HomeMy WebLinkAbout21-75 ResolutionRESOLUTION NO. 21-75
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, RECOMMENDING THAT THE
CITY COUNCIL APPROVE TENTATIVE PARCEL MAP SUBTPM20251, A
REQUEST TO SUBDIVIDE AN APPROXIMATE 35-ACRE PROJECT SITE
INTO TWO (2) PARCELS OF LAND RELATED TO THE CONSTRUCTION
OF TWO NEW INDUSTRIAL WAREHOUSE BUILDINGS LOCATED
APPROXIAMTELY 650 FEET EAST OF ETIWANDA AVENUE NORTH OF
NAPA STREET; AND MAKING FINDINGS IN SUPPORT THEREOF -
APNS: 0229-291-46 AND 54.
A. Recitals.
1. Kimley-Horn and Associates, on behalf of Hillwood Enterprises, L.P., has filed an
application for the approval of Tentative Parcel Map SUBTPM20251, as described inthe title of this
Resolution. Hereinafter in this Resolution, the subject Tentative Parcel Map request is referred to as
"the application."
2. On the 8!^ day of December, 2021, the Planning Commission of the City of
Rancho Cucamonga conducted a,duly noticed public hearing on the application and concluded said
hearing on that date. and
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution
NOW, THEREFORE, it is hereby found, determined and resolved by the Planning
Commission of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds, that all of the facts, set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above -
referenced public hearing on December 8, 2021, including written and oral staff reports, together
with public testimony, this Council hereby specifically finds as follows:
a. The approximate 35-acre project site is located approximately 650 feet east of
Etiwanda Avenue, north of Napa Street. The project site is largely vacant, with an existing rail spur
running in a north -south orientation roughly bisecting the site which serves properties to the south
and existing Southern California Edison (SCE) overhead powerlines traversing the site in an east -
west orientation. The existing rail spur is proposed to remain, however the existing, overhead SCE
powerlines are proposed to be relocated, running east -west at the northern property line within the
western portion of the project site, at which point the lines would turn south, and near the frontage
of the property be made to run roughly parallel to Napa Street within the eastern portion of the
project site. The proposed project includes the construction of one new north -south street which will
be located along the westerly property line of the project area and will be designed to eventually
connect to.a future east -west street located immediately south of the Metrolink railway and parallel
to Napa Street; and
b. The existing General Plan Land Use and Zoning Designations for the project site
and adjacent properties are as follows:
Exhibit F
PLANNING COMMISSION RESOLUTION NO. 21-75
SUBTPM20251 — HILLWOOD ENTERPIRSES, L.P.
DECEMBER 8, 2021
Page 2
Land Use
General Plan
Zoning**
Industrial Employment
Heavy Industrial (HI) and Flood
(IE) District (for portion
Control Utility Corridor (FC/UC) (for
within City); Regional
Site*
Vacant
portion within City); General
Industrial (IR) (within
Industrial (GI)/ General Industrial (I-
County) and General
G) (for portion within
Industrial (M-2) (for
County/Fontana SOI)
portion within Fontana
SOI)
North
Industrial
Heavy Industrial (HI) and Flood
Neo-Industrial (NI)
Control/Utility Corridor (FC/UC)
District
Regional Industrial (IR);
Industrial
General Industrial (GI), Special
Kaiser Commerce
South
(County/Fontana
Development (SD)/General
Center Specific Plan
SOI)
Industrial (I-G) (within
(KC/SP)/General
County/Fontana SOI)
Industrial (M-2) (within
County/Fontana SOI)
West
Industrial and
East Etiwanda
Heavy Industrial (HI) and Flood
Industrial Employment
Creek(FC/UC
Control/UtilityCorridor )
(IE) District
San Sevaine
Open Space (OS) and General
Regional Industrial
(IR)/Open Space -Natural
East
Channel
Industrial (GI) (within
(OS-N) (within
County/Fontana SOI)
County/Fontana SOI)
-In the 2010 General Plan, APN: 0229-291-54 also includes a "floating" designation as a location for a potential public park'
"Prior to the adoption of Ordinance 982, the Industrial Employment (IE) zoning district was referred to as the Heavy Industrial (HI) district and
the Neo-Industrial I district was referred to as the General Industrial GI district.
C. The project is for the development of two new industrial warehouse buildings on
two new parcels of land: Building A will total approximately 500,648 square feet including
approximately 10,000 square feet of office space, and Building B will total approximately 155,230
square feet and include an office area of approximately 10,000 square feet square feet; and
d. Tentative Parcel Map SUBTPM20251 is for the subdivision of the approximate 35-
acre project site into two parcels of land. Proposed Building A, totaling approximately 500,648
square feet will be located on Parcel I which will total an area of approximately 26.73 acres. Building
B, totaling approximately 155,230 square feet will be located on Parcel II which will total an area of
approximately 8.67 acres. The project will also result in the construction of a new north -south public
street to be located along the projects westerly boundary and which will connect Napa Street to
future road way expansions within the Southeast Industrial Quadrant (SEIQ) of the City. Vehicular
access to both parcels will be provided from Napa Street. The new north -south public street will
provide additional access to Parcel ll; and
e. In addition to the subject Tentative Parcel Map, the project scope includes:
Annexation (DRC2020-00185) to annex APN: 0229-291-46 and'a portion of APN: 0229-291-23 into
PLANNING COMMISSION RESOLUTION NO. 21-75
SUBTPM20251 — HILLWOOD ENTERPIRSES, L.P.
