
heaters; food waste grinders; dishwashers; washing
machines; water heaters; clothes dryers; or other motor-
operated appliances not exceeding one horsepower
(HP), kilowatt (KW), or kilovolt-ampere (KVA), in rating,
each ........................................ $3.®
NOTE: For other types of air conditionera and
other motor-driven appliances having
larger electrical ratings, see Power
Apparatus.
Resolution No. 99-146
Page 7
Non-residential Appliances:
For non-residential appliances and self-contained
factory-wired, non-residential appliances not exceeding
one horsepower (HP), kilowatt (KW), or kilovolt-ampere
(KVA), in rating including medical and dental devices;
food, beverage, and ice cream cabinets; illuminated
show cases, drinking fountains, vending machines;
laundry machines; or other similar types of equipment,
each ........................................ $3.®
NOTE: For other types of air conditioners and
other motor-driven appliances having
larger electrical ratings, see Power
Apparatus.
Power Apparatus:
For motors, generators, transformers, rectifiers,
synchronous converters, capacitors, industrial
heating, air conditioners and heat pumps, cooking or
baking equipment and other apparatus, as follows:
Rating in horsepower (HP), kilowatts (KVV), kilovolt-
amperes (KVA), or kilovolt-amperes-reactive (KVAR):
Up to and including 1, each ....................... $3.°a
Over 1 and not over 10, each ..................... $7.50
Over 10 and not over 50, each ................... $15.00
Over 50 and not over 100, each .................. $30.®
Over 100, each ............................... $45.®
NOTE: f. For equipment or appliances having
more than one motor, transformer,
heater, etc., the sum of the combined
ratings may be used.
2. These fees include a~ switches,
circuit breakers, contractors,
thermostats, relays and other
directly-related control equipment.
Busways:
For trolley and plug-in-type busways, each 100 feet
or fraction thereof .............................. $4.50
Resolution No. 99-146
Page 8
NOTE: An additional fee will be required for
lighting fixtures, motors and other
appliances that are connected to trolley
and plug-in-type busways. No fee is
required for portable tools.
Signs, Outline Lighting and Marquees:
For signs, outline lighting systems or marquees
supplied from one branch circuit, each ............. $15.®
For additional branch circuits within the same sign,
outline lighting system or marquee, each ............ $3.00
Miscellaneous Apparatus, Conduits and Conductors:
For electrical apparatus, conduits and conductors for
which a permit is required but for which no fee is
herein set fodh ............................... $11 .oo
NOTE: This fee is not applicable when a fee is
paid for one or more services, outlets,
fixtures, appliances, power apparatus,
busways, signs or other equipment.
1.10 Plumbing Permits
(a) Permit Issuance
For the issuance of each permit .................. $15.®
For issuing each supplemental permit ............... $4.50
(b) Unit Fee Schedule (in addition to issuance fee above)
For each plumbing fixture or trap or set of fixtures
on one trap (including water, drainage piping, and
back protection therefor) ......................... $6.®
For each building sewer and each trailer park sewer .. $15.®
Rainwater systems --per drain (inside building) ........ $6.®
For each cesspool (where permitted) .............. $22.s°
For each private sewage disposal system ........... $45.00
For each water heater and/or vent ................. $7.50
Resolution No. 99-146
Page 9
For each industrial waste pretreatment interceptor
including its trap and vent, excepting kitchen-type
grease interceptors functioning as fixture traps ....... $12.®
For installation, alteration, or repair of water piping
and/or water-treating equipment, each ..............
For repair or alteration of drainage or vent piping,
each fixture ................................... $3.®
For each lawn sprinkler system on any one meter,
including back flow protection devices therefor ........ $9.®
For atmospheric-type vacuum breakers not included
in lawn sprinkler system:
1 to 5 ............................... $7.50
Over 5, each ......................... $1.5o
For each backflow protective device other than
atmospheric-type vacuum breakers:
2 inches and smaller ................... $7.50
Over 2 inches ....................... $15.®
For each gas piping system of one to four outlets ...... $320
For each gas piping system of five or more, per outlet .. $ .75
Swimming pool or spa piping including water heater
(not including gas piping) ....................... $10.®
1.11 Mechanical Permits
A fee for each mechanical permit shall be paid to the Building
Official as set forth in the following Schedule of Fees:
(a) Permit Issuance
For the issuance of each permit ................. $ 157
For issuing each supplemental permit ............. $ 4?
(b) Unit Fee Schedule (in addition to issuance fees above)
For the installation or relocation of each forced-air or
gravity-type furnace or burner, including ducts and
vents attached to such appliance, up to and including
100,000 Btu/h ................................. $9.®
Resolution No. 99-146
Page 10
For the installation or relocation or each forced-air or
gravity-type furnace or burner, including ducts and
vents attached to such appliance over 100,000
Btu/h ...................................... $11 .co
For the installation or relocation of each floor furnace,
including vent ................................ $ 9.00
For the installation or relocation of each suspended
heater, recessed wall heater or floor-mounted unit
heater ....................................... $9.00
For the installation, relocation or replacement of each
appliance vent installed and not included in an
appliance permit ............................... $4.50
For the repair of, alteration of, or addition to each
heating appliance, refrigeration unit, cooling unit,
absorption unit, or each heating, cooling, absorption,
or evaporative cooling system, including installation
of controls regulated by this code .................. $9.00
For the installation or relocation of each boiler or
compressor to and including three horsepower, or
each absorption system to and including 100,000
Btu/h ........................................ $9.®
For the installation or relocation of each boiler or
compressor over three horsepower to and including
15 horsepower, or each absorption system over
100,000 Btu/h and including 500,000
Btu/h ....................................... $167
For the installation or relocation of each boiler or
compressor over 15 horsepower to and including 30
horsepower, oreach absorption system over 500,000
Btu/h to and including 1,000,000
Btu/h ....................................... $22.50
For installation or relocation of each boiler or
compressor over 30 horsepower to and including 50
horsepower, or for each absorption system over
1,000,000 Btu/h to and including 1,750,000
Btu/h ....................................... $33.so
For the installation or relocation of each boiler or
refrigeration compressor over 50 horsepower, or
each absorption system over 1,750,000
Btu/h ....................................... $56.®
Resolution No. 99-146
Page 11
For each air-handling unit to and including 10,000
cubic feet per minute, including ducts attached
thereto ....................................... $6-5°
NOTE: This fee shall not apply to an air-handling
unit which is an integral portion of a
factory assembled appliance, cooling unit,
evaporafive cooler or absorption unit for
which a permit is required elsewhere in
this code.
For each air-handling unit over 10,000
cfm ........................................ $11.00
For each evaporative cooler other than portable
type ......................................... $6?
For each ventilation fan connected to a single duct ..... $4.50
For each ventilation system which is not a portion of
any heating or air-conditioning system authorized by
a permit ...................................... $6.5°
For the installation of each hood which is served by
mechanical exhaust, including the ducts for such
hood ........................................ $6.s°
For the installation or relocation of each domestic.-
type incinerator ............................... $11 .o0
For the installation or relocation of each commercial
industrial-type incinerator ....................... $45.®
For each appliance or piece of equipment regulated
by this code but not dassed in other appliance
categories, or for which no other fee is listed in this
code ........................................ $6.50
1 ;12 permit Fees
A fee for each grading permit shall be paid to the Bu ilding Official
as set forth in the following Schedule of Fees:
Quantity of Cut and Fill Fees
50 cubic yards or less $15.00
51 to 100 cubic yards $22.50
Resolution No. 99-146
Page 12
Quantity of Cut and Fill Fees
101 to 1,000 cubic yards $22.50 for the first
100 cubic yards
plus $10.50 for
each additional
100 cubic yards or
fraction thereof.
