Loading...
HomeMy WebLinkAbout2470-LNO SCALENO SCALESHEET L-2, L-5, L-21,L-25, & L-28SHEET L-3, L-7, L-22,L-26, & L-29SHEET L-4, L-8, L-23,L-27, & L-30SHEET L-2, L-6, L-21,L-25, & L-281.All work shall be done in accordance with these plans, the City of RanchoCucamonga Standards and the Standard Specifications for Public WorksConstruction - current edition, including its annual supplements ofamendments. Contractor shall be familiar with and shall be responsible foradherence to these Standards and Specifications.2.All pipelines or substructures of any kind, telephone or power poles, watermeters, valves, fire hydrants, etc. shown or not shown on these plans withinthe right-of-way limits or in adjacent areas where improvement work is tobe done shall be the removed, replaced, relocated or protected in place asrequired at no cost to the City of Rancho Cucamonga.3.Any contractor performing work on this project shall familiarize himselfwith the site and shall be solely responsible for any damage to existingfacilities resulting directly or indirectly from his operations, whether or notsuch facilities are shown on these plans.4.A permit shall be obtained from the City of Rancho Cucamonga PublicWorks, Engineering Department prior to any encroachment or constructionwithin any City of Rancho Cucamonga easement or right-of-way.5.All grade stakes shall be set by the Contractor or Engineer. Paving stakesshall be set at all hinge points, edge of pavement points within 0.01 foot ofsub-grade elevation and at not more than 50 foot intervals. Additionalpaving stakes may be required by City Engineer as needed at warped orvertical curve areas.6.All sewer, water, electric, gas, phone or other utility laterals, mains, orcrossings shall be constructed prior to paving.7.Compaction tests of embankment construction, trench backfill, compactingoriginal ground and all sub-grades shall be performed at no cost to the Cityof Rancho Cucamonga. A written report with these compaction tests shallbe submitted to the City Engineer for approval prior to the placement ofbase materials and/or surfacing.8.At the completion of paving, a materials report shall be submitted to theCity Engineer. Listing all tests or determinations completed to verifystability oil content and gradation of asphalt paving.9.Prior to installation of any paving, a materials report shall be submitted tothe City Engineer. Listing all tests or determinations completed to verify:R-Value, sieve analysis and sand equivalent of aggregate base.10.Paving shall be performed in accordance with R-Value and Pavement teststaken to determine structural sections.11.When improvements are to be placed on native soil which consists of arocky material, the subgrade shall be prepared by removing all rocks whichprotrude above the sub-grade and all voids or depressions shall be filledwith a fine grade material of a quality better than the native material.12.If the asphalt concrete is to be placed on sub-grade, a soils sterilantregistered by the E.P.A. for use under A.C. and P.C.C. shall be uniformlyapplied at the manufacturer's recommended rate for the full pavementwidth prior to paving.13.Estimate of quantities is provided by the Engineer only for the convenienceof the developer, the contractor shall make his own determination ofconstruction quantities before submitting a bid. Any item of work requiredby these plans which is not specifically listed in the estimate of quantitiesshall be considered as included in the other items of work.14.Street signs per City of Rancho Cucamonga Standard Number 401 shall beconstructed at each intersection.15.City approval of plans does not relieve the developer from responsibilityfor the correction of error and omission discovered during construction.Upon request the required plan revisions shall be promptly submitted to theCity Engineer for approval.16.Work site and exterior streets shall be in a neat, clean, hazard free, orderlystate, throughout construction. Site shall be cleaned upon request of theinspector.17. Contact all Utility Companies as required, 48 hours prior to excavation.1.Street trees on new streets are to be selected from the city's approved streettree list, based upon available planting area (typically betweenback-of-curb and the sidewalk). Established streets should already havedesignated tree species. Contact the Engineering Services Department at(909) 477-2740 for additional information.2.Street Trees are to be shown on street or other public improvement planssigned by the City Engineer, and constructed per the same.3.Street trees shown on the Planning Department's submittals are conceptualonly.4.Interior streets will be required to select “deciduous” trees for East-Weststreets and “evergreen” trees for North-South streets from the City'sapproved street tree list. Wind-Prone areas may be required to utilize amore deciduous palette.5.Indicated spacing and sizes are requirements for City maintained trees only.Where the tree concept goes beyond areas of influence near publicimprovements and / or any city maintenance easement, spacing and sizeswill be per the on-site plans approved by the Planning Department, on-siteand off-site plans shall be coordinated.6.Street improvement plans shall reflect the legend and notes indicatedbelow. In some cases, when details about parkway sizes or utilities areunavailable at the time of conditioning, options are provided for varioussituations. It is the designer's responsibility to ascertain the context of thetree planting, select the appropriate tree option, and omit any erroneousinformation on the final legend.7.Street improvement plans shall reflect a line item within the constructionlegend to state: Street trees shall be installed per the notes and legend onsheet __L24__StreetBotanic NameCommon NameSizeSpacingCommentsQty.Prosopis chilensis"Thornless"Chilean Mesquite32" Box15815' O.C.The ResortParkway--The ResortParkwayWashingtoniarobusta hybridMexican FanPalm20' BTH42' O.C.--90The ResortParkwayPhoenixdactyliferaDate Palm20' BTH--1230' O.C.2nd SUBMITTAL DATE: 02/14/20181DATE: 07/20/2018ADDED CITYSIGNATURE BLOCKTHE RESORT PARKWAYLANDSCAPE PLAN1SHEET L-32, L-33T1COVER SHEETL1CONSTRUCTION NOTES AND LEGENDL2CONSTRUCTION PLANL3CONSTRUCTION PLANL4CONSTRUCTION PLANL5CONSTRUCTION PLAN @ 10 SCALEL6CONSTRUCTION PLAN @ 10 SCALEL7CONSTRUCTION PLAN @ 10 SCALEL8CONSTRUCTION PLAN @ 10 SCALEL9CONSTRUCTION DETAILSL10CONSTRUCTION DETAILSL11CONSTRUCTION DETAILSL12CONSTRUCTION DETAILSL13CONSTRUCTION DETAILSL14CONSTRUCTION DETAILSL15CONSTRUCTION DETAILSL16IRRIGATION NOTES & LEGENDL17IRRIGATION DETAILSL18IRRIGATION DETAILSL19IRRIGATION DETAILSL20IRRIGATION DETAILS, CALCS. & SCHEDULESL21IRRIGATION PLANL22IRRIGATION PLANL23IRRIGATION PLANL24PLANTING NOTES, LEGEND & DETAILSL25PLANTING PLAN (TREES & GROUNDCOVER)L26PLANTING PLAN (TREES & GROUNDCOVER)L27PLANTING PLAN (TREES & GROUNDCOVER)L28PLANTING PLAN (SHRUBS & VINES)L29PLANTING PLAN (SHRUBS & VINES)L30PLANTING PLAN (SHRUBS & VINES)L31SPECIFICATIONSL32NORTH OF 6TH EXTENSION- CONSTRUCTION & IRRIGATION PLANL33NORTH OF 6TH EXTENSION - PLANTING PLANL34INTERIM WEST SIDE CONDITION PLANSL35INTERIM WEST SIDE CONDITION PLANSA1PRECISE GRADING PLANA2PRECISE GRADING PLAN3rd SUBMITTAL DATE: 04/23/20182DATE: 07/20/2018ADDED (2) ADDENDUMSHEETS AT NORTHRESORT PARKWAY3DATE: 09/25/2018ADDED ELEC. PULLBOXES, PARKLETBOUNDARIES, & PLANSUPDATE201/31/184DATE: 01/11/2018IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH.SYSTEMCVWD SUBMITTALTEMPORARY WEST SIDECONDITION PLANSSTREET TREES SPECIES &PLANS CORRECTIONCROSSING SIGNS LOCATION444th SUBMITTAL DATE: 01/16/20195DATE: 02/11/2019ARTIST REVISIONSTREET SIGNAGE5556DATE: 03/06/2019LIGHTING SPEC. & NOTES7DATE: 06/21/2019TEMPORARY WEST SIDECONDITION PLANTING8DATE: 06/24/2021REV.DUE TO DRIVEWAYREMOVAL & RIGHT-OF-WAYADJUSTMENT9DATE: 07/07/2022REV.DUE TO DRIVEWAYREMOVAL & R.O.W. ADJUSTMENT,SITE FURNISHING UPDATES Icon Obelisk @ Table Top Crossing See Detail 5, Sheet L-9 (Per Artist, Separate Submittal) Enhanced Sidewalk Paving See Detail 1, Sheet L-9 Table Top Crossing Section See Detail 6, Sheet L-9 Stamped Concrete at Street Crossing See Detail 3, Sheet L-9 Parkway Separation Concrete Band See Detail 7, Sheet L-9 Standard Concrete Walkway Per Production Plans Rim Bench @ Parklet "Artistic Bike Rack North" See Detail 1, Sheet L-10 Key Bike Rack @ Parklet "Artistic Bike Rack North" See Detail 2, Sheet L-10 Unit Paver at Sidewalk Pedestrian See Detail 4, Sheet L-9 R.O.W. Separation Concrete Header See Detail 8, Sheet L-9 60" Sq. Planter See Detail 3, Sheet L-10 Linear Bench @ Table Top 'Club Connection' See Detail 4, Sheet L-10 Market Umbrella See Detail 5, Sheet L-10 Aluminum Header See Detail 6, Sheet L-10 D.G. Paving See Detail 6, Sheet L-10 Wooden Bench @ Parklet 'Garden Haus' See Detail 1, Sheet L-11 Precast Concrete Table See Detail 8, Sheet L-10 Outdoor Couch @ Parklet 'Garden Haus' See Detail 9, Sheet L-10 Outdoor Chair @ Parklet 'Garden Haus' See Detail 10, Sheet L-10 24" Sq. Planter @ Parklet 'Garden Haus' See Detail 7, Sheet L-10 36" Dim. Focal Planter Bowl @ Parklet 'Garden Haus' See Detail 1, Sheet L-12 Outdoor Chandelier @ Parklet 'Garden Haus' See Detail 2, Sheet L-12 Angular Benches @ Tabletop East 'Pentagon' See Detail 2, Sheet L-11 Angular Archway @ Tabletop East 'Pentagon' See Detail 5, Sheet L-12 (Per Artist, Separate Submittal) I-Beam Arches @ Tabletop West 'Outdoor Room' See Detail 3, Sheet L-12 (Per Artist, Separate Submittal) Oval Daybed @ Tabletop West 'Outdoor Room' See Detail 4, Sheet L-12 CONSTRUCTION LEGEND & FIELD NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Precast Lounge Chair @ Tabletop West 'Outdoor Room' See Detail 6, Sheet L-12 72" Precast Concrete Planter@ Parklet 'Hangout' See Detail 3, Sheet L-13 Rectangular Planter@ Parklet 'Hangout' See Detail 7, Sheet L-12 Bar Height Counter @ Parklet 'Hangout' See Detail 1, Sheet L-13 Wood Tile Paving @ Parklet 'Hangout' See Detail 2, Sheet L-13 Bristol Table Set @ Parklet 'Hangout' See Detail 4, Sheet L-13 Bar Stool @ Parklet 'Hangout' See Detail 5, Sheet L-13 Decorative Metal Wall @ Parklet 'Secret Garden' See Detail 6, Sheet L-13 Curved Bench @ Parklet 'Secret Garden' See Detail 7, Sheet L-13 Circular Bench @ Parklet 'Secret Garden' See Detail 9, Sheet L-14 Bike Sharing Station @ Parklet 'Bike Sharing Station' Per City Bike Sharing Program Outdoor Lounge Chair Set@ Parklet 'The Lounge' See Detail 1, Sheet L-14 Outdoor Sofa Set@ Parklet 'The Lounge' See Detail 2, Sheet L-14 Boulders@ Tabletop East 'Garden Loop' See Detail 3, Sheet L-14 Boulder Seats @ Tabletop East 'Garden Loop' See Detail 5, Sheet L-14 Art Sculpture (Per Artist, Separate Submittal) See Detail 4, Sheet L-15 Decorative Paving w/ Metal Divider @ Tabletop West 'Harmony Plaza' See Detail 4, Sheet L-14 Floating Arch. @ Tabletop East 'Lantern' See Detail 8, Sheet L-14 Precast Arch Benches @ Tabletop East 'Lantern' See Detail 1, Sheet L-15 Sculpture @ "Tabletop West 'Modular Modern' See Detail 6, Sheet L-14 Personal Shade Pods @ Tabletop West 'Modular Modern' See Detail 3, Sheet L-15 (Per Artist, Separate Submittal) Rubberized Surface Detail @ Tabletop West 'Modular Modern' See Detail 7, Sheet L-14 Iconic Project Logo Sculpture@ Parklet 'Project Icon' See Detail 2, Sheet L-15 Street Utility per Utility Plan Street Lights per Lighting Plan ADA Curb Ramp per Civil Street Imp. Plans ADA Truncated Domes per Civil Street Imp. Plans Electrical Pull Box Layout Plan (Typical) See Detail 8, Sheet L-12 Circular Bench (Per Artist, Separate Submittal) Pedestrian Crossing Beacon & Push Bottom by Others Outdoor