HomeMy WebLinkAbout09-41 - Resolutions RESOLUTION NO. 09-41 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW DRC2007-00440 A PROPOSAL TO CONSTRUCT AN OPERATIONS AND MAINTENANCE FACILITY FOR OMNITRANS TRANSIT AGENCY ON A VACANT PROPERTY OF APPROXIMATELY 29 ACRES IN THE GENERAL INDUSTRIAL(GI)DISTRICT, (SUBAREA 8), LOCATED AT THE NORTH SIDE OF ARROW ROUTE APPROXIMATELY 1,200 FEET EAST OF THE 1-15 FREEWAY; AND MAKING FINDINGS IN SUPPORT THEREOF—APN: 0229-021-60. A. Recitals. 1. Pitassi Architects, Inc., on behalf of Omnitrans, filed an application for the issuance of Development Review DRC2007-00440, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." 2. On the 28th day of October 2009, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on October 28, 2009, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a parcel of land located at the north side of Arrow Route approximately 1,200 feet east of the 1-15 Freeway-APN: 0229-021-60. The parcel has an overall area of about 1,252,528 square feet (28.75 acres); b. The parcel is about 995 feet (east to west) by about 1,300 feet (north to south); C. The site is bound on the north by the Foothill Marketplace shopping center,while to the south, across Arrow Route, is a steel products manufacturing facility. To the east, is Air Liquide, a chemical manufacturing facility. The property is bound on the west by an industrial building and a self-storage facility; d. The applicant proposes to construct, in two (2) phases, a bus operations and maintenance facility (Omnitrans Mid-Valley Facility). This facility will be comprised of multiple buildings —two operations/maintenance buildings ("Access" and "Fixed Route"), with a combined floor area of approximately 159,000 square feet and three smaller buildings for various support activities, with a combined floor area of approximately 10,000 square feet for a total combined floor area of about 169,000 square feet; PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 2 e. At Phase 1 of the project, the "Access" building and associated parking for the employees and the fleet vehicles will be constructed. Included in this phase will be all of the required improvements in the public right-of-way, including the new cul-de-sac. In the interim period between Phases 1 and 2, undeveloped areas between the "Access" vehicle parking area and Arrow Route will be landscaped with groundcover,while the remaining undeveloped rear half of the site will remain in its natural state. At Phase 2 of the project, the "Fixed Route" building, fueling depot, vehicle cleaning/detailing building, associated support buildings and equipment, and remaining parking will be constructed; f. Per Chapter III, Section 2.5.3.8,the maximum floor area ratio(FAR)in the General Industrial (GI) land use category is 60 percent. The net site area after the completion of the new cul-de-sac and associated public improvements will be 1,218,661 square feet (27.98 acres). The overall building coverage proposed will be 169,428 square feet(3.89 acres). Therefore,the FAR for this site will be 13.9 percent; g. The project is a bus operations and maintenance facility for Omnitrans, a public transit agency. As defined in Development Code Section 17.30.030, public safety and utility services are permitted in this Development District with an approved Conditional Use Permit. The applicant has filed Conditional Use Permit DRC2008-00664 for review and action; h. The facility will operate 24 hours a day, 365 days a year; i. The facility will employ over 1,000 persons working during various shifts; j. For Phase 1,the applicant is required to provide 85 parking stalls and has provided 159 parking stalls. For Phase 2, the applicant is required to provide 355 parking stalls and has provided 457 parking stalls. At build-out, the applicant is required to provide a total of 440 parking stalls and has provided a total 616 parking stalls. In addition to these requirements,the applicant is also providing 111 spaces and 340 space at Phases 1 and 2, respectively,for a total of 451 spaces to be used for the storage of the agency's fleet vehicles; and k. The nearest residential district/use is a multi-family complex 0.40 mile to the north to northwest located at the northwest corner of Day Creek Boulevard and Victoria Park Lane. 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed development is in accord with the General Plan,the objectives of the Development Code, and the purposes of the district in which the site is located. The proposed project is the construction of a bus operations and maintenance facility. This is consistent with development in the vicinity. b. The proposed development,together with the conditions applicable thereto,will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. The surrounding properties are zoned industrial or commercial and the surrounding uses are industrial-oriented or intensively commercial. PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 3 C. The proposed development complies with each of the applicable provisions of the Development Code. The proposed development meets all standards outlined in the Development Code and the design and development standards and policies of the Planning Commission and the City. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. Pursuant to the California Environmental Quality Act("CEQA")and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that,with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the MitigatedNegative Declaration and, based on the whole record before it, finds: (i)that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii)that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a signif icanf effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. C. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. d. The custodian of records for the Initial Study, Mitigated Negative Declaration, Mitigation Monitoring Program and all other materials which constitute the record of proceedings upon which the Planning Commission's decision is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the construction, in two (2)phases,of a bus operations and maintenance facility (Omnitrans Mid-Valley Facility) comprised of PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 4 multiple buildings — two operations/maintenance buildings, a fueling depot building, a vehicle washing/detailing building, and associated support buildings, with a combined floor area of approximately 169,000 square feet on a parcel located at the north side of Arrow Route about 1,200 feet east of the 1-15 Freeway — APN: 0229-031-023. 2) Approval of this request shall not waive compliance with any sections of the Development Code, State Fire Marshal's regulations, Uniform Building Code, or any other City Ordinances. 3) All walls, including retaining walls, exposed to the public shall be decorative masonry. Decorative means slump stone, split-face, or stucco. 4) Any new groundmounted equipment and utility boxes, including transformers, back-flow devices,etc., shall be screened by a minimum of two rows of shrubs spaced a minimum of 18 inches on center. This equipment shall be painted forest green. 