1,001 to 10,000 cubic yards $117.05 for the first
1,000 cubic yards,
plus $9.® for each
additional 1,000
cubic yards or
fraction thereof.
10,001 to 100,000 cubic yards $198.® for the first
10,000 cubic
yards, plus $40.50
for each additional
10,000 cubic yards
or fraction thereof.
100,001 cubic yards or more $562.50 for the first
100,000 cubic
yards, plus $22.50
for each additional
10,000 cubicyards
or fraction thereof.
1.13 Application for Plan Duplication
Application for duplication processing ....................... $30.00
SECTION 2: BUSINESS LICENSE FEES
Fees for business licenses are found within Title 5 of the City of
Rancho Cucamonga Municipal Code, Business Taxes, Licenses
and Regulations and contained in Chapters 5.04, 5.06, 5.12 and
5.16, thereof.
Resolution No. 99-146
Page 13
SECTION 3: CITY CLERK'S OFFICE FEES
Fee Activity Fees
Municipal Code ........ $150.00
Supplements to the municipal code ........ Amount Variable
will vary in cost and will be
billed accordingly
SECTION 4: COPYING RATES, MEDIA AND SUBSCRIPTION FEES
Fee Activity Fees
Photocopies ........ $ .25/page*
Microfilming ........ $ .25/page*
$1 ?°/plan page
Microfiche Jackets ........ $1 .°°/sheet
Audio Tape ....... $10.°°/tape
Video Tape ........ $10.°°/tape
Computer Diskettes ........ $5.°0 diskette
Subscriptions
Council Agenda ........ $118.°°/yr.
Minutes ........ $145.°°/yr.
Planning Commission Agenda ........ $43.s°/yr.
Minutes ....... $160.°°/yr.
Historic Preservation Comm. Agenda ........ $9?/yr.
Engineering Plans and Specifications
per set cost ........ Amount Variable
Mailing Costs (overnight) for the above ........ Amount Variable
Research Requests - All Departments ........ First 1/2 Hour, No Charge
Time spent beyond 1/2 hour will be
billed in increments of 1/4 hr. at: ........ $25.°°/Hr.
*There will be a minimum charge of $1.e° for f-3 pages
Resolution No. 99-146
Page 14
Fee Activity Fees
FAX Requests - All Departments ........ No Fee*
A maximum of 6 pages may be requested.
* If material requested is more than 6 pages, material will be
mailed and billed at rate established by this Resolution.
SECTION 5: ENGINEERING FEES
5.'1 Applications
Fees
Tentative Parcel Map ........ $2,514.®
Initial Study ........ $225.®
Tentative Parcel Map Appeal ........ $251 .oo
Time Extension - Tentative
Parcel Map ........ $549.00
Certificate of Compliance ........ $1,190.®
Lot Line Adjustment ........ $1,190.00
Amending Parcel Map and ........ $1,190.®
~.~odi~cation of Map Conditions
Reappodionment Map ........ $600.00
~/a two-sheet Parcel/Tract Map; $30.00 for each additional sheet)
Street Vacation ........ $1,156.®
Standard AgreementJDoc. Processing ........ $298.®
Release of Lien Agreement ........ $298.®
Certificate of Correction ........ $256.00
Flood Hazard Letter ........ $314.®
Bond Substitution ........ $420.®
Private Street Designation ........ $495.®
Reimbursement Agreement
Storm Drain ........ $2,227.®
Street and Utilities ........ $2,827.®
Traffic Study Review ........ $751.00
(Dev. Proj.)
Resolution No. 99-146
Page 15
5,2 Map and Plan Checking Fees
Fees
Property Legal Description ........ $584.00
Map Checking
Residential Parcel Map ........ $1,370.® + $180.°°
per Parcel
Tract Maps and Non-Residential
Parcel Maps of 10 lots or less ........ $2,070.00
Tract Maps and Non-Residential
Parcel Maps over 10 lots ........ $1,720.® + $35.°°
per Parcel or Lot
5.__3 Improvement Plans
Fees
Widening of Existing Streets ........ $1.3s per LF + Sheet Charge
for Interior Streets
Interior Streets 1-2 Sheets: ........ $1,370.® per Sheet
3-5 Sheets: ........ $2,740.® + $1,200.®
per Sheet over 2 Sheets
6-10 Sheets: ........ $6,340? + $1,095.°°
per Sheet over 5 Sheets
11 or More: ........ $11,815.® + $1,025.®
per Sheet over 10 Sheets
Storm Drain Plans ........ Same as for Interior Streets
Hydrology Study
Fees
Drainage Areas up to 150 Acres ........ $1,370?
Drainage Areas over 150 acres ........ $2,740.°e
Landscape and Irrigation Plans
for City-Maintained Areas ........ $400.00 per Sheet
For map and plan checking, the fees for rush checking, when
approved by the City Engineer, will be 50% greater than those
listed above. The fees for checking the revisions to approved
plans will be on the basis of actual costs at hourly rates as
determined by the City Engineer with a minimum fee of $100.°%
Resolution No. 99-146
Page 16
5.__3 Public Works Construction
Permit Fee
5% of Improvement Cost to $25,000, Min. $50.00
4.5% of Improvement Cost for next $75,000.®
4% of Improvement Cost over $100,000.®
The improvement cost of a project shall be based on the
Engineer's Cost Estimate as shown on Surety Bond and as
approved by the City Engineer.
NOTE: Development lmpact Fees may also apply
and are addressed under separate
resolutions.
5.5 Oversize Loads
Fees
Single Permit* ........ $15.®
Repetitive Permit* ........ $70.® initial fee + $15.®
per month renewal fee to
a maximum of 6 months
Annual Permit*. ....... $70.00 per year
* These fees are based on the provisions of the California
Vehicle Code Section 35795 and Caltrans Fee Schedule.
5.6 Other Fees
Collection of San Bernardino County fees, as adopted by the
County, including but not limited to:
· Documentary Handling Fee for Filing Notice of Determination
· Development Review Fees
· County Recording Fee
· County Printing Fee
Resolution No. 99-146
Page 17
SECTION 6: FIRE PROTECTION DISTRICT FEES
(These Fees have been adopted by the Fire Board.)
6.1 Plans Checking Fees
Includes Plan Review and two Inspections.
Does NOT include Fee for any required Fire District Permits.
