1.0 Buildings
(A) -- 1.1 Building Permit Fees: The following fees shall be charged for
building permits:
Total Valuation Fee
$1.00 to $500.00 $10.00
$501.00 to $2,000.00 $10.00 for the first $500.00 plus
$1.00 for each additional $100.00
or fraction thereof to and including
$2,000.00.
$2,001.00 to $25,000.00 $20.00 for the first $2,000 plus $4.00
for each additional $1,000 or fraction
thereof, to and including $25,000.00.
$25,001.00 to $50,000.00 $112.00 for the first $25,000 plus
$3.00 for each additional $1,000 or
fraction thereof to and including
$50,000.00.
$50,001.00 to $100,000.00 $187.00 for the first $50,000 plus
$2.00 for each additional $1,000 or
fraction thereof to and including
$100,000.00.
$100,001.00 to $500,000.00 $287.00 for the first $100,000 plus
$1.50 for each additional $1,000 or
fraction thereof, to and including
$500,000.00.
$500,001.00 and up $882.00 for the first $500,000 plus
$1.00 for each additional $1,000 or
fraction thereof.
(B) -- 1.2 Plan Checking Fees: The Plan Checking Fees shall be as follows
"When the valuation of the proposed construction exceeds one
thousand dollars and a plan is required to be submitted by
subsection (c) of Section 301 of the Uniform Building Code,
a plan checking fee shall be paid to the building official
at the time of submitting plans and specifications for
checking. Said plan checking fee shall be equal to 75%
of the building permit fee as set forth in the schedule in
Section 1.1."
Where plans are of such complexity, are incomplete, or are
changed so as to require additional plan checking, an additional
plan-check fee shall be charged at a rate established by the
Community Development Director."
(C) -- 1.3 Code Inspection of a Structure to be Moved: The fee for a required
Code inspection of a structure to be moved shall be thirty-five
dollars ($35.00) when located within twenty-five miles (25) of the
City limits, and a fee of one dollar per mile in addition to the
original thirty-five dollars shall be paid in excess of twenty-five
miles for such Code inspection.
(D) -- 1.4 Additional Fees for Improper Occupation: If a building or structure
is occupied prior to the requirements of Section 306 (a) of the
Uniform Building Code without prior approval as provided in Section
306 (d) therein, then an inspection permit fee shall be paid by the
-2-
builder to the Building Department of $100.00 before a final
inspection shall be made. Inspection permit fees, double that
of the last violation of this section, shall be paid to the
Building Department for each repeated violation.
(E) -- 1.5 Hazardous and Unsafe Commercial Buildings: Any person may file
for an appeal from notice to abate by paying a fee of $50.00 at
the time of application for an appeal hearing.
(F) -- 1.6 Mechanical Permits: Any person desiring a permit required by
the Uniform Building Code, shall, at the time of filing an
application, therefore, pay a fee as required by this Section.
1.6.1 For the issuance of each permit ............... $ 3.00
1.6.2 For the installation or reloaation of each
forced-air or gravity-type furnace or burner,
including ducts and vents attached to such
appliance, up to and including 100,000
B.T.U's ....................................... 4.00
1.6.3 For the installation or relocation of each
forced-air or gravity-type furnace or burner,
including ducts and vents attached to such
appliance over 100,000 B.T.U.'s ................. 5.00
1.6.4 For the installation or relocation of each
floor furnace, including vent ................... 4.00
1.6.5 For the installation or relocation of each
suspended heater, recessed wall heater or
floor mounted unit heater ....................... 4.00
1.6.6 For the installation, relocation or replace-
ment of each appliance vent installed and
not included in an appliance permit ............. 2.00
1.6.7 For the repair of, alteration of, or addition
to each heating appliance, refrigeration
unit, comfort cooling unit, absorption unit,
or each comfort heating, cooling, absorption,
or evaporative cooling system, including
installation of controls regulated by this
Code ............................................ 4.00
1.6.8 For the installation or relocation of each
boiler or compressor to and including three
horsepower, or each absorption system to and
including 100,000 B.T.U.'s ...................... 4.00
1.6.9 For the installation or relocation of each
boiler or compressor over three horsepower to
and including 15 horsepower, or each absorp-
tion system over 100,000 B.T.U.'s to and
including 500,000 B.T.U.'s ...................... 7.50
1.6.10 For the installation or relocation of each
boiler or compressor over 15 horsepower to
and including 30 horsepower, or each absorption
system over 500,000 B.T.U.'s to and including
1,000,000 B.T.U.'s .............................. 10.00
1.6.11 For the installation or relocation of each
boiler or compressor over 30 horsepower to
and including 50 horsepower, or for each
absorption system over 1,O00,000 B.T.U.'s
to and including 1,750,000 B.T.U.'s ............ 10.00
1.6.12 For the installation or relocation of each
boiler or refrigeration compressor over 50
horsepower, or each absorption system over
1,750,000 B.T.U.'s ............................. 25.00
-3-
1.6.13 For each air handling unit to and including
10,000 cubic feet per minute, including
ducts attached thereto ................................. $ 3.00
NOTE: This fee shall not apply to an air
handling unit which is a portion of
a factory assembled appliance, com-
fort cooling unit, evaporative
cooler or absorption unit for which
a permit is required elsewhere in
this code.
