HomeMy WebLinkAbout88-023 - Resolutions RESOLUTION NO. 88-023
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO
CUCAMONGA, CALIFORNIA, ORDERING THE WORK IN CONNECTION
WITH ANNEXATION NO. 11 TO LANDSCAPE MAINTENANCE DISTRICT
NO. 3 AND ACCEPTING THE FINAL ENGINEER' S REPORT FOR DR
86-39
WHEREAS, the City Council of the City of Rancho Cucamonga did on the
2nd day of December, 1987, adopt its Resolution of Intention No. 87-651 to
order the therein described work in connection with Annexation No. 11 to
Landscape Maintenance District No. 3, which Resolution of Intention No. 87-651
was duly and legally published in the time, form and manner as required by law,
shown by the Affidavit of Publication of said Resolution of Intention on file
in the office of the City Clerk; and
WHEREAS, after the adoption thereof, notice of the passage of said
Resolution of Intention, headed "Notice of Improvement", was duly and legally
posted in the time, form, manner, location, and number as required by law, as
appears from the Affidavit of Posting said notices, on file in the office of
the City Clerk; and
WHEREAS, after the adoption thereof, notices of the adoption of the
Resolution of Intention were duly mailed to all persons owning real property
proposed to be assessed for the improvements described in said Resolution of
Intention No. 87-651, according to the names and addresses of such owners as
the same appears on the last mailing or as known to the City Clerk of the City
of Rancho Cucamonga, which said copies were duly mailed in the time, form, and
manner as required by law, as appears from the Affidavit of Mailing on file in
the office of the City Clerk; and
WHEREAS, said City Council having duly received considered evidence,
oral and documentary, concerning the Jurisdiction facts in this proceeding and
concerning the necessity for the contemplated work and the benefits to be
derived therefrom and said City Council having now acquired Jurisdiction to
order the proposed work.
SECTION 1: It is hereby resolved by the City Council of the City of
Rancho Cucemonga that the public interest and convenience requires the
annexation to the District and the ordering of the work, and said City Council
hereby orders that the work, as set forth and described in said Resolution of
Intention No. 87-651, be done and made; and
SECTION 2: Be it further resolved that the report filed by the
Engineer is hereby finally approved; and
SECTION 3: Be it further resolved that the assessments and method of
assessment in the Engineer's Report are hereby approved.
Resolution No. 88-023
Page 2
SECTION 4: Be it finally resolved that said assessments shall not
begin until after 60 percent of said tracts have been occupied.
PASSED, APPROVED, and ADOPTED this 6th day of January, 1988.
AYES: Brown, Buquet, Stout, King, Wright
NOES: None
ABSENT: None
Dennis L. Stout, Mayor
ATTEST:
Beverly ~. Authelet, City Clerk
I, BEVERLY A. AUTHELET, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed,
approved, and adopted by the City Council of the City of Rancho Cucamonga,
California, at a regular meeting of said City Council held on the 6th day of
January, 1988.
Executed this 7th day of January, 1988 at Rancho Cucamonga,
California.
Resolution No. 88-023
Pase 3
CITY OF RANCHO CUCAMONGA
Engineer's Report for
Landscape Maintenance District No. 3
Annexation No. 11 For
DR 86-39
SECTION 1. Authority for Report
This report is in compliance with the requirements of Article 4, Chapter
1, Division 15 of the Streets and Highways Code, State of California
{Landscaping and Lighting Act of lg72).
SECTION 2. General Description
This City Council has elected to annex all new developments into Landscape
Maintenance District No. 3. The City Council has determined the areas to be
maintained will have an effect upon all the developments as mentioned above.
All landscaped areas to be maintained in the annexed developments are shown on
the recorded Map as roadway right-of-way or easements to be granted to the
City of Rancho Cucamonga.
SECTION 3. Plans and Specifications
The plans and landscaping are as stipulated in the conditions of approval
for the development and as approved by the City Engineering Division.
Reference is hereby made to the subject development plan and the assessment
diagram for the exact location of the landscaped areas. The plans and
specifications for landscaped improvement on the individual development is
hereby made a part of this report to the same extent as if said plans and
specifications were attached hereto.