A. Start-up Fee for Commercial,
Industrial or Multi-family Dwelling Units, paid prior to TRC . $82.®
B. Plan Review Fees
1. Single Family Residence ....................... $132.00
2. Single Family Residential Tract, per Phase ......... $132.®
3. Multi-Family Residential, per Building ............. $677.®
4. Commercial and Industrial Development, per Building $677.00
5. Water Plan/Underground Water Supply ........... $132.®
6. Conditional Use Permit ........................ $132.®
7. Minor Development Review .................... $132.®
8. Parcel Map Review ........................... $132.®
9. Tenant Improvement, per hour, one hour minimum . .. $87?
10. Special Events Review ........................ $87.®
11. Accessory Plans Review:
Aisles, Access, Seating, Etc .................. $66.®
12. Alternate Method Approval ...................... $92.®
13. Revision to existing Plan
(e.g., As-Builts, Excluding TI Plans) .............. $92.®
14. New Fire Sprinkler Systems,
Standpipes or over ten heads ................... $164.®
15. Fire Sprinkler Alteration, ten heads or less .......... $92.®
16. Pre-Engineered Fire Protection Systems .......... $147.®
17. Fire Detection and Alarm Systems ............... $154.®
18. Flammable Finishes Spray Booth, per booth ........ $164.®
19. LPG Tank Installation Review, per tank ........... $147.00
20. Underground Storage Tank Removal Review,
per tank .................................... $147.®
21. Flammable & Combustible Liquid, Tank & Piping .... $147.®
22. Failure to keep Appointment, one hour minimum ..... $66.®
23. Microfilm Charges, per page ...................... $1.00
24. Minor Plan Review not requiring a District Inspection . No Fee
Resolution No. 99-146
Page 18
C. Inspection Fees
Per hour, one hour minimum
1. Field Inspection required after the Initial
and Follow-Up Inspection ...................... $110.00
2. Failure to keep an Inspection Appointment .......... $66.®
3. Field Inspection of Self Inspection Occupancies,
Failure to Comply ............................. $66.®
4. Fire Flow Test, Witness Test ..................... $87.00
5. Unscheduled Field Inspection or Investigation ....... $66.®
.............. 87 oo
6. Same Day, Short Notice Inspection .. $ .
6.2
I. Permit Fees
[Initial Permit and subsequent renewal of Permit unless
otherwise indicated (e.g. one time only Permit activity)]
A. Permits
1. General Use Permit ............................ $827°
2. Access Control .............................. No Fee
3. Aerosol Products (more than 500 Ibs. of Level 2 or 3) $131 .oo
4. Aircraft Refueling Vehicles ...................... $95?0
5. Aircraft Repair Hangar ........................ $84?0
6. Automobile Wrecking Yard ...................... $82?o
7. Asbestos Removal ........................... $132.oo
8. Bowling Pin or Alley Refinishing
involving Flammable Finishes .................... $82.00
9. Candles and Open Flames in Assembly Areas .. Not Permitted
10. Carnivals and Fairs (see also 6.2E) .............. $132.®
11. Cellulose Nitrate Film .......................... $82.°°
12. Cellulose Nitrate Storage,
more than 25 Ibs .............................. $84.®
13. Combustible Fiber Storage,
more than 100 cubic feet ........................ $82.®
14. Combustible Material Storage,
more than 2,500 cubic feet ..................... $115.®
15. Compressed Gases:
a. Corrosive, 200 cubic feet or more .............. $95.°°
b. Flammable, 200 cubic feet or more ............. $84.00
c. Highly Toxic, any amount .................... $95.00
Resolution No. 99-146
Page 19
d. Inert/Simple Asphyxiant, 6,000 cubic feet or more . $85.00
e. Irritant, 200 cubic feet or more ................ $84.®
f. Other Health Hazards, 650 cubic feet or more .... $84.®
g. Oxidizing (includes Oxygen), 504 cubic feet or more $84.®
h. Pyrophoric, any amount ..................... $95?0
i. Radioactive, any amount ..................... $98.®
j. Sensitizer, 200 cubic feet or more .............. $95.®
k. Toxic, any amount .......................... $95?0
I. Unstable (Reactive), any amount ............. $132.®
16. Commercial Rubbish-Handling Operations .......... $84.®
17. Cryogens:
a. Corrosive -- Inside, over 1 gallon ............... $95.®
b. Corrosive -- Outside, over 1 gallon ............ $95.®
c. Flammable -o Inside, over 1 gallon ............. $84.®
d. Flammable -- Outside, 60 gallons or more ....... $84.00
e. Highly toxic -- Inside, over 1 gallon ............. $95.®
f. Highly toxic -- Outside, over 1 gallon ............ $95.®
g. Nonfiammable -- Inside, 60 gallons or more ...... $95?
h. Nonfiammable -- Outside, 500 gallons or more .... $84?0
i. Oxidize -- Inside, 50 gallons or more ............ $84.®
j. Oxidizer -- Outside, 50 gallons or more .......... $84.®
18. Dry Cleaning Plants .......................... $132.®
19. Dust-Producing Operations ...................... $84.00
20. Explosives or Blasting Agents:
a. Storage, Manufacture, Process or Sell .......... $84?
b. Use .................................... $150.®
21. Fire Hydrants and Water-Control Valves,
use for other purposes ........................ $ 84.®
22. Fire Protection Systems and Equipment, per building. No Fee
23. Fireworks:
a. Retail Sales Not Permitted
b. Aerial Displays (see also 6.2E) ................ $84.®
24. Flammable or Combustible Liquids:
a. Pipeline, to Use, Operate,
Repair or modify a Pipeline .................. $132.®
b. Class I Liquids,
more than 5 gallons Inside a Building ........... $84.®
Resolution No. 99-146
Page 20
c. Class I Liquids,
more than 10 gallons Outside a Building ......... $84.®
Exceptions to b. & c.:
1. Storage or use of Class I Liquids
in Vehicle, Vessel, Aircraft or
Equipment Fuel Tanks.
2. Storage or use of Paints, Oils,
Varnishes, or Similar Mixtures for
Maintenance, Painting or Similar
Purposes for less than 30 days.
d. Class II or II-A Liquids,
more than 25 Gallons Inside a Building ......... $ 84.®
e. Class II or IlI-A Liquids,
more than 60 gallons Outside of a Building ...... $ 84.00
f. To remove Class I or II Liquids
from an UST by other than Normal Operation .... $ 95.®
g. Installation, Construction, Alteration or Operation
where Flammable or Combustible Liquids are
Produced, Processed, Transported, Stored,
Dispensed or Used in any of the following:
Tank Vehicles .................. $95.00
Equipment ................... $105.®
Tanks, per tank ............... $121
Plants ....................... $132.®
Terminals .................... $132.00
Wells, per well ................ $ 84.00
Fuel-Dispensing Stations (Single and/or
Multiple pump Stations) ......... $ 95.®
Refineries .................... $13220
Distilleries .................... $13220
h. Installation, Alteration, Removal, Abandon, Place
Temporarily out of Service or otherwise Dispose of a
tank which contained Flammable or Combustible
Liquid .................................. $132.®
i. To change the type of contents in a Flammable or
Combustible Liquid ........................ $132.®
25. Fruit Ripening ............................... $105.®
26. Fumigation or Thermal Insecticidal Fogging ........ $12120
27. Hazardous Materials: (see also other Permit Sections)
For multiple Permits within this Section 25, the Fee will
be the total of all related Permits to a maximum of
$400.00 or Actual Costs, whichever is greater.
