February 24 Summary —
Original Proposed Project
• Tentative Parcel Map (TPM) — To allow lot split;
• Minor Design Review (MDR) — Construction of new building and various
site improvements;
• Conditional Use Permit (CUP) — To allow the service station,
convenience store, and off-sale alcohol sales;
• Public Convenience or Necessity (PCN) — Required by California
Department of Alcoholic Beverage Control (ABC) to permit off-sale
alcohol license for convenience store (Type 20).
*Proposed restaurant component proposes on-site alcohol sales (Type 41) which is
permitted by right.
- CITY OF RANCHO CUCAMONGA
*00-ki
C
J
a1600,cJ -
- --j�
Ali
,`,-
a
;_l a
. , tL
r
l *IS q16
i
a. ,
I IIt,
'
February 24 Public Hearing
At the February 24 Public Hearing, Commissioners raised a number of
concerns, some of which were also reflected in comments from public:
• Overconcentration and proximity of off-sale alcohol sales to schools (denied
by Resolution adopted on March 10);
• Desire to see the project serve as more of a local "neighborhood market" by
expanding fresh food and grocery offerings;
• Concerns that signage and lighting might impact residences across Archibald
Avenue;
• Lack of quality amenities in Southwest Cucamonga and questions as to
whether the service station with a convenience store is a benefit to the
neighborhood;
• Commissioners also noted a perceived concentration of service stations
located within proximity to proposed project.
CITY OF RANCHO CUCAMONGA
VOST'UVi
Applicant's Response to Concerns
• As a result of the denial of the CUP for alcohol, the applicant has
withdrawn the request for a PCN;
• Fresh food and grocery items have been expanded to those areas which
were previously dedicated to alcohol sales;
• Signage and lighting along Archibald frontage treated sensitively.
Landscaped area to also be illuminated at pedestrian scale;
• Tobacco products not be advertised in any window areas and not be
accessible to customers;
• To provide a quality amenity to Southwest, the project now also
incorporates:
• Two EV Charging stations (4 ports in total);
• If diesel gasoline is proposed, applicant has agreed to Bio-diesel gasoline;
• Applicant offers to design the building to LEED Silver standards and a condition
of approval requiring the building to be certified has been added.
lot III Ill ii ili�� �• • . . . • .
(7) ° $ Revised Site Plan (Detail) 1
PROPOSEDTHREE
EVCS PHASE 4RO SERVICE
GEAR TRANSFORMER
D
O ; ; . .75' ; ; •;.
5 S�RC ' N�.DISfiA E
N
waw o a wwr: -
9' L 1 9'
ROPOSED
Al R DESIGNATED
PR D M CHARGING
T EN --PARKIN
ALLS
VAULT
,,�+ I-. , . •-
• 2 '
• \ `• - �I 7 - t FRESH FOOD
- COOLER
170C
zm xm pqm m m m m
m ?� COOLER
A, VAULT
� 170A
r�
ra- R612R $bm 4'-10 -
b a
� � a
wi FRESH PRODUCE
112
2 t(3• Ta• to 5'd^ 5'.5•
MERCH
,D Revised Floor Plan (Detail) —
OFFICE
Moratorium on Service Stations
• Regarding the concerns for overconcentration of service stations, there
is no "concentration ordinance," which prohibits service stations at the
subject site.
• On April 21, 2021, the City Council approved an Urgency Ordinance
enacting a 45-day moratorium on service stations citywide. City Council
will consider whether to extend moratorium on June 5, 2021.
• Subject project was exempt from the moratorium, provided that
building permits are issued by October 21, 2021.
Project Summary and
Recommendation
• Project meets all relevant development standards;
• Project qualifies for a Class 32 Categorical Exemption;
• The applicant has revised the project to address previous concerns
raised; CUP for off-sale alcohol has been denied, and applicant has
withdrawn request for PCN.
• Staff recommends approval of the Tentative Parcel Map, Minor Design
Review and Conditional Use Permit (for the service station and
convenience store) through adoption of the attached Resolutions;
• Alternatively, if the Commission determines that certain findings cannot
be made, they may direct staff to return with Resolutions for denial.
Revised Condition
"The applicant shall design the project to meet Leadership in Energy and
Environmental Design ("LEED") silver standards and obtain certification as
such by the U.S. Green Building Council (USGBC) prior to issuance of
Certificate of Occupancy. Upon plan check submittal, the applicant shall
provide a letter from a LEED-Certified Consultant or equivalent stating
that all requirements to achieve LEED Silver are exhibited in the design
set of plans and that the required process to obtain certification from the
USGBC or State equivalent will be met in full."
i CITY OF RANCHO CUCAMONGA
1700, ri
Questions/Comments ?
4
F
Put, .�. sue..