5) Any new Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be placed 5 feet from the right-of-way and shall be screened on three sides behind a 4-foot high wall designed to match the on-site walls. 6) All wrought iron fences and sliding gates shall be painted black or similarly dark color. 7) Incorporate undulating berms along the frontage of Arrow Route and the new cul-de-sac within the landscape setback and landscape areas. The highest part of the berms should be at least 3 feet in height. 8) All landscaping shall be installed prior to release for occupancy. Prior to occupancy being granted for the Access building in Phase 1, the undeveloped areas between the "Access" vehicle parking area and Arrow Route will be landscaped with groundcover. 9) All conditions of approval for Conditional Use Permit DRC2008-00664 shall apply. 10) The project shall be constructed(building architecture, phasing,interim landscape/groundcover, site plan, grading, landscape, etc.) in accordance with the plans on file in the Planning Department for DRC2007-00440. Engineering Department r 1) A permit shall be obtained from the Metropolitan Water District(MWD) for any work, including grading, that impacts the 12-foot by 12-foot PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440 — PITASSI ARCHITECTS, INC. October 28, 2009 Page 5 RCB storm drain or its easement. This storm drain was a joint MWD-City project. MWD has expressed concerns about high flow rates estimated by the developer's consultant at two of the three existing 24-inch laterals to their RCB storm drain. Deliver to the City Engineer a copy of the MWD permit and any approved drainage report required by MWD prior to Engineering Department approval of a City Grading Permit. 2) The Metropolitan Water District shall approve all plans that impact their easement, including utilities, storm drain, slopes, street trees, and landscaping. A note shall be included on all pertinent plans requiring that John Osornia of the Metropolitan Water District-Water Systems Operations Group be notified two working days (Monday through Thursday) prior to starting any work in the vicinity of their easement. Telephone (909) 392-5095. 3) Arrow Route frontage improvements to be in accordance with City "Major Arterial" standards. Install public improvements including, but not limited to, curb and gutter, asphalt street pavement north of centerline, bus bay, catch basin(s), traffic signal, drive approaches, sidewalk, ADA access ramps, street lights, and street trees, per City standards, to the satisfaction of the City Engineer. a) The west driveway on Arrow Route shall align with the existing driveway on the south side, named Juneberry Drive per City Drawing 1283-D, Sheet 7. (One street map and the traffic study incorrectly labeled the driveway across from the proposed cul-de-sac as Juneberry Drive.) b) The design of the west driveway,whether it is a drive approach or a street-type driveway, shall be deferred until after Planning Commission approval but before the Engineering Department plan check ends. The Engineering Department will consult with the developer to choose a design acceptable to both parties. c) Install a traffic signal at the west driveway; the developer is responsible in full for the cost. d) Install master controller at the proposed west driveway traffic signal. Install telephone drop for signal communications, install 2-inch conduit, and 12 pair#19 communication cables to afuture signal at the proposed cul-de-sac. e) Provide a catch basin immediately east of the proposed cul-de-sac, connected to the RCB storm drain. f) Street trees, a minimum of 24-inch box size, shall be of a species and spaced in accordance with the Street Tree Legend in the Standard Conditions. (See below). PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 6 g) Sidewalk to be curvilinear. h) Catch basin roughly near the frontage's midpoint shall use the existing storm drain connection. i) Provide R26(S) "No Stopping" signs. j) Provide additional traffic striping and signage, as required. k) Provide two-way left-turn lane on Arrow Route for all driveways. 1) Provide 9500 lumen HPSV street lights. 4) Cul-de-sac improvements to be in accordance with City "Industrial Local Street"standards. Install public improvements including but not limited to cul-de-sac, curb and gutter, asphalt street pavement, any necessary curbside drain outlets, drive approaches, property-line-adjacent sidewalk, street lights, ADA access ramps, and street trees, per City standards,to the satisfaction of the City Engineer. a) Construct entire width of proposed cul-de-sac,including parkway. b) Construct drive approach for Air Liquide, who will relocate their driveway from Arrow Route. c) Provide R26 "No Parking" signs along entire frontage. d) Provide additional traffic striping and signage, as required. e) Provide 5800 lumen HPSV street lights. f) Street trees, a minimum of 15 gallon size, shall be of a species and spaced in accordance with the Street Tree Legend in the Standard Conditions. (See below). 5) Parkways shall have a 2 percent cross slope from the right-of-way line to the top-of-curb along all street frontages. 6) Dedicate right-of-way for: a) The proposed new cul-de-sac. b) Lot corner cutoffs behind proposed ADA access ramps of the cul-de-sac and, if applicable, the street-type, west driveway. c) Fifty feet of right-of-way from centerline along Arrow Route. d) Additional street right-of-way shall be dedicated along the bus bay, to provide a minimum of 8.5 feet measured from the face of curb. PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440 — PITASSI ARCHITECTS, INC. October 28, 2009 Page 7 7) Off-site right-of-way for the east half of the cul-de*sac shall be obtained prior to the issuance of building permits. 8) Since the north leg of the signalized west driveway is private, provide an easement to the City for signal loops and signal maintenance equipment located in the private drive aisle. 9) On-site runoff shall be directed to 2 existing connections of the MWD storm drain, with the following qualifications: a) If the west driveway is designed with a drive approach, runoff from the driveway shall be diverted to the on-site storm drain system so that concentrated runoff does not flow over the sidewalk. b) If the west driveway is designed as a street-type driveway, the drainage scheme for its runoff shall be determined at Engineering Department plan check and an appropriate design shall be made. 10) Public improvement plans shall be 90 percent complete prior to the issuance of grading permits. Public improvement plans shall be 100 percent complete, signed by the City Engineer, and an improvement agreement and bonds executed by the developer, prior to building permit issuance. 