Loading...
HomeMy WebLinkAbout08-45 - Resolutions RESOLUTION NO. 08-45 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2008-00083, A PROPOSAL TO CONSTRUCT TWO (2) INDUSTRIAL WAREHOUSE/MANUFACTURE/OFFICE BUILDINGS WITH A COMBINED FLOOR AREA OF APPROXIMATELY 88,200 SQUARE FEET ON A PARCEL OF APPROXIMATELY 5.46 ACRES OF LAND IN THE GENERAL INDUSTRIAL (GI) DISTRICT, SUBAREA 3, LOCATED AT 8575 HELMS AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF —APN: 0209- 021-42. A. Recitals. 1. Pneudraulics, Inc. filed an application for the issuance of Development Review DRC2008- 00083, as described in the title of this Resolution. Hereinafter in this Resolution, the subject request is referred to as "the application." 2. On the 27th day of August 2008, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is herebyfound,determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on August 27, 2008, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a parcel of land located at 8575 Helms Avenue with an overall area of approximately 237,838 square feet (5.46 acres), and a street frontage along Arrow Route of approximately 586.7 feet and a street frontage along Helms Avenue of approximately 374.4 feet; and b. To the north, across Arrow Route are single-family residences; to the east, is a business center; to the south, is the applicant's existing industrial facility; and to the west, across Helms Avenue, is an industrial facility; and C. The proposed development is in conjunction with Tentative Parcel Map SUBTPM18994 to subdivide the property into two (2) parcels of 2.67acres and 2.79 acres (Parcels 1 and 2, respectively). d. The applicant proposes to construct two (2) buildings totaling 41,160 square feet on Parcel 1 (Building 1) and 47,040 square feet on Parcel 2 (Building 2); and PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083 — PNEUDRAULICS, INC. August 27, 2008 Page 2 e. The application contemplates warehouse tenants. Warehouse intensive uses are permitted in this development district. Additional potential tenants include manufacturing uses which are permitted subject to the availability of parking on-site; and f. The applicant is required to provide 67 parking stalls for Building A and 48 parking stalls for Building B, respectively. They have provided 68 parking stalls for Building A and 58 parking stalls for Building B; and 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed development is in accord with the General Plan, the objectives of the Development Code, and the purposes of the district in which the site is located. The proposed project is to construct two (2) industrial buildings and is consistent with the development in the vicinity. b. The proposed development,togetherwith the conditions applicable thereto,will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. The surrounding properties to the west, south, and east are zoned industrial and the surrounding uses are industrial-oriented. C. The proposed development complies with each of the applicable provisions of the Development Code. The proposed development meets all standards outlined in the Development Code and the design and development standards and policies of the Planning Commission and the City. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have any significant impacts upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, City staff prepared an Initial Study of the potential environmental impacts of the project. Based on the findings contained in that Initial Study, City staff determined that, with the implementation of mitigation measures, there would be no substantial evidence that the project would have any significant impacts on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration; and b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it,finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii)that, based on the implementation of mitigation measures, there is no substantial evidence that the project will have any significant impacts on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings,the Planning Commission hereby adopts the Mitigated Negative Declaration; and PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083 — PNEUDRAULICS, INC. August 27, 2008 Page 3 C. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project; and d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program, and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public.review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the construction of two warehouse buildings with a combined floor area of 88,200 square feet in the General Industrial District, Subarea 3, located at the southeast corner of Arrow Route and Helms Avenue -APN: 0209-021-42. 2) Approval also includes Master Sign Program DRC2008-00360 and Tree Removal Permit DRC2008-00359. 3) Proposed land uses requiring a Conditional Use Permit, as identified in Table 17.30.030 of the Development Code, shall require a separate review and approval by the Planning Director prior to submittal of documents for plan check and occupancy. 4) Downspouts shall not be visible from the exterior on any elevations of the buildings. All downspouts shall be routed through the interior of the building walls. 5) The screen wall, parallel to Arrow Route and exposed to the public, shall be decorative masonry. Decorative means slump stone, split-face, or stucco to match the buildings. 6) All trash enclosures shall be surrounded with dense shrub plantings. 7) Provide an overhead trellis at the employee lunch area. The overhead trellis shall have cross members spaced no more than 18 inches on center with minimum dimensions of 4 inches by 12 inches. Also, each support column shall have a decorative base that incorporates the architectural finishes/trim used on the building. The trellis shall be painted to match the building. Also, provide durable street furniture in the outdoor employee eating area such as tables, chairs, waste receptacles. PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083— PNEUDRAULICS, INC. August 27, 2008 Page 4 8) All ground-mounted equipment, utility boxes including transformers, and back-flow devices shall be surrounded by a minimum of two rows of shrubs spaced a minimum of 18 inches on-center. 9) Landscaping shall be installed prior to release for occupancy. 10) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low pressure spray. 11) The parking lot light fixtures shall be located outside of the parking spaces and shall not disrupt parking capacity. Design Review Committee 1) Designate all parking stalls, located along the eastern wall of Building, as "Employee Parking Only." Illustrate on the plans to be reviewed during Plan Check. 2) Reduce the proposed number of future truck loading knockout doors from 8 to 4 for Building 1 (east elevation) and from 7 to 2 for Building 2 (west elevation). Illustrate on the plans to be reviewed during Plan Check. 3) All wall signs shall not exceed 70 percent of the building fascia area and shall not extend onto or beyond building reveals. Engineering Department 1) Arrow Route public frontage improvements shall be improved in accordance with City"Major Arterial' Standards, including but not limited to: a) Protect existing curb and gutter at 36 feet south from the street centerline. , b) Provide new street pavement section as prescribed by the City Engineer to centerline of street, curvilinear sidewalk, three (3) 9500 lumen HPSV streetlights, traffic signing and striping, and street trees. c) Provide drive approaches in accordance with the City "Driveway Policy." d) Install street trees per the Street Tree Requirement Form. 2) Helms Avenue public frontage improvements shall be improved in accordance with City"Local Industrial'Standards including, but not limited to: a) Protect the existing curb and gutter at 22 feet west from street centerline. PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083— PNEUDRAULICS, INC. August 27, 2008 Page 5 b) Provide new street pavement section as prescribed by the City Engineer to centerline of the street, property line adjacent sidewalk, two (2) 8500 lumen HPSV streetlights, drainage facilities as determined necessary, traffic signing and striping, and street trees. c) Provide drive approaches in accordance with City"Driveway Policy." d) Install street trees per the Street Tree Requirement Form. 3) An in-lieu fee as contribution to the future undergrounding of the existing overhead utilities(telecommunications and electrical, except for the 66 kV electrical) on the opposite side of Arrow Route shall be paid to the City prior to the issuance of building permits. The fee shall be one-half of the City adopted unit amount times the length of the project frontage. 4) A signed consent waiver form to join and/or form the appropriate landscape and lighting districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. The proposed project shall be annexed into Landscaping Maintenance District No. 3B and Street Lighting District Nos. 1 and 6. Building and Safety Department (Grading) 1) The applicant shall provide a copy of EPA Form 7520-16 (Inventory of Injection Wells) with the Facility ID Number assigned prior to issuance of the grading permit. 2) A HCOC exists for the downstream receiving water. The downstream receiving water (Mill Creek, Prado Area) is experiencing significant degradation of its banks. The project must implement a volume-based treatment control Best Management Practices(retention/detention facility). 3) Obtain written permission to construct wall on the property line or provide detail(s) showing the wall offset from the property line. 4) A drainage study showing a 100-year, AMC 3 design storm event for on- site drainage shall be prepared and submitted to the Building Official for review and approval for on-site storm water drainage. All reports shall be wet signed and sealed by the Engineer of Record. 5) Prior to issuance of a grading permit a Water Quality Management Plan (WQMP) must be completed, approved, notarized, and recorded. Police Department 1) Provide lighting for outdoor eating areas. PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083 — PNEUDRAULICS, INC. August 27, 2008 Page 6 Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any Grading Permits, the developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment and activities shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e., wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083 — PNEUDRAULICS, INC. August 27, 2008 Page 7 • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. • Wash truck tires leaving the site to reduce the amount of particulate matter transferred to paved streets as required by SCAQMD Rule 403. • Limit traffic speeds on all unpaved road surfaces to 15 miles per hour or less to reduce fugitive dust. The Applicant shall post signs on the Project site limiting traffic speeds on unpaved road surfaces to a maximum of 15 miles per hour. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB])daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) The project shall designate a minimum of 10 percent of the total parking spaces as preferential parking for vanpool/carpool. 