Loading...
HomeMy WebLinkAbout00-211 - Resolutions RESOLUTION NO. 00-211 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, ADOPTING THE FIVE- YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2000/01 THROUGH 2004/05 AND TWENTY-YEAR TRANSPORTATION PLAN BEGINNING IN FISCAL YEAR 2000/01 FOR THE EXPENDITURE OF MEASURE "I" FUNDS On Wednesday, October 18, 2000, on motion by Councilmember Bob Dutton, seconded by Councilmember Paul Biane_, and carried, the City Council of the City of Rancho Cucamonga, County of San Bernardino, finds as follows: WHEREAS, San Bernardino County voters approved passage of Measure "I" in November, 1989 authorizing San Bernardino Associated Governments, acting as the San Bernardino County Transportation Authority, to impose a one-half of one percent retail transactions and use tax applicable in the incorporated and unincorporated territory of the County of San Bernardino; and WHEREAS, revenue from the tax can only be used for transportation improvement and traffic management programs authorized in the Expenditure Plans set forth in Ordinance No. 89- 1 of Authority; and WHEREAS, Expenditure plans of the Ordinance requires each local jurisdiction receiving revenue from the tax to expend those funds pursuant to a Five-Year Capital Improvement Program and Twenty-Year Transportation Plan adopted by resolution of the local jurisdiction, and WHEREAS, Expenditure Plans of the Ordinance also require that each local jurisdiction annually adopt and update the ;,Five and Twenty-Y•ear pans. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rancho Cucamonga, State of California, hereby adopts the Measure "I" Five-Year Capital Improvement Program and Twenty-Year Transportation Plan, a copy of which is attached to this resolution. Resolution No. 00-211 Page 2 of 7 PASSED, APPROVED, AND ADOPTED this 18`h day of October 2000. AYES: Alexander, Biane, Curatalo, Dutton, Williams NOES: None ABSENT: None ABSTAINED: None eCPi William J. Alexa der, Mayor ATTEST: dcacto De a J. Adams,CMC, City Clerk I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed, approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting of said City Council held on the 18`h day of October 2000. Executed this 19`h day of October, at Rancho Cucamonga, California. Debra J. Ada CMC, City Clerk CITY OF RANCHO CUCAMONGA MEASURE I FIVE YEAR PLAN 2000/05 Coit Estimate ($) YEAR STREET 8 LIMITS 159,000 00/01 6th St-Archbald to Hermosa Pavement Rehabilitation 339,000 6th St- Haven to Milliken Pavement Rehabilitation 421,000 6th St- Milliken to Hyssop - Pavement Rehabilitation - - 4,000 7th St- Milliken to Pittsburgh Pavement Rehabilitation - 7.__0- 8th St-Archibald to Haven Pavement Rehabilitation 666 - - Pavement Rehabilitation - 26th St-Center to Haven - - - - _ Intersection ramps and driveway modifications 103,000 ADA Corrective Measures- City Wide - - - -- Pavement Rehabilitation __._ - 365.060 Amethyst St- 19th to Hillside -- Amethyst St- Hillside to North City Limits Pavement Rehabilitation and widening - - 8P2,000 Arrow Rte-Grove to Baker Arrow Rte at Hellman AV Pavement Rehabilitation and widening _ - _ _ _- . - . - - -- - - - 72,000 -- - - Remove crossgutter and replace with storm ram _.._ -"" 113,000 - Left turn lane for driveway Arrow Rte- East of Rte 115 y -- - - - - - - m-a- -- - - --- 135,000 - Pavement Rehabilitation Baseline Rd -Vineyard to Hellman -_ ---- -- - --- -- - 2,000 - Beryl-St- - e to Pavement Rehabilitation - Baseline to 19th - _ _ ------ _-__ _._ - 212,000 --- - t -- - Pavement Rehabilitation Carnelian St-Vineyard to Base Line - - - - ---" - - _._ Pavement Rehabilitation - " " 7,000 Center St-6th to 7th -- ------ --- -- - 10,000 - - - - - -- -" -- Pavement Rehabilitation -- - Center St- 7th to 8th __.__ .._. - .