HomeMy WebLinkAbout88-251 - Resolutions RESOLUTION NO. 88-251
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PAN(HO
(1JCAI~)I~A, CALIFORNIA, ORDERING THE WORK IN CONNECTION
WITH ANNEXATION NO. 13 TO STREET LIGHTING MAINTENANCE
DISTRICT NO. 6 AND ACCEPTING THE FINAL ENGINEER' S REPORT
FOR DR 87-26 (PM 10782)
WHEREAS, the City Council of the City of Rancho Cucamonga did on the
16th day of March, 1988, adopt its Resolution of Intention No. 88-150 to order
the therein described work in connection with Annexation No. 13 to Street
Lighting Maintenance District No. 6, which Resolution of Intention No. 88-150
was duly and legally published in the time, form and manner as required by law,
shown by the Affidavit of Publication of said Resolution of Intention on file
in the office of the City. Clerk; and
WHEREAS, after the adoption thereof, notice of the passage of said
Resolution of Intention, headed "Notice of Improvement", was duly and legally
posted in the time, form, manner, location, and n~ber as required by law, as
appears from the Affidavit of Posting said notices, on file in the office of
the City Clerk; and
WHEREAS, after the adoption thereof, notices of the adoption of the
Resolution of Intention were duly mailed to all persons owning real property
proposed to be assessed for the improvements describe4 in said Resolution of
Intention No. 88-150, according to the names and addresses of such owners as
the same appears on the last mailing or as known to the City Clerk of the City
of Rancho Cucamonga, which said copies were duly mailed in the time, form, and
manner as required by law, as appears from the Affidavit of Mailing on file in
the office of the City Clerk; and
WHEREAS, said City Council having duly received considered evidence,
oral and documenzary, concern{ng the jurisdiction facts in this proceeding and
concerning the necessity for the contemplated work. and the benefits to be
derived therefrom and said City Council having now acquired jurisdiction to
order the proposed work.
SECTION 1: It is hereby resolved by the City Council of the City of
Rancho Cucamonga that the public interest and convenience requires the
annexation to the District and the ordering of the work, and said City Council
hereby orders that the work,, as ~et forth and described in said Resolution of
Intention No. 88-150, be done and made; and
SECTION 2.' The Report filed by the Engineer is hereby finally
approved; and
Resolution No. 88-251
Page 2
SECTION 3: The assessments and method of assessment in the Engineer's
Report are hereby approved.
SECTION 4: The assessments shall not begin until after 60 percent
of said tracts have been occupied.
PASSED, APPROVED. and ADOPTED this 20th day of April, 1988·
AYES: Brown, Buquet, Stout, King, Wright
NOES: None
ABSENT: None ~~ ~~
Dennis L. ~ Stout, Mayor
ATTEST:
Beverly A~ Authelet, City Clerk
I, BEVERLY A. AUTHELET, CITY CLERK of the City of Rancho
Cucamonga, California, do hereby certify that the foregoing Resolution was duly
passed, approved, and adopted by the 'City Council of the City of Rancho
Cucamonga, C~lifornie, at · regular meeting of said. City Council held on the
20th day of April, 1988.
Executed this 2lst day of April, 1988 at Rancho Cucamonga, California.
· Bevewly A/Authelet. City Clerk
Resolution No. 88-251
Page 3
CITY OF RANCHO C~CAMONGA
Engineer' s Report for
Street Lighting Maintenance District No. 6
Annexation No. 13 for
DR 87-26 (PM 10782)
SECTION 1. Authority for Report
This report is in compliance with the requirements of Article
Chapter 1, Division 15 of the Streets and Highways Code, State of California
(Landscaping and Lighting Act of 1972).
SECTION 2. General Description
This City Council has elected to annex all new developments into
Street Lighting Maintenance District No. 6. The City Council has determined
that the street lights to be maintained will have an effect upon all lots
within said developments as well as on the lots directly abutting the street
lights.
Work to be provided for with the assessments established by the
district are:
The furnishing of services and materials for the ordinary
and usual maintenance, operating and servicing of street
light improvements on local streets as shown on the
Lighting District Atlas Map which is on file with the City
Engineer. Improvement maintenance is considered of general
benefit to all areas in the District and cost shall be
assessed on a per unit basis.