Lamp @ Parklet 'Garden Haus' See Detail 11, Sheet L-10 27 28 29 30 31 32 33 34 35 36 37 38 39 41 42 43 44 45 46 47 48 49 40 50 51 52 53 54 55 56 57 FINISH SCHEDULE ENHANCED CONCRETE PAVER AT TABLETOP #1 CLUB CONNECTION: A1: 10" Wide Colored Concrete band. Color to be Light Gray #8084 by Davis Color w/ medium broom finish. A2: Concrete paver "Diamond 8" 23 78" x 3 78" x 7 78" by Stepstone. Color to be "Granada White" #1801 w/ Sandblast & #1401 Exposed Aggregate finish in 50-50 alternating blend. Installed per manufacture's specs. STAMPED CONCRETE AT TABLETOP & STREET CROSSING: Granite Frayed Edge TL-04232 24"x24" by Bomanite stacked bond pattern. B1: Color to be 1266 Cool Gray w/ release agent color A-33 Classic Gray B2: Color to be 5130 Spring Beige w/ release agent color A-55 Pecan Tan * All concrete colors by L.M. Scofield COLORED CONCRETE PAVING AT PENTAGON: C1: Colored Concrete "Euroblue" #418 by Davis Color w/ light broom finish with sealer. C2: Colored Concrete "Euroblue" #418 by Davis Color w/ hand seeded glass aggregate. Glass aggregate to be "Blue" in small size by ASGGLASS. Evenly seed glass aggregate at 12/SF ratio per manufacture's specs. Provide 3'x3' P.I.P. sample to be approve by Landscape Architect prior to construction COLORED CONCRETE PAVING AT OUTDOOR ROOM: D1: Colored concrete "Euroblue" #418 by Davis Color w/ #3 Topcast finish D2: Colored concrete "Denim Blue" #1511 Emerchrome SC Color Hardener by L.M. Scofield. D3: Colored Concrete "Euroblue" #418 by Davis Color w/ hand seeded grass aggregate. Glass aggregate to be "Blue" in small size by ASGGLASS. Evenly seed glass aggregate at 1 LB/SF ratio per manufacture's specs. Provide 3'x3' P.I.P. sample to be approve by Landscape Architect prior to construction D4: 6" wide natural concrete band with light broom finish. WOOD TILE PAVER: 'AEQUA SERIES' outdoor porcelain tile (non-slip) 8"x32" R11 Anti-slip. Available thru Arizona Tile. Color to be "Aequa Castor". Mortar color to match tile. Joint spacing to be 1/8". (Install per mfg. specs.) D.G. PAVING: NaturalPAVE XL resin pavement By 'SSPCO' www.sspco.com. Color to be Fresco Plus #1702. Installation per manufacturer's specs. CIRCULAR PAVING AT HARMONY PLAZA: G1: Colored concrete "Tile Red" #1117 w/ #3 Topcast finish. G2: Colored concrete "Harvest Gold" #5084 w/ light trowel finish. G3: Colored concrete "Sangria" #1117 w/ #3 Topcast finish. G4: Colored concrete "Palomino" #5447 w/ light trowel finish. G5: 14" thick aluminum 'L' shaped concrete divider by National Meta Shapes, Inc. Shape and secure as required. *All colors are by Davis Color. COLORED CONCRETE AT GARDEN LOOP: H1: Colored concrete "Mesa Buff" #5447 by Davis Color w/ #3 Topcast finish. Saw cut grid as shown. H2: Colored concrete band "Flagstone Brown" #641 by Davis Color w/ light trowel finish. 6" wide at +/- 40" O.C. measured from inside curve. CONCRETE PAVERS AT LANTERN: I1: Florentine 3 18" x 9 38" x 4cm FM unit paver by Acker-Stone in herring bone pattern, 40% grind finish 60% shot blast finish. Color to be Palomino Face Mix. Installed per manufacture's specs. I2: 6" wide natural concrete band with light trowel finish. RUBBERIZED SURFACE AT MODULAR MODERN: J1: Poured-in-place rubber surface. Install per mfg. specifications. Finish surface of play rubber surface to be flush with finish surface of adjoining concrete paving. Field Color to be "Yellow". *All rubber surface colors are by GameTime or equal. J2: Poured-in-place rubber surface. Install per mfg. specifications. Finish surface of play rubber surface to be flush with finish surface of adjoining concrete paving. Field color to be "Brown" with 3" wide stripe in 36" o.c. as shown. Stripe color to be "White" *All rubber surface colors are by GameTime or equal. DOUGLAS FIR WOOD BEAM FOR DAYBED: Natural wood color and apply appropriate exterior sealer, such as Penofin® Oil Finish or equal. Apply minimum two coats per the manufacturer's directions, ENHANCED SIDEWALK CONCRETE PAVING: L1: Natural color concrete with medium broom finish. Run perpendicular to edge, provide concrete sealer L2: Natural color concrete with light sand blast finish. 14" tool joint at 30" O.C. as shown STANDARD CONCRETE PAVING: To be natural concrete with medium broom finish. Saw cut grid as shown STAMPED CONCRETE AT ROUNDABOUT: Stone textured Edinburgh Cobble FM-520 6"x6" by Brickform in running bond pattern. Color to be 6063 Winter Beige w/ release agent color A-55 Pecan Tan. All colors by L.M. Scofield DECORATIVE METAL WALL: To be 1 4" steel plate. Prepare metal surface per manufacturer's specifications. Remove oil, dust, dirt, loose rust, or other contamination to ensure good adhesion. Contractor shall apply all Rust-Oleum coatings and materials with the manufacturer's specifications in mind. Mix and thin coatings according to manufacturer's recommendations. Do not apply to wet or damp surfaces. Apply coatings using methods recommended by manufacturer. Uniformly apply coatings without runs, drips, or sags, without brush marks, and with consistent sheen. Apply coatings at spreading rate required to achieve the manufacturers recommended dry film thickness. Regardless of number of coats specified, apply as many coats as necessary for complete hide, and uniform appearance. Protect finished coatings from damage until completion of project. Touch-up damaged coatings after substantial completion, following manufacturer's recommendation for touch up or repair of damaged coatings. Repair any defects that will hinder the performance of the coatings. Apply "white" #215969 clear metal primer, then "Safety Red" #7524402 High Performance Protective Enamel as finish. Primer and Enamel by Rust-Oleum COLOR PANEL FOR ICON OBELISK: 12" gauge "Chroma" panel by 3Form. w/ Renewable Matte finish for both front and back sides. Installed per manufacture's specs. - Color to be selected at 'Club Connection' - Color to be selected at 'Pentagon' and 'Outdoor Room' - Color to be selected at 'Garden Loop' and 'Harmony Plaza' - Color to be selected at Lanterns' and 'Modular Modern' WOOD BENCH TOP AT PARKLET 'GARDEN HAUS' Custom size "Wall-top Bench" #2047-6-1 by Columbia Cascade. Kiln-dried premium Douglas fir slats with black powder-coated steel frames. Quote #: Q-18-82322-A1 WOOD BENCH TOP AT TABLE TOP 'PENTAGON' Custom size "Wall-top Bench" w/ fascia by Columbia Cascade Kiln-dried premium Douglas fir slats with black powder-coated steel frames. Quote #: Q-18-82322-A1 P.I.P. CONCRETE To be natural color concrete. Grind smooth and seal. Provide sample for Landscape Architect's approval. A B C D E F G H I J K L M N O P Q R S RIM BENCH AT ARTISTIC BIKE RACK NORTH: (QTY. x1) Pod Metal Canopy (DF5310) 75 18" x 18" x 74" by Tectura Designs www.tecturadesigns.com. Metal color to be "Red" #2; concrete color to be "Stella" #A30. Installed per manufacture's specs. KEY BIKE RACK AT ARTISTIC BIKE RACK NORTH: (QTY. x4) Chiave (#377) 15" x 3" x 35" by ID Metalco www.idmetalco.com Color to be #RAL1021, #RAL1028, #RAL2002, #RAL3003. In-ground mounting option, install per manufacturer's specifications. 60" SQ. PLANTER: (QTY. x3 at 'Club Connection'; QTY. x2 at 'The Lounge'; QTY. x1 at 'Club 6' ) Standard Square (SL6036) planter 60" x 60" x 36" w/ drain hole by Old Town Fiberglass, www.oldtownfiberglass.com. Install per manufacturer's specifications. Reinforcement by manufacture at base for anchoring as require. - Custom color to match recreational building SW-155-C5 'Cucuzza Verde' (M) finish at 'Club Connection' & 'Club 6' - Color to be Bronze #12 (M) finish at 'The Lounge'. LINEAR BENCH AT 'CLUB CONNECTION': (QTY. x5) Parallel 42 bench straight unit 18" x 67" x 18” h by Landscape Forms www.landscapeforms.com. Powdercoated metal color to be 'Buttercup'; wood surface to be Jarrah (P). Unit with surface mount option, install per manufacturer's specifications. All metal is finished with Landscape Forms proprietary Pangard II' Polyester powdercoat. MARKET UMBRELLA: (QTY. x1 at 'Club Connection'; QTY. x1 at 'The Lounge' ) Schattello Eccentric 6.7' (w) x 13.1(l) off center umbrella by Shadescapes Americas, www.shadescapesamericas.com. In-ground installation option w/ #SZ150 anchor, install per manufacturer's specifications. - Color to be "Textured Tangerine" #314610 at 'Club Connection'. Post color to be 'Brown Powder-Coat' # RAL 8019. - Color to be "Rust" #314022 at 'The Lounge'. Post color to be 'Brown Powder-Coat' # RAL 8019. PRECAST CONCRETE TABLE: (QTY. x1 at ' 'Garden Haus'; QTY. x2 at 'The Lounge' ) Stone #Q2STONE18B 24" x 24” x 18" by QCP www.qcp.com Color to be Mission White w/ Craftsman's Etch finish. Install per manufacturer's specifications. OUTDOOR COUCH AT GARDEN HAUS: (QTY. x1) Kartell "Sofa" 32" x 77" x 30" by KARTELL www.moro.com Color to be "Terracotta". Customize legs for anchoring by manufacture per request. Install per manufacturer's specifications. T U V W X Y Z OUTDOOR CHAIR AT GARDEN HAUS: (QTY. x1) Kartell "Chair" 45" x 29” x 25" by KARTELL www.moro.com Color to be "Terracotta". Customize legs for anchoring by manufacture per request. Install per manufacturer's specifications. 24" SQ PLANTER AT GARDEN HAUS: (QTY. x1) Elevaire planter (QS-ELEV-2016P) 20" sq. x 16" w/ drain hole and anchor rod by QCP, www.qcp.com. Color to be Mission White w/ Craftsman's Etch finish. Install per manufacturer's specifications. 36" DIA. FOCAL PLANTER BOWL AT GARDEN HAUS: (QTY. x1) Malibu (MLB3618) Ø36" x 18" with drain hole by Old Town Fiberglass, www.oldtownfiberglass.com. Color to be Aqua #06 (M), install per manufacturer's specifications. Reinforcement by manufacture at base for anchoring as require. PRECAST LOUNGE CHAIR AT OUTDOOR ROOM: (QTY. x2) Chill Seating 28" x 62" x 33” h by Landscape Forms www.landscapeforms.com Color to be "Daisy", install per manufacturer's specifications. RECTANGULAR PLANTER AT THE HANGOUT: (QTY. x6) Ample Rectangle-Corten 72" x 20" x 24" w/ drain hole by Plantercraft, www.plantercraft.com. Color to be "Corten Steel", install per manufacturer's specifications. BRISTOL TABLE SET AT THE HANGOUT: (QTY. Table x3, Chair x6) Tuscany 36" Thermory Bistro Table #T2237T 31" H x 34" W x 36" L & Tuscany Thermory Chair #T2235T 33" H x 20" W x 24" D by ANOVA, www.anovafurnishings.com. Color to be Thermory for slat, and Textured Pewter for steel frame. Install per manufacturer's specifications. BAR STOOL AT THE HANGOUT: (QTY. x10) Tuscany Thermory Bar Height Chair #T2245T 43" H x 20" W x 23" D by ANOVA, www.anovafurnishings.com. Color to be Thermory for slat, and Textured Pewter for steel frame. Install per manufacturer's specifications. CURVED BENCH AT SECRET GARDEN: (QTY. x4) "Swerve Bench" #11701BX, 47" x 18" x 16.5” H by TENJAM, www.tenjam.com Color to be Yellow #YE (x2) & Lime Gareen #LM (x2). Bench w/ ganging bracket kit and "Weightcap" options, install per manufacturer's specifications. CIRCULAR BENCH AT SECRET GARDEN: ( QTY. x5) "Circle Large" #11301BX 17.75" D x 16.5” H by by TENJAM, www.tenjam.com. Color to be Light Blue #LB (x2), Violet #VI (x2), & Yellow #YE (x1) Bench w/ "Weightcap" option, install per manufacturer's specifications. OUTDOOR LOUNGE CHAIR SET AT THE LOUNGE: ( QTY. x5) SWING 46 SOFA # MB-154865 37" x 36" x 25" by Babmar, www.babmar.com Color to be ED6006 for chair and 1415 for cushion. Install per manufacturer's specifications. OUTDOOR SOFA SET AT THE LOUNGE: ( QTY. Corner x1; Middle x4 ) Swing 46 Corner Sofa # MB-S46COR) 36" W x 36" D x 25" H, Swing 46 Middle (armless) Sofa (#MB-SW46M) 36" W x 30" D x 25" H by Babmar, www.babmar.com Color to be ED6006 for chair and 1415 for cushion. Install per manufacturer's specifications. BOULDERS AT THE GARDEN LOOP: ( QTY. x5 ) "Desert Sand" landscape boulders by Southwest Boulders, www.southwestboulder.com 92 cu. ft. (x1), 27 cu. ft. (x2), 8 cu. ft. (x2) BOULDERS SEATS AT THE GARDEN LOOP: ( QTY. x2 ) "SoMA Stones" by Concrete Works, www.concreteworks.com. 31" x 42” x 13" for small size (x1) Color to be "Chalk" w/ standard finish 47" x 60” x 16" for large size (x1). Color to be "Fog" w/ standard finish Install per manufacturer's specifications w/ anti-graffiti sealer.. PERFORATED METAL PANEL AT LANTERNS: Perforated panel with ONION (OIN) PATTERN by PARASOLEIL, www.parasoleil.com Color to be "Copper Foil" (CFL) w/ custom cut size to fit overhead shape SCULPTURE AT MODULAR MODERN: ( QTY. x3 ) Sculptural bench "BOA" (#139) 94" x 15" x 47" H by Outsider, www.out-sider.dk/en Color to be "Orange" (RAL2003). Fill sculpture with water and install per manufacturer's specifications. UNIT PAVERS AT CLUB 6 PLAZA: PP1: 60mm 3"x12" unit paver by Belgard. Color to be Lime PP2: 60mm 3" x 12" unit paver by Belgard. Color to be Foundry * Pavers finish, color, and pattern shall match and coordinate w/ the clubhouse architecture plans. Installed per manufacture's specs over concrete base. AA BB CC DD EE FF GG HH I I JJ KK LL MM NN OO PP CONSTRUCTION NOTESAND LEGENDCONSTRUCTION NOTES 1. Contractor to verify site conditions prior to beginning construction. Discrepancies shall be brought to the attention of the owners representative. 