11) Proposed cul-de-sac shall be constructed full width, including the Arrow Route catch basin immediately upstream of it to the east and street lights for its entire length. Off site street trees and sidewalk may be deferred until development of the adjacent property. If required in spite of the Memorandum of Understanding with Air Liquide executed January 16, 2009, the developer may request a reimbursement agreement to recover the cost for improvements east of the centerline from future development as it occurs on the opposite side of the street. If the developer fails to submit for said reimbursement agreement within 6 months of the public improvements being accepted by the City, all rights of the developer to reimbursement shall terminate. Building and Safety Department (Grading) 1) The Engineering Department has determined that there are outstanding issues on this project. Those issues must be resolved to the satisfaction of the Engineering Department. 2) It is noted that the project to the west is nearing completion. The plan view shows the existing development to the west. All related sections and details must be updated to reflect the current field conditions. 3) Metropolitan Water District (MWD) shall approve all plans that impact their easement, including utilities, storm drain, slopes, and street trees and landscaping prior to issuance of a grading permit. A note shall be PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440 — PITASSI ARCHITECTS, INC. October 28, 2009 Page 8 included on all pertinent plans requiring Metropolitan Water District Operations Maintenance Branch to be notified two working days prior to starting any work in the vicinity of their easement. 4) Approval shall be obtained from the Metropolitan Water District for any work within their right-of-way, including grading prior to issuance of a grading permit. a) The applicant shall obtain written comments from MWD regarding site design restrictions within their easement and provide a copy of said comments to the Building and Safety Official for review. 5) Prior to removing fences or walls along common lot lines and prior to constructing walls along common lot lines the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. 6) Any cross lot drainage facilities shall be installed prior to map recordation. 7) A Storm Water Quality Management Plan shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit. 8) The Water Quality Management Plan (WQMP) prepared by(company which prepared the document did not provide their information), dated June 13, 2008, is deemed approved. 9) Maintenance of the BMPs identified in the WQMP shall be addressed in the project CC&Rs. Environmental Mitigation Air Quality 1) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. Contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers'specifications. Maintenance records shall be available at the construction site for City verification. 2) Prior to the issuance of any grading permits, developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low-emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 9 3) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 4) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 5) All construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, contractors shall include the following provisions: • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds(i.e.,wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 6) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 7) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 8) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 9) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 10 10) All industrial and commercial facilities shall post signs requiring that trucks shall not be left idling for prolonged periods (i.e., in excess of 5 minutes). 11) All industrial and commercial facilities shall designate preferential parking for vanpools. 12) All industrial and commercial site tenants with 50 or more employees shall be required to post both bus and Metrolink schedules in conspicuous areas. 13) All industrial and commercial site tenants with 50 or more employees shall be required to configure their operating schedules around the Metrolink schedule to the extent reasonably feasible. Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities,to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Propose mitigation measures and recommend conditions of approval to eliminate adverse project effects on significant, important, and unique prehistoric resources, following appropriate CEQA guidelines. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440 — PITASSI ARCHITECTS, INC. October 28, 2009 Page 11 - specific recommendations regarding further mitigation measures (i.e., paleontological monitoring)that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full-time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon the time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. Hydrology and Water Quality 1) Prior to issuance of grading permits, the permit applicant shall submit to Building Official for approval, Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 12 activities entering the storm drain system to the maximum extent practical. 2) An erosion control plan shall be prepared, included in grading plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This erosion control plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared by Pitassi Architects (or its designee) on June 13, 2008, to reduce pollutants during construction entering the storm drain system to the maximum extent practical. Post-Construction Operational: 6) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared by Pitassi Architects (or their designee) on June 13,2008, to reduce pollutants after construction entering the storm drain system to the maximum extent practical. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of Grading Permits. 8) Prior to issuance of building permits, the applicant shall submit to the City Engineer for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440— PITASSI ARCHITECTS, INC. October 28, 2009 Page 13 Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 9) Prior to issuance of grading or paving permits, applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number)shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. Noise 1) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. 2) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.02.120-D, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.02.120. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 3) Haul truck deliveries shall not take place between the hours of , 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips(counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. PLANNING COMMISSION RESOLUTION NO. 09-41 DRC2007-00440 - PITASSI ARCHITECTS, INC. October 28, 2009 Page 14 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 28TH DAY OF OCTOBER 2009. PLANNING I SION OF-THE CITY OF RANCHO CUCAMONGA BY: 'Lou Munoz, Vice Chairman ATTEST: Jame R. Troyer, AICP, Secret ry I, James R. Troyer,AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 28th day of October 2009, by the following vote-to-wit: AYES: COMMISSIONERS: HOWDYSHELL, MUNOZ, STEWART, WZMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: FLETCHER COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT #: DRC2007-00440 SUBJECT: DEVELOPMENT REVIEW APPLICANT: PITASSI ARCHITECTS, INC., FOR OMNITRANS NORTH SIDE OF ARROW ROUTE, 1,200 FEET EAST-OF THE 1-15 FREEWAY- LOCATION: APN: 0229-021-60 ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DEPARTMENT, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval,or in the alternative,to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may,at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. Copies of the signed Planning Commission Resolution of Approval No. 09-41, Standard Conditions, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 3. The applicant shall be required to pay any applicable Fish and Game fees as shown below. The project planner will confirm which fees apply to this project. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to the Planning Commission or Planning Director hearing: a) Notice of Exemption - $50 b) Notice of Determination -$50 c) Mitigated Negative Declaration - $ 2,043.00 X d) Environmental Impact Report-$2,818.25 SC-12-08 1 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date B. Time Limits 1. Development/Design Review approval shall expire if building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans,architectural elevations,exterior materials and colors,landscaping,sign program,and grading on file in the Planning Department, the conditions contained herein, and the Development Code regulations. 2. Prior to any use of the project site or business activity being commenced thereon,all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Department to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for Planning Director review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.)or prior to final map approval in the case of a custom lot subdivision,or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code,all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 8. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. D. Shopping Centers 1. Graffiti shall be removed within 72 hours. 2. The entire site shall be kept free from trash and debris at all times and in no event shall trash and debris remain for more than 24 hours. 3. Signs shall be conveniently posted for"no overnight parking" and for"employee parking only." E. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the 2 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date Planning Director. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof-mounted mechanical equipment and/or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. F. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles,entrances, and exits shall be striped per City standards. 4. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more parking stalls. Designate two percent or one stall; whichever is greater, of the total number of stalls for use by the handicapped. 5. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. G. Trip Reduction 1. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects of more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces,whichever is greater. After the first 50 bicycle storage spaces are provided,additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent of the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 2. Carpool and vanpool designated off-street parking close to the building shall be provided for commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. 3. Category 5 telephone cable or fiber optic cable shall be provided for office buildings and other non-residential development. 4. For industrial projects with at least 40 car parking spaces, bicyclist-changing facilities shall be provided to encourage bicycle commuting per the City of Rancho Cucamonga Bicycle Transportation Plan adopted by City Council Resolution No.02-237. Accessible restrooms with storage lockers for clothing and equipment shall be sufficient. 3 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date 5. Shower facilities accessible to both men and women shall be provided per Municipal Code Section 17.30.070.A.for persons walking or bicycling to work for each project which meets the following thresholds: Commercial: 250,000 square feet Industrial: 325,000 square feet Office: 125,000 square feet Hotels and Motels: 250 rooms H. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees - 24-inch box or larger. 3. Within parking lots,trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 4. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. Prior to issuance of Building Permits,the project landscape architect shall certify on he submitted plans that the Xeriscape requirements have been met. I. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Department prior to installation of any signs. J. Environmental 1. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit,or other forms of guarantee acceptable to the Planning Director in the amount of$557 prior to the issuance of building permits,guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. K. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mailboxes. Multi-family residential developments shall provide a solid overhead structure for mailboxes with adequate lighting. The final location of the mailboxes and the design of the overhead structure shall be subject to Planning Director review and approval prior to the issuance of building permits. 4 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. ORC2007-00440 Completion Date APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT,(909)477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S) L. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; C. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans(2 sets,detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; I. Plumbing and Sewer Plans,including isometrics, underground diagrams,water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., DRC2007-00440) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 3. Contractors must show proof of State and City licenses and Workers'Compensation coverage to the City prior to permit issuance. 4. Separate permits are required for fencing and/or walls. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Department. M. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number(i.e., DRC2007-00440). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Department for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development project or major addition,the applicant shall pay development fees at the established rate. Such fees may include but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,Transportation Development Fee, Permit and Plan Check Fees,Construction and Demolition Diversion Program deposit and fees and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Department prior to permits issuance. 3. Street addresses shall be provided by the Building and Safety Official after tract/parcel map recordation and prior to issuance of building permits. 5 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Department's public counter). N. New Structures 1. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the California Building Code for required occupancy separations. 3. Provide draft stops in attic areas, not to exceed 3,000 square feet, in accordance with CBC Section 1505. 