Resolution No. 99-146
Page 21
a. Carcinogens, 10 Ibs. or more ................ $132.®
b. Corrosive Liquids, 55 gallons or more ........... $84.°°
c. Corrosive Solids, 500 Ibs. or more .............. $95.®
d. Flammable Solids, 100 Ibs. or more ............ $9520
e. Highly Toxic Liquids and Solids, any amount ...... $9520
f. Irritant Liquids, 55 gallons or more ............. $8420
g. Irritant Solids, 500 Ibs. or more ................ $8420
h. Oxidizing Liquids:
Class 4, any amount ............ $8420
Class 3, 10 Ibs. or more .......... $84.00
Class 2, 100 Ibs. or more ......... $84.®
Class 1,500 Ibs. or more ......... $84.®
i. Oxidizing Solids:
Class 4, any amount ............ $84.°°
Class 3, 10 Ibs. or more .......... $84.®
Class 2, 100 Ibs. or more ......... $84.®
Class 1,500 Ibs. or more ......... $84.®
j. Organic Peroxide Liquids and Solids:
Class 1, any amount ............ $95.o0
Class 2, any amount ........... $95.®
Class 3, 10 Ibs. or more .......... $95.°°
Class 4, 20 Ibs. or more .......... $95.®
k. Other Health Hazards:
Liquids, 55 gallons or more ....... $84.®
Solids, 500 Ibs. or more .......... $84.00
I. Pyrophoric Liquids, any amount ............... $95.®
m. Pyrophoric Solids, any amount ................ $95.®
n. Sensitizer Liquids, 55 gallons or more ........... $95.oo
o. Sensitizer Solids, 500 Ibs. or more ............. $95.00
p. Toxic Liquids, 10 gallons or more .............. $95.®
q. Toxic Solids, 100 Ibs. or more ................. $95.®
r. Unstable (Reactive) Liquids:
Class 4, any amount ........... $132.oo
Class 3, any amount ........... $132.00
Class 2, 5 gallons or more ....... $132.®
Class 1, 10 gallons or more ...... $132.®
Resolution No. 99-146
Page 22
s. Unstable (Reactlye) Solids:
Class 4, any amount ........... $132.00
Class 3, any amount ........... $132.°°
Class 2, 50 Ibs. or more ......... $13270
Class 1,100 Ibs. or more ........ $132.®
t. Water-Reactive Liquids:
Class 3, any amount ............ $95?0
Class 2, 5 gallons or more ........ $95.®
Class 1, 10 gallons or more ....... $95.®
u. Water-Reactive Solids:
Class 3, any amount ............ $95.00
Class 2, 50 Ibs. or more .......... $95?0
Class 1,100 Ibs. or more ......... $95.®
28. Hazardous Production Materials
for H-6 Occupancies .......................... $132.®
29. High Piled Combustible Storage .................. $99?0
30. Liquefied Petroleum Bases;
Store, Use, Handle or Dispense .................. $84.°°
31. Liquid or Gas-Fueled Vehicles
or Equipment in Assembly Buildings .............. $1057°
32. Lumber Yards ............................... $84?0
33. Magnesium Workings ......................... $121 .oo
34. Mall, Covered (see also 6.211D4) .................. $84.°e
35. Motor Vehicle Fuel-Dispensing Stations ........... $100.°°
36. Open Burning ............................... No Fee
37. Organic Coatings ............................ $132.®
36. Ovens: Industrial Baking or Drying ................ $84.®
39. Pallet Storage ................................ $84.®
40. Places of Assembly:
a. A-4 Stadiums,
Reviewing Stands and Amusement Park ......... $84.®
b. A-3 Occupant Load
of 50 to 299 without a Stage .................. $957°
c. A-2.1, Occupant Load
of 300 or more without a Stage ............... $147.®
d. A-2 Occupant Load
of less than 1000 with a Stage ............... $169.oo
e. A-1 Occupant Load
of 1000 or more with a Stage ................ $225.00
Resolution No. 99-146
Page 23
41. Pyrotechnical Special Effects Material (see also 6.2E) . $84.®
42. Radioactive Materials ......................... $132?0
43. Refrigeration Equipment ....................... $1157
44. Repair Garages ............................... $84-®
45. Spraying or Dipping ............................ $84.®
46. Tents, Canopies and Temporary Membrane Structures:
a. 201 to 400 square feet ...................... $84-®
b. 401 to 1500square feet .................... $110.®
c. 1501 to 15,000square feet .................. $1477
d. 15,001 to 30,000 square feet ................. $178.00
e. Over 30,000 square feet .................... $210.®
47. Tire Storage ................................ $132.®
48. Welding and Cutting Operations ................. $ 84?
II. Special Services
B. Excessive or Malicious False Alarms causing Response
of Fire Apparatus.
1. Response due to "Failure to Notify" the Fire
Department when working on or testing Sprinkler or
Fire Alarm System.
$153.00 per hour per piece of Emergency
Apparatus responding 1/2 hour, minimum
charge.
2. Malicious False Alarms.
$153.00 per hour per piece of Emergency
Apparatus responding with 1/2 hour,
minimum charge.
3. Response Due to Alarm Mallunction.
$153.oo per hour per piece of Emergency
Apparatus responding to all False Alarms
in excess of two (2) False Alarms in 30
days with 1/2 hour, minimum charge.
4. Response to False Alarms due to negligence,
tampering with the system, construction or
modification of the building.
$153.® per hour per piece of Emergency
Apparatus responding with 1/2 hour,
minimum charge.
Resolution No. 99-146
Page 24
5. Response to False Alarm by Battalion Chief and/or
Fire Inspector.
$50.00 per hour with 1/2 hour, minimum
charge.
C. Response to Fire Setter lncidents (Juvenile orAdult) and
"DUI" Callouts:
1. Cost Recovery for Emergency Apparatus responding.
$2?o per minute per piece of Equipment.
2. Cost Recovery for Personnel responding.
$ .83 per minute per Person.
3. CostRecoveryforBattalionChieforFirelnvestigator
responding.
$ .45 per minute.
D. Response to mitigate Extended Hazardous Chemical and
Material Incidents beyond Normal Service requires (this
includes response to railroad properties, freeways, and
aircraft crashes).
1. Hazardous Incident,
Overhead and Command, per hour.
$273.°° per hour per piece of Apparatus
2. Apparatus and Crews
assigned to the Incident, per hour.
$170.® per hour per piece of Equipment
3. Specialized Resources - HAZMAT Crews and
Equipment.
Actual Costs
4. Materials and Supplies used for the Incident.
Actual Costs
E. Special Activities - Apparatus and Crews assigned to
activities that require the services, at Permittees
expense, of one or more standby Firefighters.
$153.00 per hour per piece of Apparatus
$ 30? per hour, two hour minimum per
District employee, two hour minimum
charge.
Resolution No. 99-146
Page 25
F. Accelerant Detection Canine Team,
Use of Arson K-9 Team by other Agencies.
Fire Scene Examinations:
$50.0o per hour,
two hour minimum charge
Hourly Travel Rate:
$25.°e per hour, one hour minimum,
to and from Search Area
Mileage, round trip ....................... $ .35 mile
Administrative Reports ............... $25.°° per hour
Mounted Photographs .................... $1 .so each
G. Board of Appeals
Requiring a Special Meeting ................. $245.00
SECTION 7: GEOGRAPHIC INFORMATION SYSTEM FEES
Request Fees
Parcel Database ........ $10,000.®
Digital Format
(Tnere are 8 layers included in this Database: Lot lines, Rights-of-
Way, Ownership, Situs Addresses, Assessor Parcel Numbers,
Street Names, Street Center Lines, and Assessment Districts.)
Zoning Map
34 X 44" Color,
2 "E" Size Sheets ........ $30.®
Zoning or General
8-1/2 X 11" BAN
Plan Map (Vicinity) ........ $1 .o0
Zoning or General
8-1/2 X 11" Color
Plan Map (Vicinity) ........ $5.00
General Plan Map
34 X 44" Color,
2 "E" Size Sheets ........ $30.00
Flood Plain Map
34 X 44" Color,
2 "E" Size Sheets ........ $30?
Resolution No. 99-146
Page 26
Request Fees
Land Available for Potential
Development Report -- Citywide ........ $25.®
Land Available for Potential
Development Report -- Residential ........ $15.®
Land Available for Potential
Development Report -- Commercial/Industrial ........ $15.®
Land Available for Potential
Development Report -- Specific Plan ........ $15.®
Land Available for Potential
Development Report -- Citywide
34 X 44" Color,
2 "E" Size Sheets ........ $50.00
Special Reports and/or Maps ......... Time and Materials
+ $500.® Deposit
SECTION 8: LIBRARY FEES
(These fees have been adopted by the Library Board)
Fines
Fines are based on Item rather than Patron. A Child borrowin~
Adult rvlaterials will be assessed an Adult Overdue Fine.
Per Day Maximum Fine Borrowin.q Thresholds
Overdue Fine:
Adult $ .25 $10.® $5.®
Children $ .10 $ 5.® $5.®
Video $1 .oo $10.oo ........
CD/ROM $2.°° $10.°° ........
Magazine $ .10 $1 .oo ........