2. See grading plans for vertical control 3. Contractor shall be responsible for making himself familiar with all underground utilities, pipes and. structures. Contractor shall take sole responsibility for cost incurred due to damage and replacement of said utilities. 4. Contractor shall not willfully proceed with construction as designed when it is obvious that unknown obstructions and/or grade differences exist that may not have been known during design. Such conditions shall be immediately brought to the attention of the Landscape Architect. The Contractor shall assume full responsibility for all revisions due to a failure to give such notification. 5. Contractor shall be responsible for any coordinating with other sub-contractors as required to accomplish construction operations. 6. Concrete surfaces shall be formed with long, smooth gradients to reduce dips, abrupt changes and sharp transitions. 7. All curvilinear walks, curbs, headerboards and walls shall have a continuous smooth curve where applicable. All forms must be inspected and approved prior to beginning that phase of the work. 8. All concrete flatwork to be 3 1/2" minimum thickness and located as shown. Concrete will be of a 5 sack mix and maximum water/cement ratio shall be in accordance with ACI 301 and ACI 318. Maximum slump shall not exceed 4 inches for normal weight concrete if consolidationis by vibration. A slump not exceeding 5 inches is permitted if consolidation is by other means. Concrete shall have a compressive strength of 2500 PSI in 28 days. Uses of admixture shall be approved prior to construction and shall be in accordance with the ACI 301. Concrete that has been pretempered by water or cement after concrete has partially hardened, is not acceptable. Concrete shall never be covered with sheeting of any kind. Periodic tests of compressive strength of concrete shall be made in accordance with ACI 301 to verify that it meets design requirements. Concrete shall be poured continuously, where possible and thoroughly consolidated by mechanical vibration or other methods in accordance with ACI 301. All finishing shall be in accordance with ACI 301. 9. All walks shall be 3 1/2" thick concrete with a medium broom finish. Install expansion joints at 12' o.c. and at corners; scorelines at 6' o.c. or as shown of plans and in accordance with all local codes. 10. Contractor shall coordinate irrigation and lighting sleeve locations under paved areas as required. Refer to appropriate plans. 11. If in the field, scaled dimensions conflict with stated grades, and/or elevations, the design elevation shall take precedence. 12. Prior to placing concrete, the Contractor shall sufficiently moisten the subgrade and provide subgrade etc. for all hardscape paving, wall footings, etc. 13. Verify with the project Soil and/or Structural Engineer for the need for steel reinforcing, base material, etc. for all hardscape paving, wall footings, etc. 14. For masonry and wood construction notes, if any, refer to separate list of requirements within this package. 15. Waterproofing Note: Waterproofing to consist of mulasticoat and scratch kote 2000 product or pre-approved equivalent. Waterproofing coat is to be installed per manufacture's specifications. Hold 6" from top of wall and should extend a minimum of 2" over the foundation heel. Contractor may substitute equal product, but must submit cut sheet to owner or owner's representative for approval prior to installation. MASONRY NOTES 1. All masonry blocks, bricks, veneer, etc. as well as other products and equipment shall be installed per manufacturer's specifications and per industry standards. 2. Concrete shall be machine mixed. Proportions to be 1:2 1/2: 3 1/2 by volume using a maximum of 7 gallons of water per sack of cement, unless approved otherwise. Concrete shall have a minimum ultimate compressive strength of 2000 PSI minimum at 28 days, unless otherwise approved. Portland cement shall be type V from tested stock per ASTM C-150, unless otherwise approved. 3. Concrete masonry units for hollow unit masonry construction, shall be grade "N" units conforming to the requirements of ASTM C-90. The ultimate compressive strength of the masonry wall, grouted solid, shall be a minimum of f'm=1500 PSI. 4. Mortar shall be freshly prepared and uniformly mixed of 1 part Portland cement, 1/2 maximum to 1/4 minimum parts lime putty or hydrated lime and 2 1/2 to 3 parts clean washed sand. Mortar to be type "S" with lime a minimum ultimate compressive strength of 2000 PSI at 28 days. 5. Grout wall solid unless otherwise noted. Grout shall be proportioned by volume and shall have sufficient water added to produce consistency for pouring without segregation. Fine grout in spaces 2" or less, shall be composed of part Portland cement, to which may be added not more then 1/10 part hydrated lime or lime putty and 2 1/4 to 3 parts sand. For course grout add 1 to 2 parts pea gravel to fine grout. Grout shall attain a minimum ultimate compressive strength of 2000 PSI at 28 days. 6. Reinforcing steel shall conform to ASTM A-615 grade 40 for #4 Rebars and less, grade 60 for #5 Rebars and greater, unless otherwise noted. 7. All continuous bars or dowels shall lap a minimum 40 bar diameters in concrete and masonry, unless otherwise noted. 8. Excavate for foundations to the depths shown on the drawings included undisturbed soil or compacted earth, 12" minimum unless otherwise noted. 9. Contact Landscape Architect if site conditions are not as shown. 10. For RETAINING WALLS do not backfill wall sooner than 7 days or prior to reaching strength required in items 3, 4, 5 and 6 above. 11. For RETAINING WALLS do not backfill with heavy equipment closer than the vertical height of the proposed wall. 12. Design equivalent fluid pressure is from soils report or requested by Owner and is not the responsibility of this Landscape Architect. 13. Masonry construction shall conform with all applicable codes and ordinances (Uniform Building Code). 14. When retaining, walls shall receive the following waterproofing seal: Coat backside of wall in contact with earth using "Thoroseal" foundation coating (or approved equal). Apply per manufacturer's specifications. 1. All wood, moldings, caps and trim to be S4S Douglas Fir #1 construction grade, or better, unless otherwise noted. 2. All wood hidden by construction to be S4S Douglas Fir #2 construction grade, or better, unless otherwise specified. 5. Allow for adjoining construction. 7. All bolts and nuts to be cadmium plated. 10. All footings shall be poured on undisturbed native soil or 90% relative compacted fill material per Structural Engineer's requirements. 9. All machine bolts, carriage bolts and threaded rods to have a 2" diameter x 1/4" thick steel washer under nut. 3. All materials shall conform to governing codes and ordinances. 8. All straps, bracket, etc. to be galvanized steel. Unplated steel to be primed with two coats zinc chromate primer final 4. All members not shown bolted shall be attached per Uniform Building Code nailing schedule. All nails to be galvanized iron. WOOD CONSTRUCTION NOTES - S4S 11. Concrete shall conform to ASTM C-150 and shall have a compressive strength of 2000 PSI minimum at 28 days. 6. All construction to be plumb and true. All lumber to be installed crown side up. 12. Use countersunk galvanized wood screws or finishing nails set 1/8" deep on all decking, benches, railing, etc. 13. All products & equipment are to be installed per manufacturer's specification & per industry standards. 13. Refer to Structural Engineer's calculations for further construction information. Any discrepancy between Landscape Architect's and Structural Engineer's drawings are to be brought to the attention of the Landscape Architect prior to construction. coat to match wood element. 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 THE RESORT PARKWAY LANDSCAPE PLAN 1 3 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 8 OMIT 8 9 9 9 37+0038+00 36+00 35+00 34+00 33+0011 KID'S PLAYAREAFITNESSSPECIALTYFITNESSELEC 1MENWOMENFITNESSEQUIPMENTSTORAGEPOOLEQUIPMENTPOOLSHOWERINVERTERROOMUNISEXUPFX4040 TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHTFX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTUP 07AW/Hroll up roll upFX4040TYPEWIDTHHEIGHT FX 4040 TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX 4040 TYPEWIDTHHEIGHT 65" TV65" TV65" TVCATVCATVCATVCATVTELTEL6 T H S T R E E T5 1 TABLE TOP 'CLUB CONNECTIONS' 2 L-5 PARKLET 'ARTISTIC BIKE RACK NORTH' 1 L-5 PARKLET 'GARDEN HAUS' 3 L-5 5 3 2 50 51 50 5 5THE RESORT PARKWAY53 CLUB 6 PLAZA3 L-8 (See North of 6th. Extension Plans)56 56 33+00 32+00 31+00 30+00 29 + 0 0 28 + 0 0 2 7 + 0 0 2 6 + 0 0A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cRETAILLinear32Linear33LW35Linear34CONTEMPORARY MAIN STREETMAIN STREETCONTEMPORARY TEL TEL CATVCATVTABLE TOP 'OUTDOOR ROOM' 1 L-6 TABLE TOP 'PENTAGON' 4 L-52 3 2 2 2 1 51 51 5 THE RESOR T P A R K W A Y 53 56 56 6 254 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE. DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREES SPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 CONSTRUCTION PLANMATCHLINE - SEE SHEET L-3MATCHLINE - SEE SHEET BELOWMATCHLINE - SEE ABOVETYPICAL ENLARGEMENT @ 10 SCALE SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 3 3 3 3 3 3 3 3 3 3 3 3 4 5 5 CONSTRUCTED CONSTRUCTEDCONSTRUCTED 28 + 0 0 27 + 0 0 2 6 + 0 0 2 5 + 0 0 2 4 + 0 0 2 3 + 0 0 2 2 + 0 0 2 1 + 0 0 2 0 + 0 011+00A2.7cRETAILRETAILRETAILRE T A I LLW35LW36LW75 LW76Linear79CONTEMPORARY CONTEMPORARY CONTEMPORARY CONTEMPORARY MAIN STREETCATVCATV TEL PARKLET 'THE HANGOUT' 2 L-6 PARKLET 'THE LOUNGE' 1 L-7 TABLE TOP 'HARMONY PLAZA' 3 L-7 TABLE TOP 'GARDEN LOOP' 2 L-7 PARKLET 'BIKE SHARING STATION' 4 L-6 TABLE TOP 'SECRET GARDEN' 3 L-6 2 2 3 5 2 STAMPED CONCRETE PEDESTRIAN CROSS WALK SEE CIVIL STREET IMPROVEMENT PLANS 0" CURB W/ STAMPED CONCRETE LANDING. SEE CIVIL STREET IMPROVEMENT PLANS STAMPED CONCRETE PEDESTRIAN CROSS WALK SEE CIVIL STREET IMPROVEMENT PLANS 51 50 T H E R E S O R T P A R KW A Y 53 53 52 53 56 56 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE. DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREES SPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 CONSTRUCTION PLANMATCHLINE - SEE SHEET L-2 MATCHLINE - SEE SHEET L-4 SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 3 3 3 3 3 3 3 3 3 3 3 5 5 8 CONSTRUCTED CONSTRUCTED CONSTRUCTED 2 2 + 0 0 2 1 + 0 0 2 0 + 0 0 19 + 0 0 18 + 0 0 17+00 16+00 15+00 UP A2 A . 