SECTION 4. Estimated Costs
No costs will be incurred by the District for parkway and median
improvement construction. All improvements will be constructed by developers
and or/by the City. Based on historical data, contract analysis and developed
work standards, it is estimated that maintenance costs for assessment purposes
will equal thirty ($.30) cents per square foot per year. These costs are
estimated only, actual assessment will be based on actual cost data.
Landscape Maintenance District No. 3 has been demarcated into two zones. Zone
1 is comprised of Parcel Map 734g, comprised of 8 parcels, totaling 6,057
square feet. The district was formed in October 5, 1983, for the maintenance
of landscaping a detention basin and storm drain within the project. This
zone will be assessed on per lot basis for the maintenance costs within the
project boundary only as stipulated in the Engineer's Report for the formation
of the District.
Resolution No. 88-023
Page 4
Zone 2 is comprised of all other projects that are being annexed or will be
annexed to this District. All lots or parcels within Zone 2 will be assessed
on net acre basis for the maintenance of landscaped median islands on Haven
Avenue from 4th Street to Deer Creek Channel, Foothill Boulevard and 4th
Street from west to east City limit, Milliken Avenue and Rochester Avenue,
from 4th Street to Foothill Boulevard, 6th Street from Haven Avenue to
Rochester Avenue and median islands on other major divided highways and some
parkways within the Industrial Specific Plan Area and Foothill Boulevard
overlay area.
The estimated cost for Landscape Maintenance District No. 3 including
Annexation No. 11 is as follows.
Zone 1
Existing
District
Total estimated
maintenance cost $2,070
Assessment units 8
Total cost - assessment
unit for year and month ~ ~ sg58.75/year or $21.56/mo.
Zone 2
Existing Annexation New
District No. 11 Total
Total estimated annual
maintenance area - Sq. Ft. 0 0 0
Assessment units, acres 380,517.93 1.0 380,518.93
Total cost + assessment
unit for year and month 0 x $.30 ~ $ O/year O/mo.
Assessment shall apply to each lot as enumerated in Section 6 and the
attached assessment diagram.
SECTION 5. Assessment 01agram
A copy of the proposed assessment diagram is attached to this report and
labeled "Exhibit A", by thts reference the diagram is hereby incorporated
within the text of thts report.
Resolution No. 88-023
Page 5
SECTION 6. Assesment
I;provements for the Otstrtct are found to be of general benefit to
lots within the District and that assess=ent shall be equal for each parcel
for Zone 1 and shall be equal to the next acreage for each lot or parcel in
Zone 2.
The City Council will hold a public hearing In 4une, to determine the
actual assess;ents based upon the actua] costs incurred by the City during the
previous ftscal year whtch are to be recovered through assessments as required
by the Landscape and Lighting Act of 1972.
SECTION 7. Order of Events
1. City Council adopts Resolution of Preliminary Approval of Ctty Engineer's
Report.
2. City Council adopts Resolution of Intention to Annex to Otstrtct and sets
public hearing date.
3. City Council conducts public heartng, considers all testimonx and
determines to Annex to the Ofstrict or abandon the proceedings.
4. Every year in May, the City Engfneer files a report wtth the City Council.
$. Every year in 4une, the City Council conducts a public hearing and
approves, or modifies and approves the individual assessments.
Resolution No. 88-023
Page 6
Properties and improvements to be included within Annexation No.ll
(Zone 2) to Landscape Maintenance District No. 3:
PROPERTIES
PROJECT ACREAGE
DR 86-39 1.0
(pcl 2, pM 8060)
IMPROVEMENT AREAS TO BE ANNEXED IN ANNEXATION NO. 1
Area
S~t
Haven Avenue 0
Foothill Boulevard 0
Milliken Avenue 0
4th Street 0
Rochester Avenue 0
6th Street 0
Resolution No. 88-023
Page 7
ASSESSMENT DIAGRAM
LANDSCAPE MAINTENANCE DISTRICT NO.
ANNEXATION NO. I I
ARROW HIGHWAY
9th Street
CITY OF RANCm CU~IO~A A