1.6.14 For each air handling unit over 10,000 cubic feet
per minute ............................................ 5.00
1.6.15 For each evaporative cooler other than
portable type ......................................... 3.00
1.6.16 For each vent fan connected to a single duct .......... 2.00
1.6.17 For each ventilation system which is not a
portion of any heating or air conditioning
system authorized by a permit ......................... 3.00
1.6.18 For the installation of each hood which is
served by mechanical exhaust, including
the ducts for such hood ............................... 3.00
1.6.19 For the installation or relocation of
each domestic type incinerator ........................ 5.00
1.6.20 For the installation or relocation of each
commercial or industrial type incinerator ............. 20.00
1.6.21Plan Check Fees: 75% of all fees charged
except permit issuance fee, per unit.
(G) -- 1.7 Electrical Permit Fees: The fee for Electrical Permits shall be as
follows:
1.7.1 New Construction and Additions: Permit issuance fee shall be
$4.00, plus $.01 per ampere for each service switch 300 volts
or less; $.02 per ampere for each service switch 301 volts
to 600 volts; $.05 per ampere for each service switch in
excess of 600 volts. In addition, the following fees shall
apply to electrical systems contained within or on any new
structure, including new additions to existing structures:
$.0025 per sq. ft.
1. Warehouse - that part which is over 5,000 sq. ft.
2. Storage garages where no repair work is done.
3. Aircraft hangers where no repair work is done.
$.005 per sq. ft.
1. Residential accessory buildings attached or de-
tached, such as garages, carports, sheds, etc.
2. Garages and carports for motels, hotels and
commercial parking
3. Warehouses up to and including 5,000 sq. ft.
4. All other occupancies not listed, that part which
is over 5,000 sq. ft.
$.01 per sq. ft.
All other occupancies not listed up to and inclu-
ding 5,000 sq. ft.
-4-
$.001 per sq. ft.
Temporary wiring during construction.
1.7.2 Plan Check Fees: 75% of all fees charged, except permit
issuance fee, when service switch size exceeds 200 amperes
o~ 300 volts.
1.7.3 Alterations, Additions and New Construction: Where no
structural work is being done or where it is impractical
to use the square footage schedule, convert to units as
follows:
1.7.3.1Convert the following to units... then charge
$1.50 for each unit
- For each 5 outlets or fraction thereof where
current is used or controlled ........... 1 unit
-For each 5 lighting fixtures or fraction
thereof where current is used or controlled 1 unit
-For multi-outlet assembly (festoon type plug
mold, etc.) Each 20-feet or fraction thereof 1 unit
1.7.3.2 For equipment rated in Horsepower (HP), kilowatts
(KW), or Kilovolt-amperes (KVA), the fee for each
motor, transformer, and/or appliance shall be:
HP, KW, KVA, OR FRACTION THEREOF FEE
0 to 1 .................................. $1.50
Over 1 and not over l0 .................. 3.00
Over 10 and not over 50 ................. 5.00
Over 50 and not over 100 ............... 10.00
Over 100 and not over 500 .............. 15.00
Over 500 ............................... 20.00
NOTE:
1. For equipment or appliances having more than
one motor or heater, the sum of the combined
ratings may be used to compute the fee.
2. These fees include all switches, circuit breakers,
contractors, relays and other directly related
control equipment.