6 s UPUPA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2A.6sA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cLinear79Linear816Plex82Linear91Linear90Linear92Linear104Linear111SPANISHEUROPEAN HERITAGECONTEMPORARY MAIN STREETCONTEMPORARY SPANISHCONTEMPORARY CONTEMPORARY MAIN STREETMAIN STREET6.34%RAMPBUILDING MBUILDING QBUILDING NBUILDING BBUILDING CBUILDING DBUILDING EBUILDING FBUILDING PBUILDING OBUILDING SBUILDING R6-PLEX6-PLEX6-PLEX6-PLEX6-PLEX9-PLEX6-PLEX6-PLEX9-PLEX9-PLEX6-PLEX9-PLEX45° 15° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 15° 45° 45° 15° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 15° 45°CATVCATVTEL TABLE TOP 'MODULAR MODERN' 1 L-8 TABLE TOP 'LANTERNS'4 L-7 2 5 3 2 2 6 2 51 5 T H E R E S O R T P A R K W A Y 5 56 56 2 2 2 5 50 14+00 13+00 12+00 11+00BUILDING A9-PLEXCATVCATVTEL4 T H S T R E E T2 2 51 5 THE RESORT PARKWAY 50 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE. DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREES SPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 CONSTRUCTION PLANMATCHLINE - SEE SHEET L-3MATCHLINE - SEE ABOVEMATCHLINE - SEE BELOWSEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 3 3 3 5 5 5 8 8 8 CONSTRUCTED TEL2 5 THE RESORT PARKWAY 36+00 1 10 9 2 50 51 THE RESORT PARKWAY 53 56 THE RESORT PARKWAY 24 1 2 51 50 53 56 10 2 6 THE RESORT PARKWAY 50 20 18 21 17 19 (QTY. 1)(QTY. 1) (QTY. 1) (QTY. 1) (QTY. 1) THE RESORT PARKWAY 16(QTY. 1) 57 (QTY. 1) 36+00 11 13 12 (QTY. 1) (QTY. 5) (QTY. 3) THE RESORT PARKWAY TABLE TOP CROSSING SECTION 6 L-9 THE RESORT PARKWAY 23 (QTY. 1)23 (QTY. 3) TABLE TOP CROSSING SECTION 6 L-9TEL7 (QTY. 1) 8 (QTY. 4) THE RESORT PARKWAY COLOR RAL 1021 COLOR RAL 1028 COLOR RAL 3003 COLOR RAL 2002 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 CONSTRUCTION PLAN@ 10 SCALE1 PARKLET 'ARTISTIC BIKE RACK NORTH' 3 PARKLET 'GARDEN HAUS' 2 TABLE TOP 'CLUB CONNECTIONS' 4 TABLE TOP 'PENTAGON' SITE FURNITURE LAYOUT PLAN SITE FURNITURE LAYOUT PLAN SITE FURNITURE LAYOUT PLAN SITE FURNITURE LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 3 3 3 3 3 3 3 33 3 3 3 3 33 SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION*SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION* SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION* 5 5 5 5 CONSTRUCTED CONSTRUCTED CONSTRUCTED9 BB1.7cCATVCATV53 10 25 2 26 THE RESORT PARKWAY 51 1 56 3414 2 15 THE RESORT PARKWAY 4 53 TEL 28 31 2 4 THE RESORT PARKWAY 50 30 53 14 37 152 4 THE RESORT PARKWAY 50 51 53BB1.7cCATVCATV27 THE RESORT PARKWAY TABLE TOP CROSSING SECTION 6 L-9 TEL 3029 32 33 (QTY. 10)(QTY. 1)(QTY. 6) (QTY. 3) 36 35 (QTY. 5) (QTY. 4) THE RESORT PARKWAY COLOR #YE COLOR #LM COLOR #YE COLOR #LM COLOR #VICOLOR #VI COLOR #YE COLOR #LB COLOR #LB 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE. DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREES SPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 CONSTRUCTION PLAN@ 10 SCALE1 TABLE TOP 'OUTDOOR ROOM' 3 PARKLET 'THE HANGOUT'2 PARKLET 'SECRET GARDEN'4 PARKLET 'BIKE SHARING STATION' SITE FURNITURE LAYOUT PLAN SITE FURNITURE LAYOUT PLAN SITE FURNITURE LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN THE RESORT PARKWAY SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 3 3 3 3 3 3 3 3 3 SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION*SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION* 5 5 CONSTRUCTED CONSTRUCTED 14 1542 THE RESORT PARKWAY 22+00 41 42 14 40 1 15 2 TABLE TOP CROSSING SECTION 6 L-9 THE RESORT PARKWAY 56 THE RESORT PARKWAY 1 43 34 2 51 TABLE TOP CROSSING SECTION 6 L-9 56 45° 45° 45° I2 44 10 2 1 9 THE RESORT PARKWAY M I1 NN M 56 38 39 11 17 13(QTY 2) (QTY 1) (QTY 1) (QTY 5) (QTY 2) THE RESORT PARKWAY 45° 45° 45° 45 THE RESORT PARKWAY (QTY 4) TABLE TOP CROSSING SECTION 6 L-9 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE. DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREES SPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 CONSTRUCTION PLAN@ 10 SCALE1 PARKLET 'THE LOUNGE' 3 TABLE TOP 'HARMONY PLAZA' 2 TABLE TOP 'GARDEN LOOP' 4 TABLE TOP 'LANTERNS' SITE FURNITURE LAYOUT PLAN SITE FURNITURE LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN CONSTRUCTION LAYOUT PLAN SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 33 3 3 3 3 3 3 3 3 SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION* SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION* 5 5 5 5 5 5 CONSTRUCTED CONSTRUCTED Linear92474812THE RESORTPARKWAY53565CATVCATV THE RESORTPARKWAY255049Linear9255(QTY 3)THE RESORTPARKWAYTABLE TOPCROSSING SECTION6L-936+00FX4040TYPEWIDTHHEIGHTFX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT 2511CITY R.O.W.CITY R.O.W.53OUTSIDE R.O.WNOT A PARTTHE RESORT PARKWAYCENTER OF RADIUS PERPLAZA CONSTRUCTION PLAN BYTHE ARCHITECTTABLE TOPCROSSING SECTION6L-95636+00FX4040TYPEWIDTHHEIGHTFX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHTTHE RESORT PARKWAY11(QTY 1)Y3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/20229CONSTRUCTION PLAN @ 10 SCALE 1TABLE TOP 'MODULAR MODERN'2PARKLET 'PROJECT ICON'SITE FURNITURE LAYOUT PLANCONSTRUCTION LAYOUT PLANCONSTRUCTION LAYOUT PLANSEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS CONSTRUCTION LAYOUT PLAN3CLUB 6 PLAZASITE FURNITURE LAYOUT PLANTHE RESORT PARKWAYLANDSCAPE PLAN13333333333SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION*SEE SHEETS L34 & L35 FOR HARDSCAPE LAYOUT FOR TEMPORARY WEST SIDE CONDITION*OMIT555 55558CONSTRUCTED “”1ENHANCED SIDEWALK PAVING2CONCRETE JOINTSCONCRETE PAVING TABLE TOP CROSSING SECTION36CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/2022978ICON OBELISK (DYAD) AT TABLE TOP CROSSING5UNIT PAVERS4THE RESORT PARKWAYLANDSCAPE PLAN1PARKWAY SEPARATIONCONCRETE BANDR.O.W. SEPARATION CONCRETE HEADER668CONSTRUCTEDCONSTRUCTED ””””34MARKET UMBRELLALINEAR BENCHD.G. PAVING & ALUMINUM HEADERPRECAST CONCRETE TABLEOUTDOOR COUCHOUTDOOR CHAIR5678910CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/2022924" SQ. PLANTER2RIM BENCH 1KEY BIKE RACKS60" SQ. PLANTERTHE RESORT PARKWAYLANDSCAPE PLAN1466CONSTRUCTED9CONSTRUCTEDOUTDOOR LAMP11 CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/20229ANGULAR BENCHES23THE RESORT PARKWAYLANDSCAPE PLAN166CONSTRUCTED9 ”CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/202297RECTANGULAR PLANTER5LIGHTED ARCH @ PENTAGON (ANGULAR ARCHWAY)PRECAST LOUNGE CHAIR6OVAL DAYBED43OUTDOOR ROOM ARCHES @ OUTDOOR ROOM (I-BEAM ARCHES)2OUTDOOR CHANDELIER136" DIA. FOCAL PLANTER BOWLTHE RESORT PARKWAYLANDSCAPE PLAN18PULL BOX LAYOUT PLAN (TYPICAL)36666OMITCONSTRUCTED9 ”CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/2022967CURVED BENCH2DECORATIVE METAL WALL4BISTROL TABLE SET5BAR STOOL372" SQ. PRECAST CONCRETE PLANTER1BAR HEIGHT COUNTERWOOD TILE PAVINGTHE RESORT PARKWAYLANDSCAPE PLAN1CONSTRUCTED9 ”””CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/202299CIRCULAR BENCH6SCULPTURE7RUBBERIZED SURFACE DETAIL81FLOATING ARCHBOULDERS SEATSBOULDERS54DECORATIVE PAVING W/ METAL DIVIDER3OUTDOOR LOUNGE CHAIR SET2OUTDOOR SOFA SETTHE RESORT PARKWAYLANDSCAPE PLAN1OM I T 8CONSTRUCTED CONSTRUCTION DETAILS 3617-00301-31-181156 MOUNTAIN AVE. 909-946-7523 UPLAND, CA 91786Know what'sbelow.before you dig.CallRLANDSCAPE PLANS RANCHO CUCAMONGA, CA. THE RESORT PARKWAY STREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUP OF COMPANIES ADDED CITY SIGNATURE BLOCKDATE: 04/23/20181ADDED (2) ADDENDUM SHEETS AT NORTHRESORT PARKWAY. DATE: 07/20/20182ADDED ELEC. PULL BOXES, PARKLETBOUNDARIES, & PLANS UPDATE.DATE: 09/25/201834IRRIGATION REVISIONLOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL.TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTIONDATE: 01/11/20185ARTIST REVISION STREET SIGNAGEDATE: 02/11/201956LIGHTING SPEC. AND NOTESDATE: 03/01/20197PLANTING REVISIONTEMPORARY WEST SIDE CONDITIONDATE: 06/21/2019REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENTDATE: 06/24/20218REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAYADJUSTMENT, SITE FURNISHING UPDATESDATE: 07/07/20229ICONIC PROJECT LOGO SCULPTURE21PRECAST ARCH BENCHES22THE RESORT PARKWAYLANDSCAPE PLAN1PERSONAL SHADE PODS @ MODULAR MODERN3OM I TART SCULPTURE @ GARDEN LOOP466CONSTRUCTEDCONSTRUCTED ALL LINES LOCATED AT MIDDLE OR TOP OF SLOPE. ANY LINES LOCATED AT BOTTOM OF SLOPE WHEN ADJACENT TO A NON-GRADED ALL LINES WITHIN FRONT YARD OR SLOPE LESS THAN 3:1. ALL LINES LOCATED ADJACENT TO CURB OR SIDEWALK. ALL LINES LOCATED AT THE BOTTOM OF SLOPE WHEN ADJACENT TO A GRADED ALL LATERAL NON-PRESSURE LINES ARE TO BE INSTALLED AS FOLLOWS: ALL PRESSURE MAINLINES ARE TO BE BURIED PER THE SPECIFICATIONS HEREIN. CONTRACTING OFFICER PRIOR TO ANY MAJOR CHANGE(S) RESULTING IN ORDER TO GUARANTEE 100% COVERAGE. CONTRACTOR TO CONTACT THE THE IRRIGATION CONTRACTOR IS TO ADJUST HEAD LOCATIONS IN THE FIELD IN UNDER PAVING SHALL BE SCH 40 PVC AND INSTALLED 24" DEEP. ALL MAINLINE UNDER PAVING SHALL BE INSTALLED 24" DEEP. ALL LATERAL LINES MINIMUM PRESSURE AND MAXIMUM GALLONS REQUIRED NOTIFY CONTRACTING OFFICER IF PRESSURE IS NOT AS NOTED OR THE REQUIRED BEFORE INSTALLING THE SYSTEM, CHECK POINT OF CONNECTION AND IMMEDIATELY AND A MAXIMUM DEMAND AT THE POINT OF CONNECTION, AS NOTED ON THE PLAN. THE SPRINKLER SYSTEM DESIGN IS BASED ON A MINIMUM OPERATIONAL PRESSURE NOT PERFORMED, THE CONTRACTOR MUST ASSUME FULL RESPONSIBILITY FOR ANY CONTRACTING OFFICER. IN THE EVENT THAT THIS NOTIFICATION IS GRADE DIFFERENCES EXIST AND SHOULD BE BROUGHT TO THE ATTENTION OF THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT UNKNOWN OBSTRUCTIONS OR DO NOT WILLFULLY INSTALL THE SPRINKLER SYSTEM AS INDICATED ON THE PRESSURE COMPENSATING SCREENS WHEN RADIUS IS REDUCED MORE THAN FIFTY THIS SYSTEM IS DIAGRAMMATIC. ALL PIPE, VALVES, ETC. SHOWN WITHIN PAVED AREAS ARE FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS AND JOINT TRENCHES WHEREVER POSSIBLE. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL SPRINKLER HEADS FOR OPTIMUM PERFORMANCE AND PREVENT OVERSPRAY ONTO WALKS AND ROADWAYS AS MUCH AS POSSIBLE. THIS SHALL INCLUDE SELECTING THE BEST DEGREE OF ARC TO FIT THE EXISTING SITE CONDITIONS. CONTRACTOR TO USE LATERAL LINES INSTALLED ON-GRADE : OR OPEN SPACE AREA ONLY. ALL LINES LOCATED WITHIN RIGHT-OF-WAY. PAD, BENCH, CURB OR RIGHT-OF-WAY. PIPE INSTALLATION LATERAL LINES BURIED PER SPECIFICATIONS : ADDITIONAL COST TO THE OWNER. SYSTEM COVERAGE GALLONS PER MINUTE IS NOT AVAILABLE. WATER LINE UNDER PAVING IRRIGATION NOTES REVISIONS REQUIRED. SWING JOINTS FIELD CONDITIONS PERCENT (50%). DIAGRAMMATIC PLAN SPRINKLER ADJUSTMENT REQUIRED INSTALL NECESSARY CHECK VALVE IN HEADS THAT EXHIBIT TENDENCIES FOR LOW HEAD DRAINAGE. INSTALL ALL HEADS WITH DOUBLE OR TRIPLE SWING JOINTS, USING STREET ELLS, AS PER DETAIL. MFG IRRIGATION LEGEND SYMBOL MODEL NO.DESCRIPTION GPM PSI (PURPLE) PVC SCH 40 LATERAL LINE- 12" COVER IN PLANTING AREAS, (PURPLE) MAINLINE - INSTALL 18" COVER IN PLANTING AREAS, 24" COVER UNDER PAVING - 24" COVER UNDER PAVING. - SIZES INDICATED. SIZES INDICATED. RAINBIRD EPB-CP-NP-HAN-PRS-D REMOTE CONTROL VALVE - SIZES INDICATED. AUTOMATIC CONTROLLER LOCATION - SEE PLAN 1 1/2" WATER METER - SEE C.E. PLANS FOR LOCATION RAINBIRD 44-NP ACME 1" QUICK COUPLER WITH ACME THREAD, LOCKING (PURPLE) CAP. MAINLINES (PRESSURIZED) 2 INCH AND SMALLER SHALL BE SCHEDULE 40 SOLVENT-WELD P.V.C.. MAINLINES (PRESSURIZED) 2 1/2 INCH THROUGH 3 INCH SHALL BE CLASS 315 SOLVENT-WELD P.V.C., WITH THRUST BLOCKS PER DETAIL HI-FLOW SHUT OFF SENSOR AND RELAY TO CONTROLLER (INCLUDED WITH CONTROLLER SPEC) PVC SCH 40 WIRE SLEEVE - SIZE AND LOCATION PER CONTRACTOR SLEEVES UNDER ANY PAVING THAT EXCEEDS 4' WIDE. PVC SCH 40 MAIN AND LATERAL LINE SLEEVE 2x DIA. OF PIPE. - PROVIDE RAINBIRD (2) RWS-B-C-1401 TREE BUBBLER HEAD 30.25 (.5) AIR REFLIEF VALVE ASSEMBLY - RAINBIRD AR VALVE KIT - LOCATE AT HIGHEST POINT OF EACH SYSTEM FLUSH VALVE ASSEMBLY - RAINBIRD MDCFPCAP (FLUSH CAP-PURPLE) & MDCF COUP (COUPLING) 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 INDICATES STATION NUMBER INDICATES CONTROLLER INDICATES VALVE SIZE INDICATES GPM INDICATES WATER REQUIREMENT INDICATES HYDROZONE AREA RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RECYCLED WARNING SIGN -SEE DETAIL 'RECYCLED WATER SIGNAGE', SHEET L-20 RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD XCZ-100-PRBR CONTROL ZONE KIT - REMOTE CONTROL VALVE FOR DRIP SYSTEMS .3-20 GPM IRRIGATIONNOTES & LEGENDNOTE:SEE IRRIGATION SYSTEM INFORMATION FOR INDIVIDUAL VALVE PRECIPITATION RATES AND OPERATING PSI AS REQUIRED BY CODE. Irrigation System Maintenance Procedures While the system is designed to operate automatically, a regular maintenance schedule is necessary to prevent and address failures in the system as well as ensure that the system operates in a manner that meets or exceeds the MAWA values provided. Any broken or malfunctioning irrigation system components should be replaced with the same components, or an equal or superior equivalent. Upon completion of the project, the following measures should be performed by property management at intervals noted below: Weekly: During weekly landscape maintenance operations, the maintenance personnel should look for signs of runoff, erosion, and plant die off due to irrigation system failures. If issues are detected, they should be brought to the attention of the maintenance supervisor and property management for timely correction. All overhead spray heads shall be inspected to ensure clear operation and in order to identify and repair any damaged equipment. Monthly: All irrigation and master valves shall be visually inspected by a property management representative while the valve is under operating conditions. All control valves and filters should be visually inspected and cleaned as required and in accordance with manufactures specifications. All leaks shall be promptly reported to a landscape maintenance representative so that the valve may be repaired or replaced in a timely fashion with the minimum amount of leaking water exposed to open air. All Root Watering Systems are to be visually inspected to insure that all locking grates are being reasonably kept free of debris. All grates that are not kept reasonably free of debris are to be reported to a landscape maintenance representative. All Root Watering Systems that have their locking grates damaged or missing are to be reported to a landscape maintenance representative so that the locking grate may be repaired or replaced in a timely fashion. MAINTENANCE LOG Keep a log of all inspections and maintenance performance on the irrigation system (Updated copy to be provided to Property Manager on a monthly basis) Overall Landscape Maintenance Procedures At a minimum, the following items should be addressed on a regular basis as required per city code: Weekly Pruning, weeding and maintenance of turf areas should be done on a weekly basis Monthly Dead, dying and diseased vegetation should be replaced with equivalent plant material w/ similar hydrozone requirements, provided that the replaced vegetation does not result in mixing higher water use plants with low water use plants in the same hydrozone. Invasive plant species should be eradicated as required. Plant material should be maintained in order to avoid obstruction of motorists views. Annually Mulch should be replenished in order to maintain appropriate soil moisture levels. Soil amendments consistent with the agronomic soils report for this project should be applied in the manner prescribed in order to support and maintain healthy plant growth. Lawns should be fertilized in a manner consistent with best management practices 01/31/18 COMPLIANCE STATEMENT SLEEVING FOR ALL LATERAL LINE AND MAINLINE UNDER ALL PAVING SURFACES THAT EXCEED 4' WIDE. NOTE: LATERAL SIZE IS SHOWN AT EACH VALVE EXIT. THIS LEGEND TO BE USED FOR LATERAL LINE PIPE 14-231 1/4" 1 1/2" 2" NOTE: CONTRACTOR IS REQUIRED TO PROVIDE 24-34 35-45 3/4" 1" INSTALLATION. ALL MAINLINE TO BE SIZED AS PIPE SIZING / SLEEVING PIPE SIZE INDICATED ON PLAN GPM's 9-14 1-8 RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. PRECIP 1.0"/HR .43"/HR .43"/HR .43"/HR .43"/HR DRIP IRRIGATION NOTES THE CONTRACTOR WILL NEED TO FIELD LOCATE THE AIR RELIEF VALVES AT THE HIGHEST LOCATIONS ON EACH DRIP LINE SYSTEM. AT THE EXTREME END POINT OF EVERY DRIP LINE SYSTEMS, THE CONTRACTOR SHALL INSTALL A FLUSH VALVE ASSEMBLY (SEE DETAIL) & A NETAFIM 10-F-01PRESSURE INDICATOR. FOR TURF AREA, LOCATE THE INDICATOR WITHIN THE FLUSH VALVE BOX. CONTRACTOR TO EVALUATE THE PRECIPITATION RATES OF DRIP LINE AGAINST SOIL TYPE/ INFILTRATION RATE ON REQUIRED SOIL REPORT. ANY NECESSARY EQUIPMENT CHANGES SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT FOR FURTHER DIRECTION 1 1/2" FEBCO 825-Y-BV REDUCED PRESSURE BACKFLOW-INSTALL PARALLEL TO STREET RD-12-P30-S-NP-HE-VAN-15-F RD-12-P30-S-NP-HE-VAN-15-H RAINBIRD RAINBIRD FULL SPRAY HEAD HALF SPRAY HEAD 3.70 3015' 1.85 30 RADIUS 1.58"/HR 1.58"/HR MP ROTATOR NOTES: - ALL HEADS TO BE PROVIDED WITH FIELD INSTALLED RECLAIMED WATER IDENTIFICATION CAP WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE 112" SUPERIOR MODEL 3200150-RW BRASS NORMALLY CLOSED MASTER VALVE W/ PURPLE HANDLE COVER-PROVIDE MASTER VALVE RELAY TO CONTROLLER 1 12" WILKINS SXL SERIES WYE STRAINER 1 12" WILKINS 500 HR SERIES PRESSURE REGULATOR 15' POT IRRIGATION LOCATIONS - SEE POT IRRIGATION DETAILS PULL BOX LOCATION - SEE NOTES ON PLAN THE RESORT PARKWAY LANDSCAPE PLAN 1 (EXISTING) 2 "SUPERIOR MODEL 3200-200-RW BRASS NORMALLY CLOSED MASTER VALVE W/ PURPLE HANDLE COVER (EXISTING) 2" RAINBIRD FS200B HI-FLOW SHUT OFF SENSOR (EXISTING) WATER METER - REFER TO CIVIL PLAN (EXISTING) AUTOMATIC CONTROLLER LOCATION - SEE NOTE. (EXISTING) 2" FEBCO 825Y REDUCED PRESSURE BACKFLOW PREVENTER WIRE PULL BOX LOCATION INSTALLED PER SEPARATE LANDSCAPE PACKAGES PREPARED BY SITESCAPES.SEE 4TH & 6TH STREETAT THE RESORTLANDSCAPE PLANSPREPARED BYSITESCAPES(EXISTING) 2" WILKINS SXL SERIES WYE STRAINER (EXISTING) 2-1/2" WILKINS 500 HR SERIES PRESSURE REGULATOR - SIZE PER PLAN (EXISTING) NELSON 7645 WITH ACME THREAD, LOCKING (PURPLE) CAP. (EXISTING) WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE MAINLINE INSTALLED PER SEPARATE LANDSCAPE PACKAGES PREPARED BY SITESCAPES. 4 4 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 IRRIGATION DETAILS1 PC DRIP LINE FOR SUBSURFACE INSTALLATION NETAFIM 10-F-01 (INCLUDES) INSTALL A NETAFIM 10-F-01 PRESSURE INDICATOR AT THE EXTREME END OF EACH DRIP VALVE. FOR TURF AREAS, LOCATE THE INDICATOR WITHIN THE FLUSH VALVE BOX. PVC SCH 40 SLIP TEE 2 PC DRIP LINE CONNECTIONS 4 FLUSH VALVE ASSEMBLY 5 DRIP PRESSURE INDICATOR 6 POT DETAIL 8 VALVE BOX INSTALLATION USE SPEAR DS-100 WIRE CONNECTOR WITH GEL WATERPROOF CONNECTOR OR APPROVED EQUAL. CONNECTOR NOTE: 7 WIRE CONNECTOR 9 CONTROL ZONE KIT 3 AIR RELIEF ASSEMBLY THE RESORT PARKWAY LANDSCAPE PLAN 1 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 IRRIGATION DETAILSFEBCO 825-Y THE RESORT PARKWAY LANDSCAPE PLAN 1 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 IRRIGATION DETAILSTHE RESORT PARKWAY LANDSCAPE PLAN 1 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 FOR THE ESTABLISHMENT PERIOD, THE CONTRACTOR IS TO SELECT THE APPROPRIATE 90 DAY PERIOD (I.E. MAY,JUNE,JULY) FROM THE ANNUAL SCHEDULE PROVIDED NOTE: RUN TIMES COMPLY WITH RECLAIMED WATERING WINDOW REQUIREMENTS PSI 3.3 30.0 (5.0 max.) ITEM FLOW METER WATER METER BACKFLOW DEVICE 1 1/2" SIZE 1 1/2" 1 1/2" 1" IRRIGATION HEAD PRESSURE REMOTE CONTROL VALVE LATERAL LINE LOSS IRRIGATION WORST CONDITION 'A' +9.5 PSIRESIDUAL PSI 1 1/2"MASTER VALVE SCH 315 MAINLINE LNFT 2,680'2 1/2" 95.0 PSIAVAILABLE PRESSURE A - 40 G.P.M. MAX. (UP TO (4) VALVES RUN SIMUL.) VARIES SYSTEM MAXIMUM DEMAND REMOTE CONTROL VALVE # ELEVATION OF HIGHEST HEAD PRESSURE AVAILABLE @ WATER METER WATER METER LOW - 95 PSI, HIGH - 105 PSI 2"GATE VALVE FITTING LOSS (10%) 12.0 1.2 2.0 2.0 14.2 4.2 4.6 SHANE STEVENS @ ENG. CVWD 909)987-2591 80.5 PSITOTAL SYSTEM LOSS 1 1/2" 90.0 PSISET PRESSURE REGULATOR @ IRRIGATION DETAILS,CALCS. & SCHEDULESCONTROLLER 'A1' & 'A2' CALCULATIONS AND SCHEDULES ELEVATION CHANGE (+0')- PRESSURE REGULATOR1 1/2"1.0 WYE STRAINER1 1/2"1.0 THE RESORT PARKWAY LANDSCAPE PLAN 1 CONTROLLER 'C' CALCULATIONS AND SCHEDULES FOR IRRIGATION IN THIS PACKAGE PSI 1.8 30.0 (5.0 max.) ITEM FLOW METER WATER METER BACKFLOW DEVICE 2" SIZE 2" 2" 1" IRRIGATION HEAD PRESSURE REMOTE CONTROL VALVE LATERAL LINE LOSS IRRIGATION WORST CONDITION 'C' +9.2 PSIRESIDUAL PSI 2"MASTER VALVE SCH 315 MAINLINE LNFT 230'3" 95.0 PSIAVAILABLE PRESSURE C - 15 G.P.M. C9 SYSTEM MAXIMUM DEMAND REMOTE CONTROL VALVE # ELEVATION OF HIGHEST HEAD PRESSURE AVAILABLE @ WATER METER WATER METER LOW - 95 PSI, HIGH - 105 PSI SIZE 1" 3"GATE VALVE FITTING LOSS (10%) 12.0 1.2 1.0 2.0 0.1 2.9 2.8 SHANE STEVENS @ ENG. CVWD 909)987-2591 60.8 PSITOTAL SYSTEM LOSS 2" 70.0 PSISET PRESSURE REGULATOR @ ELEVATION CHANGE (+0')- PRESSURE REGULATOR2 1/2"1.0 WYE STRAINER2"1.0 4 4 37+0038+00 36+00 35+00 34+00 33+00 KID'S PLAYAREAFITNESSSPECIALTYFITNESSELEC 1WOMENFITNESSEQUIPMENTSTORAGEPOOLEQUIPMENTPOOLSHOWERINVERTERROOMUNISEXUPFX4040 TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTUP 07AW/Hroll up roll upFX4040TYPEWIDTHHEIGHT FX4040 TYPEWIDTH HEIGHT FX4040 TYPEWIDTHHEIGHT FX 4040 TYPEWIDTH HEIGHT 65" TV65" TV65" TVCATVCATVCATVCATVTELTEL6 T H S T R E E TTHE RESORT PARKWAY 32+00 31+00 30+00 29+ 0 0 28 + 0 0 2 7 + 0 0A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cRETAILLinear32Linear33LW35Linear34CONTEMPORARY MAIN STREETMAIN STREETCONTEMPORARY TEL TEL CATVCATVTHE RESOR T P A R K W A Y MATCHLINE - SEE SHEET BELOWMATCHLINE - SEE ABOVEIRRIGATION PLANMATCHLINE - SEE SHEET L-22 SEE SHEETS L-16 TO L-19 FOR IRRIGATION NOTES, LEGEND & DETAILS SLEEVING FOR ALL LATERAL LINE AND MAINLINE UNDER ALL PAVING SURFACES THAT EXCEED 4' WIDE. NOTE: LATERAL SIZE IS SHOWN AT EACH VALVE EXIT. THIS LEGEND TO BE USED FOR LATERAL LINE PIPE 14-231 1/4" 1 1/2" 2" NOTE: CONTRACTOR IS REQUIRED TO PROVIDE 24-34 35-45 3/4" 1" INSTALLATION. ALL MAINLINE TO BE SIZED AS PIPE SIZING / SLEEVING PIPE SIZE INDICATED ON PLAN GPM's 9-14 1-8 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 MFG IRRIGATION LEGEND SYMBOL MODEL NO.DESCRIPTION GPM PSI (PURPLE) PVC SCH 40 LATERAL LINE- 12" COVER IN PLANTING AREAS, (PURPLE) MAINLINE - INSTALL 18" COVER IN PLANTING AREAS, 24" COVER UNDER PAVING - 24" COVER UNDER PAVING. - SIZES INDICATED. SIZES INDICATED. RAINBIRD EPB-CP-NP-HAN-PRS-D REMOTE CONTROL VALVE - SIZES INDICATED. AUTOMATIC CONTROLLER LOCATION - SEE PLAN 1 1/2" WATER METER - SEE C.E. PLANS FOR LOCATION NELSON 7645 WITH ACME THREAD, LOCKING (PURPLE) CAP. MAINLINES (PRESSURIZED) 2 INCH AND SMALLER SHALL BE SCHEDULE 40 SOLVENT-WELD P.V.C.. MAINLINES (PRESSURIZED) 2 1/2 INCH THROUGH 3 INCH SHALL BE CLASS 315 SOLVENT-WELD P.V.C., WITH THRUST BLOCKS PER DETAIL HI-FLOW SHUT OFF SENSOR AND RELAY TO CONTROLLER (INCLUDED WITH CONTROLLER SPEC) PVC SCH 40 WIRE SLEEVE - SIZE AND LOCATION PER CONTRACTOR SLEEVES UNDER ANY PAVING THAT EXCEEDS 4' WIDE. PVC SCH 40 MAIN AND LATERAL LINE SLEEVE 2x DIA. OF PIPE. - PROVIDE RAINBIRD (2) RWS-B-C-1401 TREE BUBBLER HEAD 30.25 (.5) AIR REFLIEF VALVE ASSEMBLY - RAINBIRD AR VALVE KIT - LOCATE AT HIGHEST POINT OF EACH SYSTEM FLUSH VALVE ASSEMBLY - RAINBIRD MDCFPCAP (FLUSH CAP-PURPLE) & MDCF COUP (COUPLING) INDICATES STATION NUMBER INDICATES CONTROLLER INDICATES VALVE SIZE INDICATES GPM INDICATES WATER REQUIREMENT INDICATES HYDROZONE AREA RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RECYCLED WARNING SIGN -SEE DETAIL 'RECYCLED WATER SIGNAGE', SHEET L-20 RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD XCZ-100-PRBR CONTROL ZONE KIT - REMOTE CONTROL VALVE FOR DRIP SYSTEMS .3-20 GPM NOTE:SEE IRRIGATION SYSTEM INFORMATION FOR INDIVIDUAL VALVE PRECIPITATION RATES AND OPERATING PSI AS REQUIRED BY CODE. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. PRECIP 1.0"/HR .43"/HR .43"/HR .43"/HR .43"/HR DRIP IRRIGATION NOTES THE CONTRACTOR WILL NEED TO FIELD LOCATE THE AIR RELIEF VALVES AT THE HIGHEST LOCATIONS ON EACH DRIP LINE SYSTEM. AT THE EXTREME END POINT OF EVERY DRIP LINE SYSTEMS, THE CONTRACTOR SHALL INSTALL A FLUSH VALVE ASSEMBLY (SEE DETAIL) & A NETAFIM 10-F-01PRESSURE INDICATOR. FOR TURF AREA, LOCATE THE INDICATOR WITHIN THE FLUSH VALVE BOX. CONTRACTOR TO EVALUATE THE PRECIPITATION RATES OF DRIP LINE AGAINST SOIL TYPE/ INFILTRATION RATE ON REQUIRED SOIL REPORT. ANY NECESSARY EQUIPMENT CHANGES SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT FOR FURTHER DIRECTION 1 1/2" FEBCO 825-Y-BV REDUCED PRESSURE BACKFLOW-INSTALL PARALLEL TO STREET RD-12-P30-S-NP-HE-VAN-15-F RD-12-P30-S-NP-HE-VAN-15-H RAINBIRD RAINBIRD FULL SPRAY HEAD HALF SPRAY HEAD 3.70 3015' 1.85 30 RADIUS 1.58"/HR 1.58"/HR MP ROTATOR NOTES: - ALL HEADS TO BE PROVIDED WITH FIELD INSTALLED RECLAIMED WATER IDENTIFICATION CAP WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE 112" SUPERIOR MODEL 3200150-RW BRASS NORMALLY CLOSED MASTER VALVE W/ PURPLE HANDLE COVER-PROVIDE MASTER VALVE RELAY TO CONTROLLER 1 12" WILKINS SXL SERIES WYE STRAINER 1 12" WILKINS 500 HR SERIES PRESSURE REGULATOR 15' POT IRRIGATION LOCATIONS - SEE POT IRRIGATION DETAILS PULL BOX LOCATION - SEE NOTES ON PLAN THE RESORT PARKWAY LANDSCAPE PLAN 1 INSTALLATION NOTE: - CONTRACTOR TO RUN (9) REMAINING CONTROL WIRES AND (1) COMMON WIRE (LABELED) FROM CONTROLLER 'A1' TO THIS LOCATION FOR 6TH STREET LANDSCAPE PER SEPARATE LANDSCAPE PLANS PREPARED BY SITESCAPES. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. - CONTRACTOR TO CAP MAINLINE AT THIS LOCATION FOR 6TH STREET LANDSCAPE PER SEPARATE LANDSCAPE PLANS PREPARED BY SITESCAPES. LOCATE BENEATH APPROVED LABELED VALVE BOX. INSTALLATION NOTE: - CONTRACTOR TO RUN (5) REMAINING CONTROL WIRES AND (1) COMMON WIRE (LABELED) FROM CONTROLLER 'A1' TO THIS LOCATION FOR 6TH STREET LANDSCAPE PER SEPARATE LANDSCAPE PLANS PREPARED BY SITESCAPES. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. - CONTRACTOR TO CAP MAINLINE AT THIS LOCATION FOR 6TH STREET LANDSCAPE PER SEPARATE LANDSCAPE PLANS PREPARED BY SITESCAPES. LOCATE BENEATH APPROVED LABELED VALVE BOX. 4 4 5 2 7 + 0 0 2 6 + 0 0 2 5 + 0 0 2 4 + 0 0 2 3 + 0 0 2 2 + 0 0 2 1 + 0 0 2 0 + 0 011+00A2.7cRETAILRETAILRETAILRE T A I LLW35LW36LW75 LW76Linear79CATVCATV TEL T H E R E S O R T P A R KW A Y 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 IRRIGATION PLANMATCHLINE - SEE SHEET L-21 MATCHLINE - SEE SHEET L-23 POINT OF CONNECTION 'A' (NEW, NON-POTABLE WATER SOURCE) SEE SHEETS L-16 TO L-19 FOR IRRIGATION NOTES, LEGEND & DETAILS SLEEVING FOR ALL LATERAL LINE AND MAINLINE UNDER ALL PAVING SURFACES THAT EXCEED 4' WIDE. NOTE: LATERAL SIZE IS SHOWN AT EACH VALVE EXIT. THIS LEGEND TO BE USED FOR LATERAL LINE PIPE 14-231 1/4" 1 1/2" 2" NOTE: CONTRACTOR IS REQUIRED TO PROVIDE 24-34 35-45 3/4" 1" INSTALLATION. ALL MAINLINE TO BE SIZED AS PIPE SIZING / SLEEVING PIPE SIZE INDICATED ON PLAN GPM's 9-14 1-8 CONTROLLER 'A1' & 'A2' LOCATION MFG IRRIGATION LEGEND SYMBOL MODEL NO.DESCRIPTION GPM PSI (PURPLE) PVC SCH 40 LATERAL LINE- 12" COVER IN PLANTING AREAS, (PURPLE) MAINLINE - INSTALL 18" COVER IN PLANTING AREAS, 24" COVER UNDER PAVING - 24" COVER UNDER PAVING. - SIZES INDICATED. SIZES INDICATED. RAINBIRD EPB-CP-NP-HAN-PRS-D REMOTE CONTROL VALVE - SIZES INDICATED. AUTOMATIC CONTROLLER LOCATION - SEE PLAN 1 1/2" WATER METER - SEE C.E. PLANS FOR LOCATION NELSON 7645 WITH ACME THREAD, LOCKING (PURPLE) CAP. MAINLINES (PRESSURIZED) 2 INCH AND SMALLER SHALL BE SCHEDULE 40 SOLVENT-WELD P.V.C.. MAINLINES (PRESSURIZED) 2 1/2 INCH THROUGH 3 INCH SHALL BE CLASS 315 SOLVENT-WELD P.V.C., WITH THRUST BLOCKS PER DETAIL HI-FLOW SHUT OFF SENSOR AND RELAY TO CONTROLLER (INCLUDED WITH CONTROLLER SPEC) PVC SCH 40 WIRE SLEEVE - SIZE AND LOCATION PER CONTRACTOR SLEEVES UNDER ANY PAVING THAT EXCEEDS 4' WIDE. PVC SCH 40 MAIN AND LATERAL LINE SLEEVE 2x DIA. OF PIPE. - PROVIDE RAINBIRD (2) RWS-B-C-1401 TREE BUBBLER HEAD 30.25 (.5) AIR REFLIEF VALVE ASSEMBLY - RAINBIRD AR VALVE KIT - LOCATE AT HIGHEST POINT OF EACH SYSTEM FLUSH VALVE ASSEMBLY - RAINBIRD MDCFPCAP (FLUSH CAP-PURPLE) & MDCF COUP (COUPLING) INDICATES STATION NUMBER INDICATES CONTROLLER INDICATES VALVE SIZE INDICATES GPM INDICATES WATER REQUIREMENT INDICATES HYDROZONE AREA RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RECYCLED WARNING SIGN -SEE DETAIL 'RECYCLED WATER SIGNAGE', SHEET L-20 RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD XCZ-100-PRBR CONTROL ZONE KIT - REMOTE CONTROL VALVE FOR DRIP SYSTEMS .3-20 GPM NOTE:SEE IRRIGATION SYSTEM INFORMATION FOR INDIVIDUAL VALVE PRECIPITATION RATES AND OPERATING PSI AS REQUIRED BY CODE. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. PRECIP 1.0"/HR .43"/HR .43"/HR .43"/HR .43"/HR DRIP IRRIGATION NOTES THE CONTRACTOR WILL NEED TO FIELD LOCATE THE AIR RELIEF VALVES AT THE HIGHEST LOCATIONS ON EACH DRIP LINE SYSTEM. AT THE EXTREME END POINT OF EVERY DRIP LINE SYSTEMS, THE CONTRACTOR SHALL INSTALL A FLUSH VALVE ASSEMBLY (SEE DETAIL) & A NETAFIM 10-F-01PRESSURE INDICATOR. FOR TURF AREA, LOCATE THE INDICATOR WITHIN THE FLUSH VALVE BOX. CONTRACTOR TO EVALUATE THE PRECIPITATION RATES OF DRIP LINE AGAINST SOIL TYPE/ INFILTRATION RATE ON REQUIRED SOIL REPORT. ANY NECESSARY EQUIPMENT CHANGES SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT FOR FURTHER DIRECTION 1 1/2" FEBCO 825-Y-BV REDUCED PRESSURE BACKFLOW-INSTALL PARALLEL TO STREET RD-12-P30-S-NP-HE-VAN-15-F RD-12-P30-S-NP-HE-VAN-15-H RAINBIRD RAINBIRD FULL SPRAY HEAD HALF SPRAY HEAD 3.70 3015' 1.85 30 RADIUS 1.58"/HR 1.58"/HR MP ROTATOR NOTES: - ALL HEADS TO BE PROVIDED WITH FIELD INSTALLED RECLAIMED WATER IDENTIFICATION CAP WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE 112" SUPERIOR MODEL 3200150-RW BRASS NORMALLY CLOSED MASTER VALVE W/ PURPLE HANDLE COVER-PROVIDE MASTER VALVE RELAY TO CONTROLLER 1 12" WILKINS SXL SERIES WYE STRAINER 1 12" WILKINS 500 HR SERIES PRESSURE REGULATOR 15' POT IRRIGATION LOCATIONS - SEE POT IRRIGATION DETAILS PULL BOX LOCATION - SEE NOTES ON PLAN THE RESORT PARKWAY LANDSCAPE PLAN 1 INSTALLATION NOTE: - CONTRACTOR TO RUN (2) REMAINING CONTROL WIRES AND (1) COMMON WIRE (LABELED) FROM CONTROLLER 'A2' TO THIS LOCATION. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. INSTALLATION NOTE: - CONTRACTOR TO RUN (2) REMAINING CONTROL WIRES AND (1) COMMON WIRE (LABELED) FROM CONTROLLER 'A2' TO THIS LOCATION. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. 4 4 4 4 4 4 4 5 8 8 8 8 2 2 + 0 0 2 1 + 0 0 2 0 + 0 0 19 + 0 0 18 + 0 0 17+00 16+00 15+00A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cLinear79Linear81Linear91Linear92Linear104Linear111BUILDING BBUILDING CBUILDING DBUILDING E9-PLEX6-PLEX6-PLEX9-PLEX45° 15° 45° 45° 45° 45° 15° 45° 45° 45°45° 15° 45° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 15° 45°CATVCATVTEL T H E R E S O R T P A R K W A Y 14+00 13+00 12+00 11+00 B1.7cBUILDING A9-PLEXCATVCATVTELTHE RESORT PARKWAY 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 IRRIGATION PLANMATCHLINE - SEE SHEET L-22MATCHLINE - SEE ABOVEMATCHLINE - SEE BELOWSEE SHEETS L-16 TO L-19 FOR IRRIGATION NOTES, LEGEND & DETAILS SLEEVING FOR ALL LATERAL LINE AND MAINLINE UNDER ALL PAVING SURFACES THAT EXCEED 4' WIDE. NOTE: LATERAL SIZE IS SHOWN AT EACH VALVE EXIT. THIS LEGEND TO BE USED FOR LATERAL LINE PIPE 14-231 1/4" 1 1/2" 2" NOTE: CONTRACTOR IS REQUIRED TO PROVIDE 24-34 35-45 3/4" 1" INSTALLATION. ALL MAINLINE TO BE SIZED AS PIPE SIZING / SLEEVING PIPE SIZE INDICATED ON PLAN GPM's 9-14 1-8 MFG IRRIGATION LEGEND SYMBOL MODEL NO.DESCRIPTION GPM PSI RAINBIRD (2) RWS-B-C-1401 TREE BUBBLER HEAD 30.25 (.5) RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. PRECIP 1.0"/HR .43"/HR .43"/HR .43"/HR .43"/HR DRIP IRRIGATION NOTES THE CONTRACTOR WILL NEED TO FIELD LOCATE THE AIR RELIEF VALVES AT THE HIGHEST LOCATIONS ON EACH DRIP LINE SYSTEM. AT THE EXTREME END POINT OF EVERY DRIP LINE SYSTEMS, THE CONTRACTOR SHALL INSTALL A FLUSH VALVE ASSEMBLY (SEE DETAIL) & A NETAFIM 10-F-01PRESSURE INDICATOR. FOR TURF AREA, LOCATE THE INDICATOR WITHIN THE FLUSH VALVE BOX. CONTRACTOR TO EVALUATE THE PRECIPITATION RATES OF DRIP LINE AGAINST SOIL TYPE/ INFILTRATION RATE ON REQUIRED SOIL REPORT. ANY NECESSARY EQUIPMENT CHANGES SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT FOR FURTHER DIRECTION RD-12-P30-S-NP-HE-VAN-15-F RD-12-P30-S-NP-HE-VAN-15-H RAINBIRD RAINBIRD FULL SPRAY HEAD HALF SPRAY HEAD 3.70 3015' 1.85 30 RADIUS 1.58"/HR 1.58"/HR MP ROTATOR NOTES: - ALL HEADS TO BE PROVIDED WITH FIELD INSTALLED RECLAIMED WATER IDENTIFICATION CAP 15' (PURPLE) PVC SCH 40 LATERAL LINE- 12" COVER IN PLANTING AREAS, (PURPLE) MAINLINE - INSTALL 18" COVER IN PLANTING AREAS, 24" COVER UNDER PAVING - 24" COVER UNDER PAVING. - SIZES INDICATED. SIZES INDICATED. RAINBIRD EPB-CP-NP-HAN-PRS-D REMOTE CONTROL VALVE - SIZES INDICATED. AUTOMATIC CONTROLLER LOCATION - SEE PLAN 1 1/2" WATER METER - SEE C.E. PLANS FOR LOCATION NELSON 7645 WITH ACME THREAD, LOCKING (PURPLE) CAP. MAINLINES (PRESSURIZED) 2 INCH AND SMALLER SHALL BE SCHEDULE 40 SOLVENT-WELD P.V.C.. MAINLINES (PRESSURIZED) 2 1/2 INCH THROUGH 3 INCH SHALL BE CLASS 315 SOLVENT-WELD P.V.C., WITH THRUST BLOCKS PER DETAIL HI-FLOW SHUT OFF SENSOR AND RELAY TO CONTROLLER (INCLUDED WITH CONTROLLER SPEC) PVC SCH 40 WIRE SLEEVE - SIZE AND LOCATION PER CONTRACTOR SLEEVES UNDER ANY PAVING THAT EXCEEDS 4' WIDE. PVC SCH 40 MAIN AND LATERAL LINE SLEEVE 2x DIA. OF PIPE. - PROVIDE AIR REFLIEF VALVE ASSEMBLY - RAINBIRD AR VALVE KIT - LOCATE AT HIGHEST POINT OF EACH SYSTEM FLUSH VALVE ASSEMBLY - RAINBIRD MDCFPCAP (FLUSH CAP-PURPLE) & MDCF COUP (COUPLING) INDICATES STATION NUMBER INDICATES CONTROLLER INDICATES VALVE SIZE INDICATES GPM INDICATES WATER REQUIREMENT INDICATES HYDROZONE AREA RECYCLED WARNING SIGN -SEE DETAIL 'RECYCLED WATER SIGNAGE', SHEET L-20 RAINBIRD XCZ-100-PRBR CONTROL ZONE KIT - REMOTE CONTROL VALVE FOR DRIP SYSTEMS .3-20 GPM NOTE:SEE IRRIGATION SYSTEM INFORMATION FOR INDIVIDUAL VALVE PRECIPITATION RATES AND OPERATING PSI AS REQUIRED BY CODE. 1 1/2" FEBCO 825-Y-BV REDUCED PRESSURE BACKFLOW-INSTALL PARALLEL TO STREET WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE 112" SUPERIOR MODEL 3200150-RW BRASS NORMALLY CLOSED MASTER VALVE W/ PURPLE HANDLE COVER-PROVIDE MASTER VALVE RELAY TO CONTROLLER 1 12" WILKINS SXL SERIES WYE STRAINER 1 12" WILKINS 500 HR SERIES PRESSURE REGULATOR POT IRRIGATION LOCATIONS - SEE POT IRRIGATION DETAILS PULL BOX LOCATION - SEE NOTES ON PLAN INSTALLATION NOTE: - CONTRACTOR TO RUN (3) ADDITIONAL CONTROL WIRES AND (1) COMMON WIRE (LABELED) FROM CONTROLLER 'A2' TO THIS LOCATION FOR 4TH STREET LANDSCAPE PER SEPARATE LANDSCAPE PLANS PREPARED BY SITESCAPES. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. - CONTRACTOR TO CAP MAINLINE AT THIS LOCATION FOR 4TH STREET LANDSCAPE PER SEPARATE LANDSCAPE PLANS PREPARED BY SITESCAPES. LOCATE BENEATH APPROVED LABELED VALVE BOX. THE RESORT PARKWAY LANDSCAPE PLAN 1 INSTALLATION NOTE: - CONTRACTOR TO RUN (6) ADDITIONAL CONTROL WIRES AND (1) COMMON WIRE (LABELED) FROM CONTROLLER 'A2' TO THIS LOCATION FOR ADDITIONAL IRRIGATION SYSTEM AT 'LOT A' PER SEPARATE LANDSCAPE PLANS PREPARED BY ARCHITERRA DESIGN GROUP. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. - CONTRACTOR TO REFER TO 'LOT A' LANDSCAPE PLANS PREPARED BY ARCHITERRA DESIGN GROUP FOR LOCATION AND SIZE OF REMOTE CONTROL VALVES 'A2-25' TO 'A2-28'. - CONTRACTOR TO KEEP (2) REMAINING CONTROL WIRES AND (2) COMMON WIRE (LABELED) IN THE SAME LABELED VALVE BOX. PROVIDE 36" LOOP. 4 4 5 8 8 8 8 8 8 8 8 Jacaranda Crape Myrtle (White) London Plane Tree (res. to both) Tipu Coast Live Oak Italian Stone Pine Orchid Tree Chilean Mesquite Jacaranda mimosifolia Lagerstroemia hybrids ‘Natchez’ Platanus acerifolia 'Columbia' Tipuana tipu Quercus agrifolia Pinus pinea Bauhinia purpurea Prosopis chilensis "Thornless" BOTANICAL NAME COMMON NAMEKEYSYMBOL F J I H E D C B A Phoenix dactylifera Archontophoenix alexandrae Washingtonia robusta hybrid L M PALMS K King Palms Date Palm OliveOlea europaea Moreton Bay ChestnutCastanospermum australeG Mexican Fan Palm Hybrid SIZE COMMENTS QTY.WUCOLS 60" BOX STD.3 M REGION 3 GROUNDCOVER All shrub and groundcover areas shall be top dressed with a 2" layer of 38" crushed rock "California Gold" over smooth finish grade as mulch/bark substitute after all planting. Submit sample to landscape architect for approval prior to installation. 48" BOX 48" BOX 14X14 4 2 10 60" BOX 1 72" BOX 84" BOX 1 1 60" BOX 1 84" BOX 1 60" BOX 32" BOX 3 163 24" BOX 3 20' BTH 20' BTH 12 91 STD. STD. STD. STD. STD. STD. M M L L L L M L M L M L L 10,785 SQ. FT. Field Grown Premium Quality SKINNED DOUBLE TRUNK Pre-purchased by Owner (Field Grown) (Field Grown) * * To be selected by Landscape Architect. Species subject to change depending on availability. Size is a place holder also subject to availability may go smaller.* Agave ‘Blue Flame’Blue Flame Agave Dianella revoluta ‘DR5000’ Little Rev Flax Lily M Dianella tasmanica ‘Silver Streak’Silver Streak Flax Lily M L Hemerocallis ‘Dwarf Red’Day Lily M Ligustrum japonicum 'Texanum'Wax Leaf Privet M Rhaphiolepis indica ‘Clara’Dwarf Indian Hawthorne M Ruellia brittoniana Mexican petunia L Carex oshimensis Japanese Sedge M Senecio mandraliscae Blue Chalk Sticks L Trachelospermum jasminoides Star Jasmine M Buxus microphylla japonica Japanese Boxwood M BOTANICAL NAME COMMON NAME WUCOLSKEYSYMBOLSSIZEQTY. 1 7 8 10 12 13 15 5 16 17 4 A H Carissa grandiflora ‘Green Carpet’Natal Plum6 Lavandula dentata French Lavender L11 M 5G 15G 5G 1G @ 18" O.C. 15G 5G 5G 1G 1G 1G@ 24" O.C. 1G@ 30" O.C. 5G 5G 5G 2273 443 171 1580 160 83 20 435 410 624 78 12 230 Aloe striata Coral Aloe L35G455 Agave weberi Webers Century Plant L215G34 Furcraea foetida 'Mediopicata'Hemp L924" BOX 4 Rosa f. ‘Trumpeter’Trumpeter Rose M1469 ADDENDUM - PLANTING PLANTING LEGEND BOTANICAL NAME COMMON NAMEKEYSYMBOL ADDENDUM - TREE PLANTING LEGEND SIZE COMMENTS QTY.WUCOLS REGION 3 Tipu Texas Honey Tipuana tipu Prosopis glandulosa "Thornless"J E Washingtonia robusta hybridM PALMS Mexican Fan Palm Hybrid 48" BOX 4 32" BOX 36 20' BTH 20 STD. STD.L L MSKINNED ADDENDUM - PLANTING PLANTING LEGEND BOTANICAL NAME COMMON NAME WUCOLSKEYSYMBOLSSIZEQTY. Dianella revoluta ‘DR5000’ Little Rev Flax Lily M Carex oshimensis ‘Everlime’ Everlime Sedge M 7 5 Carissa grandiflora ‘Green Carpet’Natal Plum6 M 5G 1G 5G 145 537 360 4 PIT DRAIN DETAIL 6 TREE PLANTING LEGEND DOUBLE STAKED TREE (5G-24" BOX) 5 PALM TREE PLANTING POT PLANTING DETAIL SHRUB PLANTING LEGEND 21 LINEAR ROOT BARRIER 30" BOX1 GALLON 5 GALLON 24" BOX 15 GALLON Indicates species 36" BOX Indicates quantity 42" BOX SIZING LEGEND 48" BOX B.T.H. as noted. 54" BOX Indicates palm 60" BOX FOR FOURTEEN (14) CONSECUTIVE DAYS UNTIL WEED SEEDS HAVE GERMINATED. CEASE TREE PLACEMENT NOTES: ALL INTERNAL TREES SHALL BE LOCATED OR ADJUSTED IN ACCORDANCE TO THE FOLLOWING REQUIREMENTS: * A MIN. OF 5' FROM ANY BUILDING FACE OR ROOF EVE. * A MIN. OF 4' FROM ALL HARDSCAPE INCLUDING CURBS, WALKS AND WALLS * A MIN. OF 2' FROM EITHER SIDE OF TURF / SHRUB LINE * A MIN. OF 3' FROM WATER METERS, LIGHTS, OR ANY OTHER UTILITIES * A MIN. OF 8' FROM ELECTRICAL TRANSFORMERS * A MIN. OF 2' FROM DRAIN LINE PIPES (ITALIAN CYPRESS & STRELITZIA ARE EXCLUDED FROM THE ABOVE RESTRICTIONS.) TREES ARE NOT TO BE PLACED WITHIN BOTTOM OF SWALE LINES OR WHERE THEY COULD INTERFERE W/ SITE DRAINAGE SHRUB PLACEMENT NOTES: *HOLD ALL SHRUBS A MIN. OF 30" AWAY FROM STUCCO BUILDING WALLS AS MEASURED FROM THE CENTER OF THE ROOTBALL TO FACE-OF-WALL. *MOVE ALL SHRUBS AWAY FROM BOTTOM OF SWALES. *HOLD ALL GROUNDCOVER 18" AWAY FROM FACE-OF-WALL NOTE: BLOCK WALLS ARE EXCLUDED FOR THE ABOVE CRITERIA 1000 SF: (THESE RATES ARE FOR BID PURPOSES ONLY, ACTUAL RATES TO CORRESPOND TO MACHINE ROTOTILL THE FOLLOWING AMENDMENTS INTO THE SOIL AT RATES INDICATED PER AGRICULTURAL SUITABILITY AND FERTILITY (PREPARED BY A CALIFORNIA ASSOCIATION OF PRIOR TO SOIL PREPARATION, THE CONTRACTOR SHALL FURNISH A COPY OF THE SOIL TEST FOR AFTER ALL SOIL HAS BEEN IMPORTED TO THE SITE AND ROUGH GRADING COMPLETED BUT AND SEASON OF APPLICATION. DO NOT USE MATERIAL OR METHOD THAT WOULD ADVERSELY AN APPROVED LICENSED PEST CONTROL ADVISOR TO ENSURE COMPATIBILITY WITH CHEMICAL REPEATED. THE TYPE OF WEEDS THAT EXIST SHOULD BE IDENTIFIED AND COORDINATED WITH RESIDUAL WEEDS (I.E. BERMUDA) SHOULD PERSIST ERADICATION PROCEDURE SHOULD BE FOR A MINIMUM DEPTH OF 1/4"INCH BELOW THE SURFACE OF THE SOIL. IF STUBBORN AND HERBICIDE TO ERADICATE GERMINATED WEEDS. LET THE WEEDS DIE WITHOUT IRRIGATION 4 CU. YDS NITROGEN STABILIZED SAWDUST UPON REVIEWING THE SOILS REPORT THE CONTRACTING OFFICER MAY MAKE SPECIES AGRICULTURAL LABORATORIES MEMBER) TO THE CONTRACTING OFFICER. EFFECT NEW PLANTINGS, SLOPE STABILIZATION OR HYDROSEEDING. WATERING FOR THREE (3) DAYS. SPRAY A NON-SELECTIVE, NON-RESIDUAL, SYSTEMIC ALL TREES WITHIN 5 FEET OF ANY PERMANENT HARDSCAPE ELEMENT SUCH AS CONCRETE WALKS, WALLS OR BUILDINGS SHALL BE PLANTED WITH AN APPROPRIATE SIZED LINEAR ROOT BARRIER (SEE DETAIL ON THIS SHEET). TOP DRESSING NOTE SUBSTITUTIONS TO THE PLANT LIST. CONTRACTOR'S SOILS REPORT). 125 LBS STANDARD FERTILIZER DEEP ROOT BARRIERS 150 LBS. GYPSUM SOIL PREPARATION SOIL TEST ACRE AND PER MANUFACTURER'S SPECIFICATIONS. WATER ALL AREAS FOUR (4) TIMES DAILY ABATEMENT PROGRAM BY APPLYING: 100 POUNDS OF A COMMERCIAL FERTILIZER, 46-0-0, PER COMPLETION OF SOIL PREPARATION AND PLANTING OF ALL SPECIMEN TREES, BEGIN WEED WHERE PERENNIAL WEEDS EXIST ON SITE AT THE BEGINNING OF WORK, CLEAN AND REMOVE THESE EXISTING WEEDS BY MOWING OR GRUBBING OFF ALL PLANT MATERIAL. UPON PLANTING NOTES WEED CONTROL ALL SHRUB AND GROUNDCOVER AREAS SHALL BE TOP DRESSED WITH A 2" LAYER OF 38" CRUSHED ROCK "CALIFORNIA GOLD" OVER SMOOTH FINISH GRADE AS MULCH/BARK SUBSTITUTE AFTER ALL PLANTING. SUBMIT SAMPLE TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. NOTE: ALL PLANT MATERIAL SHALL BE SPOTTED BY THE LANDSCAPE ARCHITECT FOR FIRST PHASE OF CONSTRUCTION. ALLOW FOR A 48 HOUR MINIMUM PRIOR NOTIFICATION. 8 TREE GUYING (36" BOX OR LARGER) THE FOLLOWING PLANT MATERIAL SHALL PROVIDED ON SITE TO BE SLOTTED BY LANDSCAPE ARCH. 50 (5 GAL) __ Ligustrum j. 'Texanum' 50 (5 GAL) __ Dianella revoluta 'DR5000' 10 (15 GAL) __ Agave 'Blue Flame' NOTE: TILLAGE NOTE: CROSS-RIP OR ROTOTILL THE SOIL TO BE PLANTED ON 12-INCH CENTERS TO A MINIMUM DEPTH OF 12 INCHES. DO NOT RIP SOILS TO BE USED FOR FOUNDATION WORK, SIDEWALKS OR FLAT WORK, IN AREAS WHICH CANNOT BE CROSS RIPPED, RIP IN ONE DIRECTION 9" ON CENTER. REDUCE THE SIZE OF SOIL CLODS TO A MAXIMUM DIAMETER OF 1 INCH IN THE TOP 6 INCHES. OPTIMUM MOISTURE CONTENT SHOULD NOT BE SO GREAT THAT EXCESSIVE COMPACTION WILL OCCUR, NOR SO DRY THAT CLADS WILL NOT BREAK READILY. AFTER LOOSENING, HEAVY EQUIPMENT SHOULD NOT BE ALLOWED TO TRAVEL OVER THE SOIL IF THE SOIL IS MOIST AND WILL COMPACT.PLANTING NOTES,LEGEND & DETAILS7 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 SHRUB & GROUNDCOVER SPACING CONTAINER PLANTING3 9 MULCH INSTALLATION THE RESORT PARKWAY LANDSCAPE PLAN 1 ADDENDUM - FOR 6TH STREET EXTENSION TREES SHRUBS 3 3 3 3 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 8 8 8 8 8 8 8 37+0038+00 36+00 35+00 34+00 33+00 EKID'S PLAYAREAFITNESSTYELEC 1FITNESSEQUIPMENTSTORAGEPOOLEQUIPMENTPOOLSHOWERINVERTERROOMUNISEXUPFX4040 TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTUP 07AW/Hroll up roll upFX4040TYPE WIDTH HEIGHT FX4040 TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX 4040 TYPEWIDTH HEIGHT 65" TV65" TV65" TV ECATVCATVCATVCATVTELTEL6 T H S T R E E TTHE RESORT PARKWAY 32+00 31+00 30+00 29+ 0 0 28 + 0 0 2 7 + 0 0 2 6 + 0 0A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cRETAILLinear32Linear33LW35Linear34CONTEMPORARY MAIN STREETMAIN STREETCONTEMPORARY TEL TEL CATVCATVTHE RESOR T P A R K W A Y SIGN LEGEND V2 - SECONDARY VECHICULAR DIRECTIONAL P1 - ORIENTATION DISTRICT MAP KIOSK P2 - PEDESTRIAN DIRECTIONAL P3 - PASEO IDENTIFICATION NOTE: DETAILS AND INSTALLATION SPECIFICATIONS PER OTHERS. 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 MATCHLINE - SEE SHEET BELOWMATCHLINE - SEE ABOVEPLANTING PLAN(TREES &GROUNDCOVER)MATCHLINE - SEE SHEET L-26 SEE SHEET L-24 FOR PLANTING NOTES, LEGEND & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 2 7 + 0 0 2 6 + 0 0 2 5 + 0 0 2 4 + 0 0 2 3 + 0 0 2 2 + 0 0 2 1 + 0 0 2 0 + 0 011+00A2.7cRETAILRETAILRETAILRE T A I LLW35LW36LW75 LW76Linear79CONTEMPORARY CONTEMPORARY CONTEMPORARY CONTEMPORARY MAIN STREETCATVCATV TEL T H E R E S O R T P A R KW A Y SIGN LEGEND V2 - SECONDARY VECHICULAR DIRECTIONAL P1 - ORIENTATION DISTRICT MAP KIOSK P2 - PEDESTRIAN DIRECTIONAL P3 - PASEO IDENTIFICATION NOTE: DETAILS AND INSTALLATION SPECIFICATIONS PER OTHERS. 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 PLANTING PLAN(TREES &GROUNDCOVER)MATCHLINE - SEE SHEET L-25 MATCHLINE - SEE SHEET L-27 SEE SHEET L-24 FOR PLANTING NOTES, LEGEND & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 8 2 2 + 0 0 2 1 + 0 0 2 0 + 0 0 19 + 0 0 18 + 0 0 17+00 16+00 15+00A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cLinear79Linear81Linear91Linear92Linear104Linear111CONTEMPORARY MAIN STREETCONTEMPORARY CONTEMPORARY MAIN STREETMAIN STREETBUILDING BBUILDING CBUILDING DBUILDING E9-PLEX6-PLEX6-PLEX9-PLEX45° 15° 45° 45° 45° 45° 15° 45° 45° 45°45° 15° 45° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 15° 45°CATVCATVTEL TH E R E S O R T P A R K W A Y 14+00 13+00 12+00 11+00 B1.7cBUILDING A9-PLEXCATVCATVTELTHE RESORT PARKWAY SIGN LEGEND V2 - SECONDARY VECHICULAR DIRECTIONAL P1 - ORIENTATION DISTRICT MAP KIOSK P2 - PEDESTRIAN DIRECTIONAL P3 - PASEO IDENTIFICATION NOTE: DETAILS AND INSTALLATION SPECIFICATIONS PER OTHERS. 