HomeMy WebLinkAbout2021-09-22 Supplementals Thornhill, Elizabeth
From: McPherson, Sean
Sent: Tuesday, September 21, 2021 4:01 PM
To: Welday, Jason
Cc: Gillison, John; McIntosh, Anne; Burris, Matt; Thornhill, Elizabeth; nghirelli@rwglaw.com
Subject: FW: City of Ontario - Comments for Bridge Point Rancho Cucamonga
Attachments: SKM_C650i21091311470.pdf
Jason, and all: C/pkOP
FYI. See below for comments received from the City of Ontario for Bridge. `4�p�CyCC�Cq
c 0
Thanks, e�4��/'�
Sean
From: Rudy Zeledon <RZeledon@ontarioca.gov>
Sent:Tuesday, September 21, 2021 2:19 PM
To: McPherson, Sean<Sean.McPherson@cityofrc.us>
Cc: Khoi Do<KDo@ontarioca.gov>
Subject:City of Ontario-Comments for Bridge Point Rancho Cucamonga
ARNING:The sender of this email could not be validated and may not match the person in the"From"field.
CAUTION:This email is from outside our Corporate network. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Hi Sean,
Below are the City of Ontario's comments for the Bridge Point project, located at 12322 and 12434 4th
Street.
1. The final hydrology shall be submitted to City of Ontario for review and approval.
2. The project will need to obtain an encroachment permit for any proposed work impacting City
right-of-way including, but not limited to, traffic control.
If you have any questions, please let me know.
Thank you,
RUDY ZELEDON
Planning Director
City of Ontario Planning Department
303 East B Street
Ontario, CA 91764
t
ADAMS BROADWELL JOSEPH & CARDOZO
KEVIN T.CARMICHAEL A PROFESSIONAL CORPORATION SACRAMENTO OFFICE
CHRISTINA M.CARO ATTORNEYS AT LAW
JAVIER J.CASTRO 520 CAPITOL MALL,SUITE 350
THOMAS A.ENSLOW 601 GATEWAY BOULEVARD, SUITE 1000 SACRAMENTO,CA 95814-4721
KELILAH D.FEDERMAN SOUTH SAN FRANCISCO, CA 94080-7037 TEL: (916) 444-6801
ANDREW J.GRAF FAX: (916) 444-6209
TANYA A.GULESSERIAN
KENDRA D. HARTMANN' TEL: (660) 589.1660
DARIEN K.KEY FAX: (650) 589-5062
RACHAELE.KOSS amarsNall®aoamsbroaowell Con,
AIDAN P.MARSHALL 0I11y
TARA C,MESSING OA
Of Counsel September 22, 2021 �'q,�,,
MARC D.JOSEPH n
DANIEL L.CARDOZO �/77
'Nol .n..d In m Oeli/oMa
L;c.a..4,a CalP,ada. Opec 2`'?o1j q�y�D�c�
VIA EMAIL
Sean McPherson. Senior Planner
City of Rancho Cucamonga Planning Department
10500 Civic Center Drive
Rancho Cucamonga, California 91730
Email: sean.mcnherson@citvofrc.us
Re: Bridge Point Rancho Cucamonga Proiect (DRC 2020-00202, SCH No.
2020100056).
Dear Mr. McPherson:
This firm represents the Californians Allied for a Responsible Economy
("CARECA') with regard to the above-referenced Bridge Point Rancho Cucamonga
Project ("Project"). On June 21, 2021, we submitted comments on behalf of
CARECA stating objections and concerns regarding the Draft Environmental
Impact Report ("DEIR") prepared for the Project.
We are pleased to report that as a result of direct discussions with the
Applicant, the Applicant has agreed to an extensive set of additional measures
beyond the measures currently proposed in the DEIR to address the potential air
quality impacts identified in the CARECA comments. These include installation of
rooftop solar facilities, and efforts to use low or zero emission vehicles during
construction and operation of the Project.
With the adoption of these measures, CARECA's objections to the Project and
the DEIR are fully resolved, and we respectfully request that the City adopt the
DEIR and approve the Project.
5297-017acp
OpfinW on recycbCPEW
September 22, 2021
Page 2
Please let me know if you have any questions.
