Loading...
HomeMy WebLinkAbout2022-09-14 - Agenda Packet HISTORIC PRESERVATION COMMISSION AND PLANNING COMMISSION MEETING AGENDA RANCHO CUCAMONGA CIVIC CENTER COUNCIL CHAMBERS 10500 CIVIC CENTER DRIVE RANCHO CUCAMONGA, CALIFORNIA September 14, 2022 7:00 p.m. A. Call to Order and Pledge of Allegiance Roll Call: Chair Dopp Vice Chair Williams Commissioner Morales Commissioner Boling Commissioner Daniels B. Public Communications This is the time and place for the general public to address the Planning/Historic Preservation Commission (“Planning Commission”) on any Consent Calendar item or any item not listed on the agenda that is within the Commission’s subject matter jurisdiction. The Planning Commission may not discuss any issue not included on the agenda but may set the matter for discussion during a subsequent meeting. C. Consent Calendar C1. Consideration to adopt Regular Meeting Minutes of August 24th, 2022. (No meeting on August 10th, 2022.) D. Public Hearings D1. TENTATIVE TRACT MAP SUBTT20440 – SC RANCHO DEVELOPMENT CORP. (LEWIS OPERATING CORP.) – A request to subdivide 91 acres of vacant land into sixteen (16) parcels within Planning Area 1B of the Resort Specific Plan located on the North side of 6th street bound between Cleveland Avenue to the west and Milliken Avenue to the east and the rail line to the north. This request is for a tentative tract map only and does not include any development proposals or development applications. APN: 0209-272- 20. An Environmental Impact Report was certified in connection with the City’s adoption of the Resort Specific Plan (SCH# 2015041083). The proposed Tentative Tract Map is consistent with the Resort Specific Plan and the Certified Environmental Impact Report, therefore, pursuant to CEQA, no additional environmental review is required in connection with the City’s consideration of the proposed Tentative Tract Map. HPC/PC Agenda – September 14, 2022 Page 2 of 3 If you need special assistance or accommodations to participate in this meeting, please contact the Planning Department at (909) 477-2750. Notification of 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility. Listening devices are available for the hearing impaired. E. Director Announcements F. Commission Announcements G. Adjournment TO ADDRESS THE PLANNING COMMISSION The Planning Commission encourages free expression of all points of view. To allow all persons to speak, given the length of the agenda, please keep your remarks brief. If others have already expressed your position, you may simply indicate that you agree with a previous speaker. If appropriate, a spokesperson may present the views of your entire group. To encourage all views and promote courtesy to others, the audience should refrain from clapping, booing or shouts of approval or disagreement from the audience. The public may address the Planning Commission on any agenda item. To address the Planning Commission, please come forward to the podium. State your name for the record and speak into the microphone. After speaking, please complete a speaker card located on the podium. It is important to list your name, address (optional) and the agenda item letter your comments refer to. Comments will be limited to 5 minutes per individual. If a large number of individuals wish to speak on an item, the Chair may limit the time to 3 minutes in order to provide an opportunity for more people to be heard. Speakers will be alerted when their time is up, and no further comments will be permitted. If you wish to speak concerning an item not on the agenda, you may do so under “Public Communications.” Any handouts for the Planning Commission should be given to the Planning Commission Secretary for distribution to the Commissioners. A copy of any such materials should also be provided to the Secretary to be used for the official public record. As an alternative to participating in the meeting, you may submit comments in writing to Elizabeth.Thornhill@cityofrc.us by 12:00 p.m. on the date of the meeting. Written comments will be distributed to the Commissioners and included in the record. All requests for items to be placed on a Planning Commission agenda must be in writing. Requests for scheduling agenda items will be at the discretion of the Commission and the Planning Director. AVAILABILITY OF STAFF REPORTS Copies of the staff reports or other documentation to each agenda item are available at www.CityofRC.us. APPEALS Any interested party who disagrees with the City Planning Commission decision may appeal the Commission’s decision to the City Council within 10 calendar days. Any appeal filed must be directed to the City Clerk’s Office and must be accompanied by a fee of $3,365 for all decisions of the Commission. (Fees are established and governed by the City Council). HPC/PC Agenda – September 14, 2022 Page 3 of 3 Please turn off all cell phones while meeting is in session. Copies of the Planning Commission agendas, staff reports, and minutes can be found at www.CityofRC.us. I, Elizabeth Thornhill, Executive Assistant of the City of Rancho Cucamonga, or my designee, hereby certify that a true, accurate copy of the foregoing agenda was posted on Thursday, September 8, 2022, seventy-two (72) hours prior to the meeting per Government Code 54954.2 at 10500 Civic Center Drive. Historic Preservation Commission and Planning Commission Agenda August 24, 2022 MINUTES Rancho Cucamonga, CA 91729 7:00 p.m. The regular meeting of the Historic Presentation Commission and Planning Commission was held on August 24, 2022. The meeting was called to order by Chair Dopp 7:00 p.m. A. Roll Call Planning Commission present: Chair Dopp, Commissioner Morales, Commissioner Boling and Commissioner Daniels. Absent - Vice Chair Williams. Staff Present: Serita Young, Assistant City Attorney; Jennifer Nakamura, Deputy Director of Planning; Mena Abdul-Ahad, Assistant Planner; Sean McPherson, Senior Planner; Brian Sandona, Sr. Civil Engineer; Mike Smith, Principal Planner; Zack Neighbors, Building Inspection Supervisor; Elizabeth Thornhill, Executive Assistant. Chair Dopp announced that Item D1 will be removed from tonight’s agenda and will be heard at a later date. B. Public Communications Chair Dopp opened public communications and hearing no one, closed public communications. C. Consent Calendar C1. Consideration to adopt Regular Meeting Minutes of June 22, 2022. Corrections were made to the Minutes and a revised copy was placed on the dais for Commissioners to review before a motion. Motion to adopt the amended minutes by Commissioner Boling, second by Commissioner Daniels; carried 4-0-1. Absent: Vice Chair Williams. D. Public Hearings D1. CONDITIONAL USE PERMIT MODIFICATION DRC2021-00402—STOR'EM SELF STORAGE – A request to modify an existing Conditional Use Permit to allow non-vehicle, personal storage at an existing 123,577 square foot recreational vehicle storage facility located within the Neo- Industrial (NI) District at 8530 Hellman Avenue; APN—0209-012-07. This item is exempt from the requirements of the California Environmental Quality Act (CEQA) Section 15301—Existing Facilities. HPC/PC MINUTES – August 24, 2022 Page 2 of 3 FINAL E. General Business E1. Consideration of a request by the Etiwanda Historical Society for the one-time set of fee waivers to facilitate repair and maintenance at the Chaffey-Garcia House and Chaffey-Isle House located at 7150 Etiwanda Avenue and 7086 Etiwanda Avenue; APNs: 1089-593-01 and 1089-592-79. This action does not qualify as a “project” as defined in Section 21065 and described in Section 15378 of the California Environmental Quality Act (CEQA) and the CEQA Guidelines. Zack Neighbors, Building Inspection Supervisor, presented the Historic Preservation Commission with a staff report and presentation (copy on file). Commissioner Boling asked if the fee revenue that would be collected by going to the City General Fund or Enterprise Fund that will have restricted use. Jennifer Nakamura answered that all Building permit and inspection fees go directly to the General Fund. Commissioner Boling asked for confirmation that it is City owned property. Zack Neighbors replied affirmatively. Commissioner Boling stated based upon the lease agreements with the Etiwanda Historic Society, this work will maintain or preserve these historic structures that would not otherwise be performed. The request for an $1,800.00 fee waiver is reasonable and the return in the value of the work far exceeds the fees being waived. He asked what is the estimate of what the project costs are for the roof repair and front entry. Zack Neighbors replied that no analysis was done but agreed what would be waived in fees is returned in the value in the historical significance and maintenance tenfold. Chair Dopp asked what materials would be used for the roof. Will the repairs maintain the historic nature of the homes. Zack Neighbors said all repairs would be in conformance with the historic building code. No public comments were made. With no other questions from the Historic Preservation Commission, Chair Dopp asked for a motion. Motion to recommend to the City Council a one-time fee waiver, with no modification, made by Commissioner Daniels; Second motion by Commissioner Boling. carried 4-0-1. Absent: Vice Chair Williams. F. Director Announcements - None G. Commission Announcements - None HPC/PC MINUTES – August 24, 2022 Page 3 of 3 FINAL H. Adjournment Motion by Commissioner Boling, second by Commissioner Daniels to adjourn the meeting. Hearing no objections, Chair Dopp adjourned the meeting at 7:12 p.m. Respectfully submitted, ________________________ Elizabeth Thornhill Executive Assistant, Planning