HomeMy WebLinkAbout2022-11-09 - SupplementalsPlanning Commission
November 9, 2022
DRC2019-00850
Project:–A request for a site plan and design review of a mixed-use development
comprising 311 residential units and 16,000 square feet of commercial lease area on
7.94 acres of land
Entitlement:Design Review DRC2019-00850
Zoning Designation:Center 2 (CE2)(Previously Mixed Use Urban Corridor)
General Plan Designation:City Center
Project Overview
Location
Street View
The existing Land Use, General Plan and Zoning Designations for the project site
and adjacent properties are as follows, based on the General Plan Land Use and
Zoning designation at the time that the project was deemed complete (April 27, 2022)
Land Use General Plan Zoning
Site Vacant City Center Mixed Use Urban Corridor (MU-UCT)
District*
North Commercial Center Mixed-Use City
Corridor High Community Commercial (CC) District
South County Court House City Center Industrial Park (IP) District*
East Existing Office Building City Center Industrial Park (IP) District*
West Existing Office Building City Center Industrial Park (IP) District*
*Project Site Redesignated Center 2 (CE2) Zone with Zoning Map Update
Background
•The 7.94-acre project site is part of a larger 14-acre area that is currently
developed with two 80,000-square-foot 4-story office buildings;
•Prior to formal project submittal to the City,a pre-application review was
submitted (June 19,2018)for the project that was reviewed by the Planning
Commission on October 24,2018,March 13,2019,and June 26,2019;
•The current project design is similar to that which was reviewed by the
Planning Commission in June 2019;
•The main focus of the changes were to access,circulation and the
residential/commercial land use makeup to better align the project with the
new General Plan.
Site Plan
Landscape Plan
Proposed Intersection Detail
Unit Composition
UNIT SUMMARY
Residential
Unit Type Unit Size (SF -Net)Number of Units
1 Bedroom 660 to 887 SF 200
2 Bedroom 1,041 to 1,079 SF 105
3 Bedroom 1,285 SF 6
Total Number of Units 311
Commercial Total Area
Commercial (SF)N/A 16,000
Renderings
Renderings
Renderings
Elevations
Elevations
Recreational Amenities
The project includes the following shared amenities:
•Clubhouse with kitchen and game room;
•Media lounge;
•Business center;
•Gym;
•Yoga room;
•Pool/spa with lounge seating areas and fire pit;
•Pocket park with children’s play elements;
•Two rooftop decks (one each on Buildings A and B)that include seating areas
and fire pits.
Development Code Compliance
COMPLIANCE TABLE
Development Standard Required Proposed Complies
Density 40 DU/AC 40 DU/AC YES
Building Setback –
Foothill (Major)0-5’5’YES 1
Parking Setback –
Foothill (Major)30’105’YES
Building Setback –West
Property Boundary 5’170’YES 1
Parking Setback –Haven 30’60’YES
Building Setback –East
Interior Boundary 5’175’
YES 1
Parking Setback –Aspen 30’55’YES
Interior Rear Setback 0’10”YES
Building Height 12 stories 65’YES
Landscape Area 10%14.5%YES
Open Space 150 sf/unit*
(46,560 sf)50,359 sf YES
1 –Complies with reductions applied for Mixed Use Developments outlined in
RCMC Sec. 17.36.020
Density Bonus
•The applicant proposes making 5 percent of the 311 units affordable to very low-
income households,which translates into providing 16 affordable units;
•Rent for the designated affordable units are based on the tenants not paying
greater than 30 percent of their annual income towards rent.To qualify,the target
groups rent cannot exceed 50 of the Annual Medium income (AMI)of the County
based on household size;
•State and local Density Bonus Law affords projects that meet affordability
thresholds with reduced parking requirements including the elimination of required
guest parking;
Comparison of Average Market Rent to Affordable Rent
Number of Bedrooms 1 Bedroom 2 Bedroom 3 Bedrooms
Rancho Cucamonga Average Rent $2,102 $2,265 $3,190
Affordable Rent (30% of AMI)$874 $983 $1,093
Estimated Affordable Rents
State Income Limits
Number of Persons in Household 1 2 3 4 5
SB County
Area Median Income
$87,400
Acutely Low Income $9,150 $10,500 $11,800 $13,100 $14,150
Extremely Low Income $18,500 $21,150 $23,800 $27,750 $32,470
Very Low Income $30,800 $35,200 $39,600 $44,000 $47,550
Lower Income $49,300 $56,350 $63,400 $76,050 $76,050
Median Income $61,200 $69,900 $78,650 $94,400 $94,400
Moderate Income $73,450 $83,900 $94,400 $113,300 $113,300
Source: CA HCD 2022
Density Bonus Approval
•The City Council is the approving body for Density Bonus requests.A Condition of
Approval for the project requires the approval of a Housing Covenant prior to the
approval of building permits;
•The housing covenant shall outline the number of required affordable units,the
type of units (number of bedrooms),the affordability factor,the number of years
that the units are required to remain affordable (minimum 55 years)and a
verification regime to substantiate that the project is complying with the terms of
the agreement.