Sincerely,
Aidan P. Marshall
APM:acp
5297-017acp
OpHnwonrecyctedpaper
Thornhill, Elizabeth
From: McPherson, Sean
Sent: Wednesday, September 22, 2021 2:40 PM
To: Gillison, John; Burris, Matt; McIntosh, Anne; Welday, Jason; Nakamura,Jennifer
Cc: nghirelli@rwglaw.com; Thornhill, Elizabeth
Subject: FW: Bridge Point Rancho Cucamonga Project (DRC 2020-00202, SCH No. 2020100056).
Attachments: 5297-017acp - 9.22.21 Bridge Point Rancho Cucamonga Notice of Settlement.pdf
All,
See attached for Notice of Settlement from Adams Broadwell regarding the Bridge Point project.
Liz, please enter into the record for tonight's meeting.
Thanks,
Sean
From:Alisha C. Pember<apember@adamsbroadwell.com>
Sent: Wednesday, September 22, 2021 1:44 PM
To: McPherson, Sean <Sean.McPherson@cityofrc.us>
Cc: Aidan P. Marshall <amarshall@adamsbroadwell.com>
Subject: Bridge Point Rancho Cucamonga Project (DRC 2020-00202, SCH No. 2020100056).
CAUTION:This email is from outside our Corporate network. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Good afternoon,
Please see the attached correspondence.
If you have any questions, please contact Aidan Marshall.
Thank you.
Alisha Pember
Alisha C. Pember
Adams Broadwell Joseph & Cardozo
601 Gateway Boulevard, Suite 1000
South San Francisco, CA 94080
(650) 589-1660 voice, Ext. 24
a pem ber(o)ada ms b roa dwe I I.com
This e-mail may contain material that is confidential, privileged and/or attorney work product for the sole use of the
intended recipient. Any review, reliance or distribution by others or forwarding without express permission is strictly
prohibited. If you are not the intended recipient, please contact the sender and delete all copies.
1
III BRIDGE
PLANNING COMMISSION
BRIDGE POINT RANCHO CUCAMONGA
PROJECT" RESULT OF EXTENSIVE CITY INPUT
Close Coordination With Planning, Engineering, and City Manager's
Office
• 2+ Years of Work With the City
• Modifications of site plan to address City comments, including
dedication of g acres of land for a new public street
• Development Agreement with significant monetary contributions and
project commitments
• Full Environmental Impact Report showing no significant impacts
www.bridgedev.com , ,� Al BRIDGE
PROJECT RIGHT PROJECT FOR
OVERVIEW
THE RIGHT LOCATION
5 I
a
• Existingindustrial zone
F
• Compatible with surrounding uses
}r
• Far from residential
• Easyaccess to freeway
a TH IT ` —.. eLLvrPlxYCL-0acuctwoltcr ?SP_lvr; -
r.. _
...�" �-slni,MII Li%KSLV
e
r
www.bridgedev.com edev.com '
IV
"A EXISTING WAREHOUSE USE ON-SITE
OVERVIEW
• Existing building long been used Net new Project square footage
for warehouse distribution is 720,76o square feet
iiiiL
+ --- - - --- N f W STREET-
r _ --- -- - -
- -- - --- - - --- -- - - --- f
..
Existing buildin s total 1. million SF
a ; y g g 45 IFI
(outlined in blue)
X. 6U ILDING 2 BUILDIN-G 1 R
La
i t r
i
xis-i^g Industnai 0uildino " '--' Ezis-ing Retail Building i
TRANSFORMATION OF THE SITE - THE PRESENT
4'
r�
=� ,.K • - �fib � r -
TRANSFORMATION OF THE SITE - THE FUTURE
-
}':. ��"- �x -. : _� .- .� • .� ` -tom kv � _-4L:.. • . .
r
AC
All �� lal�' ''
BUILDING 2 - VIEW FROM 6TH STREET
-fiftwimAir w-
k�.
llp
t,
Jr rr �
BUILDING 2 - AT NORTHEAST ENTRANCE
A�
� � s
f�
T
4�
4
v F'
TRANSPORTATION TRUCK ROUTES
ARRUWRT.