Department Approved: HPC/PC September 14, 2022 Meeting. DATE: September 14, 2022 TO: Chairman and Members of the Planning Commission FROM: Matthew R. Burris, AICP, LEED AP, Deputy City Manager – Community and Economic Development INITIATED BY: David F. Eoff IV, Senior Planner SUBJECT: TENTATIVE TRACT MAP SUBTT20440 – SC RANCHO DEVELOPMENT CORP. (LEWIS OPERATING CORP.) – A request to subdivide 91 acres of vacant land into sixteen (16) lots within Planning Area 1B of the Resort Specific Plan located on the North side of 6th Street bound between Cleveland Avenue to the west and Milliken Avenue to the east and the rail line to the north. This request is for a tentative tract map only and does not include any development proposals or development applications. APN: 0209-272-20. An Environmental Impact Report was certified in connection with the City’s adoption of the Resort Specific Plan (SCH# 2015041083). The proposed Tentative Tract Map is consistent with the Resort Specific Plan and the Certified Environmental Impact Report, therefore, pursuant to CEQA, no additional environmental review is required in connection with the City’s consideration of the proposed Tentative Tract Map. RECOMMENDATION: Staff recommends the Planning Commission take the following action: • Approve Tentative Tract Map SUBTT20440 through the adoption of the attached Resolution of Approval with Conditions. EXECUTIVE SUMMARY: A request to subdivide 91 acres of vacant land into sixteen (16) parcels within Planning Area 1B of the Resort Specific Plan. The subject property is located on the north side of 6th Street bound between Cleveland Avenue to the west, Milliken Avenue to the east, and the rail line to the north. The tentative map is necessary to continue into the next phase of development for the Resort Specific Plan. The request is for a tentative map only at this time and does not include any development proposals or development applications. All future development proposals and applications will require separate review and approval in accordance with the Resort Specific Plan, the City’s Development Code, and the City’s General Plan. BACKGROUND: The project site is a roughly 91-acre undeveloped parcel that is regulated by the Resort Specific Plan and the City Center land use designation of the General Plan. The Resort Specific Plan was established in 2016 to facilitate the development of a mixed-use neighborhood that strategically and cohesively combines residential and non-residential uses in pedestrian-friendly environment that encourages walking, biking, and other modes of transportation. The Specific Plan covers an overall area of 160 acres that is separated into to two Planning Areas – Planning Area 1A (PA1A), which covers the area south of 6th Street to 4th Street, and Planning Area 1B (PA1B), which covers the area north of 6th Street to the rail line. PA1A has been underway with development for several years. Three residential developments consisting of attached Page 2 of 5 and detached for-sale condominiums and townhomes are complete, and one for-rent apartment development is currently under construction. Completion of the apartment project will result in PA1A being nearly built out with only a commercial pad and a mixed-use planning area remaining. The Resort Specific Plan will facilitate the next phase in PA1B with similar development types and potentially greater development intensities. In June of 2022, the City Council approved an amendment to the Resort Specific Plan that included a revised circulation network and updated street types, among others, for PA1B. The amendment was adopted to ensure future development in PA1B advanced the expectations of establishing a strong, walkable environment while maintaining adequate vehicle movement in and throughout the property. All future development applications will be required to integrate the circulation network of PA1. The existing Land Use, General Plan, and Zoning Designations for the project site and adjacent properties are as follows: Land Use General Plan Zoning Site Vacant City Center Resort Specific Plan North Industrial/Manufacturing Neo-Industrial Neo-Industrial South Multifamily Residential, Single-Family Residential Urban Neighborhood Resort Specific Plan East Multifamily Residential, Metrolink Station City Center Center 2 West Office, Industrial 21st Century Employment Mixed Employment 2 ANALYSIS: A. Subdivision: The applicant is requesting to subdivide the subject property into sixteen (16) parcels for future development (Exhibit B). The proposed tentative map implements the required street network from the Specific Plan for the areas south of “E” Street and “F” Street. The area north of “F” Street will be subdivided into two large parcels as part of this tentative map (Lot 14, Lot 15), however, any future development within this area will be required to incorporate the circulation network as shown in the Specific Plan. This is also reflected in the design of the proposed tentative map by showing the location of future intersections (T-intersection, 4-way-intersection). The following table lists each parcel and its consistency with the Resort Specific Plan. Lot Number Area Land Use Corresponding Specific Plan Parcel Consistent with Specific Plan 1 3.36 acres Residential; MU Overlay N-14 YES 2 1.34 acres Mixed Use N-13 YES1 3 1.78 acres Mixed Use N-10 YES Page 3 of 5 4 1.16 acres Residential N-9 YES2 5 0.74 acres Residential; MU Overlay N-11 YES3 6 0.79 acres Residential; MU Overlay N-12 YES4 7 3.18 acres Residential; MU Overlay N-12 YES4 8 3.20 acres Residential; MU Overlay N-11 YES3 9 6.32 acres Residential; MU Overlay N-9 YES2 10 1.75 acres Recreation; MU Overlay N-16 YES 11 0.79 acres Recreation; MU Overlay N-17 YES 12 4.88 acres Residential; MU Overlay N-15 YES 13 5.14 acres Residential; Mixed Use; MU Overlay N-18, N-19 YES 14 17.44 acres Residential; MU Overlay N-4, N-6, N-7, N-8 YES 15 18.25 acres Residential; MU Overlay; Transit N-1, N-2, N-3, N-5 YES 16 0.54 acres Mixed Use N-13 YES1 1 Lot 2 and Lot 16 are identified as one combined planning area of 1.69 acres in the SP. 2 Lot 4 and Lot 9 are identified as one combined planning area of 6.97 acres in the SP. 3 Lot 5 and Lot 8 are identified as one combined planning area of 3.48 acres in the SP. 4 Lot 6 and Lot 7 are identified as one combined planning area of 3.46 acres in the SP. As reflected in the table above, the proposed tentative tract map has been designed to implement the expectations and development intensities of the Resort Specific Plan for PA1B. Each of the created lots corresponds to an SP parcel, and each lot is consistent with the parcel size identified in Table 9.9 in the Resort Specific Plan. B. Circulation. The tentative map design accurately implements the required circulation network for PA1B. As noted above, the Resort Specific Plan was amended in June of 2022 to incorporate a strong circulation network that promotes efficient circulation of pedestrians, bicycles, and vehicles. The proposed tentative map has integrated this circulation network for all streets south of “E Street” and “F Street”. Each street shown on the tentative map is consistent with the street types provided in the Specific Plan and is shown in the proper location, as reflected on the Circulation Diagram in the Specific Plan. The tentative map includes 6 street sections, each of which reflects the design provided in the Specific Plan, including overall right-of-way width, on-street improvements (parking, bike lanes, landscaping), and off-street improvements (proper sidewalk widths, landscaping, public amenities areas). Lastly, the tentative map also identifies street connections to adjacent areas that Page 4 of 5 could occur with future development opportunities. Notable connections identified include connections to the east to the Metrolink Station area, connections to the east and west extending “C Street” to adjacent properties, and the extension of Cleveland Avenue to the north creating better circulation between adjoining properties. The connections reflected on the tentative map were identified as part of the Specific Plan Amendment adopted in June 2022 that focused on improving the circulation framework for PA1B and surrounding areas. The inclusion of these connections strengthens the consistency with the Resort Specific Plan and helps ensure adequate pedestrian and vehicle connections are maintained with future development. C. Future Development and Maps. No development is proposed with the tentative tract map at this time. The applicant and any subsequent applicant/developers will be required to submit a Design Review application and comply with the requirements of the Resort Specific Plan for all future developments within PA1B. Additionally, development of the lots established by SUBTT20440 may require additional subdivision to facilitate development of the planning area. This includes Lot 14 and Lot 15, which will be required to incorporate the remaining street connections within PA1B as required by the Specific Plan and any future street connections that may be deemed necessary. CEQA DETERMINATION: Pursuant to the California Environmental Quality Act (CEQA), the City certified an Environmental Impact Report (EIR) (SCH No. 2015041083) on May 18, 2016, in connection with the City’s approval of General Plan Amendment DRC2015-00114, Specific Plan Amendment DRC2015-00040, and Development Code Amendment DRC2015-00115 associated with the approval and establishment of the Resort Specific Plan. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR is required in connection with subsequent discretionary approvals of the same project as there have been a) no substantial changes proposed to the project that indicate new or more severe impacts on the environment; b) no substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts; c) no new important information shows the project will have new or more severe impacts than previously considered; and d) no additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. The proposed tentative tract map is consistent with the Resort Specific Plan and does not propose substantial changes which will require major revisions to the Final EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. No new information of substantial importance was found that would create new significant effects, increase the severity of previously examined effects, determine that mitigation measures or alternatives previously found not to be feasible would in fact be feasible, or introduce mitigation measures or alternatives that are considerably different from those analyzed in the Final EIR that would reduce significant impacts. The tentative tract map establishes developable lots that will accommodate the anticipated development densities, intensities, and development patterns envisioned by the Specific Plan and analyzed by the Final EIR. Therefore, no additional environmental review is required in connection with the City’s consideration of tentative tract map SUBTT20440 for the PA1B of the Resort Specific Plan. CORRESPONDENCE: This item was advertised as a public hearing with a regular legal advertisement in the Inland Valley Daily Bulletin newspaper, the property was posted, and notices were mailed to all property owners within a 660- foot radius of the project site. To date, no written correspondence, phone calls, or in person inquiries have been received regarding the project notifications. Page 5 of 5 COUNCIL MISSION / VISION / GOAL(S) ADDRESSED: Tentative Tract Map SUBTT20440 in compliance with the Resort Specific Plan, will continue to meet the City Council core values of providing and nurturing a high quality of life for all, promoting and enhancing a safe and healthy community for all, building and preserving a family-oriented atmosphere, and relentless pursuit of improvement. The Specific Plan provides opportunities for the development of a mixed-use community that offers a variety of housing options within close access to goods and services, and public transportation. The Specific Plan prioritizes the pedestrian environment with a focus on creating a walkable community and provides a variety of amenities and services that can serve the immediate community and surrounding communities of Rancho Cucamonga. The proposed tentative tract map is furthering these goals with the creation of developable lots and the establishment of the strong circulation network that will ensure the expectations of the Specific Plan are met with all future development opportunities. EXHIBITS: Exhibit A – Project Site Aerial Exhibit B – SUBTT202440 Tentative Tract Map Plans Exhibit C – Resort Specific Plan PA1B Conceptual Development Plan Exhibit D – Resort Specific Plan PA1B Vehicular Circulation Diagram Exhibit E – Resolution 22-26 Exhibit F – Conditions of Approval Exhibit A {N88°30'54"E33.20'}"A" STREET"B" STREET"F" STREET "E" STREET "D" STREET 13 THE RESORTPARKWAY 14 {190.72 N30°21'36"W } 12 10 78 23 4 1 4 9 5 6 ANAHEIM PL. AZUSA CT. 11 15 6 TH STREET16 "C" STREET 2 43 65 6TH ST. ARROW ROUTE WHITTRAM AVE. ARROW ROUTE W FOOTHILL BLVD VALLEY BLVDROCHESTER AVE15 FREEWAY4TH ST.ETIWANDA AVEMILLIKENAVEHAVEN AVEHERMOSA AVE ARROW ROUTE 6TH ST. E 8TH ST.ARCHIBALD AVEHELLMAN AVESAN BERNARDINO AVE W FOOTHILL BLVD BLVDINLAND EMPIRE N VINEYARD AVE10 CONCOURS ST.10 FREEWAY {R/W}\A1;{\Q15;0'-10' {FRONTAGE SETBACK \A1;8'\A1;SW 2%%% \A1;15'\A1;30' \A1;13'VEHICLE LANE DIAG.PARKINGR/W \A1;8'\A1;SW \A1;15'\A1;30'\A1;13'VEHICLE LANE DIAG.PARKING\A1;{\Q15;90'} 2%%% R/W 2%%% \A1;21' CL \A1;13'VEHICLE\A1;72'R/W\A1;8' \A1;SW 2%%% \A1;21' CL \A1;13'VEHICLE\A1;8'PRLL.PARKING\A1;58' R/W \A1;21' CL \A1;13'VEHICLE\A1;8'PRLL.PARKING R/W \A1;8'\A1;SW \A1;15'\A1;30'\A1;13'VEHICLE LANE DIAG.PARKING\A1;81'\A1;8'\A1;SW\A1;15'\A1;*LAA2%%%\A1;8'\A1;SW\A1;15'{\LSECTION "A" } \pxqc;{\L(STREET A, PA1B OF RESORT SPECIFIC PLAN)} {\LSECTION "C"} {\LSECTION "D"} {\LSECTION "B"} 2%%% \A1;{\Q15;0'-10' {FRONTAGE SETBACK AREA}}\pxqc;FLOWLINE\pxqc;FLOWLINE \A1;0'-10' FRONTAGESETBACK AREA \A1;0'-10' FRONTAGESETBACK AREA \A1;0'-10' FRONTAGESETBACK AREA \pxqc;FLOWLINE \A1;8'PRLL.PARKING R/W \A1;21'\A1;13'VEHICLE\A1;8'\A1;SW\A1;15'\A1;*LAA \A1;0'-10' FRONTAGE SETBACK AREA \A1;8'PRLL.PARKING 2%%%R/W\A1;8' \A1;SW \A1;21'\A1;13'VEHICLE\A1;8' PRLL. PARKI \A1;0'-10' FRONTAGESETBACK AREA 2%%% \pxqc;*LAA - LANDSCAPE AMENITY AREA \pxqc;{\Q15;*LAA - LANDSCAPE AMENITY AREA} \pxqc;*LAA - LANDSCAPE AMENITY AREA \pxqc;NTS \pxqc;{\L(STREET B, PA1B OF RESORT SPECIFIC PLAN)} \pxqc;NTS \pxqc;{\L(STREET C, PA1B OF RESORT SPECIFIC PLAN)} \pxqc;{\L(STREET D, PA1B OF RESORT SPECIFIC PLAN)} 2%%% CL \A1;13'VEHICLELANER/W\A1;8'\A1;SW \A1;21'\A1;13'VEHICLE\A1;42' \A1;*LAA \A1;8'\A1;SW \A1;21' R/W 2%%% {\LSECTION "F"} \A1;0'-10' FRONTAGESETBACK AREA \pxqc;{\L(STREET F, PA1B OF RESORT SPECIFIC PLAN)} \pxqc;NTSR/W\A1;6'\A1;SW 2%%% \A1;21' CL \A1;13'VEHICLE R/W PEDESTRIALTRAIL\A1;20'\A1;13'VEHICLELANE2%%% \A1;54'\A1;8'PRLL.PARKING {\LSECTION "E"} \A1;0'-10' FRONTAGESETBACK AREA \pxqc;*LAA - LANDSCAPE AMENITY AREA\A1;10' \pxqc;{\L(STREET E, PA1B OF RESORT SPECIFIC PLAN)} \pxqc;NTS %%uVICINITY MAP N.T.S.NORTHSITE \pxqc;SCALE: 1"=200' TENTATIVE TRACT MAP - TRACT MAP 20440 BEING A SUBDIVISION OF PARCEL 13 OF PARCEL MAP 14647, AS SHOWN ON PARCEL MAP BOOK 177, PAGES 90 THROUGH 96, INCLUSIVE, OFFICIAL RECORDS OF SAN BERNARDINO COUNTY, STATE OF CALIFORNIA. SECTION 13, TOWNSHIP 1 SOUTH, RANGE 7 WEST, SAN BERNARDINO BASE MERIDIAN, Drawing: R:\\325706\\Preliminary\\Tentative Tract Map\\706 - TTM20440 - SHT 1.dwg Layout: 24X36 L - SHT 1 Saved: 7/19/2022 1:35 PM Plotted: 7/19/2022 1:37 PM By: Arturo Romero CITY OF RANCHO CUCAMONGAEngineering, Inc. 357 N. SHERIDAN STREET SUITE 117 CORONA, CALIFORNIA 92880 TEL. (951) 279-1800 FAX (951) 279-4380 DATE FILE NO.R.C.E. NO.DRAWING NO. SHEET OF RECOMMENDED CHECKED DRAWN DESIGN CITY ENGINEER APPROVED BY DATE R.C.E. NO. DESCRIPTION OF REVISION DATE CITY APPROVED H. HA AF R M No. 55534 A R E E ANROFACFOETATSC E S S ON A EN G N R E G S TERED P R O F 55534 7/19/2022DAYS BEFORETWO WORKING DIAL 811 UNDERGROUND SERVICE ALERTDIALTOLL FREE A PUBLIC SERVICE BYBEFOREYOU DIGYOU DIGTENTATIVE TRACT MAP BB, AF, ARA KM, BB, ARA GB, AF THE RESORT - TRACT NO. 20440 6TITLE SHEET1 \A1;\pxql;METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA, OWNER OF AN EASEMENT FOR THE PURPOSE OF PIPE LINES AND CONDUITS AS RECORDED IN BOOK 1117, PAGE 423, OFFICIAL RECORDS. \A1;\pxql;{\Q15;METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA, OWNER OF AN EASEMENT FOR THE PURPOSE OF PIPE LINES AND CONDUITS AS RECORDED IN BOOK 1243, PAGE 133, OFFICIAL RECORDS.} \A1;CITY OF RANCHO CUCAMONGA, OWNER OF AN EASEMENT FOR THE PURPOSE OF CHANNELING WATER DRAINAGE AND ASSOCIATED SILT AND DEBRIS AS RECORDED IN INSTRUMENT NUMBER 19950060620 OF OFFICIAL RECORDS. \A1;EASEMENT FOR THE PURPOSE OF UNDERGROUND ELECTRIC FACILITIES, VAULT AND MANHOLE AND INTERCONNECTING DUCTS AS RECORDED IN INSTRUMENT NUMBER 94-499670 OF OFFICIAL RECORDS. \A1;EASEMENT FOR THE PURPOSE OF INGRESS, EGRESS AND ROAD PURPOSES FOR ACCESS TO THE PERMANENT EASEMENT AS RECORDED IN INSTRUMENT NUMBER 97-0333262 OF OFFICIAL RECORDS. \A1;DRAINAGE EASEMENT AGREEMENT AS RECORDED IN INSTRUMENT NUMBER 20000424213 OF OFFICIAL RECORDS. \A1;DRAINAGE EASEMENT AGREEMENT AS RECORDED IN INSTRUMENT NUMBER 20030655885 OF OFFICIAL RECORDS. \A1;AN INSTRUMENT ENTITLED A COVENANT AND AGREEMENT EXECUTED BY OAK CREEK RANCH GOLF CLUB, INC IN FAVOR OF CITY OF RANCHO CUCAMONGA AS RECORDED IN INSTRUMENT NUMBER 20050193373 OF OFFICIAL RECORDS. 1090 \A1;\pxb0.25,a0.25;{\H1.04168x;PROPOSED STORM DRAIN} \A1;{\H1.04168x;PROPOSED CURB & GUTTER} \A1;\pxb0.25,a0.25;{\H1.04168x;PROPOSED RIGHT OF WAY} \A1;\pxb0.25,a0.25;{\H1.04168x;PROPOSED LOT LINE} \A1;{\H1.04168x;PROPOSED CATCH BASIN} \A1;\pxb0.25,a0.25;{\H1.04168x;PROPOSED RET. WALL} \A1;\pxb0.25,a0.25;{\H1.04168x;EXISTING MAYOR CONTOUR } \A1;\pxb0.25,a0.25;{\H1.04168x;EXISTING MINOR CONTOUR } \A1;{\H1.04168x;PROPOSED WATER LINE} \A1;{\H1.04168x;PROPOSED REC. WATER LINE} \A1;{\H1.04168x;PROPOSED SEWER LINE} \A1;{\H1.04168x;PROPOSED EASEMENT LINE} \A1;{\H1.04168x;EXISTING EASEMENT LINE} \A1;{\H1.04168x;PROPOSED SIDEWALK} \A1;{\H1.04168x;PROPOSED STRIPING LINE} \A1;{\H1.04168x;FUTURE RIGHT OF WAY} \A1;\pxb0.25,a0.25;{\H1.04168x;PROPOSED STREET CL} Exhibit B MH MH MH MH MH M M M MM F/HF/H U/O DI S S TS TS TS TS TS M UB F/H M M F/H MH M M M M F/H DENSE TREES DENSE TREES ASPH ASPH ASPH ASPH ASPH UNDER CONSTRUCTION UNDER CONSTRUCTION CONC CONC MH W/L 1072.7 MH UB M M M M M M TS MH F/H M M M M M ASPH ASPH CONC UNDER CONSTRUCTION U/O MH MH MH MH MH MH MH UB UB F/H UB ASPH ASPH ASPH ASPH ASPH ASPH ASPH GROUND OBSCURED GROUND OBSCURED GROUND OBSCURED DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES AT-109 1073.27 M M M M WV UB ASPHUB M UB M MH M M MH TS UB M'S TS UB M M M M 1089.6 1089.7 1089.9 1083.7 1085.8 1086.61087.6 1088.3 1084.5 1083.7 1081.8 1081.4 1081.7 1079.6 1077.3 1078.7 1076.5 1081.2 1080.5 1080.9 1079.8 1080.7 1080.8 1081.4 1078.2 1078.2 1077.5 1077.4 1077.3 1077.51075.9 1075.8 1076.2 1076.6 1076.8 1076.9 1078.5 1078.7 1079.4 1079.11079.5 1078.5 1079.5 1078.6 1079.6 1080.1 1079.6 1080.6 1080.5 1080.4 1080.5 1080.5 1053.4 1053.6 1069.9 1073.2 1074.5 1075.7 1076.4 1077.6 1078.5 1079.3 1080.4 1081.7 1082.8 1081.7 1081.3 1081.3 1081.5 1081.5 1081.6 1082.6 1083.2 