HomeMy WebLinkAbout09-02 - Resolutions RESOLUTION NO. 09-02 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2008-00306, A REQUEST TO CONSTRUCT A MULTI-FAMILY HOUSING DEVELOPMENT CONSISTING OF 241 UNITS ON 15.69 ACRES OF LAND (LOT 1 OF TENTATIVE TRACT MAP SUBTT18710) WITHIN THE MEDIUM-HIGH RESIDENTIAL DISTRICT (14-24 DWELLING UNITS PER ACRE) DEVELOPMENT DISTRICT OF THE TERRA VISTA COMMUNITY PLAN, LOCATED ON THE NORTH SIDE OF CHURCH STREET AND EAST OF MILLIKEN AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF — APN: 0227-532-16. A. Recitals. 1. Lewis Operating Corporation has filed an application for the approval of Development Review DRC2008-00306, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 14th day of January 2009, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing January 14, 2009, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a 15.69-acre vacant project site that is located on the north side of Church Street and east of Milliken Avenue; and b. The site is bounded by Milliken Park to the north, Church Street to the south, multi-family residences to the east (earlier phases of Homecoming at Terra Vista), and a storage facility and multi-family residences to the west; and C. The proposed 241-unit rental condominium project is the final phase of the Homecoming at Terra Vista rental condominium development, which will have 868 units with the completion of this final phase; and d: The proposed development also includes an associated two-lot subdivision, Tentative Tract Map SUBTT18710. The associated Tentative Tract Map (SUBTT18710) proposes subdividing the 20.69-acre site into two numbered lots (Lots 1 and 2), with 241 units for condominium purposes on Lot 1. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306 — LEWIS OPERATING CORPORATION January14, 2009 Page 2 Lot 1 will consist of 15.69 acres and will be developed with 241 condominiums, Lot 2 will consist of 5 acres and is presently developed with condominiums. The 20.69-acre project site includes a 5-acre portion of an earlier phase of Homecoming at Terra Vista (Lot 2 of Tentative Tract Map SUBTT18710); and e. The project density is 16 dwelling units per acre, which is at the low end of the 14- to 24-unit density permitted within the Medium-High Residential District of the Terra Vista Community Plan; and f. The project includes six different building types which were designed to be reminiscent of Spanish style architecture. There will be 166 two-bedroom units and 75 three-bedroom units ranging in size from 1,031 square feet to 1,571 square feet; and g. The building separations for the 7-unit (Types 2 and 3) and 8-unit (Types 5 and 6) all meet or exceed the minimum separation requirements outlined in the Terra Vista Community Plan for the Medium-High Residential District. The building separations for the detached single-unit (Type 28) and duplex (Type 27) buildings are 16 feet front-to-front and 8 feet side-to-side, which is deficient in meeting the building separation requirements. The applicant has submitted Terra Vista Community Plan Amendment (DRC2008-00761) for reduced building setbacks in the Medium-High Residential District; and h. The proposed project conforms to the standards and regulations of the Development Code, as well as the Terra Vista Community Plan, in terms of setbacks, parking, and the provision of recreational amenities as noted in the staff report; and 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed project is consistent with the General Plan, Development Code, and any applicable specific plans; and b. The proposed design or improvements are consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The project is not likely to cause serious public health problems; and 4. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that, with the imposition of PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306 — LEWIS OPERATING CORPORATION January14, 2009 Page 3 mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i) that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. C. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the design and layout of a 241-unit condominium project on 15.69 acres of land (Lot 1 of Tentative Tract Map SUBTT18710), located on the north side of Church Street and east of Milliken Avenue — APN: 0227-532-16. 2) The approval of DRC2008-00306 is subject to the approval of Terra Vista Community Plan Amendment DRC2008-00761 (Planning Commission and City Council [approval and adoption after City Council second reading]) Tentative Tract Map SUBTT18710, and Variance DRC2008-00762. 3) Plans submitted for plan check shall be consistent with plans approved by the Design Review Committee on November 18, 2008. 4) All perimeter walls and walls exposed to public view shall be decorative. The perimeter walls fronting Church Street shall be consistent with the walls used on the earlier phases of the project. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306— LEWIS OPERATING CORPORATION January14, 2009 Page 4 5) All retaining walls used throughout the project shall have a decorative surface to complement the building design. 6) Access shall be provided to Milliken Park with the final location of the gate subject to approval by the Engineering Department. 7) Garage doors shall be painted brown or a color that matches building or trim color. 8) All corbels, rafter tails, and similar decorative trim shall be painted brown and not be covered with stucco. 9) All required ground level patios shall have a minimum depth of 8 feet and balconies shall have a depth of 6 feet. Engineering Department 1) The Church Street frontage shall be fully improved. Improvements shall include, but are not limited to, curbs and gutters, sidewalk, street lights, street trees, traffic signing/striping, drainage facilities, etc. a) Provide bike lane along the Church Street frontage. b) The street tree species required on Church Street on the parkway shall be Magnolia Grandiflora "St. Mary" which is the approved tree easterly of this project. 2) The median in Church Street is to be protected in place and modified or repaired as required with no new openings. a) The median shall be fully landscaped per the approved street improvement plans, Drawing No. 2058-L, prior to approval of final map or issuance of building permit, whichever occurs first. It will be necessary to recheck the plans for conformance to current City Standards, since more than a year has elapsed since their approval. 3) The proposed driveway approach to Church Street is to be in accordance with City "Driveway Policy". The commercial drive approach shall be 35 feet wide minimum and 50 feet wide maximum, per City Standard 101, Type C. 4) Revise public improvement and storm drain plans to reflect required public improvements and public storm drain connections, to the satisfaction of the City Engineer. 