HomeMy WebLinkAbout07-62 - Resolutions RESOLUTION NO. 07-62 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2007-00244 FOR THE OFFICE PROJECT (INCLUDING A UNIFORM SIGN PROGRAM) COMPRISED OF ONE 4-STORY, 140,138 SQUARE FOOT BUILDING WITH A CUP FOR INCIDENTAL RETAIL (UP TO 20 PERCENT) AND A SINGLE-STORY RETAIL BUILDING OF 16,000 SQUARE FEET INCLUDING A SHARED PARKING ANALYSIS TO ALLOW UP TO 9,600 SQUARE FEET AS RESTAURANT USE,AND A BANK WITH A DRIVE THRU OF 5,000 SQUARE FEET, ON A 9.87 ACRE PROPERTY, LOCATED ON THE WEST SIDE OF HAVEN AVENUE BETWEEN CIVIC CENTER DRIVE AND ARROW ROUTE IN THE HAVEN AVENUE OVERLAY DISTRICT;AND MAKING FINDINGS IN SUPPORTTHEREOF- AP N: 0208-341-15. A. Recitals. 1. Opus West filed an application for the approval of Development Review DRC2007-00244 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 10th day of 2007, the Planning Commission of the City of Rancho Cucamonga conducted a public hearing on the application and concluded said public hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced meeting on October 10, 2007, including written and oral staff reports, this Commission hereby specifically finds as follows: a. The application applies to the property located on the west side of Haven Avenue between Arrow Route and Civic Center Drive with a street frontage of 1248.29 feet and lot depth of 326.24 feet and which is presently unimproved with remnant vineyard; and b. The property to the north of the subject site is partially developed mixed use commercial and 3-story apartments; the property to the south consists of graded land with pending office development; the property to the east is developed mixed use retail and office; and the property to the west is 2- and 3-story apartments. 3. Based upon the substantial evidence presented to this Commission during. the above-referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: C. The proposed project is consistent with the objectives of the General Plan; and PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244 — OPUS WEST October 10, 2007 Page 2 d. The proposed use is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and e. The proposed use is in compliance with each of the applicable provisions of the Development Code; and f. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act("CEQX) and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that,with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. C. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the City Planner of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244—OPUS WEST October 10, 2007 Page 3 Engineering Department 1) Haven Avenue frontage improvements to be in accordance with City "Major Divided Highway" standards, as required and including; (7 1/2 foot median, 12 foot, 11 foot, 11 foot thru lanes, 5 foot bike lane and 11 foot bus bay at south of Civic Center Drive or 7 1/2 foot median, 13 foot, 11 foot, 11 foot thru lanes and 5 foot bike lane mid block) a) Provide curb and gutter, curvilinear sidewalk, 9500 lumens street lights, street trees, and asphalt pavement, as required. b) Provide a bus bay at the southwest corner of Haven Avenue and Civic Center Drive for southbound Haven Avenue. c) Provide a deceleration/right-turn lane on all Haven Avenue driveways and at Arrow Route. d) Revise traffic signing and striping and protect R26(s) "No Stopping" signs along Haven Avenue, as required. e) Protect or replace Haven Avenue/Arrow Route traffic signal equipment, as required. f) Proposed entrances to be in accordance with the City Driveway Policy, 35 foot minimum and 50 foot maximum width measured along the right-of-way line. Also, driveway policy calls for a minimum of 75 feet for stacking measured from the face of curb to the near edge of the first parking stall. g) Access points to Haven Avenue shall be per City Std. 101, Type C. 2) Arrow Route frontage improvements to be in accordance with City "Major Arterial" standards, as required and including: a) Provide curb and gutter, curvilinear sidewalk, access ramps, 9500 Lumens street light and street trees. b) Protect existing westbound bus bay at Arrow Route (northeast corner of Arrow Route and Haven Avenue). c) Provide a deceleration/right-turn lane for westbound driveway in accordance with City Driveway Policy. d) Revise traffic signing and striping and protect R26(s) "No Stopping" signs along Arrow Route, as required. e) Re-stripe Arrow Route to provide a left turn pocket at westerly project entrance. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244— OPUS WEST October 10, 2007 Page 4 f) Proposed entrances to be in accordance with the City Driveway Policy, 35 foot minimum and 50 foot maximum width measured along the right-of-way line. Also, driveway policy calls for a minimum of 75 feet for stacking measured from the face of curb to the near edge of the first parking stall. g) Reconstruct existing curvilinear sidewalk as it transition to the proposed drive approach. h) Access point to Arrow Route shall be per City Std. 101, Type C. 3) Civic Center Drive frontage improvements to be in accordance with City "Secondary" standards, as required and including: a) Provide curb and gutter, sidewalk, 5800 Lumens street lights and street trees. b) Proposed entrance to be in accordance with the City Driveway Policy, 35 foot minimum width measured along the right-of-way line. c) Reconstruct existing curb adjacent sidewalk as it transitions at the proposed sidewalk. d) Protect R26 "No Parking" signs along Civic Center Drive, as required. e) Revise traffic signing and striping, as required. f) Protect or replace Civic Center Drive/Haven Avenue traffic signal equipment, as required. g) Access point to Civic Center Drive shall be per City Std. 101, Type C. 4) The development requires installation of fiber optics conduits, vaults and manholes on Haven Avenue per City Standard Plans 135-137. Also,the improvement plans need to show the location and limits of the conduits, vaults, and manholes with construction notes using Standard Plans 135-137. 