Loading...
HomeMy WebLinkAbout84-184 - ResolutionsRESOLUTION NO. 84-184 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, TO LEVY AND COLLECT ASSESSMENTS WITHIN STREET LIGHTING MAINTENANCE DISTRICT NO. 2 FOR THE FISCAL YEAR 1984-85 PURSUANT TO THE LANDSCAPING AND LIGHTING ACT OF 1972 IN CONNECTION WITH STREET LIGHTING MAINTENANCE DISTRICT NO. 2, AND APPROVING FINAL ENGINEER'S REPORT WHEREAS, the City Council of the City of Raneho Cueamonga did on the 16th day of May, 1984, adopt its Resolution of Intention No. 84-141 to order the therein described work in connection with Street Lighting Maintenance District No 2, which Resolution of Intention No. 84-141 was duly and legally published in the time, form and manner as required by law, shown by the Affidavit of Publication of said Resolution of Intention on file in the office of the City Clerk; and WHEREAS, said City Council having duly received considered evidence, oral and documentary concerning the Jurisdiction facts in this proceeding and concerning the necessity for the contemplated work and the benefits to be derived therefrom and said City Council having now acquired Jurisdiction to order the proposed work. SECTION 1: It is hereby resolved by the City Council of the City of Rancho Cueamonga that the public interest and convenience required the levy and collection of assessments within Street Lighting Maintenance District No. 2 for the fiscal year 1984-85, and said City Council orders that the work, as set forth and described in said Resolution of Intention No. 84-141, be done and made; and SECTION 2: Be it futher resolved that the report filed by the Engineer, as amended by the City Council, is hereby finally approved; and SECTION 3: Be it finally resolved that the assessments for fiscal year 1984-85 and method of assessment in the Engineer's Report, as amended by the City Council, are hereby approved. PASSED, APPROVED, and ADOPTED this 20th day of June, 1984. AYES: Wright, Buquet, MikeIs, Dahl, King NOES: None ABSENT: None ATTEST: everly A.~ u ~e e , C y Clerk Resolution No. 84-184 Page 2 CITY OF RANCHO CUCAMONGA 1984-85 ENGINEER'S REPORT FOR STREET LIGHTING MAINTENANCE DISTRICT NO. 2 'SECTION 1. AUTHORITY FOR REPORT This report is prepared in compliance with the requirement of Article 4, Chapter 1, Division 15 of Streets and Highways Code, State of California (Landscaping and Lighting Act of 1972). SECTION 2. GENERAL DESCRIPTION This report deals with the estimated assessments for Fiscal Year 1984-85 of Street Lighting Maintenance District No. 2 for Tracts enumerated in Exhibit A within the City of Rancho Cucamonga. The area to be considered is specifically defined in the body of this report and on the attached Assessment Diagrams. Work to be provided for, with the assessments established by the District are: The furnishing of services and materials for the ordinary and usual maintenance, operating and servicing of street light improvements on arterial and certain collector streets. Improvement maintenance is considered of general benefit to all areas in the District and cost shall be devided on a per lot basis. In the case of condominiums with airspace ownership only, and apartments, a dwelling unit shall be considered to benefit the same as a lot. SECTION 3. PLANS AND SPECIFICATIONS The plans and specifications for street lighting have been prepared by the developers. The plans and street lights are as stipulated in the conditions of approval for the development and as approved by the City Engineering Division. Reference is hereby made to the subject tract map or development plan and the assessment diagram for the exact location of the street lighting areas. The plans and specifications for street lighting improvement on the individual development is hereby made a part of this report to the same extent as if said plans and specifications were attached hereto. Detailed maintenance activities on the street lighting district include: the repair, removal or replacement of all or any part of any improvement, providing for the illumination of the subject area. SECTION 4. ESTIMATED COSTS No costs will be incurred for street lighting improvement construction. All improvements will be constructed by developers. Based on available data, it is estimated that maintenance costs for assessment purposes will be as indicated below for the fiscal year 1984-85. These costs are estimated only, actual assessments will be based on actual cost data. 1984-85 Estimated Assessment 1. S.C.E. Maintenance and Energy: Lamp Size* Quantity Rate** 5800L 72 8.82 *High pressure Sodium Vapor **SCE Schedule LS-1. All night service per lamp per month, effective 1-1-84 Lamps Rate Months Total 72 x 8.82 x 12 $7,620.45 Resolution No. 84-184 Page 3 2. Incidental Expenses: Engineering and Administration = $1,000.00 3- Costs per dwelling unit: Total Annual Estimated Costs: $7,620.45 + $1,000 = $33.93/year/unit No. of Units in District 254 $33.93 divided by 12 = $2.82/mo./unit Assessment shall be applied to each lot as explained in Section 6. SECTION 5. ASSESSMENT DIAGRAM Copies of the proposed Assessment Diagrams are attached to this report and labeled "Street Lighting Maintenance District No. 2". These diagrams are hereby incorporated within the text of this report. (Assessment Dtagrasa are on file in the City Clerk's offlee) SECTION 6. ASSESSMENT Improvements for the District are found to be of general benefit to all dwelling units within the District and that assessment shall be equal for each unit. Where there is more than one dwelling unit per lot or parcel of assessable land, the assessment for each lot or parcel shall be proportional to the number of dwelling units per lot or parcel. It is proposed that all future development shall be annexed to the District.