11) The project shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e. in excess of 10 minutes). 12) Warehouse managers/building operators shall post both bus and Metrolink schedules in conspicuous areas. 13) Warehouse managers/building operators shall configure operating schedules around the Metrolink schedule to the extent reasonably feasible. 14) Warehouse managers/building operators shall use high efficiency/low polluting heating, air conditioning, appliances and water heaters that conform to energy use guidelines in Title 24 of the California Administrative Code. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities,to take appropriate measures to protect or PLANNING COMMISSION RESOLUTION NO, 08-45 DRC2008-00083 — PNEUDRAULICS, INC. August 27, 2008 Page 8 preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga would: Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the area's archaeological heritage. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report,documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository(i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy to the report to San Bernardino County Museum. PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083 — PNEUDRAULICS, INC. August 27, 2008 Page 9 Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM,o emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Hydrology and Water Quality Construction Activities: 1) Prior to issuance of Grading Permits, the permit applicant shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices(BMPs)that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in grading plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) Prior to issuance of building permits, the applicant shall complete the Water Quality Management Plan (WQMP) review and receive approval from the Building Official. WQMP shall include a project description and identifying Best Management Practices(BMPs)that would be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. 4) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083— PNEUDRAULICS, INC. August 27, 2008 Page 10 5) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 6) The developer shall implement the BMPs identified in the WQMP prepared by Kevin J. Richer, RCE of the Land Development Design Corporation (LDDC), submitted on May 18, 2008, to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) Prior to issuance of building permits, the applicant shall complete the Water Quality Management Plan (WQMP) review and receive approval from the Building Official. WQMP shall include a project description and identifying Best Management Practices(BMPs)that would be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. 9) Prior to issuance of Grading or Paving Permits, applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Prior to final development plan approval and during plan check, the Planning Department shall verify that the Landscape Plan and site development plans illustrates a permanent buffer for screening the outdoor loading/unloading activities along Arrow Route and the residences to the north. Screening features shall include a screening wall in between Buildings 1 and 2, parallel to Arrow Route. The wall shall be flushed with both buildings and be painted and treated to match the building exterior colors and shall use the same materials 2) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 3) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said PLANNING COMMISSION RESOLUTION NO. 08-45 DRC2008-00083— PNEUDRAULICS, INC. August 27, 2008 Page 11 consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards,then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF AUGUST 2008, PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Richard B. Fletcher, Chairman ATTEST: R' Ja s R. Troyer, AICP, Secr tary I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 27th day of August 2008, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga MITIGATION MONITORING PROGRAM Project File No.: SUBTPM18994 and DRC2008-00083 This Mitigation Monitoring Program (MMP) has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration)for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components - This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management - The MMP will be in place through all phases of the project. The project planner, assigned by the Planning Director, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the City of Rancho Cucamonga. 1 . A fee covering all costs and expenses, including any consultants' fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action, what action will be taken and when,and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga — Lead Agency Planning Department 10500 Civic Center Drive Rancho Cucamonga, CA 91730 MITIGATION MONITORING PROGRAM SUBTPM18994 AND DRC2008-00083 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,as determined by the project planner or responsible City department,to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring afterwritten notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring. The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Planning Department. The Department shall require the applicant to post any necessary funds (or other forms of guarantee) with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring, the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the City's MMP and shall be approved by the Community Development Director or Planning Director prior to the issuance of building permits. MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: DRC2008-00083 & SUBTPM18994 Applicant: Mike Saville, Pneudraulics, Inc. Initial Study Prepared by: Waen Messner Date: July 28. 