5) Dedication on Haven Avenue shall be 64 feet measured from the centerline of the street. Additional dedication shall be made at the project entry(s)to encompass sidewalk crossing the drive approaches. 6) The existing overhead utilities (telecommunications and electrical) on the project side of Haven Avenue shall be undergrounded along the entire project frontage, extending to the first pole off-site (across the street where applicable on corner sites), prior to public improvement acceptance or occupancy,whichever occurs first. All services crossing Haven Avenue shall be undergrounded at the same time. The PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244 — OPUS WEST October 10, 2007 Page 5 developer may request a reimbursement agreement to recover one-half the City adopted cost for undergrounding from future development (redevelopment) as it occurs on the opposite side of the street. If the developer fails to submit for said reimbursement agreement within 6 months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. 7) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities (telecommunications and electrical, except for the 66 KV electrical)on the opposite side of Haven Avenue shall be paid to the City prior to map approval or issuance of building permits, whichever comes first. The fee shall be one-half the City adopted unit amount times the distance on Haven Avenue from the existing overhead utilities south of Civic Center Drive to the intersection of Haven Avenue and Arrow Route. 8) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities (telecommunications and electrical, except for the 66 KV electrical) on the opposite side of Arrow Route shall be paid to the City prior to map approval or issuance of building permits, whichever comes first. The fee shall be one-half the City adopted unit amount times the length of the project frontage on Arrow Route to the intersection of Haven Avenue and Arrow Route. 9) The developer shall execute a line extension agreement for electrical service and shall construct electrical distribution facilities in accordance with such agreement and Rancho Cucamonga Municipal Utility requirements and dedicate such facilities to the Rancho Cucamonga Municipal Utility. The Rancho Cucamonga Municipal Utility shall be the electrical service provider for all project related development. 10) Provide a 5-foot wide public utility easement for Rancho Cucamonga Municipal Utility on Haven Avenue. 11) All parkways shall slope at 2 percent from the top-of-curb to 1 foot behind the sidewalk along all street frontages. 12) The citywide Transportation Development Fee, covering the City-adopted estimated costs to mitigate the traffic impacts of new development, shall be paid upon issuance of building permits. 13) Identify all applicable Best Management Practices (BMPs) of the project WQMP, show and label them on the grading plan. Maintenance of BMPs identified in the WQMP shall be addressed in the project CC&Rs. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244 — OPUS WEST October 10, 2007 Page 6 Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occur as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds (i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244 — OPUS WEST October 10, 2007 Page 7 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 10 minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. 12) All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 13) All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. 14) All residential and commercial structures shall be required to incorporate high efficiency/low polluting heating, air conditioning, appliances, and water heaters. 15) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244— OPUS WEST October 10, 2007 Page 8 • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244— OPUS WEST October 10, 2007 Page 9 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality Construction Activities: 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An erosion control plan shall be prepared, included in grading plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This erosion control plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. Post-Construction Operational: 5) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared on March 27, 2007, to reduce pollutants after construction entering the storm drain system to the maximum extent practical. PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244 — OPUS WEST October 10, 2007 Page 10 6) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 7) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 8) Prior to issuance of grading or paving permits, applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to,perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation PLANNING COMMISSION RESOLUTION NO. 07-62 DEVELOPMENT REVIEW DRC2007-00244 — OPUS WEST October 10, 2007 Page 11 plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 10TH DAY OF OCTOBER 2007 PLANNING C ISSION OF THE CITY OF RANCHO CUCAMONGA BY: Pam Chairman