• Trucks can access both freeways :-
using approved truck routes 4 Hf�RAAV.
r
41
LEGEND:
H
• EIR analysis determined VMT =0y Truck Routes
impacts are Less than significant - ° T _OutbrtToTruck�
.. � � _�u�b��r�d Trucks
30
=Inbound Trucks
Intersection improvements and
• IS
fair share contributions will als (i o SAME ARDfNV . 5
be made for certain intersections
30Ln
5
Ln
r i11
Ln 11
vaitfr af.
www.bridgedev.com 20
T:;*t
�- _-- _ -
DEVELOPMENT
AGREEMENT MONETARY CONTRIBUTIONS
0 E
$17 MmftLion in One=Time Payments
$g million $6.8 million $1 million
Community Development Impact 6'" St. Rail Crossing
Benefits Fees
wW • ed9ede-com , ill BRIDGE
DEVELOPMENT
AGREEMENT MONETARY CONTRIBUTIONS
E E
$ MmiLLions in AdditionaL Revenue
Rancho Point of Sale for Potential CFD Tax
Tenant's Material Handling to assist With
Equipment missing
infrastructure
wW • ed9ede-com , ill BRIDGE
DEVELOPMENT
AGREEMENT ADDITIONAL COMMITMENTS
m lown-mmommi
5 Acres Dedicated On -Site Solar and
For New Public Street = Utilization of RCMU
$3.OM + Land Value
wW • ed9ede-com , ill BRIDGE
THE FUTURE: BRIDGE POINT RANCHO CUCAMONGA
L i �
• I ti
Planning Commission
September 22 , 2021
Primary Case No: DRC2020-00202
Project Background
• Who: Bridge Point Rancho Cucamonga, LLC (applicant and
property owner);
• What: Redevelopment of site with two new industrial
buildings totaling 2, 175,000 square feet;
• Where: 12322 and 12434 4t" Street (APNs: 0229-283-51 and
51);
• Zoning/Land Use: Property currently split between various
land uses and zoning districts.
77
11 ' Pill i
o
61" Street
i. -- -MT7
."
♦ ��'l� ! 1t f ��� � I..V��i-I.`fig.. �.F soon. -. . � 6�
w.
� � � ;ems,�/►�a �A' r�r; i.
r
A ..�... ,..: < MCC
i k
_ . ^ e ♦ i _�' 1 fir_ MA 4
Ni A es
Mill
4tn Street
a
n Tli.Tt�11171
1.
yY
top
a�
' � Z
�a.�—�'�i •+ .�-• � .:ter*���' �,�; _ �A���:r .+{. ��
��-. I 4wm .g _ -
'A
401
402
\ 40] 404
' _ •-""ems � � __ —_._ `
Jr —
l,4d S t IAA
,tclj
�fi
l
` a
.. .. --71
"� _ ,-_. .r 4 '3_ - ..;.. '�v y •�wp�s,'C�i"�,};v�. )fr,�r� �rttk.�, ��,�, d�.r',.'�rr"yam.= _ �,_
h
I •i
b � �
£ 4 r
YyM1'y df
r. _P '1..r.,,.-r 'Y.' u`,,,.s- �? 'sney w E a .� 4S 'x t '''4'_rs +.i}°' ', ,,4• _ - ',''>y - '_4 iS
- ,. - - ', t r �..;� 3 ��4�',` #�. �-. � �.,a ,�Y;+�'�'.e,te- s+:�' �7 F-.`sa ar ,�.'1•...+ti :�,,y-,i�.4= Y .��.� 4v���e� ...��� .�,�.4��e
Y .. - _ _ rr �'�'-..' :Rr `�,'�r-+..5�, y� T4.r ��tey t�"�ky y �'�'Y•..��rr "�tiy `�ti[, _���.'Y �'�ti a�;�'3
�.;,
�,
,.�
.�
t,
a'
�..
- --- �.�. - _ - -- � - ,t
��
—. � ..
-- - � - v._
_ _.�
--f _ � ��
- " _ _ _—�"__�__� " �. Flip 3 � � .�,:� _ _ r .. - �� ��.� u
_-
"'`'�Ilt
� _.
— ,
�r
e;
,_ _ - u�4 ...,- .. ,� - -�
._��W6:
y.__ ._ � _.. .. ... -• _ _.__. - .�
�.. -
`�
Y" � - _- •emu -��
w�
`�'
r a _
E
_ ., ` � �
1
r � � 1 'i� Air � �ry'1 e, /�- �, ' ��-_! �✓
` IA meµ'.' -�� 'd � - �[ '{ F ..�� ., 4 1VI�i `L�.' � •
^h . '*r� lib. '�Y�1w4^ 1�,:y. �d "�•.:. .b ��� '�; _ - -• f
UAL
L y k
NO
^
yr".,.