SECTION 3. Plans and Specifications
The plans and specifications for street lighting have been prepared by
the developers. The plans and street lights are as stipulated in the
conditions of approval for the development and. aa. approved by the City
Engineering Division. Reference ia hereby made to the subject tract map or
development plan and the assessment diagrem for the exact location of the
street lighting areas. The plans and specifications for street lighting
improvement on the individual development is hereby made a part of this report
· to the same extent as if said plans and specifics were attached hereto.
Detailed maintenance activities on the street lighting
district include{ the repair, removal or replacement of
all or any part of any improvement, providing for the
illumination of the subject area.
Resolution No. 88-251
Page 4
SECTION 4. Estimated Costs
No costs will be incurred for street lighting improvement
construction. All improvements will be constructed by developers. Based on
available data, it is estimated that maintenance costs for assessment purposes
will be as indicated below. These costs are estimated only, actual assessments
will be based on actual cost data.
Street Lighting Maintenance District No. 6 is comprised of street
light improvements on local streets for all industrial, commercial and
institutional projects throughout the City. It has been determined that one
acre of land in industrial, commercial and institutional areas derives the same
benefit as two assessment units in residential zones.
The estimated total cost for Lighting Maintenance District No. 6 is
shown below:
1. S.C.E. Maintenance and Energy Cost:
No. of
Lamps
Lamps Annex New Lamp
Lamp Size* YTD No. 13 Total
5800L 47 -- 47
9500L 2 --- 2
*High Pressure Sodium Vapor.
Total Total Annual
Lamp Size Lamps Rate Mo' s Maint.- Cost
5800L 47 X $ 8.93 X 12 = $5,036.52
9500L 2 X $10.16 X 12 = 243.84
Total Annual Faint. Cost = $5,280.36
2. Total Assessment Units:
YTD Assess Units before this annexation = 408
Assessment Units this annex per page 4 = 30,5
Total Assessment Units 438.5
3. Cost per Assessment Unit:
Total Annual' Maintenance Cost = $5,280.36 = $12.12/year/unit
No. of Units in District 438.5
Asse. ssment shall apply to each lot or parcel as explained in Section 6.
Resolution No. 88-251
Page 5
SECTION 5. Assessment Diagram
Copies of the proposed Assessment Diagrams are attached to this report
and labeled "Street Lighting Maintenance District No. 6", Annexation No. 13.
These diagrams are hereby incorporated within the text of this report.
SECTION 6. Assessment
Improvements for the District are found to be of general benefit to
all units within the District and that assessment shall be equal for each
unit. When units are based on acreage, assessment will be 2 units per net
acre.
SECTION 7. Order of Events
1. City Council adopts Resolution of Preliminary Approval of City Engineer's
Report.
2. City Council adopts Resolution of Intention to annex a District and sets
public hearing date.
3. City Council conducts public hearing, considers all testimony and
determines to form a District or abandon the proceedings.
4. Every year in May, the City Engineer files a report with the City Council.
5. Every year in June, the City Council conducts a public hearing and
approves, or modifies and approves the individual assessments.
Resolution No. 88-251
Page 6
EXHIBIT "A"
Properties and improvements to be included within Annexation No. 13 to Street
Lighting Maintenance District 6:
Assess. No. of Lamps to be Annexed
Project Acreage Unit 5800L 9500L 16,000L 22,000L 27,500L
DR 87-26 (PM 10782)
pc1 1 1.8 4 .............
pcl 2 1.6 3 ..............
pc1 3 2.3 5 .............
pcl 4 2.6 5 ...............
pcl 5 2.1 4 .............
pcl 6 1.9 4 ..............
pcl ? 1.5 3 ............
pcl 8 2.3 5 .............
pcl 9 2.2 4 ............
pcl 10 2.5 5
pcl 11 4.6 9 .............
pcl 12 2.8 6
pcl 13 2.3 5 ...........
Total 30.5 62 ..............
Resolution No. 88-251
ASSESSMENT DIAGRAM Page 7
STREET LIGHTING MAINTENANCE DISTRICT NO. O
ANNEXATION NO. J5
,~NOW ~OU
~ ~ '-./
... , ,~ ~ ' -~ ,'
I
.~/- -.~ CITY OF RANCHO CUCAMONGA
=. ~ · STATE OF CALIFORNIA