ATTEST: Ja s R. Troyer, AICP, SecretAky I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 1 Oth day of October 2007 by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga - MITIGATION MONITORING PROGRAM Project File No.: TENATIVE PARCEL MAP SUBTPM18544 AND DEVELOPMENT REVIEW AND CONDITIONAL USE PERMIT DRC2007-00244. This Mitigation Monitoring Program (MMP)has been prepared for use in implementing the mitigation measures identified in the (Mitigated Negative Declaration/Environmental Impact Report) for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary.This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures - The following steps will be followed by the City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants' fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency Planning Department 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Mitigation Monitoring Program TENATIVE PARCEL MAP SUBTPM18544 AND DEVELOPMENT REVIEW AND CONDITIONAL USE PERMIT DRC2007-00244. Page 2 3. Appropriate specialists will be retained if technical expertise beyond the Citystaff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures.The project planner is responsible.for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Division. The Division shall require the applicant to post any necessary funds (or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or City Planner prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2007-00244 and SUBTPM18544 Applicant: OPUS WEST Initial Study Prepared by: L. J. Henderson AICP Date: September 10, 2007 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/Initials Non-compliance 2AIr QUaII},' -`'°ti.�RA N.a'�,`: _"•r�"v.:a_ r.,i�t�'3� m.�a'�gx :,.�-�^`-�a;--Y'=`4 �`'�... - s. �/n.,�.^#...-�u�'Y'j..�' �s.,ua,`�.._- .a��k�sht.a�`d,.F,'�' ,�',.t 2�` '�1' �-;�$..�`may, r'�';%.,r;.��,_ All construction equipment shall be maintained in good PD C Review of plans A/C 2/4 operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, the PD/BO C Review of plans C 2 developer shall submit Construction Plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: Reestablish ground cover on the construction site BO C Review of plans A/C 2/4 through seeding and watering. I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc1 of 8 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance • Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4 • Phase grading to prevent the susceptibility of large BO C Review of plans A/C 2/4 areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4 exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in BO C Review of plans A 4 accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established BO C During A 4 by the City if silt is carried over to adjacent public construction thoroughfares or occurs as a result of hauling. Timing may vary depending upon time of year of construction. • Suspend grading operations during high winds(i.e., BO C During A 4 wind speeds exceeding 25 mph)in accordance with construction SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils BO C During A 4 haul trucks or cover payloads using tarps or other Construction suitable means. The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and construction Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PMIO) emissions, in accordance with SCAQMD Rule 403. Chemical soil stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. The construction contractor shall utilize electric or clean BO C Review of plans A/C 4 alternative fuel-powered equipment where feasible. The construction contractor shall ensure that BO C Review of plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc2 of 8 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance All industrial and commercial facilities shall post signs BO C Review of plans A 4 requiring that trucks shall not be left idling for prolonged periods(i.e., in excess of 10 minutes). All industrial and commercial facilities shall designate PD C Review of plans A/C 2/3 preferential parking for vanpools. All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3 more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. All industrial and commercial site tenants with 50 or PD C Review of plans D 2/3 more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. All residential and commercial structures shall be BO C/D Review of plans C 2/4 required to incorporate high efficiency/low polluting heating, air conditioning, appliances, and water heaters. All residential and commercial structures shall be BO C/D Review of plans C 2/4 required to incorporate thermal pane windows and weather-stripping. .. F y;•a Cultural Resou�ces, u �ygg jm���s , � � Yacv s e a� ..� f e..'Y.TMAM _. ...,.- � +.G.^'.i?3fG..]-�: If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4 sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require PD/BO C Review of report A/D 3/4 incorporation of archaeological sites within new developments, using their' special qualities as a theme or focal point. Pursue educating the public about the area's PD/BO C Review of report A/D 3/4 archaeological heritage. I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc3 of 8 Mitigation Measures No./ Responsible Monitoring Timing of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, PD C Review of report A/D 3/4 documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report,with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. If any paleontological resource (i.e. plant or animal PD B Review of report A/D 4 fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate- Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and PD B Review of report A/D 4 equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared BO B/C Review of report A/D 4 or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for PD D Review of report D 3 documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc4 of 8 Mitigation Measures No.I Responsible g of Method . Implementing Action for Monitoring Frequency Verification Verification Date /initials Non-Compliance Submit summary report to City of Rancho PD D Review of report D 3 Cucamonga. Transfer collected specimens with a copy to the report to San Bernardino County Museum. 