' 1
Zoning:Current .
it
and Industrial Employment
Ad - IE
Proposed Zoning: Neo-Inclustrial (NI)
NI
I • e � �
= HI
� GI
r
Proposed Project
• Redesignate entire project area to General Industrial Land Use
designation and Neo-Industrial (NI) Zoning District;
• Demolish exiting improvements, subdivide into two new parcels and
redevelop site for two new industrial buildings to operate as a "Large
Distribution Fulfillment Center," (speculative, no tenant identified);
• New street to be constructed, named in honor of Catherine Vail Bridge;
• Entitlements include:
• General Plan Amendment
• Zoning Map Amendment
• Tentative Parcel Map
• Design Review
• Tree Removal Permit
• Minor Use Permit
• Development Agreement
rM
CITY OF RANCHO CUCAMONGA
00•
r� 77r—jr
T Building 2:
rl . fii++:E 752,500 square feet
6,
r�
LLj- �L t, 1. i
IA fr
._ r e- d� J�J
.P�14
- s=9 f
pp## r
; >. '. Building 1.
c � + +{ + = 1,422,500 square feet
r t-11e
54• t�''if- .� � �- � ida�g�=�n -+-� '
LIT
H+{ {--+
t
I
v
VK2M ME SHEET INDD( SrFE PLAN GENERAL N(TrE.9 KEYNOTES. PROJECT DATA
l
a
HRE DEPT.GENERAL NOTES
M;- I.- 7g- ;,hoar
SUBJECT
SAE AREA
ASSESSORS NJMB
.1 411"
7
ZZ
jil 01f2w
mates�uvo
1-k
LOT'ACSEE llhi�
-- - -- - N W F EET 'k"�l-mi-- -- - - - -- --- - - -
'117F FlII II II II III
. . . . . . . . . . .
- ,•�', ce �=�F� �f�=fii = ; _firs-I�-�I-
BUILDING 2
JI SINGLE TENWIT
SINGLE TEWNT
H IEo
BUILDING
- BUILDI WAREHOUSE
FOOfPMMr 738r270 NG-j -tj T.NT BUILDING 1,. 4—H-4-4-4
MEZZANI NE-14,'nO 3F . . . ME9AN IN E-MrOM SF . . .
+j
G-FA:72.500 3F
El G-FA-.1.422,500
+
Ll I -Ll-1-Lt-L I -lll5FLl-LLL-LLLl---Ll
.2-5.B-ME'.
. . . . . . . . . .
IIIIIII
-T.
......... likiiiiiiiiii
SITE PLAN
VKC 202"0202
- ��
Site Plan — Building
- - - - - - - - - - - —
PROPERTY UWE 321d24'_ '�__—
x - a - - NEW T&E-ET 'A" IL H
- - - - - - - - - -
�1�;««�. .11 �11 �111111111 ��I��llflfffffflf�ffll m���Elllll1111111 11111111�IIIII11111/lll�l�����`lll/ � ` ,
S c �' s Q x •'' I
✓" POTENTL4L r Y r m POTEAREA
NBAL OFFICE Q
-_ rn OFFICE -T-�- ............. ............ ............ ... ... ... ... ... .... .... .. ... .... ... ... ....IN B2 OOCIf O00H.; ME27ANINE „
if
�' � I I I 11 1 { I , � � � rtrtrtrtrtrtrt � � fifi � � � 1 � I 1 t {� I1
BUILDING
rz
SINGLE TENANT I
;I . . . . . � .FOOTPRINT::19,0000IF . 1 . . I { .
MEZZANINE:19,000 SF I I
I xweexox srtaxs,
xux xscxr:so rr.
Iff
�11.K
�. AREA
OFFICE0, 11I�
I� ��lllllll� �zlll�ll 111111111'1$ ��i���1��11��1�1JIlIlIl111tI11m1�11I�1�llllllllfllllfllllll�If�l�l ��1ff��Tl������� � If—
��� �' 1 '111 11
'I
n;Ro
EMSTING EXSTING
o INOl15TRIAL BBILOING INOBSTRIAL BUILDING
ENLARGED BUILDING 1 SITE PLAN
scuei•=so•-0•
ORC 202"0202
KFYNo-rEs
Floor Plan — Building 1
CONSTRLUTOW NOTES,
-------------- f ----- ------------------ -------
. . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . �4t
I -iID
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . t
. . . . . . . . . . . . . . . . . . . . . . . .