•By condition of approval,a housing affordability covenant shall be approved by
the City Council prior to the approval of building permits.
Parking
Table 6 -PARKING ANALYSIS*
Number
of
Units
Square Footage Parking Ratio Required
Parking
Multi-family unit
(one bedroom)200 N/A 1 per unit 200
Multi-family unit
(two bedrooms)105 N/A 1.5 per unit
158
Multi-family unit
(three bedrooms)6 N/A 1.5 per unit 9
Commercial N/A 16,000 1 per 250 SF 64
Visitor parking N/A N/A N/A N/A
Total Parking Spaces Required 431
Total Parking Spaces Provided (Project Site -Parcel 2)456
Total Covered Parking Spaces 317
Total Parking Frontage Drive (Not Counted Towards Required Parking)29
Parking Surplus 25
*Based on Density Bonus chapter of the Development Code (Chapter 17.46)
Total # Residential Units = 311 Development Code
Parking Ratio
Density Bonus
Parking Ratio
Required Under
Development Code
Required Under
Density Bonus
1 bedroom –200 Units 1.5 Spaces 1 Space 300 Spaces 200 Spaces
2 bedrooms –105 Units 2 Spaces 1.5 Spaces 210 Spaces 158 Spaces
3 bedrooms –6 Units 2 Spaces 1.5 Spaces 12 Spaces 9 Spaces
Guest Parking Spaces 1:3 Units N/A 104 Spaces 0 Spaces
Commercial (16,000)1:250 SF 1:250 SF 64 Spaces 64 Spaces
Total 690 Spaces 431 Spaces
Parking
Parking Management Plan
•A Parking Management Plan (PMP)(LSA,October 25,2022)was submitted
which provides measures to ensure adequate and convenient parking for each of
the uses on the project site and the adjacent office buildings (Parcels 1,2,and 3);
•These measures include implementing a parking permit program,monitoring the
availability of parking in enclosed private garages,and providing and monitoring
short-term parking spaces.A condition of approval is proposed by staff to ensure
long-term compliance with this plan.
•With the development of the project,there will be 668 total parking spaces across
all three parcels,which includes 509 open parking spaces,and 159 parking
spaces in garages and gated.This includes 103 parking spaces on Parcel 1,297
parking spaces on Parcel 2 (project site),and 109 parking spaces on Parcel 3.
Public Art
•This project is required to provide public art as outlined in Chapter 17.124 of the
Development Code.Based on the number of residential units and commercial
square footage for this project,the total art value required per Section
17.124.020.C.is $249,250.A condition has been included pursuant to the
Development Code that requires the public art requirement to be fulfilled prior to
occupancy.
•The project was reviewed by the Design Review Committee (DRC –Williams, and
Morales) on August 2, 2022. The Committee approved the project as presented.
Design Review Committee
Environmental Assessment
•Project as proposed is within the density and uses was contemplated for
this 7.94-acre site in the General Plan EIR, certified on December 15,
2021.
•Project is consistent with all applicable General Plan policies.
•A compliance memorandum was prepared demonstrating that the project
is in compliance with CEQA Guidelines Section 15183(c).
Additional Conditions of Approval
Parking Management Plan
The project shall remain in compliance with the parking management plan at all
times. In the event of any observed parking violations to the parking management
plan, the City reserves the right to require the preparation of off-site, on-street
parking restrictions such as, but not limited to, permit parking, no parking signage,
time-limit parking signage, red curb, and/ or similar parking restrictions.
Traffic Signal Maintenance
Prior to final occupancy, the applicant shall enter into a maintenance agreement
with the City to compensate the City for its long-term maintenance of the traffic
signal required to be installed under Engineering Condition No. 7.If, prior to final
occupancy, the City has established a community facilities district or other
financing district to finance the long-term maintenance of the required traffic
signal, then the applicant may satisfy this condition by annexing the subject
property into the district in lieu of a maintenance agreement.
Staff Recommendation
Staff recommends that the Planning Commission adopt Resolution 22-29 approving
the proposed mixed-used development on the vacant parcel of land at the southeast
corner of Foothill Boulevard and Haven Avenue,subject to the attached Conditions
of Approval,including the new conditions of approval.
•New signalized intersection on Foothill Boulevard and main drive aisle;
•New one-way frontage road parallel to Foothill Boulevard;
•New access drives from Foothill Boulevard adjacent to the existing office
buildings:
•Two vehicle/pedestrian connections to the San Bernardino County Courthouse
to the south:
•Sidewalk connections to Haven Avenue and Aspen Avenue;
•Land use mix modified from the original 302 residential units,8 live-work units,
and 5,000 square feet of commercial space to 311 residential units and 16,000
square feet of commercial lease area.
Changes Based on New General Plan