HomeMy WebLinkAbout84-184 - ResolutionsRESOLUTION NO. 84-184
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO
CUCAMONGA, CALIFORNIA, TO LEVY AND COLLECT ASSESSMENTS
WITHIN STREET LIGHTING MAINTENANCE DISTRICT NO. 2 FOR THE
FISCAL YEAR 1984-85 PURSUANT TO THE LANDSCAPING AND
LIGHTING ACT OF 1972 IN CONNECTION WITH STREET LIGHTING
MAINTENANCE DISTRICT NO. 2, AND APPROVING FINAL
ENGINEER'S REPORT
WHEREAS, the City Council of the City of Raneho Cueamonga did on the
16th day of May, 1984, adopt its Resolution of Intention No. 84-141 to order
the therein described work in connection with Street Lighting Maintenance
District No 2, which Resolution of Intention No. 84-141 was duly and legally
published in the time, form and manner as required by law, shown by the
Affidavit of Publication of said Resolution of Intention on file in the office
of the City Clerk; and
WHEREAS, said City Council having duly received considered evidence,
oral and documentary concerning the Jurisdiction facts in this proceeding and
concerning the necessity for the contemplated work and the benefits to be
derived therefrom and said City Council having now acquired Jurisdiction to
order the proposed work.
SECTION 1: It is hereby resolved by the City Council of the City of
Rancho Cueamonga that the public interest and convenience required the levy
and collection of assessments within Street Lighting Maintenance District No.
2 for the fiscal year 1984-85, and said City Council orders that the work, as
set forth and described in said Resolution of Intention No. 84-141, be done
and made; and
SECTION 2: Be it futher resolved that the report filed by the
Engineer, as amended by the City Council, is hereby finally approved; and
SECTION 3: Be it finally resolved that the assessments for fiscal
year 1984-85 and method of assessment in the Engineer's Report, as amended by
the City Council, are hereby approved.
PASSED, APPROVED, and ADOPTED this 20th day of June, 1984.
AYES: Wright, Buquet, MikeIs, Dahl, King
NOES: None
ABSENT: None
ATTEST:
everly A.~ u ~e e , C y Clerk
Resolution No. 84-184
Page 2
CITY OF RANCHO CUCAMONGA
1984-85 ENGINEER'S REPORT
FOR
STREET LIGHTING MAINTENANCE DISTRICT NO. 2
'SECTION 1. AUTHORITY FOR REPORT
This report is prepared in compliance with the requirement of Article
4, Chapter 1, Division 15 of Streets and Highways Code, State of California
(Landscaping and Lighting Act of 1972).
SECTION 2. GENERAL DESCRIPTION
This report deals with the estimated assessments for Fiscal Year
1984-85 of Street Lighting Maintenance District No. 2 for Tracts enumerated in
Exhibit A within the City of Rancho Cucamonga. The area to be considered is
specifically defined in the body of this report and on the attached Assessment
Diagrams. Work to be provided for, with the assessments established by the
District are:
The furnishing of services and materials for the ordinary and
usual maintenance, operating and servicing of street light
improvements on arterial and certain collector streets.
Improvement maintenance is considered of general benefit to all
areas in the District and cost shall be devided on a per lot
basis. In the case of condominiums with airspace ownership
only, and apartments, a dwelling unit shall be considered to
benefit the same as a lot.
SECTION 3. PLANS AND SPECIFICATIONS
The plans and specifications for street lighting have been prepared
by the developers. The plans and street lights are as stipulated in the
conditions of approval for the development and as approved by the City
Engineering Division. Reference is hereby made to the subject tract map or
development plan and the assessment diagram for the exact location of the
street lighting areas. The plans and specifications for street lighting
improvement on the individual development is hereby made a part of this report
to the same extent as if said plans and specifications were attached hereto.
Detailed maintenance activities on the street lighting district
include: the repair, removal or replacement of all or any part
of any improvement, providing for the illumination of the
subject area.
SECTION 4. ESTIMATED COSTS
No costs will be incurred for street lighting improvement
construction. All improvements will be constructed by developers. Based on
available data, it is estimated that maintenance costs for assessment purposes
will be as indicated below for the fiscal year 1984-85. These costs are
estimated only, actual assessments will be based on actual cost data.
1984-85 Estimated Assessment
1. S.C.E. Maintenance and Energy:
Lamp Size* Quantity Rate**
5800L 72 8.82
*High pressure Sodium Vapor
**SCE Schedule LS-1. All night service per lamp
per month, effective 1-1-84
Lamps Rate Months Total
72 x 8.82 x 12 $7,620.45
Resolution No. 84-184
Page 3
2. Incidental Expenses:
Engineering and Administration = $1,000.00
3- Costs per dwelling unit:
Total Annual Estimated Costs: $7,620.45 + $1,000 = $33.93/year/unit
No. of Units in District 254
$33.93 divided by 12 = $2.82/mo./unit
Assessment shall be applied to each lot as explained in Section 6.
SECTION 5. ASSESSMENT DIAGRAM
Copies of the proposed Assessment Diagrams are attached to this
report and labeled "Street Lighting Maintenance District No. 2". These
diagrams are hereby incorporated within the text of this report. (Assessment
Dtagrasa are on file in the City Clerk's offlee)
SECTION 6. ASSESSMENT
Improvements for the District are found to be of general benefit to
all dwelling units within the District and that assessment shall be equal for
each unit. Where there is more than one dwelling unit per lot or parcel of
assessable land, the assessment for each lot or parcel shall be proportional
to the number of dwelling units per lot or parcel.
It is proposed that all future development shall be annexed to the
District.