HomeMy WebLinkAbout84-140 - ResolutionsRESOLUTION NO. 84-140
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO
CUCAMONGA, CALIFORNIA, OF PRELIMINARY APPROVAL OF CITY
ENGINEER'S ANNUAL REPORT FOR STREET LIGHTING MAINTENANCE
DISTRICT NO. 2
RESOLVED by the City Council of the City of Rancho Cucamonga that:
WHEREAS, pursuant to the Landscape and Lighting Act of 1972, the City
Engineer is required to make and file with the City Clerk of the City an
annual report in writing for which assessments are to be levied and collected
to pay the costs of the improvement of said Street Lighting Maintenance
District No. 2; and
WHEREAS, the City Engineer has made and filed with the City Clerk of
said City a report in writing as called for under and pursuant to said Act,
which has been presented to this Council for consideration; and
WHEREAS, said Council has duly considered said report and each and
every part thereof, and finds that each and every part of said report is
sufficient, and that said report, nor any part thereof, requires or should be
modified in any respect.
NOW, THEREFORE, it is ordered as follows:
That the Engineer's Estimate of the itemized costs
and expenses of said work and of the incidental
expenses in connection therewith, contained in said
report be, and each of them are hereby preliminarily
approved and confirmed.
That the diagram showing the Assessment District
referred to and described in said report, the
boundaries of the subdivisions of land within said
Assessment District are hereby preliminarily approved
and confirmed.
That the proposed assessment upon the subdivisions of
land in said Assessment District in proportion to the
estimated benefit to be received by said subdivision,
respectively, from said work and of the incidental
expenses thereof, as contained in said report is
hereby preliminarily approved and confirmed.
That said report shall stand as the City Engineer's
Annual Report for the fiscal year 1984-85 for the
purposes of all subsequent proceedings.
PASSED, APPROVED, and ADOPTED this 16th day of May, 1984.
AYES:
Wright, Buquet, Mikels, Dahl, King
NOES: None
ABSENT: None
ATTEST:
Resolution No. 84-140
Page 2
CITY OF RANCHO CUCAMONGA
1984-85 ENGINEER'S REPORT
FOR
STREET LIGHTING MAINTENANCE DISTRICT NO. 2
SECTION 1. AUTHORITY FOR REPORT
This report is prepared in compliance with the requirement of Article
4, Chapter 1, Division 15 of Streets and Highways Code, State of California
(Landscaping and Lighting Act of 1972).
SECTION 2. GENERAL DESCRIPTION
This report deals with the estimated assessments for Fiscal Year
1984-85 of Street Lighting Maintenance District No. 2 for Tracts enumerated in
Exhibit A within the City of Raneho Cucamonga. The area to be considered is
specifically defined in the body of this report and on the attached Assessment
Diagrams. Work to be provided for, with the assessments established by the
District are:
The furnishing of services and materials for the ordinary and
usual maintenance, operating and servicing of street light
improvements on arterial and certain collector streets.
Improvement maintenance is considered of general benefit to all
areas in the District and cost shall be devided on a per lot
basis. In the case of condominiums with airspace ownership
only, and apartments, a dwelling unit shall be considered to
benefit the same as a lot.
SECTION 3. PLANS AND SPECIFICATIONS
The plans and specifications for street lighting have been prepared
by the developers. The plans and street lights are as stipulated in the
conditions of approval for the development and as approved by the City
Engineering Division. Reference is hereby made to the subject tract map or
development plan and the assessment diagram for the exact location of the
street lighting areas. The plans and specifications for street lighting
improvement on the individual development is hereby made a part of this report
to the same extent as if said plans and specifications were attached hereto.
Detailed maintenance activities on the street lighting district
include: the repair, removal or replacement of all or any part
of any improvement, providing for the illumination of the
subject area.
SECTION 4. ESTIMATED COSTS
No costs will be incurred for street lighting improvement
construction. All improvements will be constructed by developers. Based on
available data, it is estimated that maintenance costs for assessment purposes
will be as indicated below for the fiscal year 1984-85. These costs are
estimated only, actual assessments will be based on actual cost data.
1984-85 Estimated Assessment
1. S.C.E. Maintenance and Energy:
Lamp Size* Quantity Rate**
5800L 72 8.82
*High Pressure Sodium Vapor
**SCE Schedule LS-1. All night service per lamp
per month, effective 1-1-84
Lamps Rate Months Total
72 x 8.82 x 12 $7,620.45
Resolution No. 84-140
Page 3
2. Incidental Expenses:
Engineering and Administration = $1,000.00
3. Costs per dwelling unit:
Total Annual Estimated Costs: $7,620.45 + $1,000 = $33.93/year/unit
No. of Units in District 254
$33.93 divided by 12 = $2.82/mo./unit
Assessment shall be applied to each lot as explained in Section 6.
SECTION 5. ASSESSMENT DIAGRAM
Copies of the proposed Assessment Diagrams are attached to this
report and labeled "Street Lighting Maintenance District No. 2". These
diagrams are hereby incorporated within the text of this report.
SECTION 6. ASSESSMENT
Improvements for the District are found to be of general benefit to
all dwelling units within the District and that assessment shall be equal for
each unit. Where there is more than one dwelling unit per lot or parcel of
assessable land, the assessment for each lot or parcel shall be proportional
to the number of dwelling units per lot or parcel.
It is proposed that all future development shall be annexed to the
District.