RESERVE SLIDES
Elevations (No Change)
0:�wa�rmu xw.uiniP
EXTERIOR ELEVATION-EAST(FACING ARCHIBALD AVE.) N,6; 2
�r�T6on— •n nm
EXTERIOR ELEVATION-WEST(STOREFRONT)
yyy�Qyy f_ C
e96�whY
Elevations (No Change)
G F C E C E F M
EXTERIOR ELEVATION -NORTH (FACING 9TH STREET) 2
MATERIAL SAMPLES
wrrntr�ow®xe ewaoacvav
"o"
ce«'*'w.:ecwwia srtamxvww+n
conmrwseorrisawc __
mrora�awc..swuxm �z��alnFw�.mmr
s�Emvm wu.ssrs e�vuwr
—.eat
E � U
EXTERIOR ELEVATION -SOUTH 1
MATERIAL SAMPLES MATERIAL SAMPLES
i
WNTAGEWOOD CEDAR EMPIREBLOCK GRAY AESTHETIC WHITE SW7cm PAWONE P044W
NICHIHA NMHIHA SHERWIN WILLMS BOLLARD COVER.TYP
FIBER CEMEW SIDING FIBER CEMENT PANELS
•,
ff
IMOARKBRONZE SAVERGOIWE-SW 76M COLOINADEOMY"TU1
m I 4'" m
CENTRN-ECONOLAP lz SHERWIN WILLIMAS SHERWIN WRIDWS
CORRUGATED METAL SIDING
TRICORN BLACK-SW 62M REFLECT EWHRE-SIN"ST
SHERWIN WILLIAMS SHERWIN WILLIAMS
J
• SWLL fLCW NHG TREES SUCH
AS CERCIS MCCfR1ALIS DR
� CERCIS CANI•DENSIS
Cl C'.4TIB0. - V Al ACCENT TREES SUCH
_ AS ALOE Y ERCULES
7 J
I
,c II
Ezi®IIDR eATTO — 1MEF
f ✓yjr}1111 cD
m
fflpigLL ACCENT THE
E5SUCH
USAICCHERCULES'
E� ROWG TREES SUCH
CCC
CERC5 CCCOEN1ALU di
CANADEN515
l y T '
WeOgD OMWTE
Y L ATX
4' f
T-S"- IYbNILEI(F SIGN
• f L
N
T L�
_I.
ARCHIBALD AVE
•cf(IIeE' uYEMFDOIWMERTAI ENHANCED PAV ATARCHMALD GRASS
lYNA55E5.FLOWBI♦M WAL W y CgSNTIM•C,MTEGfUI TYeE SUCH A5 GtliE]I
SNUBSM SNMM:I0.ENTS CCLO D CONCRETE WITH TOPCAST PANSA
INSX
a F'Ln CONCEPTUAL LANDSCAPE PLAN �T
®
7-ELEVEN CORNER OF 9TH STREET & ARCHIBALD AVENUE 5G E I .IBY
RANCHO CUCAMONGA.CA
L-2
9TH STREET Original Sit2 Phan
40 MPH - -
—mot i .iw.wca.Ra,�
Mb rIA_
1
1 `fTe
Lu
1 ., •r I,,� / 2vA 'L i
I f + I w
FL
STORE
Tftir
„o ee
I e.eoo sf
r
o = I� RESIDENTIAL
l - .� 1 men rna
.. I 15 a
Pnwosn - —"'I F
1 ' 'oRrne�o .-Zx'rK-yTBnE,_ �•
fL'f \xvcnnrzo v,LRs 'A a�nuw R AMI
RE
_ cou�[wT swas._ 'y
ru
sr�u,TMs 9 I , I OmonmE
� T
� 'aI
..Alt f 1 eT R qu
I
5 oa mAz s
SMfN Rln C15LYCN1 h r _ ,Y A M
CONCEPTUAL SITE PLAN ps`"",.p t
Original Floor
MEMO-
� unn dnn —�•----- IIIIII I®��
nnn unn mw
� wul unn I mm
IIIIII IIIIII ■ IIIIII
nun nnu IMII MII MM Mlp MM FIIM MM MM MMiMM ChM� ■
nnn nnn __ ■nnn Inrnn nnlnlinilwllllil,ilrn,illl Ili__.,
nuu—
Intl -�
IC l0 IC Im
�•— � as ra m
ml
1! Im
9 \ Ip,. ® � C,�:.t IIIIIIIIIIII
� � l�l� I�I� ®III �I� �1�•+�� Iillllllllll,
_ IIIIIIIIIIII
IIIIII
1
0 � IIIIII
r, IIIIII
-- IIIIII
1
S
� ��. ... 1. •al _�.
or
• �► gloom
r ��
Y F�
• P
rti•''1 O r Z�`.
: .
r �f
r r(