Fees for Rental
Fee Loan Period Limit of Items
Video Cassette Loan Fee $1.00 7 days 4 Video Titles, Total
Business Video Series $2.00 per tape 3 days
Best seller videos $2.® per tape 3 days
Audio Cassette Fee $ .25 per tape/ 14 days 4 Cassette Titles
$2?0 max.
Resolution No. 99-146
Page 27
Fee Loan Period Limit of Items
Video Cassette Loan Fee $1 .o0 7 days 4 Video Titles, Total
CD Fee $ .25 per CD 14 days 4 CD Titles
Best Seller CD $ .50 per CD 14 days
Read AIongs $ .25 per cassette 14 days 4 Read Along Titles
Best Seller Rental Books $1.0o 7 days 4 Books/No Reserves
CD Rom Software $2.00 7 days 4 Titles
Test/Deposit Books $20? ................
Refundable Deposit Charged
Checks Allowed; Credit Card Allowed
Fees for Services
Fee
Interlibrary Loan $2.®
Reserves $ .50
Marketing Library Card $3.®
Lost Library Card $2.® for Regular Card
$3.00 for Marketing Card
Collect!or~ Fee $15.® per account
Test Monitcril'~rJ Fee $10.® per Test Session
Access to-en-L-ine-Meg~i,~es °~'~ (Fee eliminated by Action of Library Board)
Single-Sided Disc $ .50
Technology Center
Fee
In-house Computer Rental $3.® per hour
Technology Classes
Fee
Enternet Basic Searching $15.® per class NEW FEE
Internet Intermediate Searching $15.® per class NEW FEE
Internet Advanced Searching $15.® per class NEW FEE
Resolution No. 99-146
Page 28
Printouts
Fee
Color $ .30
B/VV $ .10
Photocopies
Fee
Color Photocopies $ .50
B/VV Photocopies:
Coin $ .15
Debit Card $ .10
Microform Copies $ .15
Fees for Research/Business Services
Fee
Business Locator Services $5.® per business, no charge if business not located
Brief Business Profile $10.o° per business, no charge if not located
Each additional Profile, $6.®
Business Lists on D~:~and $ .05 cents per record,
$10.® minimum
On line Data Base Searches Cost of Online Connect Time + $5.®
Lost Materials
Item Cost of Item Processing Fee
Books Original Cost + $5.®
Media Original Cost + $6?
Paperback Books Original Cost + $2.s°
Magazines Cover Price + $1
Damaqed Materials
Type of Damaqe/Loss Processing Fee
Bar Code Removed .......... $2.®
Book(s): List Cost in Computer
Cover Damaged ............ $5.®
Resolution No. 99-146
Page 29
Type of Damage/Loss Processing Fee
Plastic Cover Damaged ....... $2.®
Page Torn ................. $1.00 per page
Compact Discs: List Cost in Computer
Broken Jewel Case:
Singles ............... $1 .so
Doubles ............... $3.®
Loss of Liner Notes .......... $5.®
Loss of Book/Pamphlets ...... $5.®
Video Cassettes: List Cost in Computer
Shell Replacement .......... $5.®
Storage Case Damage ....... $5.®
Audio Book Cases:
Double .................... $5.®
4 Storage .................. $6.®
12 Storage ................. $7.®
Cassette Boxes ............. $1 .o0
SECTION 9: PLANNING FEES
9.'1 Applications
Those charged as a base fee, plus a per unit or per acre
amount, with a maximum set at 3X base fee.
Application Base Fee Per Unit Fee Maximum Fee
Tentative Tract Map $2,987.® $60.°° per d/u $8,961 .oo
Conditional Use Permit $2,921 .oo $292.® per acre $8,763.°°
Dev/Des Review -- Res $2,851 .eo $57.® per d/u $8,553.®
(5 or more)
Dev/Des Review -- Comm/Industrial $2,851 .oo $285.® per acre $8,553.®
Initial Study $225.® $22.® per acre $675.®
General Plan Amendment $2,866.® $287.® per acre $8,598.®
Spec/Comm Plan Amend.* $2,866.® $287.® per acre $8,598.®
Dev Distr Amendment* $2,866.e° $287.® per acre $8,598.®
*Should be charged at half rate if filed in conjunction with a General Plan Amendment.
Resolution No. 99-146
Page 30
9.__2 Applications
Those charged on a time-and-materials basis with a deposit
taken up front.
Application Deposit Amount
EIR Review - Sensitive ........ $10,000.®
Development Agreement Review ........ $5,000.00
Mitigation Plan - Complex ........ $1,000.®
Annexation ........ $2,000.00
Development Agreement ........ $2,000.°°
New Specific/Community Plan ........ $10,000.00
EIR Preparation ........ $5,000.®
9.3 Other Application Fees
Application Fee
Non-Construction CUP ........ $435.°°
Uniform Sign Program ........ $580.00
Minor Exception ........ $170.°°
Dev/Design Review:
4 du's or less ........ $1,027.®
Variance ........ $871.®
Variance:
4 du's or less ........ $291 .oo
Use Determination ........ $315.00
Preliminary Review ........ $325.®
Minor Development Review ........ $296.00
Time Extension ........ $549?0
Minor Time Extension ........ $136.®
Sign Permit ........ $51 .oo
Hillside Development Review
5 or more du's ........ $1,462.°°
Hillside Development Review
4 or less du's ........ $244.®
Temporary Use Permit ........ $68.®
Resolution No. 99-146
Page 31
Application Fee
Temporary Use Model Home ........ $219.®
EIR Review Only ........ $2,370?0
Landmark Application ........ $728.®
Residential and Small Business ........ No Fee
Landmark Alteration ........ $835.®
Residential and Small Business ........ No Fee
Mills Act Application ........ $724.®
Residential and Small Business ........ No Fee
Mitigation Plan (Simple) ........ $7197
Mitigation Plan (Complex) ........ (See 9.2)
9.4 Appeal Fees
Application Fee
Appeal of a City Planner Decision ........ $62.®
Appeal of a Commission Decision
!!'! Connection with an Application ........ $126.®
Appeal of a Tract Map ........ $251 .oo
9.5 Other Fees
Application Fee
Pre-application Review
(Planning Commission) ........ $325.®
Entertainment Permit ........ $571 .oo
Adult Entertainment Zoning Permit ........ $571.00
Home Occupation Permit ........ $53.®
Large Family Day Care Permit ........ $170.00
Public Convenience or Necessities
(Alcohol Beverage Control Licenses) ........ $315.®
Recycling Facilities Permit ........ $296.®
Status Map Application ........ $15.®
Trail Easement Vacation ........ $1,190.®
Resolution No. 99-146
Page 32
Application Fee
Tree Removal/New Developmen ........ 432.®
Tree Removal/Existing Development ........ $72.®
Land Use Verification Report ........ $25.®
NOTE; Planning Division fees for documents,
which are individually priced, are
contained in the Document Price List
SECTION 10: RECREATION FEES
Following are current fees for recreation activities and rentals.
All consumable costs are to be recovered.
Definition of classes of fees by groups.
GROUP 1: City of Rancho Cucamonga sponsored and co-
sponsored events; other governmental agencies
serving Rancho Cucamonga residents.
GROUP 2: Not-for-profit, civic, athletic, social organizations
which are located and based in the City whose
management is not paid and organizations
sponsoring a public forum or candidate's
information night.
GROUP 3; Not-for-profit, civic, athletic, and social
organizations which has paid management and
are located and based in the City.
GROUP 4: City resident private party activity, City resident
employee organizations, City resident political
candidate use for fund raisers; City resident
college organizations and committees; work
parties and social events.
GROUPS.' City resident commercial, business, profit-
making, non-resident not-for-profit, civic and
social organizations, non-resident colleges, their
organizations and committees, non-resident
private party activity, non-resident employee
associations.
GROUP 6: Non-resident commercial, business, and profit-
making organizations.
Resolution No. 99-146
Page 33
Neighborhood and Community Park Lighted Sports Venue Fees
Commencing September 1, 1993, each user group shall be
charged fees equal to seventy-five percent (75%) of the costs of
electricity used to provide light to that user group based on the
most recent rates published by Southern California Edison
(SCE). Commencing September 1, 1994, fees will be charged
at one hundred percent (100%).
Upon acceptance by the City of new parks in Rancho
Cucamonga, a use fee of 100% of the full light costs shall be
implemented. This fee shall include electrical usage and
demand charges as outlined by Southern California Edison
(SCE) rate policies. This use fee will be updated annually or as
rate policies by SCE are amended.
ClassesRVorkshops/Proqrams
Classes and workshops shall be structured on a cost-covering
basis, and fees shall be set based upon the market rate of
similar programs provided in the cities of Chino, Fontana,
Ontario and Upland.
Non-Resident Charge
A $5.00 fee shall be paid by each non-resident, each class, each
team, each season to participate in City-sponsored classes.
Said fee is payable at the time of registration. Does not include
one day activities or any trips sponsored by the City.
Facility Rentals
Hourly fees for Monday through 5 p.m., Friday use as follows:
Friday, 5 p.m. and later, Saturday,
Sunday and holiday use will be charged
the 5:00 p.m. to 8:00 a.m. rate.
Buildinq Rentals Hourly Fee
GROUP
ROOM SIZE TIME '1 2 3 4 5 6
30 oo
Small 8am-5pm None $8.® $8.® $25.® $ . $30.00
Small 5pm-8am None $12.°a $12.® $35.® $40.°° $40.®
NOTE: Patio at Rancho Cucamonga Senior
Center shall be rented only as a small
room at 8am-5pm rate.
Resolution No. 99-146
Page 34
Buildinq Rentals Hourly Fee Cont'd
GROUP
ROOM SIZE TIME I 2 3 4 5 6
Large* 8am-5pm None $12.® $12.00 $40.® $45.® $4520
Large* 5pm-8am & None $2020 $20.® $50.°° $5520 $55.®
Weekends
* Four hour minimum charge for large
room use on Friday and Saturday nights.
NO TE: (A) All youth sports groups are permitted
one free meeting per month. Room use
for registration purposes is also free of
charge. Groups who require room use
beyond the above criteria are charged the
group 2 and 3 building rental hourly fees.
(B) Refer to Attachment B for market
survey information.
Facility Decoratinq Discount NEWlEE
Rooms may be reserved for 50% of the room rental rate only for
purposes of decoration and removing decorations up to two
hours prior to and after the event. No more than twenty people
may be present during this discounted function.
Kitchen Hourly Fee
GROUP
I 2 3 4 5 6
None $5.°° $5.® $10.°° $10.® $15.®
Lions West, Ceramic Room Rental NEW FEE
GROUP1 GROUP 2-4 GROUP 5-6
No hourly fee $50.® per hour rental fee $75.® per hour rental fee
Materials: Actual costs Materials: Actual cost Materials: Actual cost
Staff: $1020 per hour $1020 per hour staff fee $1020 per hour staff fee
Resolution No. 99-146
Page 35
Other Fees
If additional City staff is required, services will be charged at the
rate of $10.® per hour for staff time. When a damage/security
deposit is required, the charge is $200.®.
Per Day Fees
Rental Item Fee
Coffee Pot (small) ........... $5.®
Coffee Pot (large) ........... $15.®
Coffee Service with china ........... $ 2.® per person NEW FEE
Copy Service ........... $ .05 per page NEW FEE
FAX service (incoming) ........... $ .10 per page NEW FEE
FAX service (outgoing) ........... $ .50 per page NEW FEE
Flip Chart/Easel ........... $20.® NEW FEE
Microphone ........... $10.00
PA System (small) ........... $40.®
Piano* (see Note:) ........... $25.®
Podium with PA ........... $40.® NEW FEE
Professional Lighting ........... $40.®
Tree or Spot,
Staff for Lighting ........... $10.® per hr.
Projector/Overhead ........... $10.°°
Projector/Slide ........... $20.® FEEINCREASE
Stage (large) ........... $50.00
Stage (small) ........... $20.®
T.V. with Video Player ........... $20.00
White Board with Easel ........... $10.00 NEW FEE
* The piano is tuned by the City twice a year. If the piano does not
meet the standards of the user, the City will arrange for tuning at the
user's sole expense. Tuning fees will be added to rental cost.
COMMUNITY AMPHITHEATER
The following are rental fees for amphitheaters. The first hour of
monitoring is included in the stage rental for Groups 2 and 3.
Community Amphitheater Fees
GROUP
1 2 3 4 5 6
Stage-flat fee None $25.00 $25.® $72.® $80.00 $95.00
Sound Monitor/Hourly None $12.00 $12.® $30.® $30.00 $43.®
Resolution No. 99-146
Page 36
EQUESTRIAN CENTER
Fees and Charges will be as follows:
Equestrian Center Fees Hourly Room Rental *
GROUP
ROOM SIZE TIME I 2 3 4 5 6
Small 8am-5pm None $8.® $8.00 $25.® $30.® $30.00
Small 5pm-Bam None $12.00 $12.® $35.® $40.® $40?
Daily Snack Bar ** None $5.® $5.® $7.00 $7.® $7.®
Kitchen
GROUP
I 2 3 4 5 6
ANNUAL SHARED STORAGE FEE N/C $75.® N/A N/A N/A N/A
Lights*" 100% ACTUAL ENERGY CONSUMPTION
storage For City Community Centers and Public Facilities, no
storage will be provided to groups on an ongoing basis
without the approval of the Community Services Director.
* Includes use of P.A. System.
"A deposit may be required for this use. (See Equestrian Usage Policies.)
*** The small arena will have a coin metered box for electrical cost recovery.
PICNIC SHELTERS
The following are rental fees for picnic shelters located in City
reservable parks.
Picnic Shelter Fees
GROUP
SHELTER SIZE I 2 3 4 5 6
Small None $3.0Operhr. $3.00perhr. $5-00Perhr. $8.00Perhr. $8.00Perhr-
Large None $5.°°perhr- $5.00perhr- $8.00 Perhr. $12.00Perhr.$12.00Perhr.
Resolution No. 99-146
Page 37
EPICENTER STADIUM COMPLEX TOURNAMENT FEES
Rental Fees Per Field
GROUP'1-3 GROUP 4-6
Field Rental* $140.00 $265.00
Deposit $75.00 $80.®
Infield Lining Actual Cost Actual Cost
Light Fee Actual Cost Actual Cost
* Includes initial field dragging and
watering. Thedepositwlllbe
applied to the total rental fee.
When additional City staffing, equipment and material is required
for tournaments and/or special event programs scheduled at the
Epicenter Stadium Complex Adult Sports fields, the applicant is
required to pay all event-related expenses.
Community and Neighborhood Park Leagues & Tournaments
A $50.® non-refundable deposit is required to reserve fields.
Said deposit shall apply to final field rental totals. Should there
be a need for City staff to oversee and coordinate activities, the
fee is $15.® per hour.
The applicant shall meet all comprehensive public liability
insurance requirements for usage of facilities and provide
additional equipment needed to hold the tournament at their own
cost.
Softball Field & Soccer Fields (Per Field)
Organized Leagues & Tournaments
GROUP '1-3 GROUP 4 GROUP 5-6
None $20.® $50.®
(2 hrs &less) (2hrs &less)
None $35.® $90.00
(4 hrs & less) (4 hrs & less)
None $85.® $160.00
(All day) (All day)
Resolution No. 99-146
Page 38
Rental Fees Per Field
Drag & Line* GROUP 1-6
Actual Cost
* Drag and Line fees include staff costs and are
for one drag and line per field.