4. Exterior walls shall be constructed of the required fire rating in accordance with CBC Table 5-A 5. Openings in exterior walls shall be protected in accordance with CBC Table 5-A. 6. Upon tenant improvement plan check submittal, additional requirements may be needed. O. Grading 1. Grading of the subject property shall be in accordance with California Building Code,City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The grading plan shall be prepared,stamped,and signed by a California registered Civil Engineer. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DEPARTMENT, (GRADING) (909) 477-2710, EXT. 4204 (MATTHEW ADDINGTON) P. Department Standard Conditions for Grading and Drainage Plans. 1. Grading of the subject property shall be in accordance with current adopted California Building _J_J_ Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s)shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 6 I:\PLANNING\FINAL\PLNGCOMM\2009 Res &StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date 2. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 3. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. 5. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review,that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit. 8. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. All reports shall be wet signed and sealed by the Engineer of Record. 9. It shall be the responsibility of the applicant to acquire any required off-site drainage easements prior to the issuance of a grading permit. 10. It shall be the responsibility of the applicant to acquire any required off-site drainage acceptance letter(s) from adjacent downstream property owner(s) or discharge flows in a natural condition (concentrated flows are not accepted) and shall provide the Building and Safety Official a drainage study showing the proposed flows do not exceed the existing flows prior to the issuance of a grading permit. 11. It shall be the responsibility of the applicant to obtain written permission from the adjacent __J--- property _J_property owner(s)to construct wall on property line or provide a detail(s)showing the perimeter wall(s) to be constructed offset from the property line. 12. The Grading and Drainage Plan shall Implement City Standards for on-site construction where possible, and provide details for all work not covered by City Standard Drawings. 13. All slopes shall be a minimum 2-foot off-set from the public right-of-way or adjacent private _J___J_ property. 14. Private sewer, water and storm drain improvements will be designed per the, latest adopted California Plumbing Code. 15. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. 16. Roof storm water is not permitted to flow over the public parkway and shall be directed to an under parkway culvert or underground storm drain system per City of Rancho Cucamonga requirements prior to issuance of a grading permit. 17. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary. 7 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date 18. The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Building and Safety Official. 19. The precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit." APPLICANT SHALL CONTACT THE ENGINEERING SERVICES DEPARTMENT,(909)477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Q. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails,public paseos, public landscape areas,street trees,traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets(measured from street centerline): 50 total feet on Arrow Route 3. Corner property line cutoffs shall be dedicated per City Standards. R. Street Improvements 1. All public improvements(interior streets,drainage facilities,community trails,paseos,landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to,curb and gutter,AC pavement, drive approaches, sidewalks, street lights, and street trees. 2. Pursuant to Municipal Code Section 16.37.010,no person shall make connections from a source of energy,fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances,all improvements required by these conditions of development approval have been completed and accepted by the City Council,except:that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval,as determined by the City Engineer, provided that reasonable,safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings,structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. 3. Construct the following perimeter street improvements including, but not limited to: Curb& A.C. Side- Drive Street Street Comm Median Bike Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island 1 Trail Other Arrow Route X X C X I X X e, f New cul-de-sac X X I X X X X Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. e—catch basins, f—bus bay 8 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date 4. Improvement Plans and Construction: a. Street improvement plans,including street trees,street lights,and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements,prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. C. Pavement striping,marking,traffic signing,street name signing,traffic signal conduit,and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: 1) Pull boxes shall be No.6 at intersections and No.5 along streets,a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving,which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the Planning Director prior to submittal for first plan check. 5. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 9 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & SffRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date 6. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on sheet_(typically sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. The Engineering Services Department reserves the right to adjust tree species based upon field conditions and other variables. For additional information, contact the Project Engineer. Min. Grow Street Name Botanical Name Common Name Space Spacing size City. Arrow Route Lagerstroemia indica Crape Myrtle Hybrid Pink 3' 20'0.C. 24"Box Fill Substitute at MWD 'Tuscarora' —Red Formal in S.D. on alternatin g side of meanderi ng walk Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting,an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. 4) Street trees are to be planted per public improvement plans only. 7. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. S. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the Engineering Services Department prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. T. Utilities 1. The developer shall be responsible for the relocation of existing utilities as necessary. 2. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District(CVW D), Rancho Cucamonga Fire Protection District,and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVW D is required prior to final map approval or issuance of permits,whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 10 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Project No. DRC2007-00440 Completion Date U. General Requirements and Approvals 1. Permits shall be obtained from the following agencies for work within their right of-way: MWD 2. A non-refundable deposit shall be paid to the City,covering the estimated operating costs for all new streetlights for the first six months of operation,prior to final map approval or prior to building permit issuance if no map is involved. 