5) Provide a 2-inch Traffic Signal Interconnect conduit on the north side of Church Street from the intersection of Malaga Avenue to Mayten Avenue. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306 — LEWIS OPERATING CORPORATION January14, 2009 Page 5 6) A gate for pedestrian access to Milliken Park from the private multi-family residential project to the south will not be permitted in the vicinity of the existing tot lot, for child safety purposes. A third access to East Greenway Corridor will be allowed near the northeast corner of the project site. 7) The Engineering Department shall review a copy of the on-site landscaping plans to verify conformance with City street tree requirements. Add the following note to private landscape plans that show street trees: "All improvements within the public right-of-way, including street trees, shall be installed per the public improvement plans". Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, the developer shall submit construction plans to the City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning staff. 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306 — LEWIS OPERATING CORPORATION Januaryl4, 2009 Page 6 • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e., wind speeds exceeding 25 mph) in accordance with SCAQMD Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce Fine Particulate Matter (PM10) emissions, in accordance with SCAQMD Rule 403. 7) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce Fine Particulate Matter (PM10) emissions, in accordance with SCAQMD Rule 403. 8) The construction contractor shall utilize electric or clean alternative fuel- powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 10) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 11) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306 — LEWIS OPERATING CORPORATION Januaryl4, 2009 Page 7 • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report, with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit the summary report to the City of Rancho Cucamonga. Transfer collected specimens with a copy to the report to the San Bernardino County Museum. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306— LEWIS OPERATING CORPORATION Januaryl4, 2009 Page 8 Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An erosion control plan shall be prepared, included in the grading plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This erosion control plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) The developer shall implement the BMPs identified in the Water Quality Management Plan (WQMP), prepared by Madole & Associates, Inc. on September 15, 2008, to reduce pollutants during the construction phase of project from entering the storm drain system to the maximum extent practical. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306 — LEWIS OPERATING CORPORATION January14, 2009 Page 9 6) The developer shall implement the BMPs identified in the WQMP, prepared by Madole & Associates, Inc. on September 15, 2008, to reduce pollutants after construction from entering the storm drain system to the maximum extent practical. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a WQMP, including a project description and identifying BMPs that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 9) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. The developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) The perimeter block wall shall be constructed as early as possible in the first phase. PLANNING COMMISSION RESOLUTION NO. 09-02 DRC2008-00306— LEWIS OPERATING CORPORATION Januaryl4, 2009 Page 10 4) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at anytime on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 14TH DAY OF JANUARY 2009. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Richard B. Fletcher, Chairman ATTEST: JaR. Troyer, AICP, ecreta I, James R. Troye AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 14th day of January 2009, by the following vote-to-wit: AYES: COMMISSIONERS: FLETCHER, HOWDYSHELL, MUNOZ, STEWART, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: DEVELOPMENT AND DESIGN REVIEW DRC2008-00306 SUBJECT: DEVELOPMENT AND DESIGN REVIEW APPLICANT: LEWIS DEVELOPMENT CORPORATION LOCATION: CHURCH STREET AND EST OF MILLIKEN AVENUE -APN: 0227-532-16 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents,officers,or employees,because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion,participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 09-02, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s)are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Mitigated Negative Declaration - $2,043.00 B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. 1 Project No. DRC2008-00306 Comoletion Date C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Department,the conditions contained herein, Development Code regulations, and the Terra Vista Community Plan. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram,shall be reviewed and approved by the Planning Director and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination,location,height,and method of shielding so as not to adversely affect adjacent properties. 8. If no centralized trash receptacles are provided,all trash pick-up shall be for individual units with all receptacles shielded from public view. 9. Trash receptacle(s)are required and shall meet City standards. The final design, locations,and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of building permits. 10. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 11. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 12. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners' Association are subject to the approval of the Planning and Engineering Departments and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Department a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 13. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners'association,or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and City Engineer review and approved prior to the issuance of building permits. 2 Project No. DRC2008-00306 Completion Dale 14. The developer shall submit a construction access plan and schedule for the development of all lots for Planning Director and City Engineer approval; including, but not limited to, public notice requirements,special street posting, phone listing for community concerns,hours of construction activity, dust control measures, and security fencing. 15. For multiple family development, laundry facilities shall be provided as required by the Development Code. 16. For multiple family development,a minimum of 125 cubic feet of exterior lockable storage space shall be provided. 