1082.3 1082.3 1082.3 1082.1 1077.3 1077.6 1083.3 1085.7 1084.4 1083.6 1084.0 1083.9 1087.6 1085.3 1059.6 1060.7 1060.2 1087.4 1085.4 1085.6 1086.71086.3 1074.6 1074.6 1074.4 1073.5 1073.7 1072.8 1072.8 1079.5 1079.4 1080.6 1087.4 1087.5 1078.5 1078.6 1079.7 1084.2 1084.6 1085.5 1086.6 1081.9 1083.3 1083.7 1083.3 1082.7 1082.4 1082.5 1082.4 1082.4 1081.3 1081.5 1081.6 1081.5 1081.5 1080.5 1080.6 1080.5 1080.6 1080.4 1079.5 1079.6 1079.6 1079.6 1078.4 1078.5 1078.3 1078.5 1077.7 1077.6 1077.8 1078.3 1076.3 1075.3 1077.2 1077.5 1076.5 1078.4 1070.6 1070.6 1071.3 1071.6 1071.6 1071.8 1072.2 1072.5 1072.8 1070.81070.21069.81069.5 1072.5 1072.6 1073.1 1073.3 1072.71073.2 1073.7 1073.7 1074.2 1074.5 1074.7 1074.6 1074.8 1075.1 1075.6 1075.9 1076.1 1075.2 1075.6 1075.8 1075.9 1076.0 1074.9 1074.7 1075.5 1075.5 1076.4 1076.5 1073.4 1073.4 1074.1 1074.2 1074.4 1076.61076.3 1073.3 1079.1 1079.3 1079.7 1077.4 1077.51076.5 1071.4 1071.6 1091.5 1089.5 1090.3 1083.2 1083.5 ASPH 1080.3 1081.5 1083.8 1077.9 1080.8 1080.6 ASPH 1080.6 ASPH 1075 1075 1070 1065 1060 1080 1080 1075 1080 1075 1070 1065 1065 1070 1075 1080 1075108010851070 1075 DI 1083.36EVP1083.74GB 1084.69BVC1084.98HP 1084.56EVC1083.20BVP1084.00GB 1084.59BVC1085.15HP 1083.10GB 1083.74GB 1082.94GB 1084.90EVC1076.40 EVC 1074.56 BVC 1075.00 BVP 1076.92 EVC 1079.65 EVC 1086.82 EVC 1075.09 BVC 1081.32 BVC 1077.87 BVC 3.44%1.70%1.70%1.70%2.00%1.67%1.90%1.77%0.94%1.84%1.67%1.67%1.67%1.67%1.28%1.26%1.13%0.50% 1072.00 BVP 1071.70 GB 1075.24 BVC 1077.81 EVC"A" STREET"B" STREETAPN: 209-272-25 OWNER: 6TH & CLEVELNAD LLC LAND USE: INDUSTRIAL 78 23 4 1 4 9 AREA = 1.78 AC.AREA = 1.34 AC. AREA = 3.36 AC. AREA = 1.16 AC. AREA = 3.18 AC.AREA = 3.20 AC.AREA = 6.32 AC. "A""A" "C""C""C""C" 6TH STREETTHE RESORTPARKWAY "D""D" "D""D""D""D""C""C"Δ = 4 5 31 '51 " R= 100 . 00 ' = 9 . 4 ' \W0.8500;APN: 209-272-17 OWNER: EMPIRE LAKES LLC LAND USE:MFR 5 AREA = 0.74 AC. 6 AREA = 0.79 AC.PROTECT IN PLACEEX. IMPROVEMENTS\A1;90' \A1;30'\A1;30'\A1;15'\A1;8'\A1;15'\A1;8'\A1;72' \A1;21'\A1;21'\A1;15'\A1;15'\A1;21'\A1;21'\A1;15'\A1;8'\A1;15'\A1;8'\A1;72'\A1;21'\A1;21'\A1;15'\A1;8'\A1;15'\A1;8' \A1;58' \A1;21'\A1;21'\A1;10'\A1;10' \A1;54' \A1;13' \A1;72'\A1;10'\A1;21'\A1;13'\A1;8'\A1;8'\A1;58' \A1;21'\A1;21'\A1;10'\A1;10'\A1;8'\A1;8'\A1;58' \A1;21'\A1;21'\A1;10'\A1;10'\A1;8'\A1;8'\A1;60'\A1;13'\A1;25'\A1;12'\A1;13'AREA = 0.54 AC. 16 \A1;10'\A1;10'\A1;10'\A1;10'\A1;8'\A1;10'\A1;10'\A1;10'\A1;10'"E""E"\A1;72'RIGHT OF WAYRESERVATIONFOR FUTURESTREETREMOVEDEX. IMPROVEMENTS\A1;8'\A1;6'\A1;72'RIGHT OF WAYRESERVATIONFOR FUTURESTREET0 SCALE: 1"=50' 50 100 150 MATCH LINE - SEE SHEET NO. 3 MATCH LINE - SEE SHEET NO. 4 2 TENTATIVE TRACT MAP Drawing: R:\\325706\\Preliminary\\Tentative Tract Map\\706 - TTM20440 - SHT 2.dwg Layout: 24X36 L - SHT 2 Saved: 7/19/2022 1:35 PM Plotted: 7/19/2022 1:37 PM By: Arturo Romero CITY OF RANCHO CUCAMONGAEngineering, Inc. 357 N. SHERIDAN STREET SUITE 117 CORONA, CALIFORNIA 92880 TEL. (951) 279-1800 FAX (951) 279-4380 DATE FILE NO.R.C.E. NO.DRAWING NO. SHEET OF RECOMMENDED CHECKED DRAWN DESIGN CITY ENGINEER APPROVED BY DATE R.C.E. NO. DESCRIPTION OF REVISION DATE CITY APPROVED H. HA AF R M No. 55534 A R E E ANROFACFOETATSC E S S ON A EN G N R E G S TERED P R O F 55534 7/19/2022DAYS BEFORETWO WORKING DIAL 811 UNDERGROUND SERVICE ALERTDIALTOLL FREE A PUBLIC SERVICE BYBEFOREYOU DIGYOU DIGTENTATIVE TRACT MAP BB, AF, ARA KM, BB, ARA GB, AF THE RESORT - TRACT NO. 20440 6 TENTATIVE TRACT MAP WV WV WV WVWV WV 1128.3 1129.3 PIPE PIPE PIPE U/O PIPE RAMP M M S F/H U/OU/O PIPE M M M F/H U/O F/H F/H S MH MH M M M M M S DENSE TREES DENSE TREES DENSE TREES DENSE TREES ASPH ASPH ASPH ASPH CONC CONC OUTDOOR_STORAGE OUTDOOR_STORAGE TANK S F/H MH UB S U/O ROCKS DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES ASPH ASPH CONC AT-100 1110.00 AT-1111096.54 M M UB DIRT PILES DIRT PILES 1102.5 1103.6 1101.1 1098.7 1098.5 1098.7 1099.5 1099.2 1099.6 1100.4 1100.5 1100.4 1100.6 1099.7 1099.3 1099.5 1101.3 1101.5 1100.4 1097.8 1100.9 1106.1 1103.1 1103.4 1105.4 1105.8 1104.2 1104.8 1103.3 1102.3 1102.8 1102.5 1102.5 1102.5 1102.6 1102.4 1102.6 1102.7 1103.5 1105.2 1106.4 1106.2 1108.4 1106.5 1109.5 1110.6 1109.2 1113.3 1113.4 1113.4 1113.2 1113.2 1105.9 1109.3 1108.5 1108.3 1108.1 1108.5 1109.6 1109.7 1110.21111.4 1111.31109.3 1109.5 1107.6 1108.3 1111.4 1111.4 1110.5 1108.7 1109.5 1109.1 1108.5 1109.3 1111.8 1109.6 1106.7 1106.7 1106.7 1105.7 1101.4 1100.21099.4 1099.4 1099.6 1097.9 1100.7 1101.4 1101.4 1101.9 1101.8 1102.1 1101.71101.8 1102.21103.1 1104.5 1104.3 1105.4 1104.4 1112.0 1101.7 1094.5 1095.4 1095.4 1096.41094.4 1094.5 1093.4 1093.3 1097.4 1097.5 1095.4 1093.4 1092.5 1091.6 1094.5 1093.6 1090.6 1090.6 1091.1 1091.3 1090.5 1091.5 1092.2 1088.7 1088.6 1087.6 1086.6 1082.7 1086.5 1087.6 1087.6 1084.1 1084.2 1092.61091.51090.71089.4 1088.5 1097.91097.3 1097.5 1096.6 1096.2 1096.5 1097.5 1097.6 1098.2 1102.81102.2 1103.1 1101.5 1103.9 1101.6 1103.6 1105.5 1099.8 1098.6 1088.5 1089.4 1091.4 1094.5 1093.6 UNDER CONSTRUCTION 1121.2 1120.4 1109.3 1110.2 1111.5 1111.7 1107.6 1107.6 1107.5 1109.1 1106.9 1107.4 1108.6 1106.5 1105.5 1105.3 1108.9 1108.5 1105.3 1094.5 1097.9 DIRT PILES 1108.9 ASPH 1095.6 ASPH 1094.1 1095.6 ASPH 1102.5 1101.9 1092.4 ASPH 1084.4 1086.3 1088.6 ASPH 1083.5 1085.5 1089.6 1082.4 1080 1085 1090 1095 1100 110011101100 1095 1104.10EVC1100.73EVC1103.62BVC1104.23HP 1100.75BVC1102.27BVC1102.47HP 1091.58BVC1094.34BVP 1094.08GB 1.77%0.79%0.79% 1.77% 0.77%2.20%2.20%1.70%0.94%0.94%0.96%0.96% 1090.56 BVC 1092.51 EVC 1100.55 EVP "F" STREET "A" STREETAPN: 209-401-06 OWNER: GPT 7TH STREET OWNER LP LAND USE: INDUSTRIAL APN: 209-411-18 OWNER: CABOT IV-CA LLC LAND USE: INDUSTRIAL APN: 209-411-30 OWNER: EMPIRE LAKES LLC LAND USE: INDUSTRIAL APN: 209-272-26 OWNER: CUCAMONGA COUNTY WATER DISTRICT LAND USE: INDUSTRIAL \A1;81' \A1;15'\A1;21'\A1;8' \A1;13'\A1;15'\A1;8' 8 9 10 AREA = 1.75 AC. AREA = 3.20 AC.\A1;21' \A1;10'\A1;8'\A1;58' \A1;21'\A1;21'\A1;10'\A1;10'\A1;8'\A1;8' \A1;58' \A1;21'\A1;21'\A1;10'\A1;8'\A1;8'\A1;72'\A1;21'\A1;21'\A1;15'\A1;15'\A1;8' \A1;8'\A1;81'\A1;10'\A1;21'\A1;8'\A1;15'\A1;8' =1 3 4 ' =6 5' =5 ' =1 0 5 '"C""C""B""B""D""D""B""B"14 {\C256;102.76'}S20°58'55"W 60.62 ' AREA = 6.32 AC. AREA = 17.44 AC. CLEVELAND AVENUE AREA TO BE VACATED (3,134 SF)\A1;30'\A1;43.92'\A1;27'\A1;27'\A1;10'\A1;10'\A1;10' \A1;10'\A1;30'"D" STREET FUTURE CLEVELAND AVENUE EXTENSION \A1;15'0 SCALE: 1"=50' 50 100 150 MATCH LINE - SEE SHEET NO. 5 MATCH LINE - SEE SHEET NO. 4MATCH LINE - SEE SHEET NO. 2 3 TENTATIVE TRACT MAP Drawing: R:\\325706\\Preliminary\\Tentative Tract Map\\706 - TTM20440 - SHT 3.dwg Layout: 24X36 L - SHT 3 Saved: 7/19/2022 1:35 PM Plotted: 7/19/2022 1:38 PM By: Arturo Romero CITY OF RANCHO CUCAMONGAEngineering, Inc. 357 N. SHERIDAN STREET SUITE 117 CORONA, CALIFORNIA 92880 TEL. (951) 279-1800 FAX (951) 279-4380 DATE FILE NO.R.C.E. NO.DRAWING NO. SHEET OF RECOMMENDED CHECKED DRAWN DESIGN CITY ENGINEER APPROVED BY DATE R.C.E. NO. DESCRIPTION OF REVISION DATE CITY APPROVED H. HA AF R M No. 55534 A R E E ANROFACFOETATSC E S S ON A EN G N R E G S TERED P R O F 55534 7/19/2022DAYS BEFORETWO WORKING DIAL 811 UNDERGROUND SERVICE ALERTDIALTOLL FREE A PUBLIC SERVICE BYBEFOREYOU DIGYOU DIGTENTATIVE TRACT MAP BB, AF, ARA KM, BB, ARA GB, AF THE RESORT - TRACT NO. 20440 6 UNDER CONSTRUCTION UNDER CONSTRUCTION MH MH MH MH MH MH DI DI DI S S S S F/H S S DI S S SM M M M S MH MH S S M M S M F/H UB UB U/O M M S M ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC MH MH MH MH M F/H UB F/H M F/H M S TS TS F/H UB UB F/H UB UB M MH CONC ASPH ASPH ASPH ASPH GROUND OBSCURED GROUND OBSCURED DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES DENSE TREES TS TS TS TS M WV AT-104 1098.82 MH ASPH PARKING WV M M F/H M M S M M M M F/H M M M F/H MH MH CB WV UB MH UB UB WV SIGN MH ASPH UBUB UB ASPH CONC U/O ASPH UB GROUND OBSCURED GROUND OBSCURED 1107.51108.7 1106.4 1105.3 1104.6 1104.8 1103.9 1103.5 1103.8 1100.5 1099.8 1101.9 1100.4 1096.8 1096.3 1096.6 1096.8 1097.2 1097.6 1098.5 1099.5 1099.7 1099.7 1100.1 1099.2 1101.4 1103.3 1105.4 1105.5 1104.5 1104.7 1104.6 1103.4 1103.5 1103.6 1102.4 1105.2 1106.5 1100.9 1101.8 1102.01101.3 1100.6 1100.4 1100.8 1100.4 1101.1 1100.5 1102.5 1103.1 1102.2 1101.7 1101.5 1099.7 1097.6 1097.2 1098.6 1097.6 1099.2 1099.8 1097.5 1098.5 1097.9 1095.2 1096.5 1097.8 1095.3 1093.4 1094.7 1095.3 1094.7 1093.5 1090.9 1089.4 1095.6 1095.6 1095.3 1086.9 1081.4 1081.6 1081.31084.5 1089.5 1085.4 1091.7 1090.21095.3 1095.5 1095.8 1095.5 1095.3 1095.3 1096.1 1096.2 1097.5 1097.5 1099.4 1099.4 1099.7 1100.1 1097.5 1098.4 1097.9 1099.6 1099.6 1100.5 1100.5 1101.6 1101.3 1104.1 1103.61104.2 1107.4 1101.1 1101.2 1100.4 1100.7 1100.5 1094.5 1094.5 1093.5 1093.4 1092.9 1092.3 1092.8 1092.3 1091.6 1091.4 1090.5 1090.5 1089.4 1089.51088.5 1088.5 1087.8 1087.7 1109.3 1108.8 1109.71109.2 1109.8 1110.41110.3 1105.5 1103.5 1104.7 1104.6 1105.6 1105.5 1106.7 1106.2 1105.3 1105.6 1104.4 1104.5 1094.5 1098.6 1097.6 1099.5 1100.6 1101.5 1102.4 1103.5 1104.5 1105.5 1102.0 1101.9 1099.4 1098.3 1098.6 1098.4 1098.7 1095.8 1081.6 1107.6 ASPH 1105.3 1103.5 1103.1 1098.2 1098.4 1097.8 1097.4 1097.5 1099.6 1099.6 1100.7 1100.4 1101.2 1100.4 1099.4 1097.7ASPH ASPH ASPH 1096.1 1092.5 1093.4 1091.6 1097.5 1096.4 1088.7 1090.3 1090.5 1091.5 1092.7 1088.3 1096.1 1096.4 1096.4 1098.2 1097.9 1096.2 1094.5 1090 1095 1100 11001105 1085 10901102.30EVCHP 1100.73EVP1100.47GB 1091.57EVC1093.83GB 1091.34LP 1094.09EVP1093.34 EVC 1096.66 GB 1091.43 BVC 1102.52 EVP 1096.58EVC1097.90EVC1096.47EVC1096.51BVC1096.38LP 1097.88BVC1098.07HP 1096.32BVC1096.18LP 1097.00EVP0.70%0.94%0.94%1.67%2.16%2.51%2.51%0.74%0.70%1.00% 0.93%0.93% \A1;58' \A1;21'\A1;21'\A1;42'\A1;13'\A1;13'\A1;8'\A1;8'\A1;81'\A1;15'\A1;21'\A1;8'\A1;30'\A1;15'\A1;8' \A1;81' \A1;15'\A1;21'\A1;8'\A1;30'\A1;15'\A1;8'\A1;58'\A1;21'\A1;21'\A1;8' \A1;8'\A1;8'\A1;8'\A1;58' \A1;21'\A1;8'\A1;72'\A1;21'\A1;21'\A1;15'\A1;15'\A1;8' \A1;8' \A1;58' RIGHT OF WAY RESERVATION FOR FUTURE STREET {\C256;229'}{\C256;22'}{\C256;103'}"C""C""F""F""B""B""B""B""D" "D""D" Δ= 4 06 '0 " R=100 . 