3. Prior to the issuance of building permits,a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills,and appropriate documentation is provided to the City. Form CD-1 shall be submitted to the Engineering Services Department when the first building permit application is submitted to Building and Safety. Form CD-2 shall be submitted to the Engineering Services Department within 60 days following the completion of the construction and/or demolition project. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: V. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings,with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. W. Security Hardware 1. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. 2. All roof openings giving access to the building shall be secured with either iron bars,metal gates, or alarmed. X. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. Y. Alarm Systems 1. Install a burglar alarm system and a panic alarm if needed. Instructing management and employees on the operation of the alarm system will reduce the amount of false alarms and in turn save dollars and lives. 2. Alarm companies shall be provided with the 24-hour Sheriff's dispatch number: (909)941-1488. APPLICANT SHALL CONTACT THE FIRE SAFETY DEPARTMENT, FIRE PROTECTION PLANNING SERVICES AT, (909) 477-2770, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: SEE ATTACHED 11 I:\PLANNING\FINAL\PLNGCOMM\2009 Res & StfRpt\DRC2007-00440StdCond 10-28.doc Rancho Cucamonga Fire Protection District Fire Construction Services STANDARD CONDITIONS October 15, 2009 Omnitrans Mid-Valley Facility N/S of Arrow Rte E/O 1-15 Operations and Maintenance facility DRC2007-00440 THE FOLLOWING STANDARD CONDITIONS APPLY TO THIS PROJECT The RCFPD Procedures & Standards which are referenced in this document can be access on the web at hftp://www.ci.rancho-cucamonga.ca.us/fire/index.htm under the Fire Safety Division & Fire Construction Services section. Search by article; the preceding number of the standard refers to the article. Chose the appropriate article number then a drop down menu will appear, select the corresponding standard. FSC-1 Public and Private Water Supply 1. Design guidelines for Fire Hydrants: The following provides design guidelines for the spacing and location of fire hydrants: a. The maximum distance between fire hydrants in commercial/industrial projects is 300- feet. No portion of the exterior wall shall be located more than 150-feet from an approved fire hydrant. For cul-de-sacs, the distance shall not exceed 100-feet. b. The preferred locations for fire hydrants are: 1. At the entrance(s) to a commercial, industrial or residential project from the public roadways. 2. At intersections. 3. On the right side of the street, whenever practical and possible. 4. As required by the Fire Safety Division to meet operational needs of the Fire District. 5. A minimum of forty-feet (40') from any building. c. If any portion of a facility or building is located more than 150-feet from a public fire hydrant measured on an approved route around the exterior of the facility or building, additional private or public fire hydrants and mains capable of supplying the required fire flow shall be provided. d. Provide one fire hydrant for each 1000 gpm of required fire flow or fraction thereof. FSC-2 Fire Flow I. The required minimum fire flow for this project, when automatic fire sprinklers are installed will be allowed a 50-percent reduction. This requirement is made in accordance with the California Fire Code Appendix, as adopted by the Fire District Ordinances. 3. Public fire hydrants located within a 500-foot radius of the proposed project may be used to provide the required fire flow subject to Fire District review and approval. Private fire hydrants on adjacent property shall not be used to provide required fire flow. 4. Fire protection water plans are required for all projects that must extend the existing water supply to or onto the site. Building permits will not be issued until fire protection water plans are approved. 5. On all site plans to be submitted for review, show all fire hydrants located within 600-feet of the proposed project site. FSC-3 Prerequisite for submittal of Overhead Automatic Fire Sprinkler Systems 1. Prior to submitting plans for an overhead automatic fire sprinkler system, the applicant shall submit plans, specifications and calculations for the fire sprinkler system underground supply piping. Approval of the underground supply piping system must be obtained prior to submitting the overhead fire sprinkler system plans. FSC-4 Requirements for Automatic Fire Sprinkler Systems Automatic fire sprinklers shall be installed in buildings as required by the2007 California Fire Code and the Rancho Cucamonga Fire Protection District Ordinance FD46 and/or any other applicable standards require an approved automatic fire sprinkler system to be installed. FSC-5 Fire Alarm System & Sprinkler Monitoring 1. The 2007 California Building Code, the RCFPD Fire Alarm Standard, Ordinance FD46 and/or the 2007 California Fire Code require most fire sprinkler systems to be monitoring by Central Station sprinkler monitoring system. A manual and or automatic fire alarm system fire may also be required based on the use and occupancy of the building. Plan check approval and a building permit are required prior to the installation of a fire alarm or a sprinkler monitoring system. Plans and specifications shall be submitted to Fire Construction Services in accordance with RCFPD Fire Alarm Standard. FSC-6 Fire District Site Access Fire District access roadways include public roads, streets and highways, as well as private roads, streets drive aisles and/or designated fire lanes. Please reference the RCFPD Fire Department Access Roadways Standard. 2 1. Location of Access: All portions of the structures 1s' story exterior wall shall be located within 150-feet of Fire District vehicle access, measure on an approved route around the exterior of the building. Landscaped areas, unpaved changes in elevation, gates and fences are deemed obstructions. 2. Specifications for private Fire District access roadways per the RCFPD Standards are: a. The minimum unobstructed width is 26-feet. b. The maximum inside turn radius shall be 24-feet. c. The minimum outside turn radius shall be 50-feet. d. The minimum radius for cul-de-sacs is 454eet. e. The minimum vertical clearance is 14-feet, 6-inches. f. At any private entry median, the minimum width of traffic lanes shall be 20-feet on each side. g. The angle of departure and approach shall not exceed 9-degrees or 20 percent. h. The maximum grade of the driving surface shall not exceed 12%. i. Support a minimum load of 70,000 pounds gross vehicle weight (GVW). j. Trees and shrubs planted adjacent to the fire lane shall be kept trimmed to a minimum of 14-feet, 6-inches from the ground up. Vegetation shall not be allowed to obstruct Fire Department apparatus. 