17. For residential development, recreation area/facility shall be provided as required by the Development Code. D. Building Design 1. An alternative energy system is required to provide domestic hot water for all dwelling units and for heating any swimming pool or spa, unless other alternative energy systems are demonstrated to be of equivalent capacity and efficiency. All swimming pools installed at the time of initial development shall be supplemented with solar heating. Details shall be included in the building plans and shall be submitted for Planning Director review and approval prior to the issuance of building permits. 2. All dwellings shall have the front,side and rear elevations upgraded with architectural treatment, detailing and increased delineation of surface treatment subject to Planning Director review and approval prior to issuance of building permits. 3. Standard patio cover plans for use by the Homeowner's Association shall be submitted for Planning Director and Building Official review and approval prior to issuance of building permits. 4. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings/units/buildings with open spaces/plazas/ recreational uses. 4. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 3 Project No. DRC2008-00306 Completion Date 5. All units shall be provided with garage door openers if driveways are less than 18 feet in depth from back of sidewalk. 6. Multiple car garage driveways shall tapered down to a standard two-care width at street. 7. The Covenants,Conditions and Restrictions shall restrict the storage of recreational vehicles on this site unless they are the principal source of transportation for the owner and prohibit parking on interior circulation aisles other than in designated visitor parking areas. 8. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of building permits. For residential development, private gated entrances shall provide adequate turn- around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 9. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. F. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in /_/ the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 3. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be,at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 4. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft.of slope area, 1-gallon or larger size shrub per each 100 sq.ft.of slope area,and appropriate ground cover. In addition,slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 5. For multi-family residential and non-residential development,property owners are responsible for the continual maintenance of all landscaped areas on-site,as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition,and shall receive regular pruning,fertilizing,mowing, and trimming. Any damaged,dead,diseased,or decaying plant material shall be replaced within 30 days from the date of damage. 6. The final design of the perimeter parkways,walls,landscaping,and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Department. 7. Landscaping and irrigation systems required to be installed within the public right-of-way on the / /_ perimeter of this project area shall be continuously maintained by the developer. 8. All walls shall be provided with decorative treatment. If located in public maintenance areas,the design shall be coordinated with the Engineering Department. 4 Project No. DRC2008-00306 Completion Date 9. Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of building permits.These criteria shall encourage the natural growth characteristics of the selected tree species. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) G. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number(DRC2008-00306)clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. _/ / Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. H. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(DRC2008-00306). The applicant shall comply with the latest adopted California Codes,and all other applicable codes,ordinances,and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential project or major addition,the applicant shall pay development fees at the established rate. Such fees may include,but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permit issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map _I_I recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5 Project No. DRC2008-00306 Completion Date 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). 6. Submit pool plans to the County of San Bernardino's Environmental Health Services Department for approval. I. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Roofing material shall be installed per the manufacturer's "high wind" instructions. 4. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC _/_/_ Section 1505. 5. Provide draft stops in attics in line with common walls. 6. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 7. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 8. If the area of habitable space above the first floor exceeds 3,000 square feet, then the construction type shall be V-1 Hour minimum. 9. Walls and floors separating dwelling units in the same building shall be not less than 1-hour fire-resistive construction. J. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared, stamped,and signed by a California registered Civil Engineer. K. Additional Requirements/Comments 1. The project shall fully comply with accessibility requirements of 2001 California Building Code Chapter 11A(Housing Accessibility). 6 Project No. DRC2008-00306 Completion Date APPLICANT SHALL CONTACT THE ENGINEERING DEPARTMENT, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: L. Dedication and Vehicular Access 1. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. M. Street Improvements 1. Pursuant to City Council Resolution No.88-557,no person shall make connections from a source of energy,fuel or power to any building service equipment which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building or unit, the development may have energy connections made to a percentage of those buildings, or units proportionate to the completion of improvements as required by conditions of approval of development. In no case shall more than 95 percent of the buildings or units be connected to energy prior to completion and acceptance of all improvements required by these conditions of approval of development. 2. Construct the following perimeter street improvements including, but not limited to: Curb 8 A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Other Church Street X X X X X X I X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. 3. Improvement Plans and Construction: a. Street improvement plans, including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer 7 Project No. DRC2008-00306 Completion Date Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the Planning Director prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet (typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The City Engineer reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min.Grow Street Name Botanical Name Common Name Space Spacing Size Qty. Church Street Magnolia grandiflora NCN 3 ft. 20 o.c. 15-gal. "St. Mary" Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils reportshall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Department. 