HomeMy WebLinkAbout83-134 - ResolutionsRESOLUTION NO. 83-134
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO
CUCAMONGA, CALIFORNIA, APPROVING LONG RANGE MAJOR STREET
DRAINAGE PROGRAM PRIORITIES
WHEREAS, on the 3rd day of August, 1983, the Rancho Cueamonga City
Council held a meeting to consider the attached proposed Long Range Major
Street and Drainage Program Priorities; and
WHEREAS, the Raneho Cucamonga Planning Commission concurs in the
recommended program as proposed, and has found it in conformance with the
General Plan.
NOW, THEREFORE, BE IT RESOLVED, that the Raneho Cucamonga City
Council hereby:
SECTION 1: Approves the attached Long Range Street and Drainage
Program Priorities.
SECTION 2: Directs the implementation of said Program on a priority
basis as funds become available.
SECTION 3: Further directs that said program be reviewed as a
minimum on a annual basis to evaluated progress and priorities.
PASSED, APPROVED, and ADOPTED this 3rd day of August, 1983.
AYES:
Dahl, Buquet, Schlosser, Frost, Mikels
NOES: None
ABSENT: None
ATTEST:
~r/'ma~lerk --_ -_
Resolution No. 83-134
Page 2
LON~ RANGE
MAJOR STREET & DRAINAGE
PROGRAN PRIORITIES
e
e
e
e
e
DESCRIPTION
MIDMIll- STREET RESTORATION
Programmed $50,000 Annually
IRTMRIAL-COIJ~CTOR RE3~RFACING ~
PREVENTATIVE M~IMTMNA!iCM
Programmed $1,000,000 Annual ly
BABE LIME ROaD -
Widening
HII~IDE ROaD - MaLaCHITE TO ARCHIBALD
Widening, Reconstruction and Drainage
*Potential for inclusion in Alta Loma
Channel Assessment District
VICTORIA AVEM~E - MTIWAMDATOEAST
Reconstruction, Resurfacing
HERNOSA-TUPJER INPROVEI~NT PROGRAH
Turner Ave. 3term Drain, Deer Creek
thru Foothill Blve. Intersection
including widening and appurtenant
drainage facilities
Turner Storm Drain Wident.g and
Reconstruction, Foothill to Base Line Road
Turner Avenue Wideni~ and Dr~t--Ee
Eighth Street to 26th Street
includes rail crossing improvement
Hermosa Storm Drain Extension
Base Line Road to North of 19th Street
including Base Line widening South side
Cambridge to Kinlock, laterial drain East
on Base Line to Ramona. Improvement of
rail crossing at P.E. tracks
Widening and Reeon~truction of Hermosa
Drain up Ramona to P.E. tracks
Improve rail crossing
Reconstruct Ramona from Base Line to
19th Street
RrIWANI)A RECONSTRUCTION
SUB-TOTAL
RAVEN AVENUE RESURFACING
LO~ER m~,LMAN AVENUE INPRO~ PROGRAN
Storm Drain, Street Widening and
Reconstruction, widening drainage
and signal at the AT&SF RR -
Cueamonga Creek to Ninth Street
ESTIMATE
$250,000
$500,000
$ 60,000
$100,000
$ 50,000
$1,300,000
$1,200,000
$400,000
$1,200,000
$400,000
$4,500,000
$220,000
$50,000
$1,2OO,000
Resolution No. 83-134
Page 3
10.
11.
12.
13.
14.
15.
Lateral Drains & Street Reeonstruetion
Eighth Street, Vineyard to Archibald
Storm DT~]-, Street ReeonstTuetion
North to Foothill Blvd.
S~B-TOTA~
UPPER w~R~-w~taN-BERTL IMPROVE~Fr PROGRAM
Reconstruct Cueamonga Storm Drain
Cucamonga Creek to Amethyst
Widen and Improve Hellman
P.E. RR crossing
Construct storm drain in Hellman
from Cucamonga storm drain to North
of 19th Street, street reconstruction
Construct Amethyst Drain
from Cucamonga Storm Drain North
Reconstruct Street
Construct Beryl Storm Drain
from Alta Loma Park to Rancho Wash
and Demens 2 Basin, Reconstruct street
Widen Lemon to Beryl
~ER~ AVENUE B~ TO NOR~ OF ~IL~IDE
Resurfacing, Reconstruction
ROaD - ARCHIBALD TO HAVEN
ARROW RO~T~ - ARCHIBALD TO TUR~R
Widen and Reconstruct
ARChIBaLD &~UE - 19TB TO
Realign and widen at Freeway right-of-way
CAR~ELIA~&ENU~ - Ba~E LIETO VIV~RO
Minor widening and resurfacing
$300,000
$1,000,000
$2,500,000
$1,500,000
$1,500,000
$300,000
$I,000,000
$q,300,000
$90,000
$75,000
$150,000
$75,000
$20,000
Resolution No. 83-134
Page 4
BUDGETED
PROGRAM PRIORITY
3-
4.
5.
6.
7-
8.
9-
10.
11.
12.
TRAFFIC SIC~AL PRIORITIE~
Foothill Blvd. & Hellman Avenue
Carnelian Avenue & Lemon Avenue
Nineteenth Street & Archibald Avenue
Grove Avenue at Ninth St., Arrow Route, San Bernardino Rd.
Foothill Blvd. at Vineyard & Archibald, Modification
LOCATION
Foothill @ Turner Ave.
Vineyard Ave. @ Ninth St.
Haven Ave. @ Fourth St.
Archibald Ave. @ Sixth St.
Base Line Rd. ~ Beryl Ave.
Nineteenth St. @ Hellman Ave.
Nineteenth St. @ Beryl Ave.
Nineteenth St. @ Sapphire St.
Nineteenth St ~ Hermosa Ave.
Base Line Rd. @ Hermosa Ave.
Arrow Rte. ~ Hellman Ave.
Arrow Rte. @ Turner Ave.
ESTIMATE
$35,000
$70,000
$35 000
$70,000
$70,000
$35 ooo
$35 000
$35,000
$7o ooo
$70,000
$70,000
$70,000