1.7.4 Temporary Service:
1.7.4.1 Temporary or construction service, including poles
or pedestals, each ............................ 5.00
1.7.4.2 Approval for temporary use of permanent service
equipment prior to completion of structure of
final inspection, each ........................ 5.00
1.7.4.3 Additional supporting poles, each ............. 2.00
1.7.5Miscellaneous:
1.7.5.1 Area lighting standards up to and inclu-
ding 10 a site, each .......................... 2.00
Over 10 on a site, each ....................... 1.00
-5-
1.7.5.2 Temporary sales stand including service
connections, etc ................................... $ 5.00
1.7.5.3 Inspection for reinstallation of idle
meter (removed by Utility Co.) ..................... 5.00
1.7.5.4 Any electrical work for which a permit is
required but no fee is herein provided
$10.00 per hour, minimum ........................... 5.00
1.7.6 Illuminated Signs, New, Relocated Altered
Square Feet
Up to and including 5 ....................................... 5.00
Over 5, not over 25 ......................................... 6.00
Over 25, not over 50 ........................................ 8.00
Over 50, not over 100 ....................................... 10.00
Over 100, not over 200 ...................................... 12.00
Over 200, not over 300 ...................................... 15.00
All over 300 ................................................. 03 per
sq. ft.
1.7.7 Overhead Line Construction
1. Poles and anchors, each ................................. 2.00
(H) -- 1.8 Plumbing Permits: Fees shall be paid as indicated in the following
schedule:
For issuing each permit ..................................... 3.00
In Addition:
For each plumbing fixture or trap or set of fixtures on one
trap (including water, drainage piping and backflow protection
therefore) .................................................. 2.00
For each building sewer and each trailer park sewer ......... 5.00
Rainwater systems - per drain (inside building) ............. 2.00
For each cesspool ........................................... 5.00
For each private sewage disposal system ..................... 10.00
For each water heater and/or vent ........................... 2.00
For each gas piping system of one (1) to four outlets ....... 2.00
For each gas piping system of five (5) or more, per outlet.. .50
For each industrial waste pre-treatment interceptor, including
its trap and vent, excepting kitchen type grease interceptors
functioning as fixture traps ................................ 5.00
For installation, alteration or repair of water piping and/or
water treating equipment .................................... 2.00
For repair or alteration of drainage or vent piping ......... 2.00
For each lawn sprinkler system on any one meter, including
backflow protection devices therefore ....................... 2.00
For vacuum breakers or backflow protective devices on tanks,
vats, etc. or for installation of unprotected plumbing fixtures
including necessary water piping - one (1) to four (4) ...... 2.00
Five (5) or more, each ....................................... 50
-6-
1.8.1Plan Check Fee: 75% of all fees charged except permit
issuance fee, per unit.
(i) -- 1.9 Sign Permits: All sign permit fees with the exception of subdivision signs shall be set forth in Section 4.1
(J) -- 1.10 Fee for Community Beautification: Community Beautification fees shall be as follows:
1.10.1 For each single family structure and multi-family
structure or in a hotel, motel, or dormitory, 20 cents
per square foot of gross building area under roof, or
two hundred dollars per each dwelling unit, whichever
is the greater total sum.
1.10.2 For each addition to a dwelling unit in a single family
condominium, apartment, duplex, or multiple-dwelling structure,
or in a hotel or dormitory, which addition consists of 650 square
feet or more under roof, or which addition creates an additional
dwelling unit, 20 cents per square foot of gross building area
under roof, or two hundred dollars per each dwelling unit, which-
ever is the greater total sum.
1.10.3 For each trailer space, two hundred dollars with no
additional sum for any directly accessory structure.
2.0 Land Use and Building Regulations
(K) -- 2.1 Fees for Processing Applications Affecting Zoning Laws:
2.1.1 (a) On-site Subdivision Sign
Application ..................... $ 25.00
12-month Extension ............... 50.00
Appeal .......................... 25.00
(b) Temporary Real Estate Office
Occupancy Permit Application .... 25.00
Extension ....................... 50.00
Appeal .......................... 25.00
2.1.2 General Provisions and Exceptions
(a) Temporary Trailer Coach Use Permits
Filing Fee ...................... 100.00
Renewal of same ................. 100.00
Appeal .......................... 25.00
(b) Location and Development of Permitted Uses
Filing Fee ...................... 250.00
Appeal .......................... 50.00
Extension ....................... 50.00
Nonhearing Site Approval ........ 75.00
Administrative Review and Approval 25.00
(c) Signs Adjacent to Freeways.