0 0 ' = 82 . 21 '"D""D"\A1;22'\A1;26'\A1;66'\A1;22'\A1;33'\A1;33' \A1;22'\A1;33'\A1;33'AREA TO BE VACATED (2,883 SF) AREA TO BE VACATED (727 SF) AREA TO BE ACQUIRED FOR ROAD ALIGNMENT (732 SF){\C256; 86.55'}\A1;10'\A1;10'\A1;10'\A1;10'\A1;10'\A1;10'\A1;10'\A1;10'\A1;10' \A1;10'\A1;10'\A1;26'-34' RIGHT OF WAY RESERVATION FOR FUTURE STREET (APPROXIMATE LOCATION, FINAL WIDTH TO BE \A1;26'-34' RIGHT OF WAY RESERVATION FOR FUTURE STREET (APPROXIMATE LOCATION, FINAL WIDTH TO BE DETERMINED) APN: 209-272-24 OWNER: FAIRWAY BUSINESS CENTER LAND USE: INDUSTRIAL APN: 209-272-17 OWNER: EMPIRE LAKES LLC LAND USE:MFR APN: 209-272-27 OWNER: CITY OF RANCHO CUCAMONGA LAND USE: INDUSTRIAL APN: 209-272-28 OWNER: RUMI HOLDINGS LLC LAND USE: COMMERCIAL 7 12 \pxt8;AREA = 4.88 AC. AREA = 3.18 AC. AREA = 0.79 AC. AREA = 5.14 AC. AREA = 17.44 AC.13 14 11 ANAHEIM PLACE 7 TH ST.MILLIKEN AVENUE10 "F" STREET "D" STREET AREA = 1.75 AC."B" STREET"E" STREET \A1;13'\A1;13'\A1;8'\A1;13'\A1;13' 0 SCALE: 1"=50' 50 100 150 MATCH LINE - SEE SHEET NO. 6 MATCH LINE - SEE SHEET NO. 3MATCH LINE - SEE SHEET NO. 2 4 Drawing: R:\\325706\\Preliminary\\Tentative Tract Map\\706 - TTM20440 - SHT 4.dwg Layout: 24X36 L - SHT 4 Saved: 7/19/2022 1:34 PM Plotted: 7/19/2022 1:38 PM By: Arturo Romero CITY OF RANCHO CUCAMONGAEngineering, Inc. 357 N. SHERIDAN STREET SUITE 117 CORONA, CALIFORNIA 92880 TEL. (951) 279-1800 FAX (951) 279-4380 DATE FILE NO.R.C.E. NO.DRAWING NO. SHEET OF RECOMMENDED CHECKED DRAWN DESIGN CITY ENGINEER APPROVED BY DATE R.C.E. NO. DESCRIPTION OF REVISION DATE CITY APPROVED H. HA AF R M No. 55534 A R E E ANROFACFOETATSC E S S ON A EN G N R E G S TERED P R O F 55534 7/19/2022DAYS BEFORETWO WORKING DIAL 811 UNDERGROUND SERVICE ALERTDIALTOLL FREE A PUBLIC SERVICE BYBEFOREYOU DIGYOU DIGTENTATIVE TRACT MAP BB, AF, ARA KM, BB, ARA GB, AF THE RESORT - TRACT NO. 20440 6 TENTATIVE TRACT MAP SS DENSE TREES ASPH CONC UNDER CONSTRUCTION UNDER CONSTRUCTION MHMH S U/O U/O U/O UB R.R. SWITCH R.R. SWITCH UB F/H UB U/O DENSE TREES ASPH AT-112 1120.67 1120.3 1120.5 1120.7 1120.9 1122.1 1122.6 1122.1 1122.5 1122.4 1123.5 1123.8 1123.6 1123.8 1124.6 1124.6 1121.8 1121.3 1121.1 1125.2 1119.7 1118.7 1118.4 1118.5 1119.4 1120.3 1121.3 1122.3 1125.4 1125.6 1123.8 1126.4 1126.3 1126.7 1126.41125.7 1125.6 1121.4 1121.5 1124.3 1124.5 1122.4 1122.1 1130.31130.2 1129.5 1128.41128.7 1128.6 1128.5 1128.5 1127.5 1127.7 1126.2 1125.8 1125.5 1126.1 1126.3 1126.2 1125.5 1121.9 1122.7 1122.6 1122.7 1122.2 1121.8 1122.7 1121.3 1121.7 1122.6 1122.4 1124.2 1124.1 1123.5 1123.4 1110.5 1110.5 1109.9 1110.3 1110.5 1113.1 1107.8 1108.4 1108.7 1109.41111.5 1111.6 1110.6 1111.7 1111.9 1114.2 1114.3 1114.1 1114.2 1114.3 1117.6 1117.4 1117.2 1115.4 1117.2 1114.5 1114.6 1120.3 1114.7 1117.3 1116.1 1115.2 1114.2 1113.6 1112.6 1114.6 1120.71120.0 1109.9 1115.4 1114.3 1111.1 1110.7 1109.7 1110.2 1112.1 1111.3 1111.3 1111.2 1114.2 1111.0 1115.2 1118.6 1118.6 1132.6 1132.3 1123.1 1123.9 1122.0 1122.7 1122.41125.1 1120.5 1120.3 1120.3 1121.2 1120.6 1120.5 1124.4 1124.2 1117.5 1117.5 1115.4 1115.4 1118.6 1118.1 1131.3 1123.4 1123.2 1122.7 1120.8 1120.7 1119.7 1122.0 1121.8 1122.5 1118.6 1118.4 1117.1 1115.4 1116.4 1116.5 1122.4 1110.4 1110.4 1111.7 1109.5 1110.6 1113.6 1122.8 1120.4 1120.3 1120.41120.4 1119.5 1118.3 1131.51130.6 1130.7 1130.7 1122.7 1108.4 1101.8 1102.4 1102.5 1120.8 1114.3 1113.5 1112.6 1122.5 1130.7 DIRT PILES 1111.4 1112.3 1109.5 1108.4 1116.1 1117.2 1112.7 1113.7 1111.9 1113.3 1103.5 1110 1115 1120 1125 1130 1125 1125 11201120 1105 APN: 209-272-15 OWNER: SOCAL EDISON LAND USE: VACANT 15 AREA = 18.25 AC. APN: 209-143-14 - OWNER: SAN BERNARDINO COUNTY TRANS - LAND USE: PUBLIC FACILITIES 14 AREA = 17.44 AC. FUTURE CLEVELAND AVENUE EXTENSION 0 SCALE: 1"=50' 50 100 150 MATCH LINE - SEE SHEET NO. 6MATCH LINE - SEE SHEET NO. 3 Drawing: R:\\325706\\Preliminary\\Tentative Tract Map\\706 - TTM20440 - SHT 5.dwg Layout: 24X36 L - SHT 5 Saved: 7/19/2022 1:34 PM Plotted: 7/19/2022 1:39 PM By: Arturo Romero CITY OF RANCHO CUCAMONGAEngineering, Inc. 357 N. SHERIDAN STREET SUITE 117 CORONA, CALIFORNIA 92880 TEL. (951) 279-1800 FAX (951) 279-4380 DATE FILE NO.R.C.E. NO.DRAWING NO. SHEET OF RECOMMENDED CHECKED DRAWN DESIGN CITY ENGINEER APPROVED BY DATE R.C.E. NO. DESCRIPTION OF REVISION DATE CITY APPROVED H. HA AF R M No. 55534 A R E E ANROFACFOETATSC E S S ON A EN G N R E G S TERED P R O F 55534 7/19/2022DAYS BEFORETWO WORKING DIAL 811 UNDERGROUND SERVICE ALERTDIALTOLL FREE A PUBLIC SERVICE BYBEFOREYOU DIGYOU DIGTENTATIVE TRACT MAP BB, AF, ARA KM, BB, ARA GB, AF THE RESORT - TRACT NO. 20440 65 TENTATIVE TRACT MAP WV UNDER CONSTRUCTION MHMH MH SSSSSSSSSS M S S SSSSS M MH F/H S S S SSSSSSSSS S S M S S S DENSE TREES RAMP RAMP RAMP CONC CONC CONC CONC CONC CONC CONC MH MH MH MH MH MH S S F/H S UB M MH S S S S F/H S S S S F/H S S M M F/H MH MH M M M M CB M M ASPH PARKING MH F/H F/H M ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONC CONC CONC CONC CONC CONC CONC DENSE TREES DENSE TREES GROUND OBSCURED AT-102 1122.85 1118.05 S M S M M S MH M M M M M M M MM M M MWV SM M M M M UB UB UB M SIGN DI CB ASPH M M M M M ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC SIGN ASPH 1127.5 1126.8 1127.21127.31127.4 1127.3 1127.5 1127.5 1127.4 1127.4 1127.31127.61127.4 1127.2 1127.6 1127.3 1126.8 1122.2 1122.6 1122.8 1122.5 1122.5 1123.2 1123.4 1121.4 1121.5 1121.7 1121.5 1120.5 1120.4 1120.3 1120.5 1120.4 1119.5 1119.6 1119.6 1119.5 1119.51119.5 1122.6 1120.5 1121.5 1121.5 1128.4 1128.7 1128.3 1128.7 1128.81128.81128.9 1126.3 1125.1 1124.6 1120.8 1120.7 1122.5 1128.9 1129.4 1128.51128.4 1129.3 1128.8 1121.9 1122.7 1122.3 1122.4 1122.6 1121.8 1122.3 1124.71124.5 1124.6 1124.6 1125.4 1124.9 1123.7 1123.5 1123.4 1123.2 1122.3 1121.5 1123.3 1124.2 1124.2 1123.4 1118.3 1118.5 1118.5 1118.5 1118.5 1117.4 1117.5 1117.5 1117.6 1117.5 1116.5 1116.5 1116.5 1116.4 1116.4 1115.5 1115.7 1115.4 1115.7 1114.5 1115.4 1113.5 1114.7 1114.5 1114.4 1114.7 1113.5 1113.5 1113.3 1112.4 1113.4 1111.7 1111.8 1112.4 1112.6 1111.6 1112.5 1112.2 1113.7 1112.81112.51111.81111.3 1110.5 1111.3 1112.5 1113.6 1114.6 1115.3 1116.4 1115.1 1116.5 1116.5 1119.5 1120.5 1118.5 1116.5 1116.3 1115.1 1114.8 1114.4 1116.41116.31116.6 1117.5 1118.6 1118.61118.4 1118.5 1118.6 1118.6 1119.5 1120.6 1120.7 1120.4 1120.5 1120.5 1120.5 1121.4 1121.4 1121.5 1121.5 1121.7 1121.6 1122.8 1122.6 1122.7 1122.4 1122.6 1122.4 1123.41123.31123.3 1123.5 1128.3 1128.8 1122.4 1115.3 1115.6 1115.4 1116.6 1117.5 1117.3 1117.3 1117.4 1117.2 1116.7 1116.1 1116.61117.41117.8 1117.5 1117.5 1117.3 1117.1 1115.7 1115.8 1115.6 1115.4 1116.6 1116.6 1116.2 1114.6 1114.9 1114.4 1113.9 1114.3 1114.41114.6 1114.5 1114.6 1114.0 1113.4 1113.7 1112.7 1111.7 1110.4 1110.41110.5 1110.3 1111.3 1111.2 1112.2 1117.1 1117.3 1118.6 1118.1 1118.3 1117.1 1108.7 1107.9 1107.4 1107.4 1107.5 1106.5 1106.4 1106.6 1106.5 1106.6 1107.3 1107.7 1107.21107.8 1105.5 1105.3 1106.5 1104.5 1105.4 1104.5 1104.7 1104.5 1109.6 1110.6 1107.5 1107.6 1107.4 1107.3 1108.3 1108.8 1108.4 1106.5 1106.5 1106.5 1106.7 1106.5 1105.6 1105.7 1104.8 1105.7 1110.3 1109.5 1111.4 1110.5 1110.7 1111.5 1112.4 1112.7 1112.3 1111.2 1111.8 1111.5 1111.4 1113.3 1116.61116.3 1111.7 1113.3 1113.6 1112.5 1117.21117.5 1106.6 1108.5 1112.5 1113.6 1114.5 1115.2 1114.5 1114.5 1128.5 CONC 1122.6 1120.1 1119.8 1119.4 1116.5 1117.5 1118.6 1119.7 CONC 1115.5 1117.6 1114.7 MH CB ASPH 1115.6 1125.1 1112.5 ASPH PARKING 1108.2 1109.6 1110.5 1109.5 ASPH PARKING 1110.9 CB 1110.3 1108.5 1106.6 1107.5 1125 1125 1115 1120 1120 1115 1110 1110 1115 1120 1105 APN: 209-272-11 OWNER: CITY OF RANCHO CUCAMONGA LAND USE: MIXED USE RETAIL APN: 209-272-23 OWNER: FAIRWAY BUSINESS CENTER LAND USE: INDUSTRIAL APN: 209-272-24 OWNER: FAIRWAY BUSINESS CENTER LAND USE: INDUSTRIAL APN: 209-272-27 OWNER: CITY OF RANCHO CUCAMONGA LAND USE: INDUSTRIAL MILLIKENAZUSA COURT ANAHEIM PL. APN: 209-143-14 OWNER: SAN BERNARDINO COUNTY TRANS LAND USE: PUBLIC FACILITIES AREA = 5.14 AC. 13 15 APN: 209-272-22 OWNER: CITY OF RANCHO CUCAMONGA LAND USE:MIXED USE RETAIL AREA = 18.25 AC. AVENUE 14 AREA = 17.44 AC. \A1;58' RIGHT OF WAY RESERVATION FOR FUTURE STREET \A1;58' RIGHT OF WAY RESERVATION FOR FUTURE STREET 0 SCALE: 1"=50' 50 100 150 MATCH LINE - SEE SHEET NO. 5MATCH LINE - SEE SHEET NO. 4 TENTATIVE TRACT MAP Drawing: R:\\325706\\Preliminary\\Tentative Tract Map\\706 - TTM20440 - SHT 6.dwg Layout: 24X36 L - SHT 6 Saved: 7/19/2022 1:34 PM Plotted: 7/19/2022 1:39 PM By: Arturo Romero CITY OF RANCHO CUCAMONGAEngineering, Inc. 357 N. SHERIDAN STREET SUITE 117 CORONA, CALIFORNIA 92880 TEL. (951) 279-1800 FAX (951) 279-4380 DATE FILE NO.R.C.E. NO.DRAWING NO. SHEET OF RECOMMENDED CHECKED DRAWN DESIGN CITY ENGINEER APPROVED BY DATE R.C.E. NO. DESCRIPTION OF REVISION DATE CITY APPROVED H. HA AF R M No. 55534 A R E E ANROFACFOETATSC E S S ON A EN G N R E G S TERED P R O F 55534 7/19/2022DAYS BEFORETWO WORKING DIAL 811 UNDERGROUND SERVICE ALERTDIALTOLL FREE A PUBLIC SERVICE BYBEFOREYOU DIGYOU DIGTENTATIVE TRACT MAP BB, AF, ARA KM, BB, ARA GB, AF THE RESORT - TRACT NO. 20440 66 9-16 The Resort Figure 9.6: Conceptual Development Plan by Placetype Metrolink Rancho CucamongaStation 6th Street Milliken AvenueCleveland AvenueMetrolink - San Bernardino Line Legend UN Urban Neighborhood CL Core Living VN Village Neighborhood MU Mixed Use MU