1 z T r $ s- ,ux `w FIAT; r fP Geolo and,Sals y , 't 4; ' 5 N r IN alp4qui i z ..m e..rs".tet,.-c..LFS.� .e.. a...i.`,i, '�e' �..�. .XtE'�i� � ,,moi,.. .i, a .., The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and construction RWQCB)daily to reduce PM,o emissions,in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PM,o construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PMI, emissions construction from the site during such episodes. Chemical soil-stabilizers (approved by SCAQMD and SO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,a emissions. ^r?. HyiirolTdY=g.r�wXit'.ck a-HI� . fY a $� ." O ,. F Y�1� Yand atQQUIsv { iaIty ��� EP 1L� «� � ' .., Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4 shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc5 of 8 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4 the Grading Plan, and implemented for the proposed project that identifies specific measures to control on- site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California,and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4 sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4 cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4 the Water Quality Management Plan prepared by (name/date) to reduce pollutants after construction entering the storm drain system to the maximum extent practical. Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4 controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years,shall be submitted to the City for review and approval prior to the issuance of grading permits. I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc6 of 8 Mitigation Measures No.I Responsible Monitoring Timing of Method . ActionImplementing Date/initials Non-Compliance Prior to issuance of building permits, the applicant shall CE B/C/D Review of plans A/C 2/4 submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs)that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. Prior to issuance of grading or paving permits,applicant BO B/C/D Review of plans A/C 2/4 shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage underthe NPDES General Construction Permit. IP 6 tr -.v..e F..K. Y;T{.� ):_i �ti• .�.Y_ti.a. .. ( Y 1 SS SCP � Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc7 of 8 Mitigation Measures No. Responsible Monitoring Timing of Method . Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Construction or grading noise levels shall not exceed the BO C During A 4 standards specified in Development Code Section construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. Haul truck deliveries shall not take place between the PO/BO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person ` -Mo nitoring+requency Method of Verification Sanctions CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection _ 1 -Withhold Recordation of Final Map PD-Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-R2vok CUP 7-Citation I:\PLANNING\FINAL\PLNGCOMM\ENVDOC\DRC2007-00244MMCHKLST-rev3-13-07final.doc8 of 8 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DRC2007-00244 SUBJECT: Development Review APPLICANT: OPUS WEST LOCATION: SOUTHWEST CORNER OF HAVEN AVENUE AND CIVIC CENTER DRIVE ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 07-62, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Notice of Exemption - $50 b) Notice of Determination - $50 c) Negative Declaration - $ 1,850 X d) Environmental Impact Report - $2,550 SC-1-05 1 lAPLANNING\FINAL\PLNGC0MMt2007 Res&SO Rpt\DRC2007-00244SWCond 10-10.doc Project No. ORC2007-00244 Completion Date B. Time Limits 1. Development Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations,exterior materials and colors, landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations, and the Haven Avenue Overlay. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all __/_/_ other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan,including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and City Engineer review and approved prior to the issuance of building permits. 2 1:\PLANNING\FINAL\PLNGC0MM12007 Res 8 SH Rpt\DRC2007-00244SWCond 10-10.doc Project No.DRC2007-00244 Completion Date 12. The developer shall submit a construction access plan and schedule for the development of all lots for Planning Director and City Engineer approval; including, but not limited to, public notice requirements,special street posting, phone listing for community concerns,hours of construction activity, dust control measures, and security fencing. D. Shopping Centers 1. A uniform hardscape and street furniture design including seating benches, trash receptacles, free-standing potted plants, bike racks, light bollards, etc., shall be utilized and be compatible with the architectural style. Detailed designs shall be submitted for Planning Department review and approval prior to the issuance of building permits. 