HomeMy WebLinkAbout81-99 - ResolutionsRESOLUTION NO. 81-99
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE 1981-
82 CAPITAL IMPROVEMENTS PROGRAM.
WHEREAS, on the 22nd day of June, 1981, the Rancho Cucamonga
City Council held a meeting to consider the attached proposed Capital Improve-
ments Program; and
WHEREAS, the Rancho Cucamonga Planning Commission and Advisory
Commission concurred in the recommended program as proposed.
NOW, THEREFORE, BE IT RESOLVED, that the Rancho Cucamonga City
Council hereby approves the attached proposed Capital Improvements Program for
the 1981-82 fiscal year.
PASSED, APPROVED, and ADOPTED this 22nd day of June, 1981.
AYES: Frost, Mikels, Palombo, Bridge, and Schlosser.
NOES: None.
ABSENT: None.
ATTEST:
Lauren M. Wasserman, City Clerk
Schlosser, Mayor
1981-82 Capital Improvement Program
1. VINEYARD AVENUE WIDENING
The widening of Vineyard Avenue from Arrow Route to
Eighth Street from two to four lanes with the installa-
tion of a traffic signal at Arrow Route and railroad
crossing protection at the Santa Fe Railroad (Federal
Aid Urban funding of 84%) (Portion Gas Tax).
2. NORTH TOWN STREET IMPROVEMENTS (PHASE II)
The construction of curbs, gutters, and sidewalks on the
residential streets of Main, Feron, and Reid just east of
Archibald Avenue (Community Development Block Grant Funds
CDBG) (Portion Gas Tax).
$480,000
$163,965
3. DEER CREEK BRIDGES
Funds to be provided to San Bernardino County Flood Con-
trol District for widening and placement of sidewalks
on seven bridges over Deer Creek being constructed in
conjunction with the Corp of Engineers Flood Control
Project. (SB 325) ,
$258,241
4. CARNELIAN STREET REALIGNMENT $400,000
The realignment of Carnelian Street between Church Street
and Vineyard Avenue to remove hazardous curves (Systems
Funds) (Gas Tax).
5. SAPPHIRE STREET RECONSTRUCTION $ 21,000
The reconstruction of failing pavement sections between
Hillside and Thoroughbred (SB 325) (Gas Tax).
6. ARCHIBALD RECONSTRUCTION $ 30,000
The reconstruction of failed pavements at Banyan Street
and south of Highland Avenue (SB 325) (Gas Tax)
7. DEMENS EQUESTRIAN BRIDGE $ 15,000
The construction of an equestrian and pedestrian bridge
over Demens at Jasper Street (Systems)
8. BASE LINE WIDENING $140,000
Probable cooperative project with developer to widen and
reconstruct portions of the north side of Base Line from
Hermosa to Haven (Systems)
9. DESIGN ASSESSMENT DISTRICT 79-1 $ 30,043
Loan to Industrial Assessment District 79-1 for the Design
of Streets (Gas Tax)
Resolution No. 81-99
Attachment
Page 3
STORM DRAIN FUNDS
1. DESIGN ASSESSMENT DISTRICT 79-1
$400,000
One year loan to Industrial Assessment District 79-1 for
design of stor" !rnins.
2. DESIGN STORM DRAIN 2-G
$ 50,000
Design of storm drain 2-G from Beryl and 19th Street
to Hellman Avenue at the Cucamonga Storm Drain.
3. CONSTRUCTION MINOR DRAINAGE FACILITIES
$100,364
Construction of minor nuisance and storm drain improve-
ments such as extension of catch basins at Sapphire
and Banyan, addition of catch basin at Fourth and
Archibald, and nuisance drain at Beryl and 19th
Street.
4. DESIGN AND PLANNING STUDIES
$ 50,000
Provision of fund for various master plan and other
drainage studies that may be required to deal with
unforeseen problems developed during the year.
BEAUTIFICATION FUNDS
CARNELIAN LANDSCAPE PROJECT.
The landscaping of Carnelian Avenue between San
Bernardino Road and Base Line to be phase constructed
by maintenance crews.
$200,000