J 1,- --j 1--,
iiiiiiiiiiiiiliiiiiiiii
1- 1 7fiI
. . . . . . . . . . . . . . . . . . . . . . . . . . . .
FLOOR PLAN BUILDING I
VRC 202"0262
Elevations — Building 1 � IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII
EQUIPMENTKEYNMR FINISH SCHEDULE:
iminimmimm
TYPICAL OFSIGHT
j�DO 1
' iii plaala� �l it ill it it ��� lalallal Iw■ !�l it JI�l al ��� 1 it al it ilk �.1.11�1.1.�!l!���i!!!1
��� inn ii�ii�.l ice..��: _.��'�S�il v��i i i��::"4��� •. -��
----------------------
OVERALL SOUTH1
FIT
T..Y Y....Y ®■IIIIII■_-■_ -■_-_IIIIII■■®.Y.�..�ppY.■.
1!!!�!!■!! ■■1■1■11111■ �1 it i11 it i 1 it i11 i1 ilk■ ■■11111■1■1■■ !�111 1�!!1
■11■1■I■1■ Wit•_ - ��� - _I!� III 1 "11■
1h @ @ O 4 @ @
CORNER-OFFICE / i OFFIGE CO' 1LEVATION-EAST END
���� 1 i1111 it it -Al
�'w�■� ■� .. � 1■FYI■�■1 � ■��� �i
TUT=
�'� . �nui1■n.r Y W �G ��i IA
PARTIAL SOUTH
ELEVATION
,• I I
n
Elevations — Building 1
� r• r
;� �■ �■ ■�■m1■■m■�■ ■ 11 1 ■�■m■■mm�OP !
I ■ ram.•� _ ■e�±•�s
■ P iff■ ■ ■
� 1 :
i,��a��__i.ii.i__Q___i.ii.i___ ___.u.______.u.______i.ii.______i.ii.i.�_____i.ii.i__'•�an iiPI ��_
i.L.L LIT.!W.L.1f L�.l.!i.Ll!LL".L�W�I!.1f.1_�.L�.1.I.1'.L.!.L�.�fW.L.1.LL'.i.�.:WI r�.iI,I„ 1 ^ yi,+i.1_.=F1 1,iy :71 e 1'iW�_�mm.7e-
IN IBM IN IN
MGM I
�lT�r!!r■��■�■ram■��■ 1■1■111■■®■1■� ■ 1■11■1■II■1� ■1■11■11 �
In Ism In -MA MINNINIH
�i wiiiii
om
BUILDING 1-STREET VIEW
FROM SOUTHWEST CORNER AT 4TH STREET
I
A
BUILDING 1-BUILDING CORNER VIEW
FROM SOUTHEAST CORNER AT MAIN ENTRANCE
l�� 1
,i ���
DRC 201E-0OB80
EXISTING
Site . : • ing 2 INDUSTRIAL BIALGING
ji
IJI I o I
� I ' I � . ns r � , ✓
POTENTALUFFIGE
AREA W/
MIRZMINEI }
II ' '
�, ✓all
o [ � p aulLoiNG 2 d f
SINGLETENANT
� — ✓ -✓��- --F0OTPRIWrT38.2705F -✓- a ��_ f
MUZANINE.14230 SF $ —$
'� �• s __ JI _ __ GFA-75Z50,05F ��
'�� �— � :� ✓I� � -occurarcr:asi I ✓ f I� $_ i� � ////
I� „/' oox.^m�cnonmeixa r %�
V xusuaor smwes:i r n
�a i unc hseNr:wrr. �j- ran
� ✓ ✓
N J
J m
I
I Fu, a ✓ _J
Ys
O I ✓ POTENTIALAPEA
J
° ✓ OFFICE
EUSTHG IRMIJANG A"0114IPLLL III
,>M�R�PI� l
�� I � Iplll IIII IIILI
ENLARGED BUILDING 251TE PLAN
scuEi•.so'-0•
DRC 202"0202
KEYNOTES
Floor Plan — Building 2q
------- ---------------------------- ----------------- ----------
----------
OFFICE
FF
-7-ARRIE 1
�J�11 L-1 I L_j L-1 L-1�L� L-1 L L-1 q;L_j A NR FA
-------------------- ------------J
------- ------------------------------------
;..........
