Loading...
HomeMy WebLinkAbout1986/04/02 - Agenda Packet - RDACITY OF RANCHO LLCNv1ONCA REDEVELOPMENT AGENCY AGENDA Lions Park Community Center 9161 Base Line goad Rancho Cucazooga, California A. Roll Call: Mikel■ _. Buquet Ring Dahl _, and Wright _. B. Approval of Minutest Bone Submitted 2. caBBaT CALAQ" She following Consent Caleadar +tar are expected to bm routine amt nom -coast oeeraial. SDP will be acted upon by the mA at one tir without discauior. RUBE SUBMITTED 3. PUBLIC BBA2IWJj ROME SUBMITTED �l CITY OF RANCHO C REDEVELOPMENT STAFF REPORT DATE: April 2, 1986 TO: Chairman and Members of the Agency FROM: Jack Lam, AICP, Deputy Executive Director BY: Olen Joncs, Redevelopment Analyst SUBJECT: REPAYMENT AGREEMENT BETWEEN THF. CITY AND REDEVELOPMENT AGENCY IN CONNECTION WITH 20% HOUSING SET ASIDE BOND PROGRAM BACKGROUND: At the meeting on March 20, 1986 the Agency authorized staff to proceed with the development of a tax dlocation bond program for use in connection with the 20% Housing Set Aside Program. As a part of that action, staff was Instructed to develop a Repayment Agreement between the Agency and the City. EVALUATION: Tax reform legislation currently being considered by Congress Imposes a numberaew restrictions on tax exempt bond financing, potentially Impacting this issue of bonds. One of these new restrictions would require that 5% of the net bond proceeds be expended within 30 days of closing. As a method of dealing with this requirement, bond counsel has suggested that the Agency and City enter into an agreement whereby the City would odvonce certain cots prior to the sale of the bond with the understanding that, upon the sale, the Agency would reimburse those costs. This method allows relative program costs to begin accruing now, helping to ensure the 5% expenditure. Due to the extension of the effective date of tax reform for "essential function bonds" to September I, 1986, this cgreement may not become necessary. However, should the 5% requirement be imposec, this agreement will assist in providing for the necessary expenses. Both Agency and City attcvneys have reviewed and approved the agreement. RECOMMENDATION: The Agency authorize the Chairman to execute a Repayment greemenA�t I1,e City of Rancho Cucamonga relating to a proposed tax allocation bond Issue by the Agency. Jack Lam, AICP, Deputy Executive Director JL:OJ:kop REPAYMENT AGREEMENT Between the Reecho Cucamonga Rdevelopment Agency ad the City or Rancho Cucamonga Relating to Proposed Tax Allocation Bond Issu= bt the Agency THIS REPAYMENT AGREEMENT is entered this day of 1986, by and between the Rancho Cucumonns Redevelop,nent�nry (the�and the City of Rancho Cucamonga (the "City°}: W I T N E S 5 E T H WHEREAS, the Agency Intends to Issue its tax allocation bonds (the "Hord, -"n to provide funds to finance certain public Improvements for the prupose of Increasing the supply of low and moderate housing within the Clty: WHEREAS, the public Improvements proposed to be flnatced include many of the public improvements described in the exhibit attached to this Agreement; WHEREAS, the City is willing to pay certain costs of design engineering mid related services with respect to such public improvements pending the Issuance by the Agency of the Bonds crvt the Agency Is wltt;ng to repay the City for such costs from the proceeds of the Bonds; NOW, THEREFORE, in consideration of the mutual promises herein set °.orth, it is agreed that the City :hall pay