2. Provide for the following design features in each trash enclosure, to the satisfaction of the Planning Director: a. Architecturally integrated into the design of (the shopping center/the project). b. Separate pedestrian access that does not require the opening of the main doors and to include self-closing pedestrian doors. C. Large enough to accommodate two trash bins. d. Roll-up doors. e. Trash bins with counter-weighted lids. f. Architecturally treated overhead shade trellis. g. Chain link screen on top to prevent trash from blowing out of the enclosure and designed to be hidden from view. 3. Graffiti shall be removed within 72 hours. 4. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 5. Signs shall be conveniently posted for "no overnight parking" and for "employee parking only." 6. Hours of operation shall be restricted to until 7. Textured pavement shall be provided across circulation aisle, pedestrian walkway, and plaza. They shall be of brick/tile pavers,exposed aggregate,integral color concrete,or any combination thereof. Full samples shall be submitted for Planning Director review and approval prior to the issuance of building permits. 8. All future building pads shall be seeded and irrigated for erosion control. Detailed plans shall be included in the landscape and irrigation plans to be submitted for Planning Department approval prior to the issuance of building permits. 9. The lighting fixture design shall compliment the architectural program. It shall include the plaza area lighting fixtures, building lighting fixtures (exterior), and parking lot lighting fixtures. 10. The design of store fronts shall compliment the architectural program and shall have subtle variations subject to Design Review Committee approval prior to the issuance of building permits. 11. Any outdoor vending machines shall be recessed into the building faces and shall not extend into the pedestrian walkways. The design details shall be reviewed and approved by the Planning Director prior to the issuance of building permits. 3 I:\PLANNINGTINAL\PLNGCOMM\2007 Res 8 Stf Rpt\DRC2007-00244Stdcond 10-10.doc Project No. DRC2007-00244 Comoletion Date E. Building Design 1. For commercial and industrial projects, paint roll-up doors and service doors to match main _/_/_ building colors. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 5. The Covenants, Conditions and Restrictions shall restrict the storage of recreational vehicles on this site unless they are the principal source of transportation for the owner and prohibit parking on interior circulation aisles other than in designated visitor parking areas. 6. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 7. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. G. Trip Reduction 1. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial,office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 2. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other non-residential development. 3. Transit improvements such as bus shelters, bus pullouts, and bus pads shall be provided. Bus shelters shall also include a bench, a trash receptacle, and an adjoining bike rack (minimum 3 capacity)on a concrete pad. Bus shelter shall be located outside public right-of-way and shall be privately maintained. 4. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle Transportation Plan adopted by City Council Resolution No.02-237. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. 4 I:\PLANNING\FINAL\PLNGCOMM\2007 Res& Stf Rpt\DRC2007-00244StdCond 10-10.doc Project No. DRC2007-00244 Completion Date H. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 7. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 8. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along both sides of the drive aisles from Haven Avenue to the parking areas. 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of building permits.These criteria shall encourage the natural growth characteristics of the selected tree species. 11. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. I. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. 5 :\PLANNING\FINAL\PLNGC0MM\2007 Res&Sit Rpt\DRC2007-00244StdCond 10-10.doc Project No.DRC2007-00244 Completion Date APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: J. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number(i.e., DRC2007-00244)clearly identified on the outside of all plans. - 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. K. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., DRC2007-00244). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition, the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 6 I:\PLANNINGTINALTLNGCOMM2007 Res 8 Stf RpADRC2007-00244SWCond 10-10.doc Project No. DRC2007-00244 Completion Date 3. The building and Safety Official shall provide the street addresses after tract/parcel map recordation and prior to issuance of building and safety. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). L. New Structures 1. Provide compliance with the California Building Code(CBC)for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. M. Grading 1. Grading of the subject property shall be in accordance with California Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects _/ / and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. 7 (:\PLANNING\FINAL\PLNGC0MM\2007 Res&Stf Rpt\DRC2007-00244StdCond 10-10.doc Project No.DRC2007-00244 Completion Date NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) N. Additional Requirements/Comments APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from street centerline): As needed total feet on Haven Avenue 50 total feet on Arrow Route 44 total feet on Civic Center Drive 2. Corner property line cutoffs shall be dedicated per City Standards. 3. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or deeds and shall be recorded prior to, or concurrent with, the final parcel map. 4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. 5. Easements for public sidewalks and/or street trees placed outside the public right-of- way shall be dedicated to the City. 6. Additional street right-of-way shall be dedicated along right turn lanes, to provide a minimum of 7 feet measured from the face of curbs. P. Street Improvements —/ /- 1. Pursuant to City Council Resolution No. 88-557, no person shall make connections from a source of energy, fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 8 I:\PLANNING\FINAL\PLNGC0MM\2007 Res& Stf Rpt\DRC2007-00244StdCond 10-10.doc Project No. DRC2007-00244 Completion Date 2. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Haven Avenue X X (c) X X X X (b) Arrow Route X (c) X X X (b) Civic Center Drive X X X X x X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in- lieu of construction fee shall be provided for this item. 3. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of .building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the,satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer., s (:\PLANNING\FINAL\PLNGC0MM\2007 Res&Stf Rpt\DRC2007-00244StdCond 10-10.doc Project No. DRC2007-00244 Completion Date g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the Planning Director prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet—(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing,., Size Gty. Haven Avenue Magnolia grandiflora NCN 8' 60'0.C. 15 Gal Fill In Foreground 'Magestic Beauty' Intentionally P.A.8'or greater, spaced this Generally in front of far apart sidewalk P.A. Less than 8' Magnolia grandiflora NCN 3' 20'0,C, 15 Gal Fill In 'St.Mary' Primary tree in Brachychiton populneus Bottle Tree 8' 25'0.C. '15 Gal Fill In masses,mainly Formal on behind sidewalk alternating side of meandering walk Arrow Route Lagerstroemia indica Crape Myrtle Hybrid— 3' 20 O.C. 24" Box Replacement for 'Tuscarora' Pink Informal—if Liguidambar 8-1-05 maintained DER by City Civic Center Drive Platanus acerifolia London Plane Tree 8' 30'0.C. 15 Gal Fill In Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Department. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. 10 I:\PLANNING\FINAL\PLNGCOMM\2007 Res&SO Rpt\DRC2007-00244StdCond 10-10.doc Project No. DRC2007-00244 Completion Date Q. Public Maintenance Areas / /- 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. R. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 2. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. S. Utilities /—/- 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. I Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies —/—/ involved. Approval of the final parcel map will be subject to any requirements that may be received from them. T. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. 2. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. 11 IAPLANNINGTINALTLNGCOMMM07 Res&Stf RptORC2007-00244StdCond 10-10.doc Project No. DRC2007-00244 Completion Date APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: U. Security Lighting —/—/- 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION —/—/— PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 12 I:\PLANNINGTINAL\PLNGCOMM\2007 Res&SO Rpt\DRC2007-00244StdCond 10-10.doc Rancho Cucamonga Fire Protection INII 1 District Fire Construction Services STANDARD CONDITIONS May 24, 2007 Opus West Corporation SWC Haven & Arrow Commercial Subdivision SUBTPM18544 & DRC2007-00244 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. The 4-Story building must comply with the Low Rise requirements of RCFPD Ordinance 39 The RCFPD Procedures & Standards which are referenced in this document can be access on the web at http://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division & Fire Construction Services section. Search by article; the preceding number of the standard refers to the article. Chose the appropriate article number then a drop down menu will appear, select the corresponding standard. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. Fire hydrants are to be located. The preferred locations for fire hydrants are: 1. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40) from any building. c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed may be reduced by 50-percent for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring . This requirement is made in accordance with the California Fire Code Appendix III-A, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Firewater plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until firewater plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirement for Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance 15, the 2001 California Fire Code and/or any other applicable standards require an approved automatic fire sprinkler system to be installed in: 1. , Commercial or industrial structures greater than 7,500 square feet. 2. Assembly and Educational Occupancy Buildings. 3. "All structures that do not meet Fire District access requirements (see Fire Access). 4. When required fire flow cannot be provided due to inadequate volume or pressure. 