2008 Mitigation Measures No. Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Air Quality u All construction equipment shall be maintained in good PD C Review of plans A/C 2/4 operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. Prior to the issuance of any grading permits, the PD/BO C Review of plans C 2 developer shall submit Construction Plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. All paints and coatings shall meet or exceed PD C Review of plans A/C 2/4 performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. All asphalt shall meet or exceed performance standards BO B Review of plans A/C 2 noted in SCAQMD Rule 1108. All construction equipment shall comply with SCAQMD BO C Review of plans A/C 2/4 Rules 402 and 403. Additionally, contractors shall include the following provisions: o Reestablish ground cover on the construction site BO C Review of plans A/C 2/4 through seeding and watering. 1 of 9 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification . . Date/initials Non-Compliance o Pave or apply gravel to any on-site haul roads. BO C Review of plans A/C 2/4 o Phase grading to prevent the susceptibility of BO C Review of plans A/C 2/4 large areas to erosion over extended periods of time. o Schedule activities to minimize the amounts of BO C Review of plans A/C 2/4 exposed excavated soil during and after the end of work periods. o Dispose of surplus excavated material in BO C Review of plans A 4 accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule BO C During A 4 established by the City if silt is carried over to construction adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. o Suspend grading operations during high winds BO C During A 4 (i.e., wind speeds exceeding 25 mph) in construction accordance with SCAQMD Rule 403 requirements. o Maintain a minimum 24-inch freeboard ratio on BO C During A 4 soils haul trucks or cover payloads using tarps Construction or other suitable means. o Limit traffic speeds on all unpaved road BO C During A 4 surfaces to 15 miles per hour or less to reduce Construction fugitive dust. The Applicant shall post signs on the Project site limiting traffic speeds on unpaved road surfaces to a maximum of 15 miles per hour. The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and Construction Regional Water Quality Control Board [RWQCB]) daily to reduce Particulate Matter (PMS,) emissions, in accordance with SCAQMD Rule 403. 2of9 Mitigation Measures No. Responsible . . of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Chemical soil stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction Construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. The construction contractor shall utilize electric or clean BO C Review of plans A/C 4 alternative fuel-powered equipment where feasible. The construction contractor shall ensure that BO C Review of plans A/C 2/4 construction-grading plans include a statement that work crews will shut off equipment when not in use. The project shall designate a minimum of 10% of the PD C Review of plans A/C 2/3 total parking spaces as preferential parking for vanpool/carpool. The project shall post signs requiring that trucks shall BO C Review of plans A 4 not be left idling for prolonged periods (i.e. in excess of 10 minutes). Warehouse managers/building operators shall be PD C Review of plans D 2/3 required to post both bus and Metrolink schedules in conspicuous areas. Warehouse managers/building operators shall be PD C Review of plans D 2/3 required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. Warehouse managers/building operators shall use high PD C Review of plans D 2/3 efficiency/low polluting heating, air conditioning, appliances and water heaters that conform to energy use guidelines in Title 24 of the California Administrative Code. Cultural Resources If any prehistoric archaeological resources are encountered before or during grading,the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: 3of9 Mitigation Measures No./ Responsible Monitoring Timing of of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance o Enact interim measures to protect undesignated PD/BO C Review of report A/D 3/4 sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. o Consider establishing provisions to require PD/BO C Review of report A/D 3/4 incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. o Pursue educating the public about the area's PD/BO C Review of report A/D 3/4 archaeological heritage. o Propose mitigation measures and recommend PD/BO C Review of report A/D 3/4 conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. o Prepare a technical resources management PD C Review of report A/D 3/4 report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. If any paleontological resource (i.e. plant or animal PD B Review of report A/D 4 fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures(i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: 4of9 Mitigation Measures No. Responsible Monitoring Timing of of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance o Assign a paleontological monitor, trained and PD B Review of report AID 4 equipped to allow the rapid removal of fossils with minimal construction delay, to the site full- time during the interval of earth-disturbing activities. o Should fossils be found within an area being BO B/C Review of report AID 4 cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. o Prepare, identify, and curate all recovered PD D Review of report D 3 fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). o Submit summary report to City of Rancho PD D Review of report D 3 Cucamonga. Transfer collected specimens with a copy to the report to San Bernardino County Museum. 