Bases* GROUP1-3 GROUP 4-6
$20.® per field $40.00 per field
* Bases are available only when renting the fields
for a tournament, Fee is based on per field, per
day, basis subject to availability by City.
NOTE: Refer to Attachment E- Field Rental
Fees Survey for Market Survey
information.
Snack Bar
For City-owned snack bars located in City Parks.
GROUP1 GROUP 2 GROUP 3-6
Seasonal None $450.00 N/A
Other non-profit groups bringing in snack bars (i.e. trailers)
will be charged a flat $300.00 seasonal permit fee, unless
group is participating in a City sponsored event.
Storage
For City-owned storage located in City parks.
GROUP1 GROUP 2 GROUP 3-6
Seasonal None $75? N/A
Resolution No. 99-146
Page 39
R.C. FAMILY SPORTS CENTER RENTAL FEES
Athletic Use ONLY
Basketball Courts (Per Court)
GROUP 1 GROUP 2-4 GROUP 5-6
None $40,00 $50.®
(2 hrs &less) (2hrs &less)
None $75.® $90.®
(4 hrs & less) (4 hrs & less)
None $100.® $120.®
(6 hrs & less) (6 hrs & less)
None Plus $15.00 per hour Plus $15.00 per hour
(2 staff) (2 staff)
None Cleaning/Damage Cleaning/Damage
Deposit $200.® Deposit $200.00
Racquetball Courts (Per Court)
GROUP1 GROUP 2-4 GROUP 5-6
None $45.00 $60.00
(3 hrs & less) (3 hrs & less)
None $75.® $90.®
(6 hrs & less) (6 hrs & less)
None Plus $15.00 per hour Plus $15.® per hour
(2 staff) (2 staff)
None Cleaning/Damage Cleaning/Damage
Deposit $200.® Deposit $200.®
R.C. Sports Center Teen Center Rental NEW FEE
GROUP1 GROUP 2-4 GROUP 5-6
None $150.00 rental fee $200.® rental fee
(2 hr. minimum) (2 hr. minimum)
None $50.00 each $60.00 each
additional hour additional hour
None $10.00 per hour $10.°°per hour
for staff (required) for staff (required)
None Cleaning/Damage Cleaning/Damage
Deposit $200.® Deposit $200
Resolution No. 99-146
Page 40
EPICENTER STADIUM COMPLEX FEES
Stadium Facility
Ticketed Events * Non-Ticketed Events
a. Stadium Rental $1,500.® per day $2,000.00 per day
plus 10% of gross
ticket sales
b. Sky Box Rental Rate $50.e° per hour $50.00 per hour
c. Cafe' Area Rental Rate $50.00 per hour $50.® per hour
d. Pavilion Area Rental Rate
i. Covered Pavilion
3rd Base side $50.00 per hour $30.00 per hour
ii. Open Pavilion
1st Base side $25.® per hour $15.00 per hour
e. Event Expenses Applicant is required to pay all event related
expenses including personnel, equipment and
materials and other related costs.
Parking Lot Events
Ticketed Events * Non-Ticketed Events
a. Stadium On-Site Lots
i. Rental rates for
Parking Lots
A, B, C $500.00 per day $670.® per day
plus 10% of gross
ticket sales
ii. Rental rates for
Parking Lots
D, E, F $250.00 per day $ 335.® per day
plus 10% of gross
ticket sale
b. Expanded Parking Lots
i. Parking Lot #1 $500?0 per day $670.® per day
plus 10% of gross
ticket sales
Resolution No. 99-146
Page 41
Ticketed Events * Non-Ticketed Events
b. Expanded Parking Lots Cont'd
ii. Parking Lot #2 $250.® per day $335.® per day
plus 10% of gross
ticket sales
iii. Parking Lot #3 $1,500.°° per day $2,000.® per day
plus 10% of gross
ticket sales
OR
iii. Event Quadrant $250.00 per day $335.® per day
(A-F) plus 10% of gross
ticket sales
c. EventExpenses Applicant is required to payevent-related
expenses including personnel, equipment and
materials and other related costs.
Parkinq Fees **
a. Baseball Events ............ $2.® per car; $15.00 per bus
b. Concerts and ............. $3.00 to $5.® per car; $5.® to $10.® VIP per car;
Special Events $15.® per bus, depending on event
c. Parking Lot Events ......... Option to charge $2.® to $5.® per car
Concessiorts
a. Food and Beverage ......... 20% of gross sales
10% for non-profit organizations
utilizing the Adult Sports Park
b. Merchandise and ........... 20% of gross sales to be negotiated -- books,
Novelties novelties, tapes, CD's, programs, T-shirts, etc.
10% for non-profit organizations
Miscellaneous
a. Commercial Filming ......... Minimum of $1,000.°° to $4,000.00 per day,
depending on filming requirements, plus actual
costs for City services
Resolution No. 99-146
Page 42
b. Commercial Filming ......... Minimum of $500.® to $2,000.00 per day, depending
in Parking Lot on filming requirements, plus actual costs for City
services
c. Commercial ............... Minimum of $500.oo to $2,000.® per day, depending
Photograph on photography requirements, plus actual costs for
City services
d. Audio Broadcast ........... $300?0 per performance
Recording Fee ............. $500?0 per performance
Taping - TV ............... $1,500? per performance
Location Credit Required
e. Deposit .................. Minimum of $500.00 to $2,500?0 per day,
depending upon event/rental requirements.
NOTE: At the discretion of the Community
Services Director, additional
damage/security deposit may be required
according to event/rental requirements
and the City's liability exposure.
f. Additional Move-in .......... 50% of daily event rental rate
Take Down/Move-
Out Days
g. Tent/Canopy Main- . ........ Minimum of $300.® to $1,000.® per even
tenance Reserve Fee depending upon event/rental requirements.
* Based on Provisions of Municipal Ordinance.
** Exception to Parking Rates apply to vehicles entitled to occupy the preferred
parking area (lot A) delineated In lease with Va~ey Baseball Club, Inc.
SECTION 11: RANCHO CUCAMONGA SHERIFF DEPARTMENT FEES
Descpription Fee
Fingerprinting, per card ........ $1070
Criminal Reports ........ $20.00
Traffic Accident Reports ........ $20.00
Traffic Accident Reports - Mail ........ $20.00
Criminal History Letters ........ $15.00
Resolution No. 99-146
Page 43
Descpription Fee
Bicycle License ........ $3.®
Special Event Jobs *. ....... No Fee
Costs associated with towing and releasing
stored or impounded vehicles ........ $75.®
Repossession vehicle release fee ........ $15.°°
Citation proof of correction ** ........ $15.®
Copy of citation or other document,
not a report, per page ........ $5.00
Public Information Clerk, per hour ........ $14.®
Station Clerk, per hour ........ $16.00
Station Clerk Supervisor, per hour ........ $18.®
Secretary, per hour ........ $17.®
Secretary II, per hour ........ $19.®
Forensic Specialist II, per hour ........ $35.®
Community Services Officer, per hour ........ $20.®
Deputy Reserve, per hour ........ $31
Deputy II, per hour ........ $57.®
Deputy III, per hour ........ $58.°°
Sergeant, per hour ........ $64.°°
Lieutenant, per hour ........ $74.°°
Captain, per hour ........ $82.®
Vehicle Cost, per hour ........ $85.°°
· There is no fee for special events. However, if security services
are required for the event such as regular or reserve officers,
or private security, these fees are separate.
· * This fee will not apply to persons residing
or working within the City of Rancho Cucamonga or
citations issued by the Rancho Cucamonga Police.