Overlay REC Recreation Transit Potential Future Connection Tunnel Connection NTS Approximate Location. Final location to be determined by owner during final mapping. N-2 N-1N-3 N-5 N-4 N-6 N-7 N-8 N-9 N-9 N-14 N-14 N-15 N-13 N-11 N-11 N-12 N-12 N-10 N-16 N-17 N-18 N-19 7th Street Empire Lakes Empire Lakes 2013425 • 10-00-15 Rancho cucamonga, ca Lewis opeRating coRp 0.5mi l estot r a n sit 0.25milestotran sit Metrolink Rancho Cucamonga Station Metrolink San Bernardino Line 6th Street 7th Street 7th Street Milliken AveNorth Legend Secondary Entry View Corridor Recreation Municipal Joint Use Facilities Development Potential Employment Transit The Ion Metrolink RanchoCucamongaStation Existing Signal Potential Connection Mixed Use Landscape Buffer Mixed Use Overlay Design Concept Future Onsite Street Connection Potential Future Connection-By Others Mixed Use Overlay Note: Figure not to scale. Exhibit C Planning Area IB Planning Area IB developMenT plan and gUidelines | J U ly 2022 The ResoRT specific plan 9-17 Section 9Table 9.1: PA1B Development Program North of 6th Street Placetypes Acres(1) Non-Residential Max SF Residential Permitted Density Range(2) Minimum Permitted Units(2) Maximum Permitted Units(2) Transit (T)1.2 25,000(3)--- Mixed Use (MU)3.34 75,000 combined 14-40 0 133 2.43 35-55 0 134 Urban Neighborhood (UN)18.14 -24-80 435 1,451 Core Living (CL)25.41 -18-35 416 889 Village Neighborhood (VN)7.85 -16-28 126 220 Potential Subtotal 58.37 75,000 16.7 - 48.4 977 2,875 Net Developable Minimum Required(1)/ Maximum Permitted 58.37 100,000 27.3 - 34.2 1,594 2,000 Non-Developable Recreation (REC) 2.54 (3)- -- Roads/Misc. OS 21.12 ---- Non-Developable Subtotal 23.66 (4)--- Gross Developable Minimum Required(1)/ Maximum Permitted 82.03 100,000 19.4 - 24.3 1,594 2,000 PA1B Mixed-Use Overlay Acres(1) Non-Residential Max SF Residential Permitted Density Range(2) Minimum Permitted Units(2) Maximum Permitted Units(2) Minimum Required SF North of 6th Street -20,000(5)Consistent with Underlying Placetype Table notes: (1) Exact acreage, configuration, and boundary lines subject to final design. Minimum required units regulated by target units on a per parcel basis. See 9.7 Implementation for parcel target units, tracking, and density transfers. (2) Development of each parcel may occur at any density within the established range; however, in no case shall the total number of dwelling units developed exceed the Gross PAIA and PA1B Total of 3,450 dwelling units. (3) Development SF in the T Placetype was not included in the EIR analysis because it is adjacent to a Transit Station and provides Transit supportive uses. Therefore the 220,000 SF maximum for PA1A and PA1B is equivalent to the 195,000 SF in the EIR. (4) Development square footage within the REC Placetype is for private use by residents of PAIA and PA1B, not contributing to trip generation of the site, and is therefore not subject to the square footage maximum established by this table or the applicable EIR traffic study. Any non-residential use developed for public access within the REC Placetype shall be subject to the 220,000 SF maximum. The City of Rancho Cucamonga may include up to 25,000 SF and up to 1.75 acres of Planning Area N-13 for Municipal Joint Use Facilities. (5) A minimum of 50,000 SF of non-residential development in the Overlay is required; if only 20,000 SF is developed south of 6th Street, 30,000 SF of non-residential use is required north of 6th. General Note: Aggregate of all PAI non-residential development, (excluding recreation area development within the REC Placetype), shall not exceed the 220,000 SF maximum. 9-62 The Resort E. Vehicular Circulation The street and circulation feature sections in Figures 9.29 through 9.43e establish standards for vehicular circulation throughout PAIB. The landscaping shown in the street sections is conceptual and for illustration purposes only. All streets and features shall promote efficient circulation of vehicles, bicycles, and pedestrians. Incorporation of traffic calming features is highly encouraged as feasible based on traffic analysis. The location and alignment of residential streets for interior circulation (Neighborhood Streets, Private Drive Aisles,and Alleys) will be established at the time of tentative map submittal. Where parallel or perpendicular street parking is shown on the following figures, diagonal parking may be substituted as an appropriate parking option subject to RCFPD and City Engineering Department approval. Figure 9.29: PA1B Vehicular Circulation Diagram MetrolinkRancho CucamongaStation 6th Street 7th Street Milliken AvenueMetrolink - San Bernardino Line NTSCleveland AvenueApproximate Location. Final location to be determined by owner during final mapping. Legend Street A Street B Street C Street D Street E Street F Street G Potential Future Connection Exhibit D RESOLUTION NO. 22-26 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT MAP SUBTT20440, A REQUEST TO SUBDIVIDE A VACANT PARCEL OF APPROXIMATELY 91 ACRES INTO 16 LOTS WITHIN PLANNING AREA 1B OF THE RESORT SPECIFC PLAN, LOCATED NORTH OF 6TH STREET BETWEEN MILLIKEN AVENUE TO THE EAST, CLEVELAND AVENUE TO THE WEST, AND THE RAIL LINE TO THE NORTH; AND MAKING FINDINGS IN SUPPORT THEREOF – APN: 0209-272-20. A.Recitals. 1.SC Rancho Development Corp. (Lewis Operating Corp.), filed an application for the issuance of Tentative Tract Map SUBTT20440, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2.On the 14th day of September 2022, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3.All legal prerequisites prior to the adoption of this Resolution have occurred. B.Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1.This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2.Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on September 14, 2022, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a.The application applies to the undeveloped property roughly 91 acres in size located north of 6th Street between Milliken Avenue to the east, Cleveland Avenue to the west, and the rail line to the north, further identified by assessor’s parcel number 0209-272-20; and b.The existing land uses on, and General Plan land use and zoning designations for, the project site and the surrounding properties (relative to the above-noted) are as follows: Land Use General Plan Zoning Site Vacant City Center Resort Specific Plan (Placetypes: Transit, Mixed Use, Urban Neighborhood, Core Living, Village Neighborhood, Recreation) North Industrial/Manufacturing Neo-Industrial Neo-Industrial Exhibit E PLANNING COMMISSION RESOLUTION NO. 22-26 TENTATIVE TRACT MAP SUBTT20440– SC RANCHO DEVELOPMENT CORP. September 14, 2022 Page 2 South Multifamily Residential, Single-Family Residential Urban Neighborhood Resort Specific Plan (Placetypes: Mixed Use, Core Living, Village Neighborhood, Recreation) East Multifamily Residential, Metrolink Station City Center Center 2 West Office, Industrial 21st Century Employment Mixed Employment 2 c. The proposal is to subdivide a property of approximately 91 acres into sixteen (16) lots for future development of Planning Area 1B (PA1B) of the Resort Specific Plan, which among other things, calls for the development of walkable, mixed-use community providing a range of opportunities for living, recreation, and working; and d. The tentative map is designed to be consistent with the circulation and development plan for PA1B in the Resort Specific Plan, including lot sizes, street types, street placement, among others; and e. The proposal is for a tentative map only and does not include any development proposal or development application. All future development will require submittal of separate applications for review in compliance with the Resort Specific Plan and the City’s Development Code, including Lot 14 and Lot 15, which will require a subsequent subdivision and incorporation of additional street connections as part of any future development; and 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the tentative tract is consistent with the General Plan, Development Code, and the Resort Specific Plan. The proposal involves a subdivision for development of a mixed- use community development within PA1B of the Resort Specific Plan. The Specific Plan provides criteria to help guide the development of a mixed-use community as envisioned by the Resort Specific Plan and further expected by the City Center land use designation of the General Plan. The Resort Specific Plan is intended to develop into a walkable, mixed-use community that prioritize pedestrian activity while still ensuring adequate vehicle circulation is maintained. The tentative tract map implements these expectations of the Resort Specific Plan and the General Plan with the creation of developable lots that meet the development density and intensities of the Specific Plan, and with the integration of the circulation network that will provide strong access and movement for pedestrians and vehicles. b. The design or improvements of the tentative tract is consistent with the General Plan, Development Code, and Resort Specific Plan. The proposal involves a subdivision for development of a mixed-use community development within PA1B of the Resort Specific Plan. The Specific Plan provides criteria to help guide the development of a mixed-use community as envisioned by the Resort Specific Plan and further expected by the City Center land use designation of the General Plan. The tentative tract map implements these expectations of the PLANNING COMMISSION RESOLUTION NO. 22-26 TENTATIVE TRACT MAP SUBTT20440– SC RANCHO DEVELOPMENT CORP. September 14, 2022 Page 3 Resort Specific Plan and