5. When buildings do not meet the requirements of the 2001 California Building Code and the RCFPD Fire Department Access - Fire Lane Standard 9-7 6. When any applicable code or standard requires the structure to be sprinklered. FSC-5 Fire Alarm System 1. RCFPD Ordinance 15, based on use or floor area (or by other adopted codes or standards) requires an automatic and/or manual fire alarm system. Refer to RCFPD Ordinances 15 and 39, the California Building Code, RCFPD Fire Alarm Standard #10-6 and/or the California Fire Code. 2. Prior to any removal, remodel, modification and/or additions to the building or suite's fire alarm system, Fire Construction Services' approval and a building permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard #10-6. 3. Based on the number of sprinkler heads; the sprinkler system is required to monitored by a listed central station fire alarm system. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Lanes Standard 9-7 2 1. Location of Access: All portions of the structures 15i story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The fire department access must comply to the 5-50' rule in Appendix 1-13 of RCFPD Ordinance 39. c. The maximum inside turn radius shall be 20-feet. d. The minimum outside turn radius shall be 46-feet. e. The minimum radius for cul-de-sacs is 45-feet. f. The minimum vertical clearance is 14-feet, 6-inches. g. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. h. The angle of departure and approach shall not exceed 9-degrees or 20 percent. i. The maximum grade of the driving surface shall not exceed 12%. j. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). k. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District.Standard #9-2. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. c. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for $20.00. f. Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. 3 i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. 8. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures with roofs less than 75' above the level of the fire access road. a. This. access must be reachable by either fire department ground ladders or by an aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. c. . The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. f. Multiple access ladders may be required for larger buildings. g. Ladder construction must be in accordance with the RCFPD Roof Access Standard 9-9 Appendix A and drawings 9-9a and 9-9b. h. A site plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce . conditions that may be hazardous to life or property. • Battery Systems • Candles and open flames in public assemblies • Compressed Gases • Public Assembly • Cryogenics • Dry Cleaning Plants • Refrigeration Systems • Repair Garages • Flammable and Combustible Liquids • Spraying or Dipping Operations • Hazardous Materials 4 • Tents, Canopies and/or Air Supported Structures • Liquefied Petroleum Gases • LPG or Gas Fuel Vehicles in Assembly Buildings FSC-11 Hazardous Materials — Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909).387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2001 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD15 and FD39 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. FCS-14 Map Recordation 1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a property that is being subdivided. The reciprocal agreement is required to be recorded between property owners and the Fire District. The recorded agreement shall include a copy of the site plan. The Fire Construction Services shall approve the agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino, Recorders Office. Reciprocal access agreement — Please provide a permanent access agreement between the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. 5 Reciprocal water covenant — Please provide a permanent maintenance and service covenant between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing.of cost recovery to the property by the fire District. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with, Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards # 9-4, #10-2 and #10-4. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard 9-8. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". 6 PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards #9-1 or #9-2 by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be-installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address with minimum 8-inch numbers on contrasting background, visible from the street and electrically illuminated during periods of darkness. When the building setback exceeds 200 feet from the public street, an additional non-illuminated 6-inch minimum number address shall be provided at the property entrance. Larger address numbers will be required on buildings located on wide streets or built with large setbacks in multi-tenant commercial and industrial buildings. The suite designation numbers and/or letters shall be provided on the front and back of all suites. 10. Hazardous Materials: Prior to the issuance of a Certificate of Occupancy, the applicant must demonstrate (in writing from the County) that the facility has met or is meeting the Risk Management Plan (RMP) or Business Emergency/Contingency Plan with the San Bernardino County Fire Department, Hazardous 7 Materials/Emergency Response and Enforcement Division. The applicant must also obtain inspection and acceptance by Fire Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District.use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 1/2" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 8