SECTION 12: MISCELLANEOUS FEES
Descpription Fee
Calculation for
1915 Bond Act Assessment Districts ........ $7.50
Resolution No. 99-146
Page 44
Descpription Fee
Amendment to Tax Statements
for Prepaid Assessments ........ $20.®
Bingo License ........ $50.®
Industrial Bond Development
Bond Application ........ A fee of 1/4 of 1% of the
established maximum amount
of the proposed bond
application and not less than
$1,250.®
Dog Licensing ........ (See Resolution 81-79)
Filming Permits:
Business License Tax ........ $20.®
Application Fee (See Planning Fees) ........ $129.®
Basic Fee for each day of filming ........ $132.50
Investigation Fee ........ $110.® per
filming day
Fire Department ........ $100.® per hour *
· Per Hour for each 3-man piece of equipment
Police Department **
(See Rancho Cucamonga Sheriff Department Fees)
· * Number and type of personnel is determined by
the Station Commander after reviewing plans for
the event
Mobfie Home Park Rent Mediation
Appeal Fee (per Section 8.08, Municipal Code) ........ $300.®
Mobile Home Park Rent Mediation
Filing Fee (per Section 8.08, Municipal Code) ........ $1 5.®
Massage Establishment Application ........ $225.®
Renewal ........ $111 .oo
Massage Outcall Service ........ $90.®
Renewal ........ $45.®
Massage Technician Application ........ $178.®
Renewal ........ $90.®
Resolution No. 99-146
Page 45
Descpription Fee
School Fees ........ (Please refer to Ordinance
Nos. 69-C and 74 regarding
these fees)
Solicitor, Non-profit, Identification Badge ........ $5.® each
Taxicab Driver's Permit Application ........ $120.00
Renewal ........ $60.®
Taxicab Service Application ........ $95.®
Renewal ........ $45.®
C. EFFECTIVE DATE:
This Resolution shall become effective with its adoption.
PASSED, APPROVED, AND ADOPTED this 16th day of June, 1999.
AYES: Alexander, Biane, Curatalo, Dutton, Williams
NOES: None
ABSENT: None
ABSTAINED: None
A'I'FEST:
~bra J. Adair/s, CMC, City Clerk
Resolution No. 99-146
Page 46
I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California,
do hereby certify that the foregoing Resolution was duly passed, approved and adopted by the City
Council of the City of Rancho Cucamonga, California, at a regular meeting of said City Council held
on the 16th day of June, 1999.
Executed this 17th day of June, 1999, at Rancho Cucamonga, California.
Resolution No. 99-146
Page 47
FEE STUDY
PLANNING DIVISION
CURRENT PROPOSED PERCENT
SERVICE DESCRIPTION FEE FEE CHANGE EXPLANATION
PRE-APPLICATION Informal workshop with $0' $325 100% Similar to a Preliminary Review which requires a $325 fee.
REVIEW Planning Commission to This fee is already set (Fee Resolution 96-012) at a 50%
provide developers with recovery level, based on the 1991 User Fee Study by DMG
guidance eady in the Associates. Of the seven surrounding cities surveyed, only
process. one offered this service, but charges $1,500.
LAND USE Zoning information letter $0 $25 100% Similar to Engineering's Flood Hazard Letter which requires a
VERIFICATION REPORT (i.e., zoned uses, fee of $314. With one exception, surveyed cities charge a fee
previous or outstanding ranging from $25 to $139
violations, RDA sphere of
influence).
TRAIL EASEMENT The City vacates $0 $1,190 100% Similar to Engineering's Lot Line Adjustment which has a
VACATION easement rights. current fee of $1,190 (based on the 1991 User Fee Study by
DMG Associates).
PUBLIC CONVENIENCE Determination with regard $0 $315 100% Staff time req'd to research licensing info from ABC & obtain
OR NECESSITY-PCN to ABC liquor licensing in input from Code Enforcement &Police Dept. City Council
terms of over- determination req'd, necessitating a staff report and resolution.
concentration. Similar to a Use Determination which requires a $315 fee.
This fee is already set (Fee Resolution 96-012) at a 50%
recovery level based on the 1991 User Fee Study by DMG
Associates.
* Fee currently charged not yet adopted by City Council
Resolution No. 99-146
Page 48
PLANNING DIVISION
FEE COMPARISON
SERVICE CHINO CHINO HILLS FON~'AIIA MONTCLAIR ONTARIO RIALTO UPLAND
PRE- Not applicable $1,500 Not applicable Not applicable Not applicable No charge Not applicable
APPLICATION
REVIEW
LAND USE $30/hour $50 to $75 Hourly research No charge $139 $52 $100
VERIFICATION (research fee) rate varies (Misc.Approval)
REPORT
TRAIL No charge. No charge Summary No charge $1,780 Not applicable Not applicable
EASEMENT Exception in east Easement Street Vacation fee is
VACATION Chino regarding Vacation is $800 Abandonment $1,740 or Lot
an SCE + advertising fee is $613 Line Adjustment
easement; cost. Full fee is $600
$203.38 per Vacation
dwelling unit (involving PC
and Council)
$1,000 +
advertisin~l cost
PUBLIC No charge. CUP No charge. If No charge; CUP No charge; CUP No charge; If No charge; CUP No charge; If
CONVENIENCE req'd at $1,611. CUP is req'd, req'd at $750. req'd at $2,109. CUP req'd, that req'd at $2,813 CUP req'd, that
OR NECESSITY PC that fee ranges PC PC fee is $3,333. PC fee is $1,800. PC
determination from $1,500 to determination determination Staff determination determination
$3,000 Currently determination if
a City Council use is permitted,
determination, otherwise, PC
but changing to determination.
Community
Development
Director or his
desi~nee.
Resolution No. 99-146
Page 49
FEE STUDY
ENGINEERING DIVISION
SERVICE DESCRIPTION CURRENT PROPOSED PERCENT EXPLANATION
FEE FEE CHANGE
Standard Agreement To allow processing of $298 $298 0% Formerly called Subordination
Document Processing different cetegodes of Agreement. Name change
a~]reements and documents only/,
Other Fees Collection of San Bernardino $0.00 Vades in accordance with Varies Amendment to add this
County Fees as adopted by County fees. section to fee schedule to be
County consistent with survey cities
in land development
processing,
Resolution No. 99-146
Page 50
FEE STUDY
LIBRARY FEES
CURRENT PROPOSED FEE PERCENT CHANGE
SERVICE DESCRIPTION ~E~[: EXPLANATION
Adults/per item overdue books $0,25/day $0.25/day Borrowing threshold is new and
FINES
Max, $10 Max. $10 when it is reached. further
Borrowing threshold $5 borrowing will be limited so it does
not exceed $5.
Children/per item overdue books $0.1 O/day $0.10/day Borrowing threshold is new and
Max, $5 Max. $5 when it is reached, further
Borrowing borrowing will be limited so it does
threshold not exceed $5,
$5
CD Rom overdue fine $2/day New fee
Max fine $10
CD Rom Software overdue fine $2 for a 7 day loan pedod New fee. 4 titles are allowed
SERVICE DESCRIPTION CURRENT PROPOSED PERCENT EXPLANATION
FEE FEE CHANGE
TECHNOLOGY In-house COmputer rental $3/hr,* 100% New fee. *Per COntract with pdvate provider
CENTER
Printouts - Color $.25/page' 100% New fee. *Per COntract with private provider
Printouts - B & W $.15/page* 100% New fee. 'Per COntract with private provider.
pHOTOCOPIES Color photocopies $.50/page* 100% New fee. *Per COntract with private provider
Aft above fees have been adopted by the Board of Library Trustees at one of their regulaHy scheduled meetings per CA Education Code Section 18960.