Loading...
HomeMy WebLinkAbout2000/04/04 - Agenda Packet DESIGN REVIEW COMMITTEE MEETING ACTION AGENDA AND MINUTES TUESDAY APRIL 4, 2000 7:00 P.M. RANCHO CUCAMONGA CIVIC CENTER RAINS ROOM 10500 CIVIC CENTER DRIVE RANCHO CUCAMONGA Committee Members: Larry McNiel Pam Stewart Dan Coleman Alternates: Peter Tolstoy Rich Macias John Mannerino CONSENT CALENDAR The following items are expected to be routine and noncontroversial. Typically they are items such as plan revisions prepared in response to discussions at a previous meeting. 7:00 p.m. (Rudy) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-07 — FORECAST HOMES—The design review of building elevations and detailed site plan for recorded Tract 13759 consisting of 56 single-family lots on 14 acres of land in the Low Residential District (2-4 dwelling units per acres), located on the west side of Haven Avenue, east side of Center Avenue and north of the Southern Pacific Railroad right-of-way-APN: 1076-301-20 through 75. Related file: Variance 00-01 and Tree Removal Permit 00-07. VARIANCE 00-01- FORECAST HOMES -A request to increase the wall height to 9 feet along the southern boundary of recorded Tract 13759 where the Development Code allows a maximum wall height of 6 feet for Development Review 00-07 located. on the west side of Haven Avenue, east side of Center Avenue and north of the Southern Pacific.Railroad right-of-way-APN: 1076-301-20 through 75. Related files: Development Review 00-07 and Tree Removal Permit 00-07. PROJECT REVIEW ITEMS This is the time and place for the Committee to discuss and provide direction to an applicant regarding their development application. The following items do not legally require any public testimony, although the Committee may open the meeting for public input. 7:10 p.m. (Emily) DEVELOPMENT REVIEW 00-15— GAINEY TRANSPORTATION—The development of a 19,067 square foot truck maintenance facility onto an existing truck transportation facility on 10.42 acres of land in the General Industrial District (Subarea 8) of the Industrial Area Specific Plan, located at 10807 Jersey Boulevard—APN: 209-143-08. 7:40 p.m. (Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-05—SCRIPTO TOKAI — The development of a 120,620 square foot industrial building on 8.3 acres of land, within the Rancho Cucamonga Corporate Park, a master planned development by Catellus, which is in Subarea 7 (Industrial Park) of the Industrial Area Specific Plan, located south of Foothill Boulevard, east of Milliken Avenue — APN: 229-011-32. n DRC AGENDA April 4, 2000 Page 2 • PUBLIC COMMENTS This is the time and place for the general public to address the Committee. State law prohibits the Committee from addressing any issue not previously included on the Agenda. The Committee may receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes per individual. ADJOURNMENT r fl CONSENT CALENDAR COMMENTS 7:00 p.m. Rudy Zeledon April 4, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-07— FORECAST HOMES —The design review of building elevations and detailed site plan for recorded Tract 13759 consisting of 56 single-family lots on 14 acres of land in the Low Residential District (2-4 dwelling units per acres), located on the west side of Haven Avenue, east side of Center Avenue and north of the Southern Pacific Railroad right-of-way - APN: 1076-301-20 through 75. Related file: Variance 00-01 and Tree Removal Permit 00-07. VARIANCE 00-01- FORECAST HOMES-A request to increase the wall height to 9 feet along the southern boundary of recorded Tract 13759 where the Development Code allows a maximum wall height of 6 feet for Development Review 00-07 located on the west side of Haven Avenue, east side of Center Avenue and north of the Southern Pacific Railroad right-of-way - APN: 1076-301-20 through 75. Related files: Development Review 00-07 and Tree Removal Permit 00-07. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Rudy Zeledon The Committee reviewed the revised design and recommended approval with conditions. 1. Continue the wainscoting treatment along all elevations around to side elevations to the proposed return wall location or to a logical ending. 2. All corner, side, and return walls exposed to public view shall be of decorative masonry. 3. All two-story homes rear or side-on to Haven Avenue shall incorporate a second story deck as a standard and not an option to the homebuyer. 4. The applicant shall, in a good faith effort, work with the adjacent property owners, along the north boundary of the tract, in repainting the exterior or their walls prior to the release of occupancy. DESIGN REVIEW COMMENTS 7:10 p.m. Emily Wimer April 4, 2000 ENVIRONMENTAL ASSESMENT AND DEVELOPMENT REVIEW 00-15 - GAINEY TRANSPORTATION-The development of a 19,067 square foot truck maintenance facility onto an existing truck transportation facility on 10.42 acres of land in the General Industrial District(Subarea 8) of the Industrial Area Specific Plan, located at 10807 Jersey Boulevard-APN: 209-143-08. Design Parameters: The site is a 10.42 acre previously developed parcel with an office in front and a paved parking area in the rear for truck storage. The existing office building was constructed before City incorporation and features a tile mansard roof. The proposal is to construct a 4- bay maintenance facility with a wash bay, parts storage, fuel island, driver's facilities and management offices with tractor/trailer repair and service. The maintenance facility also incorporates approximately 1700 square feet of storage, an equipment room, and a break room for truck drivers. Truck access will continue to use the existing driveway on the northwest corner of site. Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: There are no major design issues. The applicant has worked diligently to resolve design issues. Secondary Issues: Once all major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues: 1. Provide canopy trees within new parking area at a rate of 1 tree for every 3 parking stalls. A minimum of 20 trees is required by Code (59 stalls divided by 3 = 20 trees). 2. The Industrial Area Specific Plan requires trees around the new building at a rate of 1 tree per 30 linear feet. Staff believes that this could interfere with functionality of this maintenance facility; therefore, recommends that landscaping be concentrated at the front entryway of the new building. A planter should be provided between handicap parking spaces and building, and extend across the width of the office areas. 3. Screen existing gated entrance from street by planting accent trees at the northwest corner of site along Jersey Boulevard. Staff Recommendation: Staff recommends that the Committee approve the project subject to the minor modifications as recommended above. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Emily Wimer The Committee reviewed the project and recommended approval subject to staffs comments. DESIGN REVIEW COMMENTS 7:40 p.m. Brent Le Count April 4, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-05 — SCRIPTO TOKAI — The development of a 120,620 square foot industrial building on 8.3 acres of land, within the Rancho Cucamonga Corporate Park, a master planned development by Catellus, which is in Subarea 7 (Industrial Park) of the Industrial Area Specific Plan, located south of Foothill Boulevard, east of Milliken Avenue —APN: 229-011-32. Design Parameters: The site is located within the Catellus Master Plan area which was approved by Planning Commission in April of 1999. The site slopes from north to south at approximately 2 percent. The Lowe's Home Improvement store site is currently being graded to the west of the site and GATX Building A is nearly completed to the south. The Masi Plaza automotive repair uses are under construction to the east. A six-foot high masonry wall is planned along Masi's west property line (east property line of site) which will provide screening. The building design incorporates the basic geometric and archway patterns that were established by the GATX buildings. The anticipated business activity involves large container truck loading which would occur on the south side of the building behind a screen wall. The building will be visually prominent from Foothill Boulevard, especially while the land to the north remains vacant. Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: The applicant has been working with staff to resolve design issues. There are no major outstanding design issues. Secondary Issues: Once all of the major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues: 1. Provide additional canopy trees within central parking area to provide shading of 50 percent of pavement at maturity of tree canopy. Suggest four tree wells in diamond shape. 2. Provide a solid concrete tilt-up screen wall along the north property line to provide visual separation between the industrial building and future, potentially more commercial oriented uses to the north. Wall design should include architectural elements compatible with building design. 2. Provide wall returns for vertical change of plane to convey a sense of depth. 3. Wrap reveal treatment so that no reveals terminate at exterior corners. 4. Provide glazing within arches at south end of west wall to match reminder of wall and south wall treatment and provide enhanced entry statement (entry to site is at southwest corner). 5. Wall surface treatment, such as glass columns and archway details, should be inset at least one to two feet to convey sense of depth and enhance wall surface articulation. 6. Provide berms along west screen wall so that no more than 8 feet of wall is exposed. 7. Security/entry gate shall be automatically operated so that it is open the minimum length of time to allow truck ingress/egress. 8. Guard House design shall be architecturally compatible with building. DRC AGENDA DR 00-05— SCRIPTO TOKAI April 4, 2000 • Page 2 Policy Issues: The following items are a matter of Planning Commission policy and should be incorporated into the project design without discussion: 1. All roof and ground mounted equipment shall be fully screened from surrounding property and streets. This may require increasing parapet height given roof ridge elevation. 2. Provide at least one tree per 30 linear feet of building wall exposed to public view plus one tree per 30 linear feet of site perimeter, and one tree per 3 parking spaces to provide shade. This is a minimum landscaping requirement. Additional trees to enhance the main entry points and complement the building architecture shall be provided. 3. Provide shade, tables and chairs within employee outdoor eating area consistent with the GATX project/Catellus Master Plan. 4. Provide decorative driveway paving consistent with Catellus Master Plan provisions. Staff Recommendation: Staff recommends approval subject to the above. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Brent Le Count • The Committee recommended approval subject to staff's comments with the following additional comments: 1. The Committee will accept a 2 to 3-foot high solid concrete wall along the north property line with decorative wrought iron above if it can be demonstrated that the site to the north can be graded to approximately match the grade of the Script-Tokai site. If the site to the north is graded, it shall be hydroseeded in the interim to control dust. 2. It is not necessary to provide glazing within archway features at south end of west elevation. Instead, provide heavier arched trim element to cast shadow and provide surface relief. 1 DESIGN REVIEW COMMENTS 49 April 4, 2000 PUBLIC COMMENTS There were no public comments at this time.. ADJOURNMENT The meeting adjourned at 8:10 p.m. RespectfuLy submitted, Brad Buller Secretary 49