(1) Directional
Application Fee ............ 50.00
Appeal ..................... 25.00
(11) T-emporary, On-site
Subdivision Signs
Application ................ 50.00
Renewal .................... 50.00
Appeal ..................... 25.00
(111) Temporary - Off-site
Subdivision Signs
Application ................ 50.00
Appeal ..................... ' 25.00
12-month Extension ......... 50.00
Appeal ..................... 50.00
(d) Modifications Involving Minor Deviations
Application ................ 50.00
Appeal ...................... 50.00
-7-
2.1.3 Variances
(a) Filing of Application .................... $ 200.00
Appeal ................................... 50.00
Extension ................................ 50.00
(b) Variances Granted without Hearing
Filing Fee ............................... 100.00
Appeal ................................... 50.00
2.1.4 Zone Change
(a) Filing Fee ............................... 500.00
+ 25.00/acre
(b) Appeal ................................... 100.00
(c) Extension Request ........................ 50.00
2.1.5 Planned Unit Developments
(a) Filing Fee ............................... 1,000.00
(b) Appeal ................................... 100.00
(c) Extension Request ........................ 50.00
2.1.6 "T" Standard Plot Plan Review ................. 10.00
3.0 Subdivisions~ Legal Map~ Lot Line Adjustments
(L) -- 3.1 Fees~ Bonds and Deposits
3.1.1 Tentative Tract Filing Fee .................... 500.00
+ 25.00/lot
3.1.2 Revert Subdivided Land to Acreage ............. 50.00
+ 1.00/acre
3.1.3 Subdivision Appeal Fee ........................ 200.00
3.1.4 Tentative Map Extension Request ............... 50.00
3.1.5 Final Map Checking Fee ........................ 500.00
+ 25.00/lot or
actual cost, whichever is greater.
3.1.6 Engineering and Inspection Fee ......... 5% to $25,000.00
4~% next $75,000.00
4% over $100,000.00
3.1.7 Subdivision Agreement Time
Extension Request ............................ 200.00
3.1.8 Engineering Plan Check ................ 1½% of est.
improvement costs.
3.2 Parcel Map
Checking Fee ....... ~ ................................ 150.00
+ 15.00/parcel
or actual cost, whichever is greater.
(M) -- 3.3 Mobile Home/Recreational Vehicle Parks
3.3.1 Mobile Home Park Site Approval ............... 300.00
3.3.2 Mobile Home Location and Development Permit.. 300.00
+ 5.00/space
3.3.3 Appeal ....................................... 100.00
Processing Costs ............................ 100.00
+ 5.00/space
3.3.4 Engineering and Inspections Fee ............ 5% to $25,000.00
4~% next $75,000.00
4% over $100,000.00
-8-
(N) -- 3.4 Fees for Lot Line Adjustments~ Lot Splits~ Minor Subdivisions.
3.4.1 Permit ...................................... $100.00
3.4.2 Appeal ...................................... 50.00
3.4.3 Exemptions and Certificates of Compliance... 100.00
3.4.4 Fee for a Combined Application for Land
Division and Certificate of Compliance ...... 150.00
(O) -- 3.5 General Plan Amendments ............................ 1,000.00
,(P) -- 3.6 Specific Plan ...................................... 500.00
(Q) -- 4.0 Environmental Impact Report
4.1 Initial Filing for Environmental Review Committee
Processing ......................................... 70.00
4.2 The fee for environmental impact reports and
Environmental Review Board determination which is
in addition to the initial fee shall be equal to the
cost of the environmental impact report.
4.3 Request for Environmental Review Board determination
on the use of a single environmental impact report.. 70.00
If amendments and/or addenda to an existing
environmental impact report are required by the
Environmental Review °tDard, the fee shall be
equal to cost.
4.4 Information Report/Negative Declaration ............. (actual cost)
4.5 Appeal Fee .......................................... 100.00
(R) -- 5.0 Miscellaneous Fees
5.1 Returned Check Charge: A charge of five dollars ($5) will
be made for all checks returned by the customer's bank
for nonsufficient funds or because the account has been
closed.
5.2 Penalty for Failure to Pay License Fee: A penalty of 10% per
month of the license fee due shall be paid for failure to pay
a license fee within 30 days after the same shall become due.
Maximum penalty 50% of license fee. The City shall collect in
addition to the penalty due any costs incurred by the necessity
to file suit for collection in the Courts.
5.3 Replacement for Lost or Destroyed License: A fee of $1.00 shall
be paid for the replacement of lost or destroyed licenses.