j j --------- I I-----------
-------------6T
FLOOR PLAN-BUILDING 2
))RC 202"0262
KEYNDTESGFIN13H SCHEDULE:
Elevations — Building 2
IIIIIIIIIIIIIII IIIIIIIIIIIIIIII IIIIIIIIIIIIII
EQUIPMENTTYPICAL j�DO TYPICAL TUBE STEEL FENCE 1
�_�_�_p���■�lI�N��ITllTI��I�lI����P!r1YT.1����1�����1T.lITI�f�l��■1���� �IIIIIIIIIIH '�
= ppp� I i� 11�q�i ���1�i1�1�i���i��F����i �i�i�1�1��>A
DVERALL
1 LFFH ELEVATION
SOUTHPARIIAL k 1 DFICE GI1' 1 1 1
------------------------------------------------------------
---------------------------------------------------------------
1 !!■■I■I■11■1■■p1 i1 i11 it ilp■p■■p■pl it i11 i1 i1p_ 1 i1 ill 1 Ipl 1 11 1 Ip■p■■p■p,.1�1 11 1 Ip■■I■II■I■1■■
1ELEVATION
,• 202"0202
Elevations - Buildings
1 IIIIIIIHIL i1 +11 +1 i■ I it i11 i1 i 111
■■ !■1!!� !!!1
■ JI■1■1��� ��� JI■1■1 ■�[
■.�.�i�T�sx�.�u.sua�lra° ■ ■ ■■ ■ az� lv� m� �.�.�' iY.
I: ,mow, -�,� . �i- uii 1 ■ ■ ■1 ■ 1 �.�� .�� -.� ::��! :::!! I.. :I I:.:I
■
o a m o s
r rPARTIAL EAST ELEr r r• rN-NORTH END
---------------------------------------------------------------------------------------------------
r r
ampow-
m o 0
NORTHi r
Elf-
r ������������■����������������
���1 1 11 I I�■��■�■�I it ill it i it ill it i��■��■�■�I
1 11 1 �1! 1111 1■ i
�aL A=w�w���rr■:�...n�.:.� "�'� .
BUILDING 2-STREET VIEW
RenderingsBuilding FROM NORTHEAST CORNER AT GTH STREET
BUILDING 2-BUILDING CORNER VIEW
FROM NORTHEAST CORNER AT MAIN ENTRANCE
I L
Idd i
DRC 2020-00202
1
I?II
- I
I
I
it
I
e
'uGQURFO�4FE-A
'_� �� rmrvisoaw[es_aa
�'m mTo]r r�car�GirTEEf�a r�uunox 9rte. e
°iT � � ffEaFww wRAFwceeF,n ixF[Nan]nN 1n fs TO CF REFEnFo.
� � �N FE9JAE PR(PGbF0l0 FB'NrMNP.oLF
uVl sibceFN:
Low
�m�Ep�neer eren mewl a eeu re
OVERALL SITE PLAN
BRIDGE POINT RANCHO CUCAMONGA 4 HUNTER LANDSCAPE
�� ]e1 Rt;F AHA$TPEjT PFApfTl0.G 971M
■�19.I OB ]u 9N6lmT FdY]149Rd.FbR
tea, ° °I: a; Rancho Cucamonga.California
Development Standards
Development Required Proposed Complies?
Standard
Maximum 35 feet(at front
Building Height setback)and Building 1: 54 feet; Building 2: 50 feet YES
75 feet(1-foot increment
from the front setback line)
Floor Area Ratio 50-60% Building 1: 59.2%; Building 2: 57.8% YES
FAR
Front Building 45 feet(4th Street); Building 1: -118 feet YES
Setback 35 feet 6th Street 4th Street); Building 2: -215 feet 6th Street
Street Side 25 Feet(Catherine bridge Building 1: -185 feet; YES
Setback Place) Building 2: -93 feet
45 feet(4th Street); 45 feet 4th Street
Average Depth of 35 feet(6th Street); ( to )'
Landscape 25 feet(Catherine Bridge -72 feet(6 Street); YES
Place 25 feet(Catherine Bridge Place)
25 feet(4th Street); 46 feet(4th Street);
Parking Setback 20 feet(6th Street); -72 feet(6th Street); YES
15 feet(Catherine Bridge 25 feet(Catherine Bridge Place)
Place
Interior Side Yard Min. 5 feet Building 1: 136 feet YES
Setback Building 2: 45 feet
Rear Yard Setback Min. 0 feet Building 1: 77 feet YES
Building 2: -90 feet
Open
Space/Landscape 10% 10% YES
Standards
Parking Ratio Required Provided Parking Complies?