4) Street trees are to be planted per public improvement plans only. 6. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. N. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 8 Project No. DRC2008-00306 Completion Dale O. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system,water,gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 4. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. P. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,prior to final map approval or prior to building permit issuance if no map is involved. 2. Prior to finalization of any development phase,sufficient improvement plans shall be completed beyond the phase boundaries to assure secondary access and drainage protection to the satisfaction of the City Engineer. Phase boundaries shall correspond to lot lines shown on the approved tentative map. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 9 Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS January 6, 2009 Terra Vista Apartment Homes SFR/Duplex/Multi-Family Development N/S of Church &W/O Malaga SUBTT18710 &DRC2008-00306 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT. The RCFPD Procedures & Standards which are referenced in this document can be access on the web at site www.rcfire.M under the Fire Safety Division & Fire Construction Services section. FSC-1 Public and Private Water Supply Design guidelines for The Fire Protection water supply must be in accordance with RCFPD Standard 5-10. FSC-2 Fire Flow 1. The required fire flow for this project will be based on the square footage of the largest building, type of construction and determined in gallons per minute at a minimum residual pressure of 20-pounds per square inch. This requirement is made in accordance with the 2007 California Fire Code, as amended by the Fire District Ordinance. 2. The required minimum fire flow for this project when automatic fire sprinklers are installed can be reduced by 50-percent. 3. Fire Protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits for the construction of the buildings will not be issued until the public fire protection water plans are approved by the water and lire districts. 4. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system (in accordance with RCFPD Standard #5-10)must be obtained prior to submitting the overhead fire sprinkler system plans. Include a copy of the approved underground plans as reference with the overhead submittal FSC-4 Requirements for Automatic Fire Sprinkler Systems Rancho Cucamonga Fire District Ordinance FD46, the 2007 California Fire Code section 903.2.7 or because of an approved migration alternative such as: 1. When required fire flow cannot be provided due to inadequate volume or pressure. 2. When the building access does not meet the requirements of the 2007 California Building Code and the RCFPD Fire Department Access - Fire Lane Standard #5-1. FSC-5 Fire Alarm System 1. RCFPD Ordinance FD46, the 2007 California Building Code, and/or the California Fire Code section 907.2.8. 2. Prior to the installation of the fire alarm system, Fire Construction Services' approval and a building permit must be obtained. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard 9-3. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access—Fire Lanes Standard #5-1 and the 2007 California Fire Code for specific requirements. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided in accordance with the 2007 California Building Code, Fire and/or any other applicable standards. 4. Knox Rapid Entry System: are required in accordance to the RCFPD Residential Vehicular Gate Standard # 5-3 and the RCFPD Knox Box Installation Standard 5-9. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Residential gates installed across Fire District access roads shall be installed in accordance with RCFPD Residential Gate Standard #5-3. 6. Fire Lane Identification: Red curbing, pavement marking and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall be included in the architectural plans submitted to B&S for review and approval. 7. Mitigated Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. 6. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures with roofs less than 75' above the level of the fire access road in accordance to RCFPD Standard#5-6. FSC-10 Occupancy and Hazard Control Permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Battery Systems • Candles and open flames in public assemblies • Compressed Gases • Public Assembly • Cryogenics • Flammable and Combustible Liquids • Tents, Canopies and/or Air Supported Structures • Liquefied Petroleum Gases • LPG or Gas Fuel Vehicles in Assembly Buildings FSC-12 Hazardous Materials - Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense hazardous materials in accordance with the 2007 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD46 and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the review fee. FCS-14 Map Recordation 1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a property that is being subdivided. The reciprocal agreement is required to be recorded between property owners and the Fire District. The recorded agreement shall include a copy of the site plan. The Fire Construction Services shall approve the agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino, Recorders Office. Reciprocal access agreement—Please provide a permanent access agreement between the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. Reciprocal water covenant—Please provide a permanent maintenance and service covenant between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access and Fire Protection Water Supply: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard #9-7. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. Please refer to the RCFPD Standards# 14-1 & 14-2 for the requirements specific to fire protection water supply and fire department access during construction. 3 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. J. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with.Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION —Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Prior to the issuance of a Certificate of Occupancy, commercial and multi-family buildings shall post the building addresses, address monuments, site directories, suite directional signage and suite designations in accordance to RCFPD Multi-Family Residential Addressing Standard. 10. Hazardous Materials which require use permits from the fire district must be in accordance to the conditions of the permit. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 Yz" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard #13-1 shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 4