applicable cats of design engineering and relatrd services with respect to tho a public Improvements which the Agenq, shall thereafter finance with the proceeds of the Bonds, perdl%'he Issuance by the Agency of the Bads and the Agency shall repay the City for such cos is from M-- proceeds of the Bonds. ATTEST: -3—ec«y ATTEST: City Clerk RANCHO CUCAMONGA REDEVELOPMENT AGENCY a anon CITY OF RANCHO CUCAMONGA a Mayor Q, V. CAPITAL IMPROVEMENT NEEDS LOW AND MODERATE INCOME NEIGHBORHOODS OLD ALTA LOMA Neighborhood No. 1: needed Improvements Include: Alley between Hellman c d City Hall - general reconstruction of pavement ($17,000) La Mesa - curb <sd gutter on both sides of street, driveway aprons will need to be improved/provir,;d; street lights could be provided without too much Interference with existing vegetation and grade; street paving will need to be Improved'provided; relocotion of water meter /lines ($81,230) Layton - curb, gutter, sidewalk, and street lights, relocation of water meter/lines, pavement rehabilitation ($61,000) I.emita - complete missing curb d gutter and driveway aprons; street lights could be provided without too much Interference with existing vegetation and grade, pavement rehabilitation ($116,200) Lo Grande - complete missing curb & gutter and driveway aprons; sidewalks could be provided on one side of street; al.•o street pavement rehabilitation Is needed, v relocation of water meter /lines ($118,200) i 3 1 La Vine - complete missing curb & gutter and driveway aprons; street lights could be provided without too much Interference with ex;sting vegetation and grade; sidewclks could be provided on one side of the street; also street pavement needs to be rebuilt; relocation of water meter /lints ($98,200) Whide Amethyst - needs curb and gutter; some widening Is needed; stdewc:k should be pros ided, meter relocations end street lights ($17,000) Monte Vista - street pavement, overlay, sidewalk, street lights, complete missing curb end gutter, relocation of water meter /lines ($142,800) Fkllmen Aveswe - (from Monte Vista S /to Baseline) - curb, gutter, sidewalks(?), street lights, CCWD indicates need for 8" water line and 12" sewer line (City Improvements - $440,000; CCWD improvements - $95,000) Storm D:.,i„ Project 02 should precede any Improvements to He] Imon Avenue. COST= $1,091,600 for City improvements $ 95,000 for CCWD Improvements I� 2 { 'OLD ALTA LAMA "s ). Ndghborhixxi Na. 2s i needed Improvements include. Lion - pavement rehcbiMtation, street lights (N/LOGfande not needed), curb, gutter, and sidewalk spot replacement ($66,000) La Ronda - pavement rehCbllitatian, street lights, curb, gutter, and sidewalk spot replacement ($50,250) Roberds - pavement rehabilitation, street tights, curb, gutter, and sidewalk spot replacement ($26,500) Cielito - spot pavement improvements, curb, gutter and sidewalk spot replacement ($13,750) Avenida Leon - pavement rehabilitation, street lights, Curb, gutter and sidewalk spot replacement ($29,500) Selma - pavement rehabilitation, curb, gutter and rtrewalk spot replacement ($140n0) La Grande - spot pavement improvements, curb, gutter, and sidewalk spot replacement ($7,500) Eastwood - spot pavement Improvements, curb, gutter, end sidewalk spot replacement ($6,125 r r i r. 3 e , a-u•. %w a Lomita - pavement «habilitation, curb, gutter, CM sidewalle spot replacement, d•iveway oprons ($9,250) COST. $220,000 rar City Improvements NOTE: Improvements to Hallman Avenue are included In Neighborhood Project 01. 4 OLD ALTA LOMA Neighborhood Nn 3: needed Improvements Include: Beryl Avenue - pavement rehabilitation, some street widening, replacement of sections of existing curb and gutter with water carrying curb S gutter, Infill missing curb and gutter, sidewalk, street lignts, handicap romps at intersections, rebuild storm drain catch basin structures Beryl between Hamilton end 19th (W)S) - complete street improvements as needed COST: $385,000 for City Improvements OLD ALTA LOMA Neighborhood No. 4: needed improvements Include: La Grande - pavement rehabilitation and street lights, driveway aprons ($20,250) Agate - pavement rehabilitation, street lights, replacement curb and gutter to water carrying curb and gutter, sidewclk improvements (where possible), relocation of water meter /lines (where necessary) ($119,,,00) Roberds - pavement rehabilitation, street lights, replacement of curb ono gutter to water carrying curb era gutter sidewalk (where possible); relocation of water meter /iines (where necessary) ($34,375) La Vine - pavement rehabilitation, street lights, replacement of curb and gutter to woter carrying curb and gutter, sidewalk (where possible); relocation of water meter /lines (where necessary) ($37,625) Garnet - pavement rehabilitation, street lights, replacement cf curb and gutter to water carrying curb and gutter, sidewalk (where possible); refer ation of w, ter meter /lines ($154,375) i COST: $400,000 for City improvements NOTE: Includes Lo Lema Court ($12,500) am' Roberds Court ($20,625) +I 6 i 'Y OLD ALTA LCMA Neighborhood No. S (. eman and Haven Area): needed improvements include: curb and gutter spot replacement, pavement rehabilitation, street light review, fill In missing sldewalk�, Sewer cormectiont probable, drivnvcy aprons (as needed), relocation of water meter /lines Halsted Avenuo ($39,300) La Gloria Drive ($19,400) Filkim, Avenue ($49,700) - Kinlock Avenue (30,100) Malvan Avenue ($30,00U) c Revere Avenue ($37,200) Llbert7 Street ($22,200) r Mayberry Avenue ($43,700) by COST: $271,600 for City improver.. -nts i� °L 7 t f,Q OLD ALTA LOMA Neigld:orhood Nm 6 (W /CarnJion between 19th S Baseline} needed improvements Include: Spot Curb old gutter replacement, pavommt rehabilitation or replacement (as appropriate), street light review, filling of sidewalks, sewer connections probable, driveway oprens (as needed), relocation of water meter /lines as required by sidewalk construction Sauna Street ($40,500) Mope Avenue ($93,500) Topo¢Street ($114,125) Slerro Vista ($46,125) Roberds Street ($51,750) LanitoDrive ($1%000) L.a Poix Street ($43,375) La Grade Street ($69,625) Lo Vine Street ($41,250) 8 Tapa=Sim rt ($67,O= Cameo street (552,250) Monte Vista Street ($57,000)' Avalon ($71,875) Jasper ($165,125) Surd Street and Hairy Cow t ($31,750)) Camay Street ($26,250) Ha wwt ($38,175) Mi9caette ($22,000) Holly Street ($21,250) Ambwaood Orive ($40,875), 1912% Street ($76,000) COST: $1,247,750 far City improvements P / Jl e• SOUTHWEST CUCAMONGA Neighborhood No. I: needed improvements Include: Hellman Avenue - street widening In vicinity of Arrow Highway and Calle Vejar ($68,625) Calle Vejar - street lights, replace curb and gutter, drainage culvert, sidewalks considered, rehabilitation of street pavements, "I- de -soc bulb by park at west end, relocation of water meter /lines (where necessary) ($163,625) Avenida Leon - Colle Vejar sidewalk to Arrow, street Ilghts, replace curb and gutter, drainage culvert, rehabilitation of pavement, cul-de -sac bulb; relocation of water meter /lines (where necessary) ($40,125) Konacti - street ending at park (cul- de-soc bulb) ($22,900) Alley between Avenida Leon and Hellman Avenue - regrading and paving, ($22,250) COST: $325,525 far City improvements 10 1-u . M --G��� MH FC ; ILL a j Im . /•r^'- ,TT',yTM' �L..u.Y.lrrr•-+.r• �' , i ��j� 4yhi ..1 .' � �I - • I tiff" I. SOUTHWEST CUCANONGA 1 NEIGHBORHOOD NO. 1 / �� J � 4.✓w y' • � • yr.F IY �F`•V Y . R SOUTHWEST CUCAMONGA Neighborhood Na 2: needed improvements include: Caleveras - curb, gutter and sidewalk, street lights as needed, undergrounding utilities if possible, pov•ment rehabil,tation4 install 8" water and sewer line ($63,750) (CCWD improvements - $40,000) S/S 9th Street - street lights, curb, gutter and sidewalk, pavement rehabilitiotion, upgrade water line to 8" to Vineyard, Install 8" saver line to Baker ($65,125) (CCWD improvements - $200,000) Virmar - street lights, curb, gutter and sidewalk, Pavement rehobiiition, install 8" sewer line ($63,750) Sierra Madre - street lights, curb and gutter, sidewalk, pavement rehabilitation; may need cul- de-sac bulb, ($70,000) alley - maintenance grading end base pave ($8,200) COST: $270,800 for City improvements $240,000 for CCWD improvements NOTE: CCWD plans may be available for both water and sewer work; la•crals and individual connections additional ($3500 /connectiora. N SOUTH ST CUCAMONGA Neighborhood Nm 3: needed Improvements includo N/S 9th ftreet - curb gutter and sidewalk, street repavement, street lights, underground utilities, upgrade water line to 8" to Vineyard, insta!I 8" sewer line to Baker ($82,000) Sierra Madre - pavement rehabilitation, curb and gutter rehabilitation, sidewalks, driveway aprons, street lights as needed, sewer connections, relocation of water meter ($34,400) Salina- pavement rehabilitation, sidewalks, driveway aprons, street light as needed, sewer connections, relocation of water meter /lines ($20,400) Edwin (IBC /9th) _ crass gutter needs rebuilding, curb aM gutter mointenoxe, slurry seal of pavements ($12,600) Calweras - cuib, gutter and sidewalk, street lights and driveway aprons as needed, underground utilities If possible, sewer connectiom, relocation of water meter /lines; street rehabilitation ($53,400) :van% - po +lent rehaNlitation as needed, sidewalks, driveway cprors, street lights as needed, rep!ace curb return of Virmcr d Salina (NcC), sewer corutections ($10,007) 5/S Arrow Highway (from Calaveras to Baker) - curb, gutter, sidewalks, pavement widening, street Iighis, undergrounding of utilities, relocation of water meter /lines ($131,300) COSTr $344,100 for City improvements 13 s SOUTHWEST CUCAMONGA Neighborhood No. 4: needed improvements Include: Arrow Highway (from Baker, east to Flood Control) - complete improvements in front of existing hones, minimal widening of undeveloped lots w /AC berm, underground utilities, curb, gutter, sidewalk, relocation of water meter /lines (where necessary) ($257,100) Baker (from 8th Street to Foothill) - complete improvements In front of existing tomes, minimal widening, street rehabilitation ($315,600) COSTt $572,700 NOTE: Storm Drain Project No. 4 should be completee prior to street improvements. 14 ` So(m &EST C(tclln;>]NGA Neighborhood No. 5- .needed laProvements include- sacra Madre - curb, Sutler and sidewalk, street rehabilitation, driveway oprora; LOO' at street Iight spoai g, sewer eaneahorns, relowt;m of water meter /lines; s9grode water fine 10 10" from Arrow to Foothill ($103,)(10) (CCV/p improvements - $6% Avacdo Vejar- curb. 9uttc and sidewalk, street rehabilitattonn, look at street light spealrg, drhvwoy ap-aru, sewer eomr_tiore, relocotim of water meter /lines ($117,400) Floc''do - 'r+b, gutter' and sidewalk, street rehabilitation, 10,4, at street light 5pa"n' drh ay oDrcrL% sewer Connections, relocation of water meter /lines ($35,400) Vi0 Car"110 - curb, gaiter and sidewalk, street rehabilitation, look of street light *=;n% 616t GY oprats (nay be able to do street trees if parkway Is established), sewer carvnectiom, relocation of water meter /lines ($33,%0) N/5 Arrow F ' '"'"W (from Baler west almost 10 Grove) - Complete i ^nP'ovemmts in front of exist'n9 tames, minimal widening of undeveloped lots wJAC berth, u ndergreundinng utilities curb, gutter and sidewalk ($135,000) COST: $480,000 for Cif) inprovements; $60,000 for CCV/C irrgravements 15 a� k.1 9 SOUTHWEST CUCAMONGA, Neighborhood No. 6s needed Improvements include. Top)a Via ( alreody committed to MSG Program If funding available) - curb, gutter, sidewalk, Pavement rehab, street Iights< relocation of water meter /lines ($100,000) Rondr7la (already committed to CDBG Program If funding available) - curb, gutter, sidewalk, strait lights, pavement rehab, relocation of water meter /lines ($150,100) COST: $250,500 for C,ty Improvements 16 ac! Y'� L •, er • r: dra 1 NORTH TOWN AREA needed improvements include: Humboldt Avenue _ sewer connection by Turner Avenue - no sewer line exists of Present time on o portion of Humboldt Avenue COST: $15,000 for CCWD Improvements NOTE: Storm Drain Project 0. would need to be done In order for the Humboldt sewer line to be Installed. 17 31 . A C. C' �o s t ", . 1 ■ �� ,;� suit �� � • a Wu � ■ NEW F T 1 [Ile ■ If sun Future City Hall �- n� . i. ,uNh ■ Vii) ' `" ; ; M, i = u' A■I a ■ ?1 MH - Jj NORTH TOWN AREA r un /� .ti Cam,■ €Kul CENTRAL NCAMONGA Neighbortxtod No. Is - needed Improvements Includes Devon - pavement rehabilitation, street light review, curb and gutter spot replacement, driveway aprons needed, sewer connections ($63,000) Ramona - pavement rehobilitation, street light review, curb and gutter spot replacement, deiveway aprons needed (Note: curb and gutter replacement work is more extonslve on this street as compared to others In the neighborhood.), sewer eomec`irms ($37,500) Ramona - (East Side, between Hcmpstdre & FootW[D - curb and gutter and parkway beautification ($12,000) Hampshire - pavement rehabilitation, street light review, curb and gutter spot replacement, driveway aprons needed, sewer eonnectic s ($65,000) tvnr9nx,ay - pmement rehobilitation, street light review, curb and gutter spot repiocemeni, driveway aprons needed, sewer eonneatlons ($37,500) Malvern - pavement rehablldstloN street light review, curb and gutter spot replacement, driveway aprons needed, rawer comretions ($37,500) London - pavement rehabilitation, street light re -4ew, curb o-d gutter spot, replacement, driveway uprons needed, sewer connections (a37,5C0) COST, $290,000 : c R` ' 4 YY ^'M..'3tA.n a�.r: t�Yl�t �'s�V..)J, {' +°i�. R! 1� n ' •, -��+��: ',l L� ]' M 0 1 CENTRAL O NEIGHBORHHOOD OD NO. N0. 1 I " Ir I. r� .r .I; .I II r� ,I - 1 i + ::-�' I i i r . %.. 6 rT 1MOPM �� M M ' -a i L :t � i L .1 I „ . -' T all . 1 a CENTRAL CUCAMONGA Neighborhood No. 21 needed Improvements Include: Stafford - curb and gutter replacement, pavement rehob or replaced (as appropriate), street light review, sidewalks, driveway aprons (as needed). This area navy has sewer lines however some of the homes are still on septic tanks. Connection work may also be possible. ($147,700) Malvern - curb and gutter replacement, pavement rehabilitation or replaced (as appropriate), street light review, sidewalks, driveway aprons (as needed), connection to sewer system may be possible. ($20,700) Dorset - curb and gutter replacement, pavement rehabilitation or replacement as appropriate, street light review, sidewalks ?, driveway aprons (as needed), connection to sewer system may be possible. ($142,600) Ofen - curb end gutter replacement, pavement rehabilitation or replocement (as appropriate), street light review, sidewalks?, driveway aprons (as neededy connection to sewer system may be passible. ($145,400) Norwlck (to Kialock) - curb and guttet replacement, pavemen• rehabilitation or replacement (as appropriate), street tight review, sidewalks ?, driveway aprons (as needed) ($147,600) ? 19 V s `�. Ashford O<Inlock to Center) - curb and gutter replacement, pavement rehabilitation or replacement (as appropr!ate), street light review, sidewalks ?, driveway aprons (as needed) ($64,000) Center Street (Foothill Blvd. to Ashford St.) - general pavement reconstruction ($43,500) COST' $711,500 for City Imprcvements 20 '': nq- :o 1� s ' :rrie ...•x 21WANDA AREA Neighborhood No. 1: .' needed improvements Include: Curb and gutter spat replacement, pavement rehabilitation or replacement (as appropriate), street light review, sidewalks, sewer connections may be po.;s,ble, driveway aprons (as needed) COST: $175,000 NOTE: Plans are available for Immediate construct N 39 try Is ETIVIANDA AREA Neighborhood No. Z= needed Imprmemenis include: Curb and gutter spot replacement, pavement rehabilitation er reploeemcnt (Cs appropriate), street light review, sidewalks, sewer connections may be possible, driveway opro u (as needed) COSTr $65,509 '<'• :3s Y _i LM t � V..�,�„ i own Elim E.S.P. ETIWANDA AREA NEIGHBORHOOD NO. 2 EUS,11 I ETIWYNI•A AREA ' NEIGHBORHOOD NO. 1 7 t { ETIWANDA ARIA Neighborhood No. 3: needed impravernents Inenudes .i ;n Curb and gurter spot replacement, pavement rehabilitation or replacement (as appropriate, street light review, sidewalks, sewer connections may ba possible, " " r driveway aprons (as needed) COST: $265,600 for City improvements ' i 1 If s if a£ 4a. 23 n . � C FC ■ E.S.P. ❑ :V PIG i «s 13 004 1 0 0 GC ,� A ■ :. ■ ■UC❑ 0 O ■ e o 00 v u � O v- 000 � v I: 7AREAETIWANDA ' NEIGHBORHOOD NO. 3 1 ! J�� I �11 � � � 1 I.S.P• .. 7 I E.Q.P. J ; STORM DRAMS Project 0) Turner/Hermosa Storm Drain Location: Cosh Foothill, go N /on Turner, crossing Baseline and ends just N 11911% (ties into existing Alta Loma Channel) Storm Drain $4.5 million Widening of Turner $1.5 million Source of Possible Funding: City General Fund (no contribution has yet been mode) Dev. Drainage Fund (from Fees) (4100,000 rr. fund) Gas Tax available for Turner widening orgy Reliaf Area sited for Nort:, Town Area between Arrow & 81h on Turner Avenue by virtue of storm flow diversion Projec Time. Project would take 1.5 years to design and ccnstruet 24 43 H07M I Death has occurred at Turner/Feron due to nood problems 8 Cars have been washed away due to flooding in this area Project 02 Ixsver Partin of the Upper Hellman Avenue Drain Location. Cost: Start at Monte Vista on Hel lmom, go S/to SPRR, then Walong RR tit it hooks Up to Cucasarvga Cask at Camelion. Simns Drain - $2 mil8an Design wuk has been Completed for work between Monte Vista and SPRR. This will allow for Increased capacity in existing v.cunly storm drain. Project Time: Project would td%,x 4 mo. to complete design; 8 rn . Construct. Canwnuds CCWD has parotid sewer and water line that carwwt be Completed until storm drain is complete (OW Alto Lama Neighborhood No. 2). /25 Yy -:a t= Project 83 Lowu Turner Avenue Drainage System Location: Begin at Deer Creek E/Turner d N /61h Street. Follow Humboldt Avenua to Turner, N /on Turner to Feron; W /on Feron to Rancho Cucamonga Middle School; then N /throvgh school to Ramono Avenue; then N /on Ramona to Arrow (end). Costs $2.5 million Project Time: 9 mm design; 9 mo. construct. Commentst Project 03 will not be 100% successful unless Project 01 is completed. Primary relief will be of school site. Rouling and/or scheduling is dependent upon possible construction of proposed development which is south of Feron Avenue (Hawkins). 266 qJ Project 04 Baker / Arraw Drain Location: Begins 5 /Foothill at Baker; goes South to Arrow, then E /to existing Cucamonga Creek Channel (WNineyord) Cosh. $1 million Project Time: 3 ma design; F mw construct Comments: Property damage to homes (3 flooded) on Baker would be protected with this Improvement. C27 T/- PROJ] VIUNITY ' MAP CRY OF nAl#el,,l CIlz--.ImN4" 1 SUMMARY OF IMPROVEMENT COSTS BY NEIGHBORHOOD STORM DRAIN PROJECT NEIGHBORHOOD PROJECTS: Old Alta Loma Neighborhood No. I 1,091,(.00 Etlwanda Subtotal TOTAL for all Neighborhoods STORM DRAIN PROJECTS: Project Of (Turner/Hermosa) Project 02 (Hellman Avenue) Project 03 (lower Turner Av,.) Project 94 (Baker /Arrow) TOTAL for all Storm Drains TOTAL CAPITAL IMPROVEMENTS: $ 220,000 $$$ 385,000 400,000 271,600 $1,247,750 325,525 510,800 344,100 572,700 540,000 250,50 15,000 290,000 711,500 175,000 65,500 265 600 S J,�15,9�L $ 2,543,!,25 $ 15.000 $ 1,001,500 506,100 $ 7,602,175 6 MILLION (can be phased) 2 MILLION 2.5 MILLION fl .MILLION tl 500 000 R9, 82, No. 2 No. 3 No. 4 No. 5 No. 6 Old Alto Loma Subtotal Southwest Cucamonao Neighborhood No.I No. 2 No, 3 No. 4 i No. 5 No. 6 i Southwest Cucamonga Subtotal C y North Town Area i North Town Area Subtotal r Control Cueamor� Neighborhood No.I ;t Na2 r! Central Cucamonga Subtotal Etiwada — Melghborh 000 No, 1 No. 2 a No. 3 Etlwanda Subtotal TOTAL for all Neighborhoods STORM DRAIN PROJECTS: Project Of (Turner/Hermosa) Project 02 (Hellman Avenue) Project 03 (lower Turner Av,.) Project 94 (Baker /Arrow) TOTAL for all Storm Drains TOTAL CAPITAL IMPROVEMENTS: $ 220,000 $$$ 385,000 400,000 271,600 $1,247,750 325,525 510,800 344,100 572,700 540,000 250,50 15,000 290,000 711,500 175,000 65,500 265 600 S J,�15,9�L $ 2,543,!,25 $ 15.000 $ 1,001,500 506,100 $ 7,602,175 6 MILLION (can be phased) 2 MILLION 2.5 MILLION fl .MILLION tl 500 000 R9, 82, -, 4 ` r ACTIONS /lgc.r w •• w • .w Lfona Park Coaesoicy Coster. 9161 Due Lilo Rose R"Cho Caeaaoata. C•llienia t_ cats.,mJ=I 7:05 p.m. A. roll Calls Ititel• x . De•aet X .Ray X. Dahl =. sad Vrft \t A . t. Approval of Kilotons Rasa SehsittM The tallwiy Coolant Calower !tees am gaoted to be rwties rod aaa-sestrwwolal. bA will be est.M also by the •a at oes ties witSeet di•eaaaiaa. RDNR SUIM1tiW R01R SD9MITTXV L —MM 1MMM A. AM=ZUAnOr eM Ta4 cA&tNAq TO UjMlg r anAMX Approved 0.0-1 AGtt>rsT VITA tQ E1ea E fkI ; COBPLTIIMI Vila TS ffi art l3len IMS PI -. y. r to �7 7:09 P.M.