the General Plan with the creation of developable lots that meet the development density and intensities of the Specific Plan, and with the integration of the circulation network that will provide strong access and movement for pedestrians and vehicles. c. The site is physically suitable for the type of development proposed. Currently, the site is undeveloped. The proposed project involves the establishment of developable lots and a new circulation network through the tentative map process. The proposed site is roughly 91 acres and has been analyzed and designed to accommodate the anticipated development intensities and densities provided in the Resort Specific Plan for PA1B. d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat. An Environmental Impact Report was certified for the establishment of the Resort Specific Plan, which called for the development of a mixed-use community at a range of densities and intensities. The EIR covered all potential impacts to humans and wildlife and provided necessary mitigations to reduce any identified impacts to less than significant. The proposed tentative tract map will be required to comply with all mitigation measures identified for the project site. Additionally, the potential for environmental damage to wildlife habitat is less than likely, as the site has completed mass grading across the site as part of the Specific Plan adoption in 2016 and the clearing of previous land use activities on the site. e. The tentative tract is not likely to cause serious public health problems. The proposed project involves a subdivision for the development of a mixed-use community that is a continuation of a similar development south of the project site. The future mixed-use community will combine residential and non-residential use in a cohesive manner that encourages healthy and active living, and ultimately establishes a built environment that focuses on people first. f. The design of the tentative tract will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. The project incorporates several points of access into the project site to complement that development pattern and program for the PA1B. Any identified easements have been considered in the design of the circulation network and land use plan and are not expected to cause any potential conflict with future development. 4. Pursuant to the California Environmental Quality Act (CEQA), the City certified an Environmental Impact Report (EIR) (SCH No. 2015041083) on May 18, 2016, in connection with the City’s approval of General Plan Amendment DRC2015-00114, Specific Plan Amendment DRC2015-00040, and Development Code Amendment DRC2015-00115 associated with the approval and establishment of the Resort Specific Plan. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR is required in connection with subsequent discretionary approvals of the same project as there have been a) no substantial changes proposed to the project that indicate new or more severe impacts on the environment; b) no substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts; c) no new important information shows the project will have new or more severe impacts than previously considered; and d) no additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. PLANNING COMMISSION RESOLUTION NO. 22-26 TENTATIVE TRACT MAP SUBTT20440– SC RANCHO DEVELOPMENT CORP. September 14, 2022 Page 4 The proposed tentative tract map is consistent with the Resort Specific Plan and does not propose substantial changes which will require major revisions to the Final EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. No new information of substantial importance was found that would create new significant effects, increase the severity of previously examined effects, determine that mitigation measures or alternatives previously found not to be feasible would in fact be feasible, or introduce mitigation measures or alternatives that are considerably different from those analyzed in the Final EIR that would reduce significant impacts. The tentative tract map establishes developable lots that will accommodate the anticipated development densities, intensities, and development patterns envisioned by the Specific Plan and analyzed by the Final EIR. Therefore, no additional environmental review is required in connection with the City’s consideration of tentative tract map SUBTT20440 for the PA1B of the Resort Specific Plan. The Planning Commission has independently reviewed City staff’s determination, and based upon the whole record before it, and its independent review and judgement, finds that the tentative tract map is not subject to further environmental review. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the attached Conditions of Approval. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF SEPTEMBER 2022. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Bryan Dopp, Chairman ATTEST: Matthew R. Burris, Secretary, AICP, LEED AP I, Matthew R. Burris, Secretary, AICP, LEED AP, of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of September 2022, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Conditions of Approval Community Development Department Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions All conditions of approval associated with the approval of General Plan Amendment DRC 2015-00114, Specific Plan Amendment DRC2015-00040, Development Code Amendment DRC 2015-00115, Tentative Tract Map SUBTT20073, and Specific Plan Amendment DRC 2020-00164 including all environmental requirements and Mitigation Monitoring and Reporting requirements associated with the Final certified EIR (SCH No. 2015041083), shall remain in effect and complied with where applicable as part of the approval of this Tentative Tract Map. 1. The developer is required to annex the subject property into existing CFD 2018-01 to finance the maintenance of certain public improvements and the provision of certain public services. The developer shall reimburse the City for its cost to complete the CFD annexation in accordance with the process set forth in the City’s CFD Policies and Goals for the annexation into CFD 2018-01. This condition must be completed before approval of a Final Map for Tentative Tract Map SUBTT20440. 2. The developer is required to form a new CFD to finance maintaining and servicing landscape and tree maintenance, storm drain repair and maintenance, streets and roadway services, public safety services, including, but not limited to, police and fire safety calls and services, public works capital maintenance projects and a capital reserve account for any future repairs and maintenance within the greater Metrolink activity area (beyond the Cucamonga Station site alone) or pay an in -lieu deposit to finance such maintenance and services equal to 100 years. The City will produce a fiscal impact analysis to demonstrate the proportionate impact of these services caused by the development of the subject property before the formation of the proposed new CFD and the rate applicable to the subject property shall be so apportioned. This condition must be completed before approval of a Final Map for Tentative Tract Map SUBTT20440. The developer shall reimburse the City for its cost to complete the CFD formation in accordance with the process set forth in the City ’s CFD Policies and Goals for the formation of the CFD. Should the developer opt to annex into CFD 2018-01 and form the proposed new CFD in lieu of making a cash deposit for such services, the developer shall provide funding for both annexations into CFD 2018-01 and the formation of the new CFD. A $50,000 deposit is required and a minimum of $5,000 of the deposit is non -refundable for City administration costs per our City ’s Goals and Policies. The City may request additional funds to offset the costs and expenses for the CFD proceedings per our City ’s Goals and Policies. This condition must be completed before initiating the CFD formation and annexation processes, as applicable, and before approval of a Final Map for Tentative Tract Map SUBTT20440. 3. This approval is for the subdivision of roughly 92 acres of land into sixteen (16) Lots within Planning Area 1B of the Resort Specific Plan. The subdivision shall remain in substantial conformance with the requirements of the Resort Specific Plan, including but not limited to, all parcel sizes, development intensities, circulation requirements, among others. 4. www.CityofRC.us Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions The future subdivision of Lot 14 and Lot 15 of SUBTT20440 shall occur in conformance with the requirements of the Resort Specific Plan, including all parcel sizes, circulation /street connections, street types, among others. 5. All future entitlement applications and subdivision applications for future development of the Lots created under SUBTT20440 shall require separate review in accordance with City requirements and the Resort Specific Plan for PA1B. 6. Prior to the recordation of the final map for SUBTT 20440, the property owner /developer shall dedicated land, pay in-lieu fees, or a combination of both for the provision of neighborhood and community parks for recreational purposes. Land to satisfy dedication requirements shall be conveyed to the City at the time of recordation of the Final Map. In-lieu fees shall be paid to the City prior to the recordation of the Final Map. 7. Standard Conditions of Approval The applicant shall sign the Statement of Agreement and Acceptance of Conditions of Approval provided by the Planning Department. The signed Statement of Agreement and Acceptance of Conditions of Approval shall be returned to the Planning Department prior to the submittal of grading/construction plans for plan check, request for a business license, and /or commencement of the approved activity. 8. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. In the event such a legal action is filed, the City shall estimate its expenses for litigation. The applicant shall deposit such amount with the City or enter into an agreement with the City to pay such expenses as they become due. 9. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 10. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Exemption fee in the amount of $50.00. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing or within 5 days of the date of project approval. 11. Engineering Services Department Standard Conditions of Approval www.CityofRC.us Page 2 of 8Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval The developer shall make a good faith effort to acquire the required off -site property interests necessary to construct the required public improvements, and if he /she should fail to do so, the developer shall, at least 120 days prior to submittal of the final map for approval, enter into an agreement to complete the improvements pursuant to Government Code Sections 66462 and 66462.5 at such time as the City decides to acquire the property interests required for the improvements. Such agreement shall provide for payment by the developer of all costs incurred by the City if the City decides to acquire the off -site property interests required in connection with the subdivision. Security for a portion of these costs shall be in the form of a cash deposit in the amount given in an appraisal report obtained by the City, at developer's cost. The appraiser shall have been approved by the City prior to commencement of the appraisal. This condition applies in particular, but not limited to: The connection between E Street and 7th Street 1. Corner property line cutoffs shall be dedicated per City Standards.2. All existing easements lying within future rights -of-way shall be quit -claimed or delineated on the final map. 3. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails, public paseos, public landscape areas, street trees, traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and /or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 4. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of Building Permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 5. Public storm drain easements shall be graded to convey overflows in the event of a blockage in a sump catch basin on the public street, and provisions made to pass through walls. 6. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 7. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. 8. All proposed public landscaping and irrigation systems shall be continuously maintained by the developer until accepted by the City. 9. A signed consent and waiver form to join and /or form the appropriate Landscape Districts, Lighting Districts, and/or Community Facilities District shall be filed with the Engineering Services Department prior to final map approval or issuance of Building Permits whichever occurs first. Formation costs shall be borne by the developer. 10. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall be submitted to the Engineering Services Department for review and approval prior to final map approval or issuance of Building Permits, whichever occurs first. The following landscaped parkways, medians, paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance District:: 11. www.CityofRC.us Page 3 of 8Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval If possible, install a connection to a Cucamonga Valley Water District or Inland Empire Utilities Agency recycled water line for use irrigating the public landscape area being constructed. 12. Add the following note to any private landscape plans that show street trees: “All improvements within the public right-of-way, including street trees, shall be installed per the public improvement plans .” If there is a discrepancy between the public and private plans, the street improvement plans will govern. 13. Developer shall install a dark fiber conduit package fronting the development. Two 4” Schedule 40 PVC conduits, along with three 1 ¼” innerducts in one of the 4” conduits, per City Standard 145. The size, placement, and location of the conduit shall be shown on the Street Improvement Plans and subject to Engineering Services Department review and approval prior to issuance of Building Permits or final map approval, whichever comes first. 14. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy, fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 15. www.CityofRC.us Page 4 of 8Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of Building Permits, whichever occurs first. b. Prior to any work being performed in public right -of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring . Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer. Notes: 1) Pull boxes (where required) shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit (where required) shall be 3-inch pvc with pull rope or as specified. e. Access ramps for the disabled shall be installed on all corners of intersections per latest ADA standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single-family residential lots. h. Street names shall be approved by the Planning Manager prior to submittal for first plan check. 16. www.CityofRC.us Page 5 of 8Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. The street species shall be approved by the Public Works Department. Street improvement plans shall include a line item within the construction legend stating: Street trees shall be installed per the notes and legend on Sheet 1. Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. Street Name Botanical Name Common Name Min. Grow Space Spacing Size Qty. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. Street trees are to be planted per public improvement plans only. 17. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. 18. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped areas, etc.) shown on the plans and /or tentative map shall be constructed to City Standards, governing specific plans, and agreements. Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement, drive approaches, sidewalks, street lights, and street trees. 19. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 20. Developer shall execute a Line Extension Agreement for electric service and shall construct electrical distribution facilities in accordance with such agreement and shall construct electrical distribution facilities in accordance with such agreement and Rancho Cucamonga Municipal Utility requirements and dedicate such facilities to the Rancho Cucamonga Municipal Utility. The Rancho Cucamonga Municipal Utility shall be the electrical service provider for all project related development. 21. The developer shall be responsible for the relocation of existing utilities as necessary.22. www.CityofRC.us Page 6 of 8Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 23. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 24. Grading Section Standard Conditions of Approval Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan (s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 1. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 2. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 3. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 4. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit. 5. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign (s) shall be located outside of the public right of way. 6. If a Rough Grading and Drainage Plan /Permit are submitted to the Engineering Services Department for review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading and Drainage Plan/Permit. 7. The Grading and Drainage Plan shall implement City Standards for on -site construction where possible, and shall provide details for all work not covered by City Standard Drawings. 8. www.CityofRC.us Page 7 of 8Printed: 9/7/2022 Project #: SUBTT20440 Project Name: EDR - The Resort Location: 9097 CLEVELAND AVE - 020927220-0000 Project Type: Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Building and Safety Official. 9. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre -grading meeting. The meeting shall be attended by the project owner /representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i)The bottom of the over-excavation; ii)Completion of Rough Grading, prior to issuance of the building permit; iii)At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 10. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on -site storm water drainage prior to issuance of a grading permit. The report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 11. Prior to issuance of a grading permit the applicant shall demonstrate that the storm water run -off will not adversely affect the downstream properties and that the water may legally discharge to the downstream properties. The engineer of record shall show on the final permitted grading and drainage plan one (1) or more of the following items are met: a) There is sufficient downstream capacity to accept the proposed storm water flows and that the downstream property owner have provided permission to accept the upstream storm water flows; b) a legal document /entity exists allowing developed storm water flows to be discharged to the property lower in elevation; c) a storm drain system to safely convey the storm water flows to a public storm drain system without causing flooding to adjacent property(ies). 12. www.CityofRC.us Page 8 of 8Printed: 9/7/2022