DECEMBER 8, 2021
Page 3
the City of Rancho Cucamonga; General Plan Amendment (DRC2020-00184) to assign a land use
designation to. parcels, and portions thereof to be annexed, and to redesignate portions of the
project area from Flood Control/Utility Corridor to Heavy Industrial, and remove a Floating Park
designation for APN: 0229-291-54; Pre -Zoning (DRC2020-00186) to assign a pre_zoning
designation to those parcels and portions thereof to be annexed; and Design Review (DRC2020-
00177), Conditional Use Permit (DRC2021-00317) and Uniform Sign Program (DRC2020-00178) to
permit the use, construction and signage of the proposed project. The project scope also includes
the proposal by the applicant of a Development Agreement (DRC2021-00180; and
3. Based, upon the substantial evidence presented to this Council during the above -
referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above,
this Council hereby finds and concludes as follows:
a. The tentative parcel map is consistent with the General Plan, Development Code,
and any applicable specific plans. The General Plan permits a variety of land uses within industrial
districts,, such as warehouses, distribution centers and similar uses. The Development Code, as
affected by Ordinance 982, permits Storage Warehouses upon the approval of a Conditional Use
Permit.
b. The design or improvements of the tentative parcel map will be consistentwith the
General Plan, Development Code, and any applicable specific plans. The proposed two parcel
tentative parcel map and the proposed industrial warehouse development comply with all
requirements of the General Plan and Development Code. Each parcel complies with the 0:5-acre-
minimum lot size and 100-foot minimum lot width outlined in Table 17.36.040-1 of the Development
Code. Additionally, the proposed industrial warehouse development complies with all of the related
development standards including building setbacks, lot coverage, height, parking and design; and
C. The site is physically suitable for the type of development proposed. The project
site is well suited for the proposed industrial warehouse development as it is located along multiple
street frontages, thereby providing multiple points of ingress/egress and emergency services
access; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat. An Environmental Impact
Report was submitted as part of the review of the project which demonstrated that the project would
not have a significant impact on the environment upon implementation ofidentified mitigation
measures; and.
e. The tentative parcel map is not,likely to cause serious public health problems. The
subdivision of the project site is not expected to cause serious public health issues, as the proposed
tentative parcel map is for the subdivision of the project site into two separate parcels in order to
create two separate parcels for two new proposed industrial warehouse buildings. The review of the
project included the evaluation of environmental studies which concluded that the project would not
have a significant impact on the environment.
f. The design of the tentative parcel map will not conflict with any easement acquired
by the public at large, now of record, for access through or use of the property within the proposed
subdivision. The subject property does not contain any easements that would limit access to -or use
of the project site.
PLANNING COMMISSION RESOLUTION NO. 21-75
SUBTPM20251 — HILLWOOD ENTERPIRSES, L.P.
DECEMBER 8, 2021
Page 4
4. The Tentative Parcel Map,, in addition to the General Plan Amendment, Annexation, Pre -
Zoning, Design Review, Conditional Use Permit, Uniform Sign Program and Development
Agreement (collectively, the "Project") were environmentally reviewed pursuant to the California
Environmental Quality Act and the State CEQA Guidelines. Pursuant to CEQA Guidelines Section
15060(d), the City determined that an EIR would clearly be required for the Project, and therefore
prepared an environmental impact report (EIR) that focused on the potentially significant effects of
the Project. Based upon the facts and information contained in the EIR prepared for the Project and
the entire record before it, the Planning Commission hereby recommends that the City Council
certifies the final EIR for the Project, adopts the findings of fact pursuant to CEQA, and adopts the
Mitigation Monitoring and Reporting Program (MMRP) for the project, based upon the findings as
follows.
a. A Notice of Availability advertising the availability of the Draft EIR was circulated for
a period of 45-days beginning on June 29, 2021 and ending on August 13, 2021; and
b. The Planning Commission has reviewed the EIR and all comments received
regarding the EIR and, based on the whole record before it, finds: (i) that the EIR was prepared in
compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no
substantial evidence that the project will have a significant effect on the environment. The Planning
Commission further finds that the EIR reflects the independent judgment and analysis of the
Planning Commission. Based on these findings, the Planning Commission, therefore, recommends
the City Council adopt the EIR; and
C. The Planning Commission has also reviewed and considered the Mitigation
Monitoring and Reporting Program (MMRP) for the project that has been prepared pursuant to the
requirements of Public Resources Code Section 21081.6 and finds that such Program is designed
to ensure compliance with the mitigation measures during project implementation. The Planning
Commission, therefore, recommends the City Council adopt the MMRP for the project; and
d. The custodian of records for the EIR, Mitigation Monitoring Program, and all other
materials which constitute the record of proceedings upon which the City Council's decision is
based is the Planning Director of the City of Rancho Cucamonga. Those documents are available
for public review in the Planning Department of the City of Rancho Cucamonga located at 10500
Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750..
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Planning Commission hereby recommends that the City Council approve the application for
Tentative Parcel Map SUBTPM20251 subject to each and every condition set forth in the
Conditions of Approval, attached hereto and incorporated herein by this reference.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 8th DAY OF December, 2021.
PLANNING YISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Francisco Oaxaca, Chairman
PLANNING COMMISSION RESOLUTION NO. 21-75
SUBTPM20251 — HILLWOOD ENTERPIRSES, L.P.
DECEMBER 8, 2021
Page 5
ATTEST:
Secretary
I, Matt Burris, FICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do
hereby certify t4atthe foregoing Resolution was duly and regularly introduced, passed, and adopted
by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the
Planning Commission held on the 81h day of December, by the following vote -to -wit:
AYES: COMMISSIONERS: GUGLIELMO, OAXACA, DOPP, WILLIAMS, MORALES
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS: