Loading...
HomeMy WebLinkAbout04-24 - Resolutions RESOLUTION NO. 04-24 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT MAP SUB1716651, A SINGLE LOT SUBDIVISION OF 6.90 ACRES OF LAND FOR RESIDENTIAL CONDOMINIUM PURPOSES IN THE FOOTHILL BOULEVARD-CUCAMONGA CHANNEL MIXED-USE AREA WITHIN SUBAREA 1 OF THE FOOTHILL DISTRICTS, LOCATED ON THE NORTH SIDE OF FOOTHILL BOULEVARD, WEST OF THE CUCAMONGA CHANNEL; AND MAKING FINDINGS IN SUPPORT THEREOF — APN: 0207-101-32, 33, AND 50. A. Recitals. 1. Fuscoe Engineering filed an application for the approval of Tentative Tract Map SUBTT16651, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2. On January 8, 2004, the applicant conducted a neighborhood meeting to present the project and solicit community feedback. Seven residents attended the meeting. 3. On February 11, 2004, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 4. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on February 11, 2004, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to 6.90 acres of vacant property located on the north side of Foothill Boulevard, west of the Cucamonga Channel, south and east of the abandoned Pacific Electric Railway corridor; and b. The site is triangular in shape and slopes southerly at an average of approximately 4 to 5 percent, with the exception of an area at the northeast portion of the site where the slopes exceed 25 percent; and C. The site is bordered by the planned Pacific Electric Inland Empire Trail and vacant land to the north, Foothill Boulevard and vacant land, followed by single-family development and a trailer park to the south,the Cucamonga Channel followed by Vineyard Town Centerto the east,and vacant land to the west; and d. The site has several scattered mature trees and a remnant Eucalyptus windrow at the southwest end; and PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 2 e. The site has been cleared under a previous demolition permit of two vacant structures that were located near Foothill Boulevard; and f. The project consists of a single lot subdivision for residential condominium purposes; and g. The subdivision is to accommodate 92 condominiums units that range in size from 1,406 to 1,923 square feet; and h. A Tree Removal Permit (DRC2003-00849) has been submitted because development of the site will require removal and replacement of 25 trees on-site; and i. A Variance application (DRC2003-00848) has been submitted in conjunction with the tract for relief from the 30-foot maximum building height and 4-foot retaining wall height; and j. The site will gain access from Foothill Boulevard. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the tentative tract is consistent with the General Plan, Development Code,and any applicable specific plans; and b. The design or improvements of the tentative tract is consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The tentative tract is not likely to cause serious public health problems; and f. The design of the tentative tract will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act (CEQA) of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 3 b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) Tree Removal Permit DRC2003-00849 is hereby approved for the removal of trees for the development of the site. The applicant/developer shall be required to remove and replace trees subject to Environmental Mitigation Numbers 1 and 2 under Biological Resources listed below. The Tree Removal Permit is valid for 60 days from the date of the issuance of building andlor grading permits. 2) Foothill Boulevard frontage improvements shall be in accordance with the Foothill Boulevard Historic Route 66 Visual Improvement Plan's typical suburban parkway design adopted by City Council Resolution No. 02-037. 3) All retaining walls shall be made of a decorative wall material, subject to review and approval by the City Planner. 4) The applicant shall get permission from adjacent property owners for any off-site grading or improvements. 5) The applicant shall make a good faith effort to incorporate the vacant offsite parcel (APN: 0207-101-13) that runs along Foothill Boulevard into the project and landscape design. If this cannot be achieved, the entry wall on the west side of the drive aisle shall be relocated on-site, to the satisfaction of the City Planner. Engineering Division: 1) According to the Federal Emergency Agency(FEMA) Flood Insurance Rate Map (FIRM) panel 8630, a portion of the southwest comer of the property may be located in Flood Zone W. The easterly end of this area fronts Foothill Boulevard near the location that provides main PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 4 access to the site. It shall be the developer's responsibility to have the current FIRM Zone'A'designation removed from the project area. The developer shall provide drainage and/or flood protection facilities sufficient to obtain an un-shaded Zone 'X' designation for the project area. The developer's engineer shall prepare all of the necessary reports, plans, and hydrologicthydraulic calculations. A Conditional Letter of Map Revision (CLOMR)shall be obtained from the FEMA prior to approval of the final map or the issuance of building permits, whichever occurs first. A LOMR shall be issued by FEMA prior to occupancy or improvement acceptance, whichever occurs first. If the FEMA is unwilling to revise the FIRM, elevation certificates shall be provided for lots within the Flood Zone. a) Plot Zone'A'limits on the Grading Plan. Determine and show the necessary mitigation measures (flood walls, etc.). Your area of responsibility shall include any and all property that may be obtained (for entry access purposes)to the west/southwest of the original project boundary. b) Ordinance No. 669 contains the City's floodplain management regulations. Flood Zone 'A' is a "Special Flood Hazard Area" (SFHA) and is defined on page 10 of the ordinance. c) The ordinance includes standards for construction (page 16) of structures within areas of Special Flood Hazard. 2) Provide a Portland Concrete Cement(PCC)drainage swale adjacent to the fill side of the retaining wall(s) along the northwest property line (see TRC Grading Plan Section D-1, submittal date stamped December 15, 2003). Collect the concentrated flows from the swales and convey through on-site private storm drain system. Provide calculations forthe sizing of this swale and drainage system prior to the issuance of grading permits. 3) The project proposes to drain to and/or could be impacted by Cucamonga Creek, a Flood Control District facility; therefore, written comments will be requested by the developer from San Bernardino County Flood Control District(SBCFCD), and those comments shall be provided to the City prior to Public Improvement Plan approval. In the event that SBCFCD does not allow direct connection with the channel: a) Construct City Master Plan Storm Drain Line No. III-1 to Foothill Boulevard from existing location, south of Foothill Boulevard, to the satisfaction of the City Engineer. Standard drainage fees for the site shall be credited to the cost of permanent Master Plan facilities, in accordance with City policy. b) Install local storm drains to convey all development drainage to the master plan storm drains. The cost of local storm drains shall be bome by this development with no fee credit. The developer PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 5 may request a reimbursement agreement to recover over sizing costs, in excess of fees, from future development within the same tributary area. If the developer fails to submit for said reimbursement agreement within six months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. c) All sump catch basins and laterals shall be designed to handle Q100. 4) On-site private storm drain system shall be designed for Q100. 5) Provide a right tum lane at the main project entry in accordance with City Standard No. 119, street type (AC per Section B-B). a) Additional right-of-way will be required to facilitate the westbound Foothill Boulevard right tum lane into the site(reference Standard Conditions). b) Right tum lane shall be 200 feet long plus 60-foot transition. c) Curvilinear sidewalk on Foothill Boulevard shall change to curb adjacent and 6 feet wide along the right tum lane. 6) Foothill Boulevard public frontage improvement through to Cucamonga Creek Channel to the east shall be installed in accordance with City "Major Divided Arterial" standards and the Foothill Boulevard District guidelines outlined in the Development Code, including but not limited to: a) Curbs and gutters, street pavement, drainage facilities, streetlights, street trees, curvilinear sidewalk, street type drive approach, cross-gutter, pedestrian ramps, signing, striping, etc. b) Divided Major Arterial, minimum 120-foot wide total right-of-way includes 13-foot wide parkway. Centerline of street and centerline improvements may not be the same. Dedicate additional street frontage right-of-way as required during plan check. 7) Proposed main driveway shall align with Highridge Place of Tract No. 15540. a) Modify the traffic signal at Highridge Place to fit the new intersection configuration and provide a Traffic Signing and Striping Plan along Foothill Boulevard to the satisfaction of the City Engineer(Reference City Drawing No. 1805). b) All gated entrances shall conform to the Citys Design Guide. Drive approach shall be a maximum of 50 feet wide, including two PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 6 20-foot wide ingress and egress lanes separated by a 10-foot wide island. c) In this location, with the traffic signal, use a "street type" entry rather than a commercial drive approach. With street type, provide access ramps at the curb returns and a cross gutter. Curb return radii shall be 35 feet. d) Signal loops shall be located outside the gated entry area. Provide an easement for maintenance of signal equipment. e) Line-of-Sight designs shall be provided for the main project entrance, on the Grading and Landscape Plans. 8) Reimburse developer of Tract 15540 (refer to street reimbursement agreement) for half the cost of traffic signal installation at Highridge Place. 9) A contribution in lieu of construction fee for the future median island in Foothill Boulevard shall be paid to the City prior to the issuance of building permits or final map approval, whichever occurs first. The amount of the contribution shall be one half the cost of the median (currently estimated at $60.00 per linear foot), times the length of the project frontage. 10) Grading Plan (TRC plan submittal date stamped December 15, 2003) indicates that the top of curb/flowline grades along Foothill Boulevard do not meet the City's minimum rate of slope. During plan check the flowline profile for Foothill Boulevard will need to meet the minimum standard of 0.4 percent. 11) Provide a Water Quality Management Plan(WQMP), to the satisfaction of the City Engineer, and identify applicable Best Management Practices (BMPs) on the Grading Plan. Install WQMP system and show on the Grading Plan. Maintenance of BMPs identified in the WQMP shall be addressed in the project Covenants, Conditions, and Restrictions (CC&Rs). 12) Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50 percent of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Division when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Division within 60 days following the completion of the construction and/or demolition project. PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 7 Environmental Mitigation Air Quality 1) All residential and commercial structures shall be required to incorporate high efficiency/low polluting heating, air conditioning, appliances and water heaters. 2) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. 3) The site shall be treated with water or other soil-stabilizing agent (approved by South Coast Air Quality Management District[SCAQMD] and Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PM1o) emissions, in accordance with SCAQMD Rule 403. 4) Foothill Boulevard shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 5) Grading operations shall be suspended when wind speeds exceed 25 miles per hour to minimize PM10 emissions from the site during such episodes. 6) Chemical soil-stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 7) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. Contractors shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 8) Prior to the issuance of any grading permits,the developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD, as well as City Planning Staff. 9) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. 10) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 8 11) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions on Grading Plans and mediate on-site when appropriate or as soon as feasible. • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 12) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 13) The construction contractors shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. Biological Resources 1) All Eucalyptus windrow trees identified for removal shall be replaced with 15-gallon Eucalyptus maculata (Spotted Gum) trees, 8 feet on center, as required by the Tree Preservation Ordinance. Any beetle infested wood shall be chipped, removed, and buried at a dump site or tarped to the ground for a minimum of six months, sealing the tarp edges with soil, to prevent emerging Borer Beetles from reinfesting other trees or wood. The movement of Eucalyptus wood containing live Borer Beetles or their larvae in trucks or trailers is prohibited by State law pursuant to Public Resources Code 4714.5. 2) All other removed heritage trees shall be replaced with new trees as required by the Rancho Cucamonga Municipal Code, Title 17 Development Code, Table 17.08.040-G. The size, location, and PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 9 species of the trees shall be to the satisfaction of the City Engineer and City Planner. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. Pursue educating the public about the area's archaeological heritage. Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources,following appropriate CEQA guidelines. Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) A qualified paleontologist shall conduct a preconstruction field survey of the project site. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay,to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 10 • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to the San Bernardino County Museum. 3) California Health and Safety Code Section 7050.5 dictates that if any human remains are unearthed during construction, no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to CEQA regulations and Public Resources Code Section 5097.98. Geology And Soils 1) Prior to issuance of grading permits,the permit applicant shall submit to City Officials for approval, Storm Water Pollution Prevention Program (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants entering the storm drain system to the maximum extent practical. 2) All disturbed and bare or exposed soils shall be kept moist or re-planted with drought resistant landscaping as soon as possible to avoid erosion. Hydrology and Water Quality 1) The developer shall implement the BMPs identified in the Water Quality Management Plan (WQMP) (Fuscoe Engineering, October 2003). BMPs shall be identified on the Grading Plans for review and approval by the City Engineer. 2) Prior to issuance of grading or paving permits, the applicant shall submit to the City Engineer a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollution Discharge elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Dischargers Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise 1) Sound barriers at least 6.5 feet high must be erected around all first floor private patios facing Foothill Boulevard from the two southernmost buildings. 2) Sound barriers at least 6.5 feet high must be erected around the Mini-Park at the west end of the project site. 3) Sound walls at least 5.5 feet high must be erected around all other private patios with any view of Foothill Boulevard and less than 225 feet from the roadway centerline. PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 11 4) Each completed noise control barrier must present a solid face from top-to-bottom. Cutouts and openings are not permitted except for drain holes. 5) STC 30 glazing shall be added to all units with a view to Foothill Boulevard and less than 225 feet from the roadway centerline. 6) STC 28 glazing shall be added to all units with any view of Foothill Boulevard but greater than 225 feet from the roadway centerline. 7) To maintain ambient indoor noise levels at 45 dBA or less, adequate fresh air ventilation shall be provided through the installation of air conditioning or a "summer switch" and outside ducting. 8) Common floor to ceiling assemblies between units shall be constructed using one of the following methods: 8 inch concrete slab; • 1.5 inch LWC, sub-floor, R-11 insulation, resilient channel,drywall ceiling; • 1.375-inch Gyp-crete, sub-floor, 2 inch by 10 inch joists, R-11 insulation, resilient channel, .5 inch drywall ceiling; Some recommended assemblies can not meet the Impact Insulation Class 50 minimum requirement without carpet. Uncarpeted areas above other living units will require some form of proprietary isolation product under the floor to achieve the required rating such as Enkasonic, Acousti-Mat,Monsanto SC50, or others. 9) Common wall assemblies between units shall be constructed of one of the following methods: • Two layers .5 inch direct nailed drywall, 2 inch by 6 inch plate, 2 inch by inch staggered studs, fiberglass insulation, two layers .5 inch direct nailed drywall; • Two layers .625 inch direct nailed drywall, 2 inch by 6 inch plate, 2 inch by 4 inch staggered studs, R-11 insulation, two layers .625 inch drywall; .625 inch direct nailed drywall, 2 inch by 4 inch plate, 2 inch by 4 inch studs, R-11 insulation, 1 inch airspace at plate,with 2 inch by 4 inch plate with 2 inch by 4 inch studs, .625 direct nailed drywall; • Same as last, with two layers of R-11 insulation; PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 12 Two layers .625 drywall direct nailed, 2 inch by 4 inch studs, 1 inch airspace, 2 inch by 4 inch studs, R-11 insulation, two layers .625 drywall; Same as last, with two layers of R-11 insulation 10) All plumbing and electrical installations shall be installed for compliance with the California Code of Regulations Title 24, Part 2, Appendix Chapter 35. 11) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 12) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 13) The perimeter block wall shall be constructed as early as possible in first phase. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 11TH DAY OF FEBRUARY 2004. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: •f , - � )�v arty . cNiel, Vice Chairman ATTEST: Brad W, Secre 1, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 11th day of February 2004, by the following vote-to-wit: PLANNING COMMISSION RESOLUTION NO. 04-24 SUBTT16651 — FUSCOE ENGINEERING February 11, 2004 Page 13 AYES: COMMISSIONERS: FLETCHER, McNIEL, McPHAIL, STEWART NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: MACIAS COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: TENTATIVE TRACT MAP SUBTT16651 —TUSCANY VILLAS AT REDHILL SINGLE-LOT SUBDIVISION FOR 92 ATTACHED CONDOMINIUM UNITS ON 6.90 ACRES SUBJECT: OF LAND APPLICANT: FUSCOE ENGINEERING LOCATION: NORTH SIDE OF FOOTHILL BOULEVARD, WEST OF THE CUCAMONGA CHANNEL ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Completion Date A. General Requirements 1. The applicant shall agree to defend at his sole expense any action brought against the City, its _/_/_ agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees maybe required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Approval of Tentative Tract Map No.SUBTT16651 is granted subject to the approval of Variance DRC2003-00848. B. Time Limits 1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the City Engineer within 3 years from the date of the approval. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Division,the conditions contained herein,and Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the City Planner. SC-10-03 1 Project No. SUBTT16651 Completion Date 3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 4. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 5. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 6. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners'Association are subject to the approval of the Planning and Engineering Divisions and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Division a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 7. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 8. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail,all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. D. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds maybe used bythe City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. E. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) F. General Requirements 1. Submit five complete sets of plans including the following: —/—/— SC-10-03 2 Project No. SUBTT16651 Completion Date a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets,detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number (i.e., TT#, CUP#, DR #, etc.) clearly identified on the outside of all plans. . 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. —/—/— G. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., SUBTT16651 /DRC2003-00847/ DRC2003-00848). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). 6. Submit pool plans to the County of San Bernardino's Environmental Health Services Department for approval. H. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. 4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC --/--L— Section 1505. SC-10-03 3 Project No. SUBTT16651 Completion Date 5. Provide draft stops in attics in line with common walls. —/—/- 6. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 7. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 8. If the area of habitable space above the first floor exceeds 3,000 square feet, then the construction type shall be V-1 Hour minimum. 9. Walls and floors separating dwelling units in the same building shall be not less than 1-hour fire-resistive construction. I. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped, and signed by a California registered Civil Engineer. J. Additional Requirements/Comments 1. Project shall fully comply with accessibility requirements of 2001 California Building Code, _/_/_ Chapter 11 A (Housing Accessibility). APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: K. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): SEE SPECIAL CONDITIONS OF APPROVAL. 2. Additional street right-of-way shall be dedicated along right turn lanes,to provide a minimum of 7 feet measured from the face of curbs. L. Street Improvements 1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. SC-10-03 4 Project No. SUBTT16651 Completion Date 2. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other FOOTHILL BLVD. X X (c) (e) X X (b) (d) Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item Median Island. (e) Street type entry per Standard No. 119, Section B-B, with cross-gutter. 3. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2)' Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in _/__J_ accordance with the City's street tree program. SC-10-03 5 Project No. SUBTT16651 Completion Date 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend and construction notes shall appear on the title page of the street improvement plans. Where public landscape plans are required,tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size" city. Foothill Boulevard Rhus lancea African Sumac 5 ft. 20 ft. 15 gal. O.C. Platanus acerifolia London Plane Tree 8 ft. 30 ft. 15 gal. O.C. *TREES SHALL BE 15-GALLON SIZE UNLESS OTHERWISE APPROVED. "QUANTITIES DETERMINED AT TIME OF PLAN CHECK. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Division. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. M. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 2. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan Foothill Boulevard. N. Drainage and Flood Control 1. The project(or portions thereof) is located within a Flood Hazard Zone;therefore,flood protection measures shall be provided as certified by a registered Civil Engineer and approved by the City Engineer. 2. It shall be the developer's responsibility to have the current FIRM Zone A designation removed from the project area. The developer shall provide drainage and/or flood protection facilities sufficient to obtain an unshaded "X" designation. The developer's engineer shall prepare all necessary reports, plans, and hydrologic/hydraulic calculations. A Conditional Letter of Map Revision (CLOMR) shall be obtained from FEMA prior to final map approval or issuance of building permits, whichever occurs first. A Letter of Map Revision (LOMR) shall be issued by FEMA prior to occupancy or improvement acceptance, whichever occurs first. 3. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. SC-10-03 6 Project No. SUBM 6651 Completion Date 4. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 5. A permit from the San Bernardino County Flood Control District is required for work within its right-of-way. I O. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District(CCW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. P. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,prior to final map approval or prior to building permit issuance if no map is involved. APPLICANT SHALL CONTACT THE FIRE SAFETY DIVISION, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED SC-10-03 7 CITY OF RANCHO CUCAMONGA ENGINEERING DIVISION STREET TREE REQUIREMENT FORM LAST UPDATED 8/27/01 _ DATE: 8/13/02 TO: HENRY MURAKOSHI, ASSOCIATE ENGINEER COMMENTS PREPARED BY: DAWN ROURK, CONTRACT LANDSCAPE PLAN CHECKER PROJECT: (PR) DRC2002-00579, DRC2003-00847, SUBTT16651 LOCATION: N/S FOOTHILL,, W/O VINEYARD DESIGN NOTES: 1. STREET TREES ON NEW STREETS ARE TO BE SELECTED FROM THE CITY'S APPROVED STREET TREE LIST, BASED UPON AVAILABLE PLANTING AREA (TYPICALLY BETWEEN BACK-OF-CURB AND THE SIDEWALK). ESTABLISHED STREETS SHOULD ALREADY HAVE DESIGNATED TREE SPECIES. CONTACT LAURA BONACCORSI AT 909-477-2740, EXT 4023 FOR INFORMATION. 2. STREET TREES ARE TO BE SHOWN ON STREET OR OTHER PUBLIC IMPROVEMENT PLANS SIGNED BY THE CITY ENGINEER,AND CONSTRUCTED PER THE SAME. 3. STREET TREES SHOWN ON PLANNING DIVISION SUBMITTALS ARE CONCEPTUAL ONLY 4. INTERIOR STREETS WILL BE REQUIRED TO SELECT DECIDUOUS TREES FOR EAST-WEST STREETS AND EVERGREEN TREES FOR NORTH-SOUTH STREETS FROM THE CITY'S APPROVED STREET TREE LIST. WIND-PRONE AREAS MAY BE REQUIRED TO UTILIZE A MORE DECIDUOUS PALETTE. 5. INDICATED SPACINGS AND SIZES ARE REQUIREMENTS FOR CITY-MAINTAINED TREES ONLY. WHERE THE TREE CONCEPT GOES BEYOND AREAS OF INFLUENCE NEAR PUBLIC IMPROVEMENTS AND/OR ANY CITY MAINTENANCE EASEMENT, SPACINGS AND SIZES WILL BE PER THE ON-SITE PLANS APPROVED BY THE PLANNING DIVISION. ON-SITE AND OFF-SITE PLANS SHALL BE COORDINATED. 6. STREET IMPROVEMENT PLANS SHALL REFLECT THE LEGEND AND NOTES INDICATED BELOW. IN SOME CASES, WHEN DETAILS ABOUT PARKWAY SIZES OR UTILITIES ARE UNAVAILABLE AT THE TIME OF CONDITIONING,OPTIONS ARE PROVIDED FOR VARIOUS SITUATIONS. IT IS THE DESIGNER'S RESPONSIBILITY TO ASCERTAIN THE CONTEXT OF THE TREE PLANTING,SELECT THE APPROPRIATE TREE OPTION,AND OMIT ANY ERRONEOUS INFORMATION ON THE FINAL LEGEND. 7. STREET IMPROVEMENT PLANS SHALL REFLECT A LINE ITEM WITHIN THE CONSTRUCTION LEGEND TO STATE: STREET TREES SHALL BE INSTALLED PER THE NOTES AND LEGEND ON SHEET ? (TYPICALLY SHEET 1) 8. THIS PROJECTOR QUIRES ONSITE LAIVD�CAPErCOSTRUCTION PlA1VS T� BE SUBMITTDAIONGT�WITHTH SRE . IMPROVEMENT PLANS T,0 VERIFY.COM,P}WNCE WITHTHE REQUIRED STREETSCAPE THE_INE(BEYOND.R,O.yN}ADVO COORDINATION_.OF,I.HE;QFFSITEANDONS TREE;LAYQU7 STR 'E NA E ' NICAL AM COMlili 1V= ME' MISPACe� 5Pi4 $ E J.mrF�!' -.1d8• ,� `" .( ' t I . h' l�.i a,� NKzLiuttpfk� .: .d FOOTHILL BLVD• a NON ACTIVITY CENTERS Rhus lancea African Sumac 5' 20'0.C. 15 GAL FILL IN -PRIMARILY IN R.O.W. INFORMAL GROUPINGS NOT MORE THAN 25%OF TOTAL FRONTAGE TREES NON ACTIVITY Platanus acerifolia London Plane Tree 8' SPACE PER ON-SITE 15 GAL FILL IN CENTERS-ON SITE PLANS- 30'O.C.SUGGESTED. RANCHO CUCAMONGA FIRE DISTRICT STANDARD CONDITIONS December 10, 2003 Tuscany Villas N/S Foothill Blvd &W/O Vineyard Ave. Fuscoe Engineering DRC2003-00847 & SUBTT16651 THE FOLLOWING STANDARD CONDITIONS APPLY TO YOUR PROJECT. Note to the applicant: 1. Building permits will not be issued until the public and private water plans are approved. 2. A Fire flow letter is required prior to Building permit issuance. The new 16"Water main on Foothill Blvd. must be installed prior to the test. 3. Reciprocal agreements including access easements from adjacent property owners must be recorded before permit issuance. RANCHO CUCAMONGA FIRE DISTRICT- STANDARD CONDITIONS & REQUIREMENTS. FSC-1 General Requirements for Public and Private Water Supply 1. General Guidance for Fire Hydrants: The following provides general guidance for the spacing and location of fire hydrants. Remember these are the maximum permitted distances between fire hydrants: a. The maximum distance between fire hydrants in multi-family residential is 400-feet. No portion of the exterior wall shall be located more than 200-feet from an approved fire hydrant. For cul-de- sacs the distance shall not exceed 150-feet. b. Fire hydrants are to be located: 1. At the entrance(s) to a project from the existing public roadways. This includes subdivisions. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs. 5. The location of fire hydrants is based upon the operational needs of the Fire District. 6. Fire hydrants shall be located a minimum of 40 feet from any building. 2. Minimum Fire Flow with Automatic Fire Sprinklers: The required minimum fire flow for this project is 3000 gallons per minute at a minimum residual pressure of 20 pounds per square inch. This flow reflects a 50 percent reduction for the installation of an approved automatic fire sprinkler system with central station monitoring in accordance to NFPA 13R and 72. This requirement is made in accordance with Fire Code Appendix III-A, as amended, and Fire District Ordinances and Standards. 3. Hydrants Used to Supply Fire Flow: Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 4. Show Existing Fire Hydrants and Mains: Existing fire hydrants and mains within 600-feet of the project shall be shown on the water plan submitted for review and approval. Include main size. FSC-2 Private(On-Site) Water and/or Fire Sprinkler Underground Plans for Fire Protection 1. Exceeds Allowable Distance: When any portion of a facility or building is located more than 150-feet from a fire hydrant located on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided. The distance is measured as vehicular path of travel on access roadways, not line of sight. Contact the Fire Construction Services (909)477-2713 2. Number of Fire Hydrants: Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof, subject to standard spacing and distribution requirements. Contact the Fire Construction Services (909)477-2713 3. Fire Sprinkler Underground: Prior to the issuance of a fire sprinkler system permit, the applicant shall submit construction plans, specifications, and calculations for the fire sprinkler system underground to the Fire Safety Division for approval. FSC-3 Fire District Site Access-Technical Comments 1. Access Roadways Defined: Fire District access roadways include public roads, streets, and highways, as well as private roads, streets, drive aisles and designated fire lanes. 2. Location of Access: All portions of the structure or facility or any portion of the exterior wall of the first story shall be located within 150-feet of Fire District vehicle access, measured by an unobstructed approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates, and fences are an obstruction. 3. Private Roadways and Fire Lanes:The minimum specifications for private fire district access roadways are: a. The minimum unobstructed width is 26-feet. b. The inside turn radius shall be 20-feet. c. The outside turn radius shall be not less than 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14 feet, 6 inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet. g. The angle of departure and approach shall not exceed 9 degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). 4. Access Walkways: Approved access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Vegetation: Trees and shrubs planted in any median shall be kept trimmed to a minimum of 14-feet, 6- inches from the ground up, so as not to impede fire vehicles. FSC-4 Single-family Residential Sales Models 1. Minimum Access and Water: Residential sales model homes require approved Fire District vehicle access and water supply from a public or private water main system. 2. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. 3. Operate a place of public assembly. FSC-5 Plan Submittal Required Notice Required plans shall be submitted and approved prior to construction in accordance with 2000/2001 Building, Fire, Mechanical, and Plumbing Codes; 1999 Electrical Code; Health and Safety Code; Public Resources Code;and RCFPD Ordinances FD15 and FD39, Guidelines and Standards. NOTE: In addition to the fees due at this time please note that separate plan check fees for tenant improvements,fire protection systems and/or any consultant reviews will be assessed at time of submittal of plans. FSC-6 Alternate Materials and Methods The Fire Safety Division will review requests for alternate materials and methods within the scope of our authority. The request must be submitted on the Fire District"Application for Alternate Method"form along with supporting documents. PRIOR TO (PARCEL) MAP RECORDATION- For Each Development Phase 1. Reciprocal Access Agreement: The plans as submitted indicate that a required point of Fire District access: a. Requires passage on property not under the control of the applicant; or b. Does not access a public way; or c. Crosses a property line Please provide a permanent access agreement granting irrevocable use of the adjacent property,for use by the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building, or other structure shall be placed within the dedicated access. The recorded agreement shall include a copy of the site plan required below. The agreement shall be recorded with the County of San Bernardino, Recorders Office. The Fire Safety Division prior to recordation shall approve the agreement. To assist the Fire Safety Division in reviewing the agreement the following shall be included in the submittal: a. Title Report. A current title report, policy of title insurance, or other equivalent documentation proving ownership of all property included in the agreement. b. Legal Description. A legal description of all property subject to the agreement. c. Assessor's Parcel Numbers. The assessor's parcel numbers of each parcel subject to the agreement. d. Site Plan: The access roadway shall comply with the requirements of Private Roadways and Fire Lanes listed above. A scaled site plan showing the path of the Fire District access, the width, turn radii, load-bearing capacity of roadway surface, etc. shall be provided. 2. Reciprocal Water Covenant and Agreement: The plans as submitted indicate that a required private fire mains or appurtenances thereto: a. Pass through or are located on property not under the control of the applicant; or b. Crosses a property line Please provide a permanent maintenance and service agreement between the owner's granting a non- exclusive easement for the purpose of accessing and maintaining the private water mains, fire hydrants, and built- in fire protection systems. The agreement shall meet the form and content approved by the Rancho Cucamonga Fire District, Fire Safety Division. The agreement shall be recorded with the County of San Bernardino, Recorders Office. The Fire Safety Division prior to recordation shall approve the agreement. PRIOR TO ISSUANCE OF BUILDING PERMITS- Complete the following: 1. Private/On-site Fire Hydrants: Prior to the issuance of any building permit, the applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District standards. Contac the Fire Safety Division for a copy of "Fire District Notes for Underground and Water Plans." 2. Private Fire Hydrants/On-site Installation: All private on-site fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). A representative of Fire Construction Services shall inspect the installation and witness hydrant flushing. The builder/developer shall submit final test and inspection report to the Fire Safety Division. 3. Public Fire Hydrants: Prior to issuance of any building permit, the applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and the Water District. On the plan show all existing fire hydrants within a 600-foot radius of the project. 4. Public Installation: All required public fire hydrants shall be installed, flushed, and operable prior to delivering any combustible building materials on-site (i.e., lumber, roofing materials, etc.). Water District personnel shall inspect the installation and witness hydrant flushing. The builder/developer shall submit a copy of the Water District inspection report to the Fire Safety Division. Contact Water District to schedule testing. PRIOR TO OCCUPANCY OR FINAL INSPECTION- Complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with Rancho Cucamonga Fire Protection District and City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers." On private property these markers are to be maintained in good condition by the property owner. 2. Private Fire Hydrants- Final Acceptance: For the purpose of final acceptance, an additional test of the on-site fire hydrants shall be conducted by the builder/developer in the presence of the Water District or Fire Construction Services, as appropriate. The builder/developer shall submit the final test report to the Fire Safety Division. 3. Fire Sprinkler System- Plans and Permit: Plans for the required automatic fire sprinkler system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. 4. Fire Sprinkler System- Final Inspection: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 5. Sprinkler Monitoring: The fire sprinkler system monitoring system shall be installed, tested, and operational immediately following the completion of the fire sprinkler system. Monitoring is required with 20 sprinklers in Group I Occupancies, or 100 or more sprinklers in all other Occupancies. 6. Fire Suppression System: Plans and specifications for the fire suppression system for the protection of commercial-type cooking equipment or other special hazard shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire Construction Services permit. 7. Fire Alarm System: Plans for the fire alarm system shall be submitted to Fire Construction Services for review and approval. No work is allowed without a Fire District permit. 8. Access ControliTraffic Calming Device Permit: A Fire District permit is required to install any access control device, traffic-calming device, or gate on any access roadway. Applicable CC&R's, or other approved documents, shall contain provisions that prohibit obstructions such as traffic-calming devices (speed bumps, humps, etc.), control gates, bollards, or other modifications in fire lanes or access roadways without prior written approval of the Fire District, Fire Safety Division 9. Knox Rapid Entry System: A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. 10. Construction Access: Fire District access, a minimum 26-feet in width and 14-feet, 6-inches minimum clear height shall be provided. These minimum clearances shall be maintained free and clear of any obstructions at all times, in accordance with Fire District Standards. 11. Phased Construction: Each phase shall be provided with approved Fire District access roadways. Dead-end roadways shall not exceed the maximum permitted by the Fire Code or Fire District standards. 12. Fire Lanes: Prior to the issuance of any Certificate of Occupancy,the fire lanes shall be installed in accordance with the approved fire lane plan. The CC&R's or other approved documents shall contain an approved fire lane map and provisions that prohibit parking in the fire lanes. The method of enforcement shall be documented. The CC&R's shall also identify who is responsible for not less than annual inspection and maintenance of all required fire lanes. 13. Address-Other Than Single-family: New buildings other than single-family dwellings shall post the address with minimum 8-inch numbers on contrasting background,visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. 14. Fire Suppression Systems-Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy,the fire suppression system(s) shall be tested and accepted by FCS. 15. Fire Alarm System- Final Inspection and Testing: Prior to the issuance of a Certificate of Occupancy, the fire alarm (and detection) system(s) shall be tested and accepted by Fire Construction Services. 16. Fire District Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" Form and submit to the Fire Safety Division. This form provides contact information for Fire District use. City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: TENTATIVE TRACT SUBTT16651, DEVELOPMENT REVIEW DRC2003-00847, AND VARIANCE DRC2003-00848. This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. , 2. A procedure of compliance and verification has been outlined for each action necessary.This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management-The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures - The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 MITIGATION MONITORING PROGRAM TENTATIVE TRACT SUBTT1 6651/DRC2003-00847/DRC2003-00848 December 29, 2003 page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed, as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued.The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division.The Division shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: SUBTT16651/DRC2003-00847/DRC2003-00848 Applicant: Fuscoe Engineering Initial Study Prepared by: Warren Morelion, Assistant Planner Date: December 29. 2003 ResponsibleMitigation Measures No. . . of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Air Quality All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate high efficiency/low polluting heating,air conditioning,appliances and water heaters. All residential and commercial structures shall be BO C/D Review of Plans C 2/4 required to incorporate thermal pane windows and weather-stripping. The site shall be treated with water or other CE C Review of Plans A/C 4 soil-stabilizing agent (approved by South Coast Air Quality Management District [SCAQMD] and Regional Water Quality Control Board[RWQCB])daily to reduce PM10 emissions,in accordance with SCAQMD Rule 403. Foothill Boulevard shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off- site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind CE C Review of Plans A 4 speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. Chemical soil stabilizers (approved by SCAQMD and CE C Review of Plans A/C 4 RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. All construction equipment shall be maintained in good CP C Review of Plans A/C 2/4 operating condition so as to reduce operational emissions. Contractors shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 1 of 8 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Prior to the issuance of any grading permits, the CP/CE C Review of Plans C 2 developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the SCAQMD as well as City Planning Staff. All paints and coatings shall meet or exceed CP C Review of Plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of Plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD CE C Review of Plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions on Grading Plans and mediate on-site when appropriate or as soon as feasible: • Reestablish ground cover on the construction site CE C Review of Plans A/C 2/4 through seeding and watering. • Pave or apply gravel to any on-site haul roads. CE C Review of Plans A/C 2/4 • Phase grading to prevent the susceptibility of large CE C Review of Plans A/C 2/4 areas to erosion over extended periods of time. Schedule activities to minimize the amounts of CE C Review of Plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in CE C Review of Plans A 4 accordance with local ordinances and use sound engineering ractices. • Sweep streets according to a schedule established CE C Review of Plans A 4 by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. 2 of 8 Mitigation Measures . / Responsible MoniIoringg of Method . . . Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-Compliance • Maintain a minimum 24-inch freeboard ratio on soils CE C Review of Plans A 4 haul trucks or cover payloads using tarps or other suitable means. The construction contractor shall utilize electric or clean CE C Review of Plans A/C 4 alternative fuel powered equipment where feasible. The construction contractors shall ensure that CE C Review of Plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. Biological Resources All Eucalyptus windrow trees identified for removal shall CP D Review of Plans A/C 2/3 be replaced with 15-gallon Eucalyptus Maculata (Spotted Gum) trees, 8 feet on center, as required by the Tree Preservation Ordinance. Any beetle infested wood shall be chipped, removed and buried at a dump site or tarped to the ground for a minimum of six months, sealing the tarp edges with soil, to prevent emerging borer beetles from reinfesting other trees or wood. The movement of Eucalyptus wood containing live borer beetles or their larvae in trucks or trailers is prohibited by State law pursuant to Public Resources Code 4714.5. All other removed heritage trees shall be replaced with CP D Review of Plans A/C 2/3 new trees trees as required by Rancho Cucamonga Municipal Code, Title 17 Development Code, Table 17.08.040-G. The size, location, and species of the trees shall be to the satisfaction of the City Engineer and City Planner. Cultural Resources If any prehistoric archaeological resources are CP B/D Review of Plans A/C 2/3 encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: Enact interim measures to protect undesignated CP/BO C Review of A/D -3/4 sites from demolition or significant modification Report without an opportunity for the City to establish its archaeological value. 3 of 8 Mitigation Measures No./ Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance • Consider establishing provisions to require CP/BO C Review of A/D 3/4 incorporation of archaeological sites within new Report developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's CP/BO C Review of A/D 3/4 archaeological heritage. Report Propose mitigation measures and recommend CP/BO C Review of A/D 3/4 conditions of approval to eliminate adverse project Report effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, CP C Review of A/D 3/4 documenting the inventory, evaluation, and Report proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. A qualified paleontologist shall conduct a preconstruction CP B Review of A/D 4 field survey of the project site. The paleontologist shall Report submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate.Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and CP B Review of A/D 4 equipped to allow the rapid removal of fossils with Report minimal construction delay, to the site full-time during the interval of earth-disturbing activities. Should fossils be found within an area being cleared BO B/C Review of A/D 4 or graded, divert earth-disturbing activities Report elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Submit a summary report to City of Rancho Cp D Review of D 3 Cucamonga. Transfer collected specimens with a Report copy of the report to San Bernardino County Museum. 4 of 8 Mitigation Measures No. Responsible Monitoring Timing of Method of Verif led Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance California Health and Safety Code Section 7050.5 CP C Review of A/D 4 dictates that if any human remains are unearthed during Report construction, no further disturbance shall occur until the County Coroner has made the necessary findings as to origin and disposition pursuant to CEQA regulations and Public Resources Code Section 5097.98. Geology and Soils Prior to issuance of grading permits,the permit applicant CE B/C/D Review of Plans A/C 2/4 shall submit to City Officials for approval, Storm Water Pollution Prevention Program (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants entering the storm drain system to the maximum extent practical. All disturbed and bare or exposed soils shall be kept CP B/C/D Review of Plans A/C 2/4 moist or re-planted with drought resistant landscaping as soon as possible to avoid erosion. Hydrology and Water Quality The developer shall implement the BMPs identified in CE B/C/D Review of Plans A/C 2/4 the Water Quality Management Plan (WQMD) (Fuscoe Engineering, October 2003). BMPs shall be identified on the grading plans for review and approval by the City Engineer. Prior to issuance of grading or paving permits, the CE B/C/D Review of Plans A/C 2/4 applicant shall submit to the City Engineer a Notice of Intent(NOI)to comply with obtaining coverage under the National Pollution Discharge elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained(i.e.,a copy of the Waste Dischargers Identification Number) shall be submitted to the City Engineer for coverage under the NPDES General Construction Permit. Noise Sound barriers at least 6.5 feet high must be erected CP/BOB/C/D Review of Plans A/C 2/4 around all first floor private patios facing Foothill Boulevard from the two southernmost buildings. I :J 5 of 8 Mitigation Measures No. Responsible Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Sound barriers at least 6.5 feet high must be erected CP/BO B/C/D Review of Plans A/C 2/4 around the Mini-Park at the west end of the project site. Sound walls at least 5.5 feet high must be erected CP/BO B/C/D Review of Plans A/C 2/4 around all other private patios with any view of Foothill Boulevard and less than 225 feet from the roadway centerline. Each completed noise control barrier must present a CP/BO B/C/D Review of Plans A/C 2/4 solid face from top-to-bottom. Cutouts and openings are not permitted except for drain holes. STC 30 glazing shall be added to all units with a view to BO B/C/D Review of Plans A/C 2/4 Foothill Boulevard and less than 225 feet from the roadway centerline. STC 28 glazing shall be added to all units with any view BO B/C/D Review of Plans A/C 2/4 of Foothill Boulevard but greater than 225 feet from the roadway centerline. To maintain ambient indoor noise levels at 45 dBA or BO B/C/D Review of Plans A/C 2/4 less, adequate fresh air ventilation shall be provided through the installation of air conditioning or a"summer switch" and outside ducting. Common floor to ceiling assemblies between units shall BO B/C/D Review of Plans A/C 2/4 be constructed using one of the following methods: 8 inch concrete slab; • 1.5 inch LWC, sub-floor, R-11 insulation, resilient channel, drywall ceiling; • 1.375 inch Gyp-crete, sub-floor, 2 inch by 10 inch joists, R-11 insulation, resilient channel, .5 inch drywall ceiling; • Some recommended assemblies cannot meet the Impact Insulation Class 50 minimum requirement without carpet. Uncarpeted areas above other living units will require some form of proprietary isolation product under the floor to achieve the required rating such as Enkasonic, Acousti-Mat, Monsanto SC50, or others. 6 of 8 Mitigation Measures No. Responsible . . g of Method of Verif ied Sanctions for Non-ComplianceImplementing Action for Monitoring Frequency Verification Verification Date/initials Common wall assemblies between units shall be BO B/C/D Review of Plans A/C 2/4 constructed of one of the following methods: • Two layers .5 inch direct nailed drywall, 2 inch by 6 inch plate, 2 inch by 4 inch staggered studs, fiberglass insulation, two layers .5 inch direct nailed drywall; Two layers .625 inch direct nailed drywall, 2 inch by 6 inch plate, 2 inch by 4 inch staggered studs, R-11 insulation, two layers .625 inch drywall; • .625 inch direct nailed drywall,2 inch by 4 inch plate, 2 inch by 4 inch studs, R-11 insulation, 1 inch airspace at plate, with 2 inch by 4 inch plate with 2 inch by 4 inch studs, .625 direct nailed drywall; Same as last, with two layers of R-11 insulation; • Two layers .625 drywall direct nailed, 2 inch by 4 inch studs, 1 inch airspace, 2 inch by 4 inch studs, R-11 insulation, two layers .625 drywall; Same as last, with two layers of R-11 insulation All plumbing and electrical installations shall be installed BO B/C/D Review of Plans A/C 2/4 for compliance with the California Code of Regulations Title 24, Part 2, Appendix Chapter 35 Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, Construction including Saturday, or at any time on Sunday or a national holiday. Construction or grading noise levels shall not exceed the CP/BO C During A 4 standards specified in Development Code Section Construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Planning Division. Said consultant shall report their findings to the Planning Division within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Planning Division. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 7 of 8 Mitigation Measures No. Responsible ActionImplementing Date/initials Non-Compliance The perimeter block wall shall be constructed as early CP C During A A as possible in first phase. Construction Key to Checklist Abbreviations Responsible Person - - Monitoring Frequency Method of Verification Sanctions CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy SO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation 8 of 8