HomeMy WebLinkAbout21-04 ResolutionRESOLUTION NO. 21-04
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW
DRC2019-00651, A REQUEST TO DEMOLISH AN EXISTING OFFICE
BUILDING AND CONSTRUCT A NEW 18,165 SQUARE -FOOT
INDUSTRIAL BUILDING/PRODUCTION FACILITY WITH A 3,490
SQUARE -FOOT OFFICE AND ADDITIONAL SITE IMPROVEMENTS.
THE PROJECT IS LOCATED IN THE GENERAL INDUSTRIAL (GI) ZONE
AT 12550 ARROW ROUTE — APN: 0229-031-23.
A. . Recitals.
1. SGE Consulting Structural Engineers for Air Gas Specialty Gas Facility filed an
application for the approval of Design Review DRC2019-00651 as described in the title of this
Resolution. Hereinafter in this Resolution, the subject Design Review request is referred to as
"the application."
2. On January 13, 2021, the Planning Commission of the City of Rancho Cucamonga
conducted a duly noticed public hearing on the application and concluded said hearing on that
date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above -
referenced public hearing on January 13, 2021, including written and oral staff reports, together
with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to the property located at 12550 Arrow Route with an
area of roughly 19 acres and is currently developed with an industrial/production facility and
various parking areas. The site is bound by industrial uses to the south, east, and west, and
general commercial to the north; and
b. The property to the south is zoned Heavy Industrial (HI), the property to the east,
and west is zoned General Industrial (GI), and the property to the north is zoned Regional Related
Commercial (RRC); and
C. The site has a General Plan land use designation of General Industrial; and
d. The application is a proposal to demolish an existing office building and construct
a new 18,165 square -foot industrial/production building for the current Air Gas Specialty Gas
operation; and
PLANNING COMMISSION RESOLUTION NO. 21-04
DESIGN REVIEW DRC2019-00651 — SGE CONSULTING STRUCTURAL ENGINEERS FOR
AIR GAS SPECIALTY GAS FACILITY.
JANUARY 13, 2021
Page 2
e. The proposed industrial building and the included office space will require 73
parking stalls. The applicant proposes to provide 75 spaces, resulting in a surplus of parking
spaces. Additionally, the proposed industrial building will include one loading, which will require a
minimum of one parking space specifically for trucks. The project site contains 13 truck parking
spaces, exceeding the minimum amount required; and
f. The proposed building will feature elements of a modern architectural style,
containing an angled roof using standing -seam metal, an exterior finish consisting of textured
insulated panels designed to replicate stucco or concrete tilt -up, and various windows to help
break up the fagade. The building will also include variation in height to complement the angled
roof and various elements such as steel canopies and window coverings to enhance the overall
design; and
g. The project was reviewed by the Design Review Committee (DRC) on November
10, 2020. No major issues were discussed. Two secondary issues related to the design of the
canopy columns and the proposed fencing along Arrow Route were discussed. The Committee
accepted Staff's recommendation that the project be forwarded to the Planning Commission for
their review and approval with the requirement that the applicant work with staff to revise the
design/material of the perimeter fencing along Arrow Route. The applicant has agreed to revise
the fencing as required by DRC and is reflected in the project plans; and
3. Based upon the substantial evidence presented to this Commission during the above -
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The proposed project is consistent with the General Plan. The General Plan land
use designation for the project is General Industrial, which provides for a wide range of industrial
uses, such as warehousing and production. The project is for the development of a new
industrial/production facility with office space, which is consistent with the intent of the General
Plan's General Industrial land use designation; and
b. The proposed use is in accord with objective of the Development Code, and the
purposes of the district in which the site is located. The Development Code states that the General
Industrial zones are areas designated for the widest possible range of light and medium industrial
activity, including manufacturing, assembling, fabrication, wholesaling, heavy commercial, and
office uses. The project is to construct a production facility with ancillary office space to improve
the operation and efficiency of the Specialty Air Gas Facility operation; and
C. The proposed use is in compliance with each of the applicable provisions of the
Development Code. The project meets all applicable development and performance standards
for a industrial development set forth by the Development Code; and
d. The proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, and welfare, or materially injurious to properties or
improvements in the vicinity. The proposed use is a compatible and complimentary to the existing
surrounding developments where it is located, as it meets the intent and purpose of the General
Plan Designation and Zoning District for the project site; and
PLANNING COMMISSION RESOLUTION NO. 21-04
DESIGN REVIEW DRC2019-00651 — SGE CONSULTING STRUCTURAL ENGINEERS FOR
AIR GAS SPECIALTY GAS FACILITY.
JANUARY 13, 2021
Page 3
4. Pursuant to the California Environmental Quality Act (CEQA) and the City's local
CEQA Guidelines, the Planning Commission finds that the qualifies underthe Class 32 exemption
under State CEQA Guidelines Section 15332 - In -Fill Development Projects, as the project
includes in -fill development consistent with the applicable General Plan designation and
regulations. The proposed construction of the new industrial/production building will occur on a
site that is developed an operational by the Air Gas Specialty company. In addition, the proposed
building will improve efficiency of the current Air Gas operation, the surrounding area is developed
with similar uses and is adequately served by all required utilities and public services. The
Planning Commission finds that there is no substantial evidence that the project will have a
significant effect on the environment.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth in
the Conditions of Approval, attached hereto and incorporated herein by this reference.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 13TH DAY OF JANUARY 2021
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: ze�
Tony Guglielmo, Chairman
ATTEST:
Anne McIntosh, AICP, Secretary
I, Anne McIntosh, AICP, Secretary of the Planning Commission of the City of Rancho
Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced,
passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular
meeting of the Planning Commission held on the 13th day of January 2021, by the fo!!owing vote -
to -wit:
AYES: COMMISSIONERS: GUGLIELMO, OAXACA, DOPP, MORALES
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS: WILLIAMS
ABSTAIN: COMMISSIONERS: