Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout1998/04/22 - Agenda Packet - Adj WorkshopCITY OF RANCHO CUCAMONGA
PLANNING COMMISSION
WORKSHOP AGENDA
WEDNESDAY APRIL 22, 1998 8:30 PM
Rancho Cucamonga Civic Center
Rains Room
10500 Civic Center Drive
Rancho Cucamonga, California
I. CALL TO ORDER
Roll Call
Chairman Barker __ Vice Chairman McNiel __
Commissioner Bethel __ Commissioner Macias __ Commissioner Tolstoy __
I1. OLD BUSINESS
A. PRE-APPLICATION REVIEW 98-02 - HMC GROUP - A request to
construct two 10,000 square foot dental office buildings on 2 acres of
land in the Haven Avenue Overlay of the Industrial Area Specific Plan,
located on the east side of Haven Avenue north of Jersey Boulevard -
APN: 209.491-08.
III. NEW BUSINESS
B. PRE-APPLICATION REVIEW 98-03 - MARRIOTT INTERNATIONAL
- Consideration of a three-story senior assisted living facility with 164
beds, located on 5.4 acres of land at the southeast corner of Haven
Avenue and Church Street -APN: 1077-421-10 and 33.
IV. PUBLIC COMMENTS
This is the time and place forthe genera/public to address the Commission. Items
to be discussed here are those which do not already appear on this agenda.
V. ADJOURNMENT
The Planning Commission has adopted Administrative Regulations that set an
11:00 p.m. adjournment time. If items go beyond that time, they shall be heard only
with the consent of the Commission.
1, Gail Sanchez, Planning Commission Secretary of the City of Rancho
Cucamonga, or my designee, hereby certify that a true, accurate copy of the
foregoing agenda was posted on April 16, 1998, at least 72 hours prior to the
meeting per Government Code Section 54964.2 at 10500 Civic Center Drive,
Rancho Cucamonga.
/
Page 2
VICINITY MAP
i__l I ::':+:':: ':':':'::+: *': "':':+:':':':+:':
| ,,,- ,,~.. li::!! ii::i::~/ al::i::!::i iiiii::::iiiiiiii!l ::::
I
I
- % ,~ ~ ,r-J
.............
, ,r ()
· k CITY HALL
CITY OF
RANCHO CUCAMONGA
PROFILE: MARRIO'R' INTERNATIONAL, INC.*
Maffiott International became a public company in October 1993, when Mardott Corporation
split into two separate companies. Today, Mardott International manages lodging and service
businesses, and its operations in 50 states and 23 countries generate annual sales of over
$10.2 billion. The company has over225,000 employees.
Mardott International owns the trademarks, trade names, reservation, and franchise systems
that were formedy owned by Marriott Corporation. The new company has two operating
groups. Its divisions are leaders in their respective businesses, and enjoy strong customer
preference.
Marriott Lodging encompasses the company's four hotel management divisions: Marriott
Hotels, Resorts, and Suites manages or franchises 299 full-service hotels; Courtyard, the
company's moderate pdce lodging division (286 hotels); Residence Inn, the leader in the
extended stay segment (223 inns); and Fairfield Inn, Marriott's economy lodging division (284
inns). In total, the group manages or franchises 1184 hotels with over 227,000 rooms.
Mardott Lodging also includes Mardott Vacation Club Intemational, which operates 31 vacation
ownership properties with over 70,000 interval owners.
In Apdl 1995, Marriott International acquired a 49% equity interest in The Ritz-Carlton Hotel
Company LLC, which owns the Ritz-Cadton business assets-including management
agreements, trademarks, and trade name. Mardott has the dght to purchase the remaining
equity interest over the next several years. The Ritz-Carlton system currently includes 21 city
hotels and 10 resorts in six countries, totaling over 10,300 rooms.
Mardott's Service Group has three principal divisions: Marriott Management Services, with
over 3,300 accounts, provides food and facilities management for business, education, and
health care clients; Marriott Senior Living Services manages 75 retirement communities
offedng independent and assisted living for older Amedcens, and Mardott Distribution Services
provides food and related products to the company's operations and extemal clients through
thirteen distribution centers.
J.W. Marriott, Jr. is Chairman and CEO, and William J. Shaw is President Marriott International.
Executive Vice Presidents include Joseph Ryan, General Counsel; Michael A. Stein, Chief
Financial Officer, William R. Tiefel, President, Marriott Lodging, and Paul Johnson, President of
Mardott Senior Living Services.
Maffiott Intemational is listed on the New York Stock Exchange, under the ticker symbol MAR.
* Statistics as of December 31, 1996 February 1997
,FRONT ELEVATION ' ASSISTED LIVING FACILITY
BUILDING ELEVATION
BRIGHTON GARDENS
CAMARILLO, CALIFORNIA
FOR
MARRIOTT SENIOR LIVING SERVICES, INC.
City of Rancho Cucamonga Archkec(ure
Planning Commission Planning
10500 Civic Center Drive In[erior Design
Rancho Cucamonga, CA
Dear Commissioners:
At the direction of Brad Buller, and in response to comments received in a
Preliminary Review on Wednesday, January 28th, we are hereby resubmitting
Rancho Cucamonga Professional Office Building for your consideration and
comment.
Sincerely,
HMC GROUP
Architecture Division
Paul R. Len~:,'AIA~(~
Senior Associate
PRL:jf
San Dieg,.,
3270 Inland EmpZre
Ontario
ITEM A F_~:
-,-,, }L&NCHO
December 17,997
City ofRancho Cucamonga
Planning Commission
Dear Commissioners,
In 1988, Rancho Dental Group, opened a professional Dental practice in the City
of Rancho Cucarnonga. For the pat nine years we have been providing dental services
from this office for the citizens of Rancho Cucarnonga and the surrounding area.
Our services have been ,,veil received and the practice has g'rown considerably.
We have now outgrown our current offices which are in leased space. As a result of our
growth, we need to expand and because of the size of building that will accommodate our
current needs and allow for future growth, we felt it would be best to build our own
building.
We set out to find a suitable piece of land on the Haven corridor as that is where
our existing office is located. We were successful and have purchased the parcel which
is the subject of this application. It is our plan to build two 10,000 sq. ft. buildings, one
of which will house our dental practice and the other would be available for some other
professional practice or other type of office. -
We will master plan the entire site which is 2 acres. In addition, we will install
the drives, landscaping, parking and also construct one of the 10,000 sq. ft buildings.
Because of the nature of our practice it is very difficult to locate it in a multi story
building. The obvious resistance of patients to go to upper floors for dental services
necessitates a ground floor location. In addition, we really prefer to be the sole user of
our building with no desire to share the facilities with tenants in upper floors.
ITEM A
For these reasons we are requesting your consideration in authorizing a single
story development on this land. Other extenuating circumstances include the size of the
parcel which really doesn't facilitate a large multi-story building, and the fact that single
story structures already exist on adjoining properr>,.
We have developed an elevation which is considerably taller in design than that
normally associated with a one story structure which we trust will compensate for the
requested one story structure. Please refer to the enclosed drawings.
Additionally, we would request your special consideration because we are an
existing, long term business in your town and this project is for our use. We are not an
out of town developer who is simply looking to build income properly for the lowest
price and the best return. We plan on making a substantial investment in this facility to
create a structure that will be a source of pride to the City. and to our patients. This will
be our permanent home as we continue to serve Rancho Cucarnonga.
Sincerely,
Enclosure
CITY OF RANCHO CUCAMONGA
PLANNING COMMISSION MINUTES
Adjourned Meeting
January28, 1998
Chairman Barker called the Adjourned Meeting of the City of Rancho Cucamonga Planning
Commission to order at 8:30 p.m. The meeting was held in the Room at Rancho Cucamonga Civic
Center, 10500 Civic Center Drive. Rancho Cucamonga, California.
ROLL CALL.
COMMISSIONERS: PRESENT: David Barker, William Bethel, Rich Macias, Peter Tolstoy
ABSENT: Larry McNiel
STAFF PRESENT: Brad Buffer, City Planner; Dan James, Senior Civil Engineer; Brent Le Count,
Associate Planner
NEW BUSINESS
A. PRE-APPLICATtON REVIEW 97-07 - HMC GROUP - A request to construct two 10,000 square
foot dental office buildings on 2 acres of land in the Haven Avenue Overlay of the Industrial
Area Specific PIan. located on the east side of Haven Avenue north of Jersey Boulevard -
APN: 209-491-08.
Brad Bullet, City Planner, explained the purpose and goals of the Pro-Application Review process.
;,.Illford Harrison, representative for Hospitality Dental Associates, presented the reasons for
requesting one story buildings rather than multi-story. He indicated that the subiect property had
been foreclosed on twice in the recent past because other developers had been unable to meet the
multi-story requirement. He stated that. in his experience, dental patients do not like to have to use
stairs to access upper floors of a dental offqce and would rather visit a one story office. He said one
of the buildings would be occupied by his dental office and ,the other is intended to be leased to an
orlhodontic outfit. He felt that multi-story development is not feasible since the site is not a typical
corner lot with left hand turn access off of Haven.
Paul Lentz, Architect. indicated that the design intent is to provide a multi-story appearance even
though the buildings are actually one story by raising the parapets to 25 feet and through use of a
35 to 40 foot high tower element. He thought the site is too small to reasonably accommodate multi-
story development. He said other parcels to the south are also too small for multi-story buildings
because it would be cost prohibitive to construct small footprint, multi-story buildings.
Brent Le Count, Associate Planner, commented on the intent of the Haven Avenue Overlay to
encourage a high-quality, multi-story, corporate style of development along Haven Avenue, given
the gateway function of the Haven corridor linking Rancho Cucamonga with the freeway and Ontario
Airport,. He indicated that, in staff's opinion, the applicant's proposal does not fully meet this intent
and may not be appropriate.
