HomeMy WebLinkAbout21-64 ResolutionRESOLUTION NO. 21-64
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW
DRC2021-00166, A REQUEST FOR SITE PLAN AND ARCHITECTURAL
REVIEW OF A 21,221 SQUARE FOOT INDUSTRIAL BUILDING ON 2.87
ACRES OF LAND IN THE NEO INDUSTRIAL (NI) DISTRICT ON THE
EAST SIDE OF ETIWANDA AVENUE AND SOUTH OF WHITTRAM
AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0229-
162-15.
A. Recitals.
1. Serge Bonaldo, on behalf of Bernell Hydraulics, filed an application for the approval of
Design Review DRC2021-00166 as described in the title of this Resolution. Hereinafter in this
Resolution, the subject Design Review request is referred to as "the application."
2. On the 13th day of October 2021, the Planning Commission of the City of
Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said
hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in .the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above -referenced public hearing on October 13, 2021, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The application applies to a property generally located on the east side of Etiwanda
Avenue, south of Whittram Avenue; and
b. The site is presently developed with four metal buildings (16,488 square feet total)
which are occupied by office, retail, and vehicle repair businesses. These buildings will remain with
the development of the remainder of the parcel; and
C. The parcel is approximately 460 feet from east to west and 270 feet from north to
south, with an area of approximately 125,017 square feet (2.87 acres); and
d. The existing Land Use, General Plan and Zoning designations for the project site
and adjacent properties are as follows:
Exhibit D
PLANNING COMMISSION RESOLUTION NO. 21-64
DR DRC2021-00166 — SERGE BONALDO FOR BERNELL HYDRAULICS
October 13, 2021
Page 2
Land Use
General Plan
Zoning
Site
Industrial Buildings/Vacant Land
General Industrial
Neo Industrial NI District
North
Single -Family Residence/
General Industrial
Neo Industrial (NI) District
Vacant land
South
Railroad Right -of -Way!
Industrial
Industrial Employment (IE)
Recycling FacilityHeavy
District
East
Vacant Land
General Industrial
Neo Industrial NI District
West
Industrial Buildings
General Industrial
I Neo Industrial NI District
e. The proposed building will be of concrete tilt -up construction and will be painted
multiple shades of gray along with the tenant's company color — red. Each elevation includes
glazing with metal awnings, with building pop -outs on the north and south elevations to provide
visual interest; and
f. The project complies with all development standards including building and parking
setbacks, floor area ratio, and landscape coverage as shown on the following table:
Development Standard
Required
Provided
Compliant?
Building Setback Street
25 Feet
25 Feet
Yes
Building Setback Side
5 Feet
40 and 50 Feet
Yes
Building Setback Rear
0 Feet
135 Feet
Yes
Parking Setback
15 Feet
25 Feet
Yes
Landscape Depth
25 Feet
25 Feet
Yes
Landscape Coverage
10 Percent
10.27 Percent
Yes
Floor Area Ratio
50 — 60 Percent
30 Percent
Yes
BuildingHeight*
35 — 75 Feet
32 Feet
Yes
g. The parking requirement for the project is based on the mix of office, retail,
storage, and vehicle repair. The project is required to provide 76 vehicle parking spaces as shown
in the following table:
Use
Parking Ratio
Required Parking
Provided Parkin
Existing Warehouse
1:1,000 SF
10
9,137 SF
Existing Retail/Office
1:250
4
1,000 SF
Existing Vehicle Repair
1:400 SF
16
6,351 SF
New Truck Service
1:400 SF
8
3,024 SF
Production Repair
1:500 SF
18
9,111 SF
Warehouse
3,509 SF
1:1,000SF
4 Spaces
47 Spaces
Office/Retail*
1:250 SF
16 Spaces
32 Spaces
3,991 SF
Total Vehicle Parking
76,S aces
76 Spaces
1,586 SF Reduction for Hallways, Stairs, Bathroom, and Mechanical Rooms
PLANNING COMMISSION RESOLUTION NO. 21-64
DR DRC2021-00166 — SERGE BONALDO FOR BERNELL HYDRAULICS
October 13, 2021
Page 3
3. Based upon the substantial evidence presented to this Commission during the
above -referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1
and 2 above, this Commission hereby finds and concludes as follows:
a. The proposed project is in accord with the General Plan, the objectives of the
Development Code, and the purposes of the district in which the site is located. The proposal is to
construct an industrial building of 21,211 square feet. The underlying General Plan designation is
General Industrial (GI) District.
b. The proposed development is compatible with the existing and proposed land uses
in the surrounding area. The proposed land uses are consistent with the land uses within the vicinity
where it is located and the expectations of the community. The zoning of the surrounding
properties, except the property to the south, is Neo Industrial (NI) District. The property to the south
is zoned Industrial Employment (IE).