5.4 Special Events: For any special events, there shall be a $25.00
permit fee. In addition, there will be charges to the applicant
for any special cost incurred by the Sheriff's Department unless
waived by the City Council.
5.5 Refunds: In the event that any person shall have obtained a
permit and no portion of the work or construction covered by
such permit shall have been commenced and such permit shall have
been cancelled, that person shall be entitled to a refund of all
fees except plan - checking fees and twenty-five dollars ($25.00).
In the event that no plan - checking has been performed on a
set of plans, the permittee shall be entitled to a refund of the
plan - checking fee except for fifteen dollars ($15.00).
(S) -- 6.0 Permit Fee for Swimming Pools: The building permit fee for new
swimming pools and spas shall be as prescribed in this subsection.
The permit fee includes plan - checking fees as shown below and
all inspection fees for all phases of the construction including
permit issuance fees, electrical permit fees, mechanical permit
fees and plumbing permit fees.
-9-
(1) Swimming Pools or spas accessory to single-
family dwellings:
(a) With a Standard Plan ................ $ 75.00
(b) With other than Standard Plan ....... 90.00
7.0 Moving Buildings and other extra Legal Loads
(T) -- 7.1 House Moving and Transportation Deposit: Before issuing the
transportation permit, the City Engineer shall require of the
applicant a deposit of a sum of money equal to twice the amount of
the estimated expense to indemnify the City for such expenses,
as well as against any loss or damage which the City may sustain
by reason of damage or injury to any street, sidewalk, fire hydrant
or other property of the City. Such deposit shall not be less than
$500.00
7.2 House Moving and Transportation Permit: A fee of $15 per section,
subject to a total minimum permit fee of $25 shall be paid by the
applicant who applies for a house moving and transportation permit.
(U) -- 8.0 Grading Permit and Plan Check Fee: A grading permit fee, in
accordance with the following schedule, shall be paid. In addition,
a grading plan check fee equal to one-half of the permit fee shall
be paid. In estimating these fees, the sum of cut and fill shall
be considered.
Schedule:
Quantity Fee
50 cubic yards or less ................... $ 20.00
50 to 100 cubic yards ..................... 25.00
101 to 1,000 cubic yards .................. 25.00
100 cubic yards plus $7.00 for each additional
100 cubic yards or fraction thereof.
1,001 to 10,000 cubic yards ............... 88.00
for the first 1,000 cubic yards, plus $6.00
for each additional 10,000 cubic yards or fraction
thereof.
10,001 to 100,000 cubic yards .............. 1~ 9
for the first 10,000 cubic yards plus $27.00 for
each additional 10,000 cubic yards or fraction
thereof.
100,001 cubic yards or more ................ 385.00
for the first 100,000 cubic yards plus $15.00 for
each additional 10,000 cubic yards or fraction thereof.
9.0 Repair or Emergency Work and Scheduled Jobs
(V) -- 9.1 Repair or Emergency Work by City: Work accomplished by the City
to repair facilities damaged by a Contractor, agency or other
party and other emergency work shall be charged for in accordance
with the following schedule:
9.1.1 When work is accomplished by a Contractor engaged by the
City, the charges shall be those established in the contract
by
(a) Formal bid procedure,
(b) Informal bid procedure,
(c) Purchase Order,
plus administrative costs in the amount of twenty-five
percent (25%) of the basic charge.
When emergency repairs are necessitated due to damage to City
facilities by a Contractor, City crews will be utilized
and charged at the then prevailing per diem wage rate as
established by the department of employment for this area.
-10-
9.1.2 When scheduled or mutual aid work is accomplished by City
crews utilizing city equipment, the basic charge shall
be computed on a time required basis during normal working
hours. Labor charges exceeding the normal working hours
will be charged at time and a half (1½ times the labor
rates listed below):
Labor Rates
Maintenance Worker I $6.25 per hr.
Maintenance Worker II 7.00 per hr.
Equipment Operator 7.50 per hr.
Equipment Mechanic 8.00 per hr.
Lead Operator 8.00 per hr.
Field Supervisor 9.00 per hr.
(W) -- 10.0 Cost of Living Increase: All Planning Fees shall be subject
to an annual cost of living increase based on the Los Angeles/
Long Beach consumer price index. For purposes of computation,
the twelve month period shall be from March to March. This
section shall apply only to those fees which are not calculated
on current valuations.