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 PLANTING PLAN(TREES &GROUNDCOVER)MATCHLINE - SEE SHEET L-26MATCHLINE - SEE ABOVEMATCHLINE - SEE BELOWSEE SHEET L-24 FOR PLANTING NOTES, LEGEND & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 5 5 8 8 8 37+0038+00 36+00 35+00 34+00 33+0011+00 EKID'S PLAYAREAFITNESSTYELEC 1FITNESSEQUIPMENTSTORAGEPOOLEQUIPMENTPOOLSHOWERINVERTERROOMUNISEXFX2640HEIGHT UPFX4040 TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTFX4040TYPE WIDTH HEIGHTUP 07AW/H2040TYPE WIDTH roll up roll upFX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040TYPEWIDTHHEIGHT FX4040 TYPEWIDTH HEIGHT FX4040TYPEWIDTHHEIGHT FX 4040 TYPEWIDTH HEIGHT 65" TV65" TV65" TV ECATVCATVCATVCATVTELTELA A A A A A A A A A A A A A A A A A A A A A A A A A AA A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A AA A A6 T H S T R E E TTHE RESORT PARKWAY T T 32+00 31+00 30+00 29+ 0 0 28 + 0 0 2 7 + 0 0 2 6 + 0 0 11+00A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cRETAILLinear32Linear33LW35Linear34CONTEMPORARY MAIN STREETMAIN STREETCONTEMPORARY TEL TEL CATVCATVH H H H H H H H H H HHH HHH H H H H H H H H HHHHHHH H HH H H H H HHHHHHH H H H H HH H H H H HH H H H H H HH H H HHHHHH H HHHHH H H HHHH A A AA A A A A A A A A A AA A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A ATHE RESOR T P A R K W A Y A T 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 PLANTING PLAN(SHRUBS & VINES)MATCHLINE - SEE SHEET BELOWMATCHLINE - SEE ABOVEMATCHLINE - SEE SHEET L-29 SEE SHEET L-24 FOR PLANTING NOTES, LEGEND & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 2 7 + 0 0 2 6 + 0 0 2 5 + 0 0 2 4 + 0 0 2 3 + 0 0 2 2 + 0 0 2 1 + 0 011+00RETAILRETAILRETAILRE T A I LLW35LW36LW75 LW76Linear79CONTEMPORARY CONTEMPORARY CONTEMPORARY CONTEMPORARY MAIN STREETCATVCATV TEL HHH H H HH H H H HHH HHH H H H H H H H H HHHHHHH H HH H H H H HHHHHHHHHH H HH H H H H HH H H H H H H H H H H HHHHH H HHHH H H H HHHH HH H H H H HHHH H H H H H H H H H HHHHHH H H H H HHH HHHHH H H H H H H H H H H H H HH H H HHH HH H HHHH H H H HHHH T H E R E S O R T P A R KW A Y H H H H H H HHHH HHHHHHHHHH H H H H HH HH H H H H T 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 PLANTING PLAN(SHRUBS & VINES)MATCHLINE - SEE SHEET L-28 MATCHLINE - SEE SHEET L-30 SEE SHEET L-24 FOR PLANTING NOTES, LEGEND & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 5 5 8 8 2 2 + 0 0 2 1 + 0 0 2 0 + 0 0 19 + 0 0 18 + 0 0 17+00 16+00 15+00A2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cA2.7cA1.7cB3.7cB2.7cB3.7c.aB2.7c.aB1.7cLinear79Linear81Linear91Linear92Linear104Linear111CONTEMPORARY MAIN STREETCONTEMPORARY CONTEMPORARY MAIN STREETMAIN STREETBUILDING BBUILDING CBUILDING DBUILDING E9-PLEX6-PLEX6-PLEX9-PLEX45° 15° 45° 45° 45° 45° 15° 45° 45° 45°45° 15° 45° 45° 45° 45° 45° 15° 45°45° 45°45° 15° 45° 45° 45° 45° 15° 45°CATVCATVTEL HHH H H H HHHH H H H H H H H H H HHHHHH H H H H HHH HHHHH H HHH H H H H HH H H HH H HHHH H H H HHHH H H H HHHH H H H H HH H H H HH H H H H HH H H H H H H HH H H H H H H H H H H H H H H H H H H H H H HHH H H H H H H H H H H H H H H HH H H H HH H H H H H H H H H HHHHHHHHHHH H HH H H H H H T H E R E S O R T P A R K W A Y H H H H H H HHHH HHHHHHHHHH H H H H H H H H H H H T 14+00 13+00 12+00 11+00 B1.7cBUILDING A9-PLEXCATVCATVTEL4 T H S T R E E TTHE RESORT PARKWAY 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 PLANTING PLAN(SHRUBS & VINES)MATCHLINE - SEE SHEET L-29MATCHLINE - SEE ABOVEMATCHLINE - SEE BELOWSEE SHEET L-24 FOR PLANTING NOTES, LEGEND & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 5 8 MATCHLINE - SEE SHEET L-22 8 8 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 SPECIFICATIONSTHE RESORT PARKWAY LANDSCAPE PLAN 1 38+00 S I G H T L I N ES I G H T L I N ECATVCATVTELTEL6 T H S T R E E TLIMIT OF WORKTHE RESORT PARKWAY (See The Resort ParkwayLandscape Plans)5 TYPICAL ENLARGEMENT SEE SHEET L-2 3 5253 THE RESORT PARKWAY 22 2 38+00 CATVCATVTELTEL6 T H S T R E E TLIMIT OF WORKTHE RESORT PARKWAY (See The Resort ParkwayLandscape Plans)THE RESORT PARKWAY 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 NORTH OF 6TH EXTENSION-CONSTRUCTION & IRRIGATIONPLANSEE SHEET L-16 - L-19 FOR IRRIGATION NOTES, LEGENDS & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 CONSTRUCTION PLAN IRRIGATION PLAN SEE SHEET L-1, L-9 - L-15 FOR CONSTRUCTION NOTES, LEGENDS & DETAILS INSTALLATION NOTE: - CONTRACTOR TO PULL (18) CONTROL WIRE AND (1) COMMON WIRE (LABELED) TO THIS LOCATION FOR FUTURE STREETSCAPE USAGE. THE FUTURE BUILDER OF THE STREETSCAPE IS RESPONSIBLE TO TIE FUTURE IRRIGATION SYSTEM FOR STREETSCAPE TO THIS SYSTEM. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. - CONTRACTOR TO CAP MAINLINE AT THIS LOCATION BENEATH APPROVED LABELED VALVE BOX. THE FUTURE BUILDER OF THE STREETSCAPE IS RESPONSIBLE TO MAKE A FINAL CONNECTION OF THIS MAINLINE AND THE MAINLINE PER THE FUTURE STREETSCAPE PLANS. EXISTING POINT OF CONNECTION 'C' (RECYCLED WATER SOURCE) EXISTING CONTROLLER 'C' LOCATION INSTALLATION NOTE: - CONTRACTOR TO PULL (18) CONTROL WIRE AND (1) COMMON WIRE (LABELED) TO THIS LOCATION FOR FUTURE STREETSCAPE USAGE. THE FUTURE BUILDER OF THE STREETSCAPE IS RESPONSIBLE TO TIE FUTURE IRRIGATION SYSTEM FOR STREETSCAPE TO THIS SYSTEM. PROVIDE 36" LOOP WITHIN AN APPROVED LABELED VALVE BOX. - CONTRACTOR TO CAP MAINLINE AT THIS LOCATION BENEATH APPROVED LABELED VALVE BOX. THE FUTURE BUILDER OF THE STREETSCAPE IS RESPONSIBLE TO MAKE A FINAL CONNECTION OF THIS MAINLINE AND THE MAINLINE PER THE FUTURE STREETSCAPE PLANS. MFG IRRIGATION LEGEND SYMBOL MODEL NO.DESCRIPTION GPM PSI (PURPLE) PVC SCH 40 LATERAL LINE- 12" COVER IN PLANTING AREAS, (PURPLE) MAINLINE - INSTALL 18" COVER IN PLANTING AREAS, 24" COVER UNDER PAVING - 24" COVER UNDER PAVING. - SIZES INDICATED. SIZES INDICATED. RAINBIRD EPB-CP-NP-HAN-PRS-D REMOTE CONTROL VALVE - SIZES INDICATED. NELSON 7645 WITH ACME THREAD, LOCKING (PURPLE) CAP. MAINLINES (PRESSURIZED) 2 INCH AND SMALLER SHALL BE SCHEDULE 40 SOLVENT-WELD P.V.C.. MAINLINES (PRESSURIZED) 2 1/2 INCH THROUGH 3 INCH SHALL BE CLASS 315 SOLVENT-WELD P.V.C., WITH THRUST BLOCKS PER DETAIL PVC SCH 40 WIRE SLEEVE - SIZE AND LOCATION PER CONTRACTOR SLEEVES UNDER ANY PAVING THAT EXCEEDS 4' WIDE. PVC SCH 40 MAIN AND LATERAL LINE SLEEVE 2x DIA. OF PIPE. - PROVIDE RAINBIRD (2) RWS-B-C-1401 TREE BUBBLER HEAD 30.25 (.5)AIR REFLIEF VALVE ASSEMBLY - RAINBIRD AR VALVE KIT - LOCATE AT HIGHEST POINT OF EACH SYSTEM FLUSH VALVE ASSEMBLY - RAINBIRD MDCFPCAP (FLUSH CAP-PURPLE) & MDCF COUP (COUPLING) INDICATES STATION NUMBER INDICATES CONTROLLER INDICATES VALVE SIZE INDICATES GPM INDICATES WATER REQUIREMENT INDICATES HYDROZONE AREA RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RECLAIMED WARNING SIGN -SEE DETAIL 10, SHEET L-17 RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. RAINBIRD XCZ-100-PRBR CONTROL ZONE KIT - REMOTE CONTROL VALVE FOR DRIP SYSTEMS .3-20 GPM NOTE:SEE IRRIGATION SYSTEM INFORMATION FOR INDIVIDUAL VALVE PRECIPITATION RATES AND OPERATING PSI AS REQUIRED BY CODE. RAINBIRD DRIP LINE SYSTEMXFS-P-06-18-500 30.5 Per 100s.f. PRECIP 1.0"/HR .43"/HR .43"/HR .43"/HR .43"/HR DRIP IRRIGATION NOTES THE CONTRACTOR WILL NEED TO FIELD LOCATE THE AIR RELIEF VALVES AT THE HIGHEST LOCATIONS ON EACH DRIP LINE SYSTEM. AT THE EXTREME END POINT OF EVERY DRIP LINE SYSTEMS, THE CONTRACTOR SHALL INSTALL A FLUSH VALVE ASSEMBLY (SEE DETAIL) & A NETAFIM 10-F-01PRESSURE INDICATOR. FOR TURF AREA, LOCATE THE INDICATOR WITHIN THE FLUSH VALVE BOX. CONTRACTOR TO EVALUATE THE PRECIPITATION RATES OF DRIP LINE AGAINST SOIL TYPE/ INFILTRATION RATE ON REQUIRED SOIL REPORT. ANY NECESSARY EQUIPMENT CHANGES SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT FOR FURTHER DIRECTION RADIUS WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE PULL BOX LOCATION - SEE NOTES ON PLAN (EXISTING) 2 "SUPERIOR MODEL 3200-200-RW BRASS NORMALLY CLOSED MASTER VALVE W/ PURPLE HANDLE COVER (EXISTING) 2" RAINBIRD FS200B HI-FLOW SHUT OFF SENSOR (EXISTING) WATER METER - REFER TO CIVIL PLAN (EXISTING) AUTOMATIC CONTROLLER LOCATION - SEE NOTE. (EXISTING) 2" FEBCO 825Y REDUCED PRESSURE BACKFLOW PREVENTER WIRE PULL BOX LOCATION INSTALLED PER SEPARATE LANDSCAPE PACKAGES PREPARED BY SITESCAPES.SEE 4TH & 6TH STREETAT THE RESORTLANDSCAPE PLANSPREPARED BYSITESCAPES(EXISTING) 2" WILKINS SXL SERIES WYE STRAINER (EXISTING) 2-1/2" WILKINS 500 HR SERIES PRESSURE REGULATOR - SIZE PER PLAN (EXISTING) NELSON 7645 WITH ACME THREAD, LOCKING (PURPLE) CAP. (EXISTING) WATTS B-6400-SS BALVE FOR 1/2"- 1 1/2" NIBCO P-619-RW GATE VALVE WITH 2" OPERATIING NUT FOR 2" AND LARGER - LINE SIZE MAINLINE INSTALLED PER SEPARATE LANDSCAPE PACKAGES PREPARED BY SITESCAPES. 2 6 T H S T R E E TLIMIT OF WORKTHE RESORT PARKWAY (See The Resort ParkwayLandscape Plans)THE RESORT PARKWAY 38+00 E ECATVCATVTELTEL6 T H S T R E E TLIMIT OF WORKTHE RESORT PARKWAY (See The Resort ParkwayLandscape Plans)THE RESORT PARKWAY 38+00 E ECATVCATVTELTEL36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 NORTH OF 6THEXTENSION - PLANTINGPLANSEE SHEET L-24 FOR PLANTING NOTES, LEGENDS & DETAILS THE RESORT PARKWAY LANDSCAPE PLAN 1 PLANTING PLAN (TREES & GROUNDCOVER) PLANTING PLAN (SHRUBS & VINES) 2 T H E RESORT PARKWAYCATVCATV2 4 + 0 0 2 TE L 2T H E RESORT PARKWAY W D W D WDWDCATVCATV2 T H E R E S O R T P A R K W A Y 1 56 CATVCATV34+00 2 T H E RESORT PARKWAY EXERCISE ROOM 3EXERCISE ROOM 236+00 2 T H E RESORT PARKWAY 1 56 CATVCATV2 T H E RESORT PARKWAY 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 INTERIM WEST SIDECONDITION PLANS1 2 SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3 PARKLET 'ARTISTIC BIKE RACK NORTH' TEMPORARY CONDITION TABLE TOP 'CLUB CONNECTIONS' TEMPORARY CONDITION PARKLET 'GARDEN HAUS' TEMPORARY CONDITION 4 TABLE TOP 'OUTDOOR ROOM' TEMPORARY CONDITION 5 PARKLET 'THE HANGOUT' TEMPORARY CONDITION 6 PARKLET 'THE LOUNGE' TEMPORARY CONDITION 4 IRRIGATION NOTE: CONTRACTOR SHALL TIE IN TEMPORARY DRIP IRRIGATION TO ADJACENT IRRIGATION SYSTEMS TO COVER ADDITIONAL PLANT MATERIAL. IRRIGATION NOTE: CONTRACTOR SHALL TIE IN TEMPORARY DRIP IRRIGATION TO ADJACENT IRRIGATION SYSTEMS TO COVER ADDITIONAL PLANT MATERIAL. IRRIGATION NOTE: CONTRACTOR SHALL TIE IN TEMPORARY DRIP IRRIGATION TO ADJACENT IRRIGATION SYSTEMS TO COVER ADDITIONAL PLANT MATERIAL. IRRIGATION NOTE: CONTRACTOR SHALL TIE IN TEMPORARY DRIP IRRIGATION TO ADJACENT IRRIGATION SYSTEMS TO COVER ADDITIONAL PLANT MATERIAL. IRRIGATION NOTE: CONTRACTOR SHALL TIE IN TEMPORARY DRIP IRRIGATION TO ADJACENT IRRIGATION SYSTEMS TO COVER ADDITIONAL PLANT MATERIAL. IRRIGATION NOTE: CONTRACTOR SHALL TIE IN TEMPORARY DRIP IRRIGATION TO ADJACENT IRRIGATION SYSTEMS TO COVER ADDITIONAL PLANT MATERIAL. 2 2 + 0 0 T H E R E S O R T P A R K W A Y 2 1 56 17+0 0 2 TH E R E S O R T P A R K W A Y 1 56 CATVCATV13+00 12+00 2 THE RESORT PARKWAY 5 36 17-003 01-31-181156 MOUNTAIN AVE.909-946-7523UPLAND, CA 91786Know what'sbelow. before you dig.Call R LANDSCAPE PLANSRANCHO CUCAMONGA, CA.THE RESORT PARKWAYSTREETSCAPEProject Sheet No.______ of ______.”LEWIS GROUPOF COMPANIESADDED CITY SIGNATURE BLOCK DATE: 04/23/20181 ADDED (2) ADDENDUM SHEETS AT NORTH RESORT PARKWAY. DATE: 07/20/20182 ADDED ELEC. PULL BOXES, PARKLET BOUNDARIES, & PLANS UPDATE.DATE: 09/25/20183 4 IRRIGATION REVISION LOT-A AND SOUTH OF 6TH. SYSTEM CVWD SUBMITTAL. TEMPORARY WEST SIDE CONDITION PLANS STREET TREESSPECIES CORRECTION DATE: 01/11/2018 5 ARTIST REVISION STREET SIGNAGE DATE: 02/11/2019 5 6 LIGHTING SPEC. AND NOTES DATE: 03/01/2019 7 PLANTING REVISION TEMPORARY WEST SIDE CONDITION DATE: 06/21/2019 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT DATE: 06/24/20218 REV. DUE TO DRIVEWAY REMOVAL & RIGHT-OF-WAY ADJUSTMENT, SITE FURNISHING UPDATES DATE: 07/07/20229 INTERIM WEST SIDECONDITION PLANS1 2 SEE SHEET L-1 FOR CONSTRUCTION NOTES & LEGENDS THE RESORT PARKWAY LANDSCAPE PLAN 1 3TABLE TOP 'HARMONY PLAZA' TEMPORARY CONDITION TABLE TOP 'MODULAR MODERN' TEMPORARY CONDITION PARKLET 'PROJECT ICON' TEMPORARY CONDITION 4