5 of 9 Mitigation Measures No. Responsible of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date linitials Non-Compliance Geology and Soils The site shall be treated with water or other BO C During A 4 soil-stabilizing agent (approved by SCAQMD and construction RWQCB)daily to reduce PM,o emissions, in accordance with SCAQMD Rule 403 or replanted with drought resistant landscaping as soon as possible. Frontage public streets shall be swept according to a BO C During A 4 schedule established by the City to reduce PM,o construction emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. Grading operations shall be suspended when wind BO C During A 4 speeds exceed 25 mph to minimize PM10 emissions construction from the site during such episodes. Chemical soil-stabilizers (approved by SCAQMD and BO C During A 4 RWQCB) shall be applied to all inactive construction construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Hydrology and Water Quality Prior to issuance of grading permits,the permit applicant BO B/C/D Review of plans A/C 2/4 shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 6 of 9 Mitigation Measures No.I Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action Date/initials Non-Compliance An Erosion Control Plan shall be prepared, included in BO B/C/D Review of plans A/C 2/4 the Grading Plan, and implemented for the proposed project that identifies specific measures to control on- site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California,and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. Prior to issuance of building permits, the applicant shall BO B/C/D Review of plans A/C 2/4 complete the Water Quality Management Plan(WQMP) review and receive approval from the Building Official. WQMP shall include a project description and identifying Best Management Practices(BMPs)that would be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. During construction, temporary berms such as BO B/C/D Review of plans A/C 2/4 sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. During construction, to remove pollutants, street BO B/C/D Review of plans A/C 2/4 cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. The developer shall implement the BMPs identified in CE B/C/D Review of plans A/C 2/4 the Water Quality Management Plan prepared by Kevin J. Richer of Land Development Design Corporation (LDDC), submitted on May 18,2008 to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 7 of 9 Mitigation Measures No. Responsible Implementing Action for Monitoring Frequency Verification Verification Date linitials Non-Compliance Landscaping plans shall include provisions for BO B/C/D Review of plans A/C 2/4 controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. Prior to issuance of grading or paving permits, applicant BO B/C/D Review of plans A/C 2/4 shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage underthe NPDES General Construction Permit. Noise Prior to final development plan approval and during plan PD B/C/D Review of plans A/C 2/3/4 check, the Planning Department shall verify that the Landscape Plan and site development plans illustrates a permanent buffer for screening the outdoor loading/unloading activities along Arrow Route and the residences to the north. Screening features shall include a screening/sound wall in between Buildings 1 and 2. The wall shall be flushed with both buildings and be painted and treated to match the building exterior colors and shall use the same materials. Construction or grading shall not take place between the BO C During A 4 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. 8of9 Mitigation Measures No. Responsible . . of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance Construction or grading noise levels shall not exceed the BO C During A 4 standards specified in Development Code Section construction 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. Haul truck deliveries shall not take place between the PO/BO C During A 4/7 hours of 8:00 p.m. and 6:30 a.m. on weekdays, construction including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site),then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. Key to Checklist Abbreviations Responsible Person Monitoring Frequency Method of Verification Sanctions CDD-Community Development Director or designee A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map PD-Planning Director or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP 7-Citation 9 of 9 COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DRC2008-00083 SUBJECT: DEVELOPMENT REVIEW APPLICANT: PNEUDRAULICS, INC. LOCATION: 8575 HELMS AVENUE (SOUTHEAST CORNER OF ARROW ROUTE AND HELMS AVENUE APN: 0209-021-42 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers,or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 08-45 Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Notice of Exemption - $50 b) Notice of Determination - $50 c) Mitigated Negative Declaration - $ 1,926.75 X d) Environmental Impact Report-$2,656.75 SC-1-05 1 hPLANNINGTINAL\PLNGCOMNIQ008 Res&Stf repORC2008-00083SWCond 8-27.doc Project No. DRC2008-00083 Completion Date B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping,sign program,and grading on file in the Planning Department, the conditions contained herein, and the Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s)are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and City Engineer review and approved prior to the issuance of building permits. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and 2 1:\PLANNING\FINAL\PLNGC0MW2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No. DRC2008-00083 Completion Date streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 4. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development, private gated entrances shall provide adequate turn- around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. F. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be _/_/_ provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle Transportation Plan adopted by City Council Resolution No. 02-237. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. G. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 3 I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No. DRC2008-00083 Completion Date 2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees -24-inch box or larger. 3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one tree per 30 linear feet of building. 5. The final design of the perimeter parkways,walls, landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 6. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering sidewalks (with horizontal change), and intensified landscaping, is required along Arrow Route and Helms Avenue. 7. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 8. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department. 9. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. Prior to issuance of Building Permits, the project landscape architect shall certify on the submitted plans that the xeriscape requirements have been met. H. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. 2. A Uniform Sign Program for this development shall be submitted for Planning Director review and approval prior to issuance of building permits. I. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the Planning Director in the amount of$538 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. 2. In those instances requiring long term monitoring (i.e.)beyond final certificate of occupancy),the applicant shall provide a written monitoring and reporting program to the Planning Director prior to issuance of building permits. Said program shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. 4 hPLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No. DRC2008-00083 Completion Date J. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. The final location of the mailboxes and the design of the overhead structure shall be subject to Planning Director review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) K. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2008-00083) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. 6. Developers wishing to participate in the Community Energy Efficiency Program (CEEP) can _/_/_ contact the Building and Safety Department staff for information and submittal requirements. L. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2008-00083 and SUBTPM18994). The applicant shall comply with the latest adopted California Codes,and all other applicable codes,ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program 5 I:\PLANNING\FINAL\PLNGC0MM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No.DRC2008-00083 Completion Date deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). M. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. N. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped, and signed by a California registered Civil Engineer. 6. If human remains are discovered on-site before or during grading, no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98 and California Health and Safety Code Section 7050.5. 6 I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No. DRC2008-00083 Completion Date APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: O. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails, public paseos, public landscape areas, street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 50 total feet on Arrow Route 33 total feet on Helms Avenue 3. Corner property line cutoffs shall be dedicated per City Standards. 4. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. P. Street Improvements 1. Pursuant to City Council Resolution No. 88-557, no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 2. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Arrow Route b C X X X Helms Avenue b X X X X (e) Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. (e) Curbside drainage outlets 3. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. 7 I:\PLANNING\FINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No.ORC2008-00083 Completion Date b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping, marking,traffic signing, street name signing,traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the Planning Director prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 8 I:\PLANNINGTINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No. DRC2008-00083 Completion Date 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing Size cty. ARROW ROUTE Gingko biloba Maidenhair Tree 5' 25'O.C. 15 Gal Fill 'Fairmount' In HELMS AVE Tristaniopsis laurina Water Gum 3' 20'O.C. 15 Gal Fill In Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Department. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. Q. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 2. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan Arrow Route. R. General Requirements and Approvals 1. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: S. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 9 I:\PLANNING\FINAL\PLNGCOMM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Project No. DRC2008-00083 Completion Date 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. T. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within _/_/_ 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. 3. All roof openings giving access to the building shall be secured with either iron bars, metal gates, or alarmed. U. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be _/_/_ a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. 3. At the entrances of commercial or residential complexes, an illuminated map or directory of _/_/_ project shall be erected with vandal-resistant cover. North shall be at the top and so indicated. Sign shall be in compliance with Sign Ordinance, including an application for a Sign Permit and approval by the Planning Department. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 10 (:\PLANNING\FINAL\PLNGC0MM\2008 Res&Stf rep\DRC2008-00083StdCond 8-27.doc Rancho Cucamonga Fire Protection OF District Fire Construction Services STANDARD CONDITIONS May 21, 2008 Pneudraulics, Inc (2) Industrial Buildings 8575 Helms SUBTPM18894 & DRC2008-00083 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT The RCFPD Procedures & Standards which are referenced in this document can be access on the web at hftp:/Avww.ci.rancho-cucamonga.r-a.ustfirefindex.htm under the Fire Safety Division & Fire Construction Services section. Search by article; the preceding number of the standard refers to the article. Chose the appropriate article number then a drop down menu will appear, select the corresponding standard. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300-feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. The preferred locations for fire hydrants are: i. At the entrance(s) to a commercial, industrial or residential project from the public roadways. ii. At intersections. iii. On the right side of the street, whenever practical and possible. iv. As required by the Fire Safety Division to meet operational needs of the Fire District. V. A minimum of forty-feet (40') from any building. C. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow 1. The required minimum fire flow for this project, when automatic fire sprinklers are installed is 2750 gallons per minute at a minimum residual pressure of 20-pounds per square inch. This flow reflects a 50-percent reduction for the installation of an approved automatic fire sprinkler system in accordance with NFPA 13 with central station monitoring. This requirement is made in accordance with the California Fire Code Appendix, as adopted by the Fire District Ordinances. 2. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 3. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until public fire protection water plans are approved. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirements for Automatic Fire Sprinkler Systems Automatic fire sprinklers shall be installed in buildings as required by the 2007 California Fire Code and the Rancho Cucamonga Fire Protection District Ordinance FD46 and/or any other applicable standards require an approved automatic fire sprinkler system to be installed. FSC-5 Fire Alarm System & Sprinkler Monitoring 1. The 2007 California Building Code, the RCFPD Fire Alarm Standard, Ordinance FD46 and/or the 2007 California Fire Code require most fire sprinkler systems to be monitoring by Central Station sprinkler monitoring system. A manual and or automatic fire alarm system fire may also be required based on the use and occupancy of the building. Plan check approval and a building permit are required prior to the installation of a fire alarm or a sprinkler monitoring system. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard. 2 FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the, RCFPD Fire Department Access Roadways Standard. 1. Location of Access: All portions of the structures 1st story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 24-feet. C. The minimum outside turn radius shall be 50-feet. d. The minimum radius for cul-de-sacs is 45-feet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20- feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 3 5. Commercial/Industrial Gates: Any gate installed across a Fire Department access road shall be in. accordance with Fire District Standard. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. C. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock available at the Fire Safety Office for $20.00. f. Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi- directional or multiple sensors may be required due to complexity of the various entry configurations. 6. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for approval. 7. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. 8. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family 4 residential structures with roofs less than 75' above the level of the fire access road. a. This access must be reachable by either fire department ground ladders or by an aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. C. The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. f. Multiple access ladders may be required for larger buildings. g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix A. h. A site plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Aerosol Products Magnesium Working • Application of Flammable Finishes Motor Vehicle Fuel-Dispensing Operation • Automobile Wrecking Yards Open Burning • Battery Systems Organic Coating • Candles and open flames in public assemblies Ovens • Cellulose Nitrate Powder Coating • Compressed Gases Public Assembly • Cryogenics Pyrotechnical Special Effects • Dry Cleaning Plants Radioactive Materials 5 • Dust-Producing Processes and Operations Refrigeration Systems • Explosive or Blasting Agents Repair Garages • Flammable and Combustible Liquids Rubbish Handling Operations • Fruit Ripening Plants Spraying or Dipping Operations • Hazardous Materials Tents, Canopies and/or Air Supported Structures • High-Pile Combustible Storage (HIPS) Tire Storage • Liquefied Petroleum Gases Welding and Cutting Operations • LPG or Gas Fuel Vehicles in Assembly Buildings Wood Products/Lumber Yards FSC-11 Hazardous Materials — Submittal to the County of San Bernardino The San Bernardino County Fire Department shall review your Business Emergency/Contingency Plan for compliance with minimum standards. Contact the San Bernardino County Fire, Hazardous Materials Division at (909) 387-4631 for forms and assistance. The County Fire Department is the Cal/EPA Certified Unified Program Agency (CUPA) for the City of Rancho Cucamonga. 1. If the facility is a NEW business, a Certificate of Occupancy issued by Building & Safety will not be finalized until the San Bernardino County Fire Department reviews your Business Emergency/Contingency Plan. California Government Code, Section 65850.2 prohibits the City from issuing a final Certificate of Occupancy unless the applicant has met or is meeting specific hazardous materials disclosure requirements. A Risk Management Program (RMP) may also be required if regulation substances are to be used or stored at the new facility. 2. Any business that operates on rented or leased property which is required to submit a Plan, is also required to submit a notice to the owner of the property in writing stating that the business is subject to the Business Emergency/Contingency Plan mandates and has complied with the provisions. The tenant must provide a copy of the Plan to the property owner within five (5) working days, if requested by the owner. FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2007California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD46 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. FCS-14 Map Recordation 6 1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a property that is being subdivided. The reciprocal 'agreement is required to be recorded between property owners and the Fire District. The recorded agreement shall include a copy of the site plan. The Fire Construction Services shall approve the agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino, Recorders Office. Reciprocal access agreement — Please provide a permanent access agreement between the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. Reciprocal water covenant — Please provide a permanent maintenance and service covenant between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities District #85-1 or #88-1 is required prior to the issuance of grading or building permits. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. 2. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and 7 approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard. 4. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 5. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 6. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 7. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 8 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. 9. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 10. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address in accordance to the appropriate RCFPD addressing Standard. it. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire Construction Services.. 12. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 13. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 8 1/2" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 9 City of Rancho Cucamonga MITIGATED NEGATIVE DECLARATION The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: TENTATIVE PARCEL MAP SUBTPM18994 AND DEVELOPMENT REVIEW DRC2008-00083 Public Review Period Closes: August 27, 2008 Project Name: Project Applicant: Pneudraulics, Inc Project Location(also see attached map): Located within the General Industrial District, Subarea 3, at the southeast corner of Arrow Route and Helms Avenue—APN: 0209-021-43. Project Description: A request to subdivide 5.46 acres of land into 2 separate parcels and a request to develop 2 industrial buildings (with office, manufacturing and warehousing)totaling 88,200 square feet (41,160 square feet and 47,040 square feet)in the General Industrial District(Subarea 3). Related Files: Sign Permit Application DRC2008-00360 and Tree Removal Permit DRC2008-0359 FINDING This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: (1) Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, and (2) There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Reportwill not be required. The factual and analytical basis for this finding is included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909)477-2847. NOTICE The public is invited to comment on the proposed Mitigated Negative Declaration during the review period. August 27, 2008 Date of Determination Adopted By