Loading...
HomeMy WebLinkAbout81-99 - ResolutionsRESOLUTION NO. 81-99 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE 1981- 82 CAPITAL IMPROVEMENTS PROGRAM. WHEREAS, on the 22nd day of June, 1981, the Rancho Cucamonga City Council held a meeting to consider the attached proposed Capital Improve- ments Program; and WHEREAS, the Rancho Cucamonga Planning Commission and Advisory Commission concurred in the recommended program as proposed. NOW, THEREFORE, BE IT RESOLVED, that the Rancho Cucamonga City Council hereby approves the attached proposed Capital Improvements Program for the 1981-82 fiscal year. PASSED, APPROVED, and ADOPTED this 22nd day of June, 1981. AYES: Frost, Mikels, Palombo, Bridge, and Schlosser. NOES: None. ABSENT: None. ATTEST: Lauren M. Wasserman, City Clerk Schlosser, Mayor 1981-82 Capital Improvement Program 1. VINEYARD AVENUE WIDENING The widening of Vineyard Avenue from Arrow Route to Eighth Street from two to four lanes with the installa- tion of a traffic signal at Arrow Route and railroad crossing protection at the Santa Fe Railroad (Federal Aid Urban funding of 84%) (Portion Gas Tax). 2. NORTH TOWN STREET IMPROVEMENTS (PHASE II) The construction of curbs, gutters, and sidewalks on the residential streets of Main, Feron, and Reid just east of Archibald Avenue (Community Development Block Grant Funds CDBG) (Portion Gas Tax). $480,000 $163,965 3. DEER CREEK BRIDGES Funds to be provided to San Bernardino County Flood Con- trol District for widening and placement of sidewalks on seven bridges over Deer Creek being constructed in conjunction with the Corp of Engineers Flood Control Project. (SB 325) , $258,241 4. CARNELIAN STREET REALIGNMENT $400,000 The realignment of Carnelian Street between Church Street and Vineyard Avenue to remove hazardous curves (Systems Funds) (Gas Tax). 5. SAPPHIRE STREET RECONSTRUCTION $ 21,000 The reconstruction of failing pavement sections between Hillside and Thoroughbred (SB 325) (Gas Tax). 6. ARCHIBALD RECONSTRUCTION $ 30,000 The reconstruction of failed pavements at Banyan Street and south of Highland Avenue (SB 325) (Gas Tax) 7. DEMENS EQUESTRIAN BRIDGE $ 15,000 The construction of an equestrian and pedestrian bridge over Demens at Jasper Street (Systems) 8. BASE LINE WIDENING $140,000 Probable cooperative project with developer to widen and reconstruct portions of the north side of Base Line from Hermosa to Haven (Systems) 9. DESIGN ASSESSMENT DISTRICT 79-1 $ 30,043 Loan to Industrial Assessment District 79-1 for the Design of Streets (Gas Tax) Resolution No. 81-99 Attachment Page 3 STORM DRAIN FUNDS 1. DESIGN ASSESSMENT DISTRICT 79-1 $400,000 One year loan to Industrial Assessment District 79-1 for design of stor" !rnins. 2. DESIGN STORM DRAIN 2-G $ 50,000 Design of storm drain 2-G from Beryl and 19th Street to Hellman Avenue at the Cucamonga Storm Drain. 3. CONSTRUCTION MINOR DRAINAGE FACILITIES $100,364 Construction of minor nuisance and storm drain improve- ments such as extension of catch basins at Sapphire and Banyan, addition of catch basin at Fourth and Archibald, and nuisance drain at Beryl and 19th Street. 4. DESIGN AND PLANNING STUDIES $ 50,000 Provision of fund for various master plan and other drainage studies that may be required to deal with unforeseen problems developed during the year. BEAUTIFICATION FUNDS CARNELIAN LANDSCAPE PROJECT. The landscaping of Carnelian Avenue between San Bernardino Road and Base Line to be phase constructed by maintenance crews. $200,000