-_- ------ 10,000 bay- -_ .. Construct west roadbed to connect to Rte 30 Frwy _ _ _ Day Creek BI_Baseline to Highland 68.2,000 - - Construct median island & bridge widening Foothill BI -Vine aril to Haven - 9- - - - - - - - --y- - Grove Av - Bth to Foothill Study - _ _ -_ _ _ _. _ _ - - - Pavement Rehabilitation 2,000 Haven AV - Lemon to Wilson _ - - - 180,000 Hellman AV at 9th St Repair east side of intersection Pavement Rehabilitation 4,000 Helms AV - Feron to 9th - 195,000 � - - - -- - - - - Pavement Rehabilitation CD Lemon AV- Carnelian to Beryl - - - - 425,000 0 Local Streets - City Wide Pavement Rehabilitation I c Pavement Rehabilitation 7,000 Marine AV - Humbolt to 26th - j 411,000 � Milliken AV -4th to 7th i Pavement Rehabilitation and widening Pavement Rehabilitation 11,000 o Pittsburgh AV -4th to 6th 6,000 m o Pavement Rehabilitation Reconstruct 5,000 0 o Pittsburgh AV - 6th to 7th Rancheria Dr- Grove to Tapia Via -4 Page 1 of 3 CITY OF RANCHO CUCAMONGA MEASURE I FIVE YEAR PLAN 2000/05 YEAR STREET& LIMITS IMPROVEMENT Cost Estimate ($) Sapphire St-!Moon to Almond Pavement Rehabilitation 2,000 Terra Vista Pkwy -Church to Spruce Pavement Rehabilitation 8,000 Vineyard Av-9th to Foothill Install bus bays 2,000 FY 00/01 Total 4,744,000 01/02 26th St-Center to Haven Pavement Rehabilitation 150,000 ADA Corrective Measures -City Wide Intersection ramps and driveway modifications 100,000 Haven Av - Baseline to Highland Ph 2 Widen west side, pavement rehabilitation, & storm drain 500,000 Local Streets -City Wide - Pavement Rehabilitation 400,000 Pittsburgh Av-4th to 6th Pavement Rehabilitation 250,000 Terra Vista Pkwy -Church to Spruce -- Pavement Rehabilitation 200,000 - -- - - ------ ...----- - ----- ----— - --- .._... - - -- - ---- --- FY 01/02 Total 1,600,000 02/03 ADA Corrective Measures -City Wide Intersection ramps and driveway modifications 100,000 Center Av-6th to 7th Pavement Rehabilitation 200,000 __ - -- - ------ - --- -- - - -- -- Center Av - 7th to 8th Pavement Rehabilitation 200,000 Etiwanda Av - Foothill to Baseline Ph 1 i Street widening and widening of 1-15 underpass 100,000 Haven Av - Baseline to Highland Ph 3 Widen west side, pavement rehabilitation, & storm drain 500,000 Local Streets - City Wide (Pavement Rehabilitation 400,000 Wilson Av-Amethyst to Haven :Design street widening and pavement rehabilitation 100,000 FY 02/03 Total 1,600,000 03/0.4 Archibald Av- S/O Banyan to Hillside I Design street widening and pavement rehabilitation 70,000 Etiwanda Av - Foothill to Baseline Ph 2 Street widening and pavement rehabilitation 800,000 Haven Av- Baseline to Highland Ph 4 Widen west side, pavement rehabilitation, & storm drain 500,000 Local Streets - City Wide Pavement Rehabilitation 400,000 Wilson Av -Amethyst to Haven Street widening and pavement rehabilitation 300,000 (NSD FY 03/04 Total 2,070,000 0 04/05 Archibald Av - S/O Banyan to Hillside Acquire right of way 50,000 o. Etiwanda Av - Foothill to Baseline Ph 3 !Street widening and pavement rehabilitation 500,000 0 Haven Av- Baseline to Highland Ph 5 'Widen west side, pavement rehabilitation, & storm drain 500,000 0 !Haven Av - Baseline to Highland East side Pavement Rehabilitation 380,000 A o I Local Streets - City Wide Pavement Rehabilitation 400,000 1 0 N V � Page 2 of 3 CITY OF RANCHO CUCAMONGA MEASURE I FIVE YEAR PLAN 2000105 YEAR ISTREET& LIMITS !IMPROVEMENT Cost Estimate ($) Wilson Av - Amethyst to Haven Street widening and pavement rehabilitation 300,000 Wilson Av- Haven to Canistel Street widening_ and pavement rehabilitation 350,000 FY 04/05 Total 2,480,000 Five Year Total 12,494,000 1 Measure I Revenue Estimate(5 Yrs.) 7,694,893 Contact: Barrye R. Hanson, Senior Civil Engineer (909)477-2740 Ext, 4065 m 0 O C_ O 7 Z o CID m o cn o O N V -+ Page 3 of 3 Resolution No. 00-211 Page 6 of 7 20 YEAR LOCAL mEASURF "I"TRANSPORTATION PLAN The 20 Year Local Measure "I"Transportation Plan for the expenditure of Measure I fun ds will use the City's General Plan Circulation Element as a base. It is anticipated that the funds will be allocated in the following manner: TYPE OF IMPROVEMENT P R NT Maintenance, Rehabilitation and Repair of 30 Existing Roadways Traffic Signal Improvements 10 Street Widening 20 Intersection Improvements 10 Railroad Crossing Improvements 10 Slurry and Chip Seal of Existing Streets 20 (See attached City's General Plan Circulation Element) i 1 I Figure III-3 1 ( � + CIRCULATION PLAN .4— IMPOSED � I IMPOSED •J$ �----------- ^ I LOG110N COLLECTOR --- ..- /- SECONDARY --- !i MAJOR ARTERIAL MAJOR DIVIDED .......... ......•••.••-• — ARTERIAL EXISTING INTERCHANGE \I ---- ----- --- , ,l O PROPOSED INTERCHANGE FREEWAYFREEWAY o � INWERcHANGLOCAL Eese GRADE SEPARATION c ti • c I ,,,,,,, r° •/ INTERSECTION FOR ( POSSIBLE WIDENING e SPECIAL BOULEVARD SPECIAL DESIGN -p L___.I SPECIAL IMPACT STUDY ZONE r -- � 1' i i m .w ......... CA ��•M1.• •.••w-..•�• •-•. • 1D Z e t c O I 1D 0 f ! ! CITY OF RANCHO CUCAMONGA -49 0 -- -- -- 1► 11128