3. Access Doorways: Approved doorways, accessible without the use of a ladder, shall be provided as follows: a. In buildings without high-piled storage, access shall be provided in accordance with the 2001 California Building Code, Fire and/or any other applicable standards. b. In buildings with high-piled storage access doors shall be provided in each 100 lineal feet or major fraction thereof, of the exterior wall that faces the required access roadways. When railways are installed provisions shall be made to maintain Fire District access to all required openings. 4. Access Walkways: Hardscaped access walkways shall be provided from the fire apparatus access road to all required building exterior openings. 5. Commercial/industrial Gates: Any gate installed across a Fire Department access road shall be in accordance with Fire District Standard. The following design requirements apply: a. Prior to the fabrication and installation of the gates, plans are required to be submitted to Fire Construction Services (FCS) for approval. Upon the completion of the 3 installation and before placing the gates in service, inspection and final acceptance must be requested from FCS. b. Gates must slide open horizontally or swing inward. c. Gates may be motorized or manual. d. When fully open, the minimum clearance dimension of drive access shall be 20 feet. e. Manual gates must be equipped with a RCFPD lock. The lock must be purchased at the Fire Administration Office. f. .Motorized gates must open at the rate of one-foot per second. g. The motorized gate actuation mechanism must be equipped with a manual override device and a fail-safe or battery backup feature to open the gate or release the locking Mechanism in case of power failure or mechanical malfunction. h. Motorized gates shall be equipped with a Knox override key switch. The switch must be installed outside the gate in a visible and unobstructed location. i. For motorized gates, a traffic loop device must be installed to allow exiting from the complex. j. If traffic pre-emption devices (TPD) are to be installed, the device, location and operation must be approved by the Fire Chief prior to installation. Bi-directional or multiple sensors may be required due to complexity of the various entry configurations. 7. Fire Lane Identification: Red curbing and/or signage shall identify the fire lanes. A site plan illustrating the proposed delineation that meets the minimum Fire District standards shall-be included in the architectural plans submitted to B&S for approval. 8. Approved Fire Department Access: Any approved mitigation measures must be clearly noted on the site plan. A copy of the approved Alternative Method application, if applicable, must be reproduced on the architectural plans submitted to B&S for plan review. 6. Roof Access: There shall be a means of fire department access from the exterior walls of the buildings on to the roofs of all commercial, industrial and multi-family residential structures with roofs less than 75' above the level of the fire access road. a. This access must be reachable by either fire department ground ladders or by an aerial ladder. b. A minimum of one ladder point with a fixed ladder shall be provided in buildings with construction features, or high parapets that inhibit roof access. c. The number of ladder points may be required to be increased, depending on the building size and configuration. d. Regardless of the parapet height or construction features the approved ladder point shall be identified in accordance to the roof access standard. 4 e. Where the entire roof access is restricted by high parapet walls or other obstructions, a permanently mounted access ladder is required. f. Multiple access ladders may be required for larger buildings. g. Ladder construction must be in accordance with the RCFPD Roof Access Standard Appendix A. h. A site plan showing the locations of the roof ladder shall be submitted during plan check. i. Ladder points shall face a fire access roadway(s). FSC-10 Operational and Construction Fire Code permits Listed are those Fire Code permits commonly associated with the business operations and/or building construction. Plan check submittal is required with the permit application for approval of the permit; field inspection is required prior to permit issuance. General Use Permit shall be required for any activity or operation not specifically described below, which in the judgment of the Fire Chief is likely to produce conditions that may be hazardous to life or property. • Candles and open flames in public assemblies • Compressed Gases • Public Assembly • Refrigeration Systems • Repair Garages • Tents, Canopies and/or Air Supported Structures • LPG or Gas Fuel Vehicles • Hazardous Materials • High pile storage FSC-12 Hazardous Materials- Submittal to Fire Construction Services Plans shall be submitted and approved prior to construction of buildings and/or the installation of equipment designed to store, use or dispense,hazardous materials in accordance with the 2007 California Building, Fire, Mechanical, Plumbing, Electrical Codes, RCFPD Ordinances FD46and other implemented and/or adopted standards. FSC-13 Alternate Method Application Fire Construction Services staff and the Fire Marshal will review all requests for alternate method, when submitted. The request must be submitted on the Fire District "Application for Alternate Method" form along with supporting documents and payment of the $92 review fee. 5 FCS-14 Map Recordation 1. RECIPROCAL AGREEMENTS for Fire Department Emergency Access and Water Supply are required on this project. The project appears to be located on a property that is being subdivided. The reciprocal agreement is required to be recorded between property owners and the Fire District. The recorded agreement shall include a copy of the site plan. The Fire Construction Services shall approve the agreement, prior to recordation. The agreement shall be recorded with the County of San Bernardino, Recorders Office. Reciprocal access agreement— Please provide a permanent access agreement between the owners granting irrevocable and a non-exclusive easement, favoring the Fire District to gain access to the subject property. The agreement shall include a statement that no obstruction, gate, fence, building or other structure shall be placed within the dedicated access, without Fire Department approval. The agreement shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. Reciprocal water covenant — Please provide a permanent maintenance and service covenant between the owners granting an irrevocable and non-exclusive easement, favoring the Fire District for the purpose of accessing and maintaining the private water mains, valves and fire hydrants (fire protection systems facilities in general). The covenant shall have provisions for emergency situations and the assessing of cost recovery to the property by the fire District. FCS-15 Annexation of the parcel map: Annexation of the parcel map into the Community Facilities District #85-1 or #88-1 is required prior to the issuance of grading or building permits. Chronological Summary of RCFPD Standard Conditions PRIOR TO ISSUANCE OF BUILDING PERMITS — Please complete the following prior to the issuance of any building permits: 1. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any building permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building & Safety Division and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 2. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CCWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. Please reference the RCFPD Water Plan Submittal Procedure Standard. 6 All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CCWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CCWD. Fire Construction Services must grant a clearance before lumber is dropped. 3. Construction Access: The access roads must be paved in accordance with all the requirements of the RCFPD Fire Lane Standard. All temporary utilities over access roads must be installed at least 14' 6" above the finished surface of the road. 4. Fire Flow: A current fire flow letter from CCWD must be received. The applicant is responsible for obtaining the fire flow information from CCWD and submitting the letter to Fire Construction Services. 5. Easements and Reciprocal Agreements: All easements and agreements must be recorded with the County of San Bernardino. PRIOR TO THE RELEASE OF TEMPORARY POWER The building construction must be substantially completed in accordance with Fire Construction Services' "Temporary Power Release Checklist and Procedures". PRIOR TO OCCUPANCY OR FINAL INSPECTION — Please complete the following: 1. Hydrant Markers: All fire hydrants shall have a blue reflective pavement marker indicating the fire hydrant location on the street or driveway in accordance with the City of Rancho Cucamonga Engineering Standard Plan 134, "Installation of Reflective Hydrant Markers". On private property, the markers shall be installed at the centerline of the fire access road, at each hydrant location. 2. Private Fire Hydrants: For the purpose of final acceptance, a licensed sprinkler contractor, in the presence of Fire Construction Services, shall conduct a test of the most hydraulically remote on-site fire hydrants. The underground fire line contractor, developer and/or owner are responsible for hiring the company to perform the test. A final test report shall be submitted to Fire Construction Services verifying the fire flow available. The fire flow available must meet or exceed the required fire flow in accordance with the California Fire Code. 3. Fire Sprinkler System: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler system(s) shall be tested and accepted by Fire Construction Services. 4. Fire Sprinkler Monitoring: Prior to the issuance of a Certificate of Occupancy, the fire sprinkler monitoring system must be tested and accepted by Fire Construction Services. The fire sprinkler monitoring system shall be installed, tested and operational immediately following the completion of the fire sprinkler system (subject to the release of power). 5. Fire Suppression Systems and/or other special hazard protection systems shall be inspected, tested and accepted by Fire Construction Services before occupancy is granted and/or equipment is placed in service. 7 6. Fire Alarm System: Prior to the issuance of a Certificate of Occupancy, the fire alarm system shall be installed, inspected, tested and accepted by Fire Construction Services. 7. Access Control Gates: Prior to the issuance of a Certificate of Occupancy, vehicular gates must be inspected, tested and accepted in accordance with RCFPD Standards by Fire Construction Services. 8. Fire Access Roadways: Prior to the issuance of any Certificate of Occupancy, the fire access roadways must be installed in accordance with the approved plans and acceptable to Fire Construction Services. The CC&R's, the reciprocal agreement and/or other approved documents shall be recorded and contain an approved fire access roadway map with provisions that prohibit parking, specify the method of enforcement and identifies who is responsible for the required annual inspections and the maintenance of all required fire access roadways. 9. Address: Prior to the issuance of a Certificate of Occupancy, commercial/industrial and multi-family buildings shall post the address in accordance to the appropriate RCFPD addressing Standard. 10. Hazardous Materials: The applicant must obtain inspection and acceptance by Fire Construction Services. 11. Confidential Business Occupancy Information: The applicant shall complete the Rancho Cucamonga Fire District "Confidential Business Occupancy Information" form. This form provides contact information for Fire District use in the event of an emergency at the subject building or property. This form must be presented to the Fire Construction Services Inspector. 12. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, a 8 '/z" x 11" or 11" x 17" site plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The site plan must be reviewed and accepted by the Fire Inspector. 8 City of Rancho Cucamonga w MITIGATED NEGATIVE DECLARATION The following Mitigated Negative Declaration is being circulated for public review in accordance with the California Environmental Quality Act Section 21091 and 21092 of the Public Resources Code. Project File No.: Development Review DRC2007-00440 and Conditional Use Permit DRC2008-00664 Public Review Period Closes: October 28, 2009 Project Name: Project Applicant: Pitassi Architects, Inc. ` Project Location (also see attached map): Located at the north side of Arrow Route approximately 1,200 feet east of the 1-15 Freeway-APN: 0229-021-60. Project Description: An architecture and site development review and land use review of a proposal to construct an operations and maintenance facility for Omnitrans Transit Agency on a vacant property of approximately 29 acres in the General Industrial (GI) District(Subarea 8), located at the north side of Arrow Route approximately 1,200 feet east of the 1-15 Freeway - APN: 0229-021-60. FINDING This is to advise that the City of Rancho Cucamonga,acting as the lead agency,has conducted an Initial Study to determine if the project may have a significant effect on the environment and is proposing this Mitigated Negative Declaration based upon the following finding: The Initial Study identified potentially significant effects but: (1) Revisions in the project plans or proposals made or agreed to by the applicant before this proposed Mitigated Negative Declaration was released for public review would avoid the effects or mitigate the effects to a point where clearly no significant effects would occur, and (2) There is no substantial evidence before the agency that the project, as revised, may have a significant effect on the environment. If adopted,the Mitigated Negative Declaration means that an Environmental Impact Report will not be required. The factual and analytical basis for this finding is included in the attached Initial Study. The project file and all related documents are available for review at the City of Rancho Cucamonga Planning Department at 10500 Civic Center Drive (909) 477-2750 or Fax (909) 477-2847. NOTICE The public is invited to comment on the proposed Mitigated Negative Declaration during the review period. October 28, 2009 Date of Determination Adopt By