Parking
YES
1 per 1,000 sf for the first 20,000 sf; 1 Building 1: 469
Warehouse/sto per 2,000 sf for the next 20,000 sf, stalls; Building Building 1: 478;
rage and office and 1 per 4,000 sf for remaining sf 2: 268 stalls Building 2: 268
Office requires 1 per 250 sf
YES
Trailer Loading Building 1:1 per loading dock 184; Building Building 1: 221;
100, Stalls 2: 91 Building 2: 91
Benefits o Development Ag
• 6-year term, could be extended an additional 9 years upon payment of
$2 million;
• Future tenants shall designate the City as point of sale for operations
equipment;
• Developer to pay "Community Benefit Fee" totaling approximately $9
million over 5 years of operation;
• Developer to complete, at their expense, traffic improvements including
construction of Catherine Bridge Place, restriping and signal timing and
payment of Fair Share contribution toward Industrial Area Traffic
Improvement Fund;
• Developer to contribute $1 million as an in-lieu fee and work in to
cooperation with the City in obtaining approval from CPUC for 6 Street
At-Grade crossing.
Public Art
• Project is subject to public art requirement pursuant to
Development Code Section 17. 124 and as a Condition of
Approval, art valued at a minimum $200,000 shall be
installed onsite.
Design Review Committee
• Design Review Committee reviewed the project on April 20,
2021 and recommended that the project be forwarded to
the Planning Commission as presented .
Environmental Review
• Environmental Impact Report (EIR) prepared for project (State Clearing
House No. 2020100056). Notice ot Preparation (NOP) circulated on
October 2, 2020, Scoping Meeting held on October 15, 2020, and
comment period closed on November 2, 2020;
• Draft EIR made available for 45-day public review on May 7, 2021,
concluding on June 21, 2021. Various comments received which have
been addressed in the Final EIR;
• Upon implementation of the project and all mitigation measures,
impacts associated with the project will remain less than significant. No
Statement of Overriding Considerations is necessary.
• AB 52 and SB 18 notices mailed to tribal governments. Two tribes
responded and concerns have been incorporated into Mitigation
Monitoring and Reporting Program.
P P4 CITY OF RANCHO CUCAMONGA
�• 6.
Noticing
• Notices mailed to all property owners within 1,500 feet as
well as various agencies (148 mailers), published in the
Inland Valley Daily Bulletin and the site was posted on
September 8, 2021;
• To date, staff has received one phone call from a nearby
property owner who requested clarification of project and
expressed general concerns of traffic in the area. Staff also
received comments from the City of Ontario regarding the
need for hydrology studies and an encroachment permit to
be approved. These have been added as conditions of
approval.
Corrections
• References to "General Industrial" zoning district in
table should read "Neo-Industrial;"
• Estimated 1,678 jobs are construction jobs; 1,470
long-term operational jobs;
• The Resolution for the Tree Removal Permit notes
589 trees AND 125 heritage trees. The site includes
589 trees onsite, INCLUDING 125 heritage trees.
Recommendation
• Staff recommends that the Planning Commission
recommend that the City Council :
• Certify the EIR;
• Adopt the MMRP;
• Approve the project through Resolutions attached to
staff report.
Findings of General Plan Conformity
9591 San Bernardino Road
September 22 , 2021
Project site
• Roughly 1.10 acres
• Owned by Cucamonga Valley adt
Water District ".
• Currently developed with theAy
„I , PROJECT SITE
Chinatown House -
- _
Background Information K a
.,r ov s
• City Acquisition
• Government Code Section
65402(a)
0
• Potential Future Housing 4 &
Development Site
View Looking South
�r CITY OF RANCHO CUCAMONGA
r ��
View Looking Northeast
T e .
. ...........
jrt-,*
CITY
i
�t
OF ♦ • CUCAMONGA
Recommendation
Staff recommends the Planning Commission take the following action:
• Adopt the attached Resolution finding that the proposed acquisition of 1 . 10
acres of real property located at the southwest corner of San Bernardino Road
and Klusman Avenue is in conformance with the City's General Plan.