Commissioner Tolstoy felt the proposed architecture was unacceptable for Haven Avenue. He said
that locating the parking towards the rear of the site is a positive design concept. He was not
comfor[able with the concept of designing a one-story building to look like a two-story building. He
thought that a one-story development could be viable as there has nat been much development
activity on Haven Avenue and the corridor is not turning out the v:ay it ,,,/as originally envisioned.
Mr. Buller added that the multi-story provision in the Haven Overlay is a policy statement rather than
an actual code requirement and, as such, is subject to the Commission's discretion.
Commissioner Bethel thought the proposed architecture is out of ptace and the low buildings would
n.gt fit well with, and would be dwarfed by, the existing multi-story buildings to the nodh. He
commented he has visited dental offices in five-story buildings so he was not certain that dental
patients necessarily prefer single story offices, as stated by the applicant. He thought a mid-block
location without left turn access off of Haven Avenue would not necessarily restrict development of
the site to single story buildings. He felt a one-story building should be designed to look like a one-
story building rather than attempting to mimic a two-story structure but that one-story development
of this parlicular site would not be appropriate.
Commissioner Macias asked what the phasing of the buildings would be.
Mr. Harrison stated that the intent is to build both buildings at the same time.
Commissioner Macins indicated he is not opposed to a one-story development program for the site
but felt the proposed architecture is too institutional in appearance, that it looks like a school rather
than a professional office building. He recommended use o~ more glazing and other elements similar
to the multi-story offices to the north.
Commissioner BarKer said he has also been to multi-story dental offices and is not sure that dental
patients prefer one-story offices. His primary concern ,.'/as compatibility and fit with the Haven
Avenue streetscape. He thought the proposed arch lecture does not appear to be compatible with
the rather high quality multi-story offices to the north and he recommended architectural redosign.
Mr. Buffer summarized the concerns raised by the Commissioners: the multi-story provision of the
Haven Avenue Overlay is poIicy and is not necessarily mandatory, a one-story development is
possible but that is will take very high quality architec ure o "so "the concept parking in the rear
is a desirable feature, developmen[ of the site mus~ fit into the context, the existing multi-story office
buildings to the north set a precedent for high quality o~ design that should be matched by
development of the site, phasing o~ the development is critical, and architecture is critical.
PUBLIC COMMENTS
There were no public comments.
ADJOURNMENT
The Planning Commission adjourned at 9:00 p.m.
Respectfully submitted.
Secretary
PC Adjourned Minutes -2- January 28, 1998
E:JZ:~r~LE EI'IBI/'TEEI'~Ir~B EZ::TRPE~R['~TIZ~rl
Sure 200
7807 Convoy Cour~ 619/268 - 8080
San Diego, CA 92~ FAX 619 / 292 - 7432
City ofRancho Cucamonga April 7, 1998
10500 Civic Center Drive
Rancho Cucamonga, CA 91729
Marriott International
Brighton Gardens of Rancho Cucamono~a
As a requirement of a pre-application review, I am submitting this Letter of
Justification/Explanation.
The above reference project is a proposed senior assisted living facility at the southeast comer of
Haven Avenue and Church Street which will be a commercial operation where each person will
be paying for different levels of care. The facility will be comprised as follows.
· 94 beds of assisted living care - 46 studio rooms, 24 one-bedroom and 12 two-bedroom
· 25 beds of Alzheimer's care - 2I private and 2 semi-private rooms
· 45 beds of skilled nursing care - 11 private and 17 semi-private rooms
· Centralized kitchen and dining - every unit will not have a kitchen.
The site is vacant is owned by Lewis Development Company and Western Land Properties and
is currently zoned "Office Professional." The site is in the Terra Vista Community Plan and has
been ~aded to pads currently covered by weeds. The proposed facility is allowed in the Office
Professional zone with a Condition Use Permit.
Follov'ing are compatibility issues.
· Location - Within the appropriate zone. Easy access to commercial centers.
· Size - The project will have approximately a 25% lot coverage and will be three stories tall
in the "H" portion of the building. The skilled nursing and Alzheimer's portion will be one
story.
· Noise - Because of the type of facility, the noise generation will be limited to roof-top
mechanical equipment, delivery trucks, and passenger car vehicular traffic.
· Traffic - Base on previous traffic studies which Boyle Engineering has prepared for other
Marriott senior living facilities, the average daily trip generated will be 244. This in
comparison to other uses for the site is very low.
ITEM B
City ofRancho Cucamonga April 7, 1998
Page 2
The proposed senior living facility will fit with the surrounding for the following reasons.
· Allowed use for the subject properly.
· A cormmercial use adjacent to a major street.
· A good transition l~om a residential to the north with an Office Professional use to the south.
· Low traffic generator.
Should you have any questions, please call.
Boyle Engineering Corporation
Mitchell A. Alderman, PE
Senior Civil Engineer
SD-MS0-113430,,'~l.-VLet:er to Ci:y ofRancho Cucamonga doc