C. The proposed development complies with each of the applicable provisions of the
Development Code. The proposed development complies with all standards outlined in the
Development Code, including building and parking setbacks, average landscape depth, floor area
ratio, parking, dock and storage area screening, landscape coverage, site planning, and
architecture.
d. The proposed project, together with the conditions applicable thereto, will not be
detrimental to the public health, safety or welfare, or materially injurious to properties or
improvements in the vicinity. The potential land uses that would be associated with this project are
consistent with the land uses within the vicinity where it is located and the expectations of the
community. The zoning of the surrounding properties, except the property to the south, is Neo
Industrial (NI) District. The property to the south is zoned Industrial Employment (IE).
4. The Planning Department staff has determined that the project is categorically exempt
from the requirements of the California Environmental Quality Act (CEQA) and the City's CEQA
Guidelines. The project qualifies under a Class 32 exemption under State CEQA Guidelines Section
15332 - In -Fill Development Projects for the following reasons: (1) the project is consistent with the
applicable General Plan designations and all applicable General Plan policies as well as with the
applicable zoning designation and regulations, (2) the proposed development occurs within the City
limits on a project site of no more than five acres substantially surrounded by urban uses, (3) the
project site has no value as a habitat for endangered, rare orthreatened species, (4) approval of the
projectwould not result in any significant effects relating to traffic, noise, air quality, orwater quality,
and (5) the site can be adequately served by all required utilities and public services.
The General Plan Land Use and Zoning designation for the project site is General Industrial and
Neo Industrial (NI) District, respectively, which permits the development and operation of a
warehouse/distribution building of the proposed size and configuration. The project complies with
the City's development standards and design guidelines, including setbacks, height, lot coverage,
and design requirements. The project site is located within the City limits, is underfive acres, and is
surrounded by existing residential development and City infrastructure. The following are the five
environmental factors that need to be analyzed in order to determine that the project qualifies for
the Categorical Exemption:
a) Traffic: A Trip Generation Assessment (Urban Crossroads; December 23, 2020) was
PLANNING COMMISSION RESOLUTION NO. 21-64
DR DRC2021-00166 — SERGE BONALDO FOR BERNELL HYDRAULICS
October 13, 2021
Page 4
prepared for the project which determined that the number of trips generated by the project
would not create a significant impact. The project will generate approximately 15 peak hour
trips which are well below 50 peak hours trips that would necessitate a Traffic Impact
Analysis.
b) Noise: A Noise Impact Analysis (Urban Crossroads; December 23, 2020) was prepared for
the project. The analysis determined that the construction and operational noise levels would
not exceed the City's noise thresholds and no mitigation measures were necessary.
c) Air Quality: Separate Air Quality and a Green House Gas Analysis (Urban Crossroads;
December 23, 2020) were prepared for the project. The analysis determined that emissions
associated with the construction and operation of the project would be below South Coast Air
Quality Maintenance District (SCAQMD) thresholds for both Air Quality and Green House
Gases.
d) Water Quality: A Water Quality Control exhibit (Valued Engineering, Inc.; October 2020) was
prepared for the project. Itwas also determined through the review of the project's preliminary
water quality plan that the project would not result in a significant impact related to water
quality of the site or surrounding properties.
e) Biological: A Habitat Assessment) (ELMT Consulting; June 7, 2021) was prepared for the
project site. The project site does not include any natural habitats and is surrounded by
development. The Habitat Assessment determined that the project site does not contain
drainage features, ponded areas, wetlands, or riparian habitats that would be under the
jurisdiction of federal, state, or local agencies. Based on the onsite conditions, the project is
not anticipated to result in any impact to federally or State -listed plants or animals listed as
endangered or threatened or to any non -listed special -status species. No natural communities
will be affected by the project and the project is not within a Habitat Conservation Plan area.
The Habitat Assessment does recommend a nesting bird survey prior to grading if vegetation
removal takes place during the bird nesting period (February 1 to August 31). A condition of
approval has been added to the project requiring the nesting bird survey if grading falls within
the nesting bird season.
The Planning Commission has reviewed the Planning Department determination of exemption, and
based on its own independent judgment, concurs in the staffs determination of exemption.
5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth
below and in the attached standard conditions incorporated herein by this reference.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
PLANNING COMMISSION RESOLUTION NO. 21-64
DR DRC2021-00166 — SERGE BONALDO FOR BERNELL HYDRAULICS
October 13, 2021
Page 5
APPROVED AND ADOPTED THIS 13TH DAY OF OCTOBER 2021.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Francisco Oaxaca, Chairman
ATTEST: d4ju, Ale v"
nne McIntosh, AICPeff
I, Anne McIntosh, AICP, Secretary of the Planning Commission forthe City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and
adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 13th day of October 2021, by the following vote -to -wit:
AYES: COMMISSIONERS: GUGLIELMO, OAXACA, DOPP, MORALES, WILLIAMS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS: