HomeMy WebLinkAbout17-07 - Resolutions - Subdivition Of Airspace For A Residental Condominium RESOLUTION NO. 17-07 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT MAP SUBTT19918, A SUBDIVSION OF AIRSPACE FOR 8 RESIDENTIAL CONDOMINIUM UNITS RELATED TO THE SITE PLAN AND ARCHITECTURAL REVIEW OF AN 8-UNIT, MULTI-FAMILY DEVELOPMENT ON 1.01 ACRES OF LAND IN THE LOW MEDIUM (LM) DISTRICT (4 TO 8 DWELLING UNITS PER ACRE) LOCATED AT THE SOUTHWEST CORNER OF 6TH STREET AND HELLMAN AVENUE; AND MAKING FINDINGS IN SUPPORT THEREOF — APN: 0210-341-74. A. Recitals. 1. RC1 Homes, LLC filed an application for the approval of Tentative Tract Map SUBTT19918, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2. On the 8th day of February 2017, the Planning Commission of the City of Rancho Cucamonga conducted a noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing of February 8, 2017, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The 1.01 acre project site is located at the southwest corner of 6th Street and Hellman Avenue; and b. The triangular-shaped project site is currently developed with a single-family residence and a large garage/storage building and was previously used for the storage of construction equipment. All the existing on-site improvements including two trees will be removed as part of the project scope; and c. The General Plan Land Use and Zoning designation for the project site is Low Medium (LM) District, which permits the development of up to 8 dwelling units per acre. There is a multi-family development within the Low Medium (LM) District to the north of the project site, across 6th street. There are single-family residences within the Low Medium (LM) District to the east of the project site, across Hellman Avenue. There is a flood control channel within the Flood Control (FC) District to the south and west of the project site; and d. The applicant proposes the subdivision of air space (Tentative Tract Map SUBTT19918) for the purpose of creating a one lot subdivision for 8 residential condominium units related to the development of an 8-unit, multi-family development (DRC2014-00732). PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC. February 8, 2017 Page 2 3. Based upon the substantial evidence presented to this Commission during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the tentative tract is consistent with the General Plan, Development Code, and any applicable specific plans. The proposed tentative tract map is consistent with the General Plan and Development Code Low Medium (LM) land use and zoning designations for the project site; and b. The design or improvements of the tentative tract is consistent with the General Plan, Development Code, and any applicable specific plans. The proposed tentative tract map is consistent with the Low Medium (LM) General Plan land use designation. The related Design Review (DRC2014- 00732) includes two Minor Exceptions, one (DRC2016-00657) for a reduction in the required street side setback and one (DRC2016-00658) for an increase in the maximum permitted wall height. With approval of these related exceptions, the project will be consistent with the Development Code; and c. The site is physically suitable for the type of development proposed. The project site is located at the intersection of two public streets and will be of similar design and density to the project to the north and will be compatible with the single-family development east, west and south. d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat. The Initial Study Part II outlines potential environmental impacts related to the project and identifies project specific mitigation measures that reduce these impacts to less-than-significant; and e. The tentative tract is not likely to cause serious public health problems. The subdivision is for residential purposes, which usually does not cause public health issues; and f. The design of the tentative tract will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. The project site does not contain any existing easements. 4. Based upon the facts and information contained in the application, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that no subsequent or supplemental environmental document is required pursuant to the California Environmental Quality Act (CEQA) in connection with the review and approval of this application based upon the following findings and determinations: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, the City staff prepared an Initial Study of the potential environmental effects of the project. Based on the findings contained in that Initial Study, City staff determined that, with the imposition of mitigation measures, there would be no substantial evidence that the project would have a significant effect on the environment. Based on that determination, a Mitigated Negative Declaration was prepared. Thereafter, the City staff provided public notice of the public comment period and of the intent to adopt the Mitigated Negative Declaration. b. During the circulation period for the proposed Mitigated Negative Declaration (MND), staff received correspondence from the South Coast Air Quality Management District (SCAQMD) for the project related MND requesting the inclusion of a mitigation measure related to asbestos emissions from the demolition of the existing on-site structures. In response, staff has modified an existing mitigation measure to the Initial Study Part II and related CEQA documents to require the project to comply with PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 3 SCAQMD Rule 1403 (asbestos emissions from demolition/renovation) for the demolition of on-site structures. Section 15073.5(c)(1) of the CEQA Guidelines states that recirculation of the MND is not required when a mitigation measure replaces with a mitigation measure that is more effective pursuant to CEQA Section 15074.1. CEQA Section 15074.1(b)(1) and (2) states that prior to adopting a substituted mitigation measure, 1) a public hearing for the project shall be held, and 2) a written finding shall be adopted that the new measure is more effective in mitigating potential significant effects and that it in itself will not cause any potentially significant effect on the environment. In accordance with this requirement, a public hearing for the project and MND was held on February 8, 2017, and the Planning Commission finds based on substantial evidence presented at that hearing that the new mitigation measure is equivalent or more effective in mitigating or avoiding potential significant effects and it in itself will not cause and potentially significant effect on the environment. The modified mitigation measure will strengthen the Air Quality section of the City's MND by limiting the potential release of asbestos, and will not cause significant effects on the environment as it will ensure that if asbestos is encountered on the project it will be properly handled in a manner in accordance with SCAQMD Rule 1403. c. The Planning Commission has reviewed the Mitigated Negative Declaration and all comments received regarding the Mitigated Negative Declaration and, based on the whole record before it, finds: (i) that the Mitigated Negative Declaration was prepared in compliance with CEQA; and (ii) that, based on the imposition of mitigation measures, there is no substantial evidence that the project will have a significant effect on the environment. The Planning Commission further finds that the Mitigated Negative Declaration reflects the independent judgment and analysis of the Planning Commission. Based on these findings, the Planning Commission hereby adopts the Mitigated Negative Declaration. d. The Planning Commission has also reviewed and considered the Mitigation Monitoring Program for the project that has been prepared pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such Program is designed to ensure compliance with the mitigation measures during project implementation. The Planning Commission therefore adopts the Mitigation Monitoring Program for the project. e. The custodian of records for the Initial Study, Mitigated Negative Declaration and all other materials which constitute the record of proceedings upon which the Planning Commission's recommendation is based is the Planning Director of the City of Rancho Cucamonga. Those documents are available for public review in the Planning Department of the City of Rancho Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730, telephone (909) 477-2750. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Department 1) Approval is for the subdivision of air space (Tentative Tract Map SUBTT19918) for the purpose of creating a one lot subdivision for 8 residential condominium units related to the development of an 8-unit multi- family development located at the southwest corner of 6th Street and Hellman Avenue on 1.01 acres of land; APN: 0210-341-74. PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 4 Environmental Mitigation Air Quality 1) All clearing, grading, earth-moving, or excavation activities shall cease when winds exceed 25mph per SCAQMD guidelines in order to limit fugitive dust emissions. 2) The contractor shall ensure that all disturbed unpaved roads and disturbed areas within the Project are watered at least three (3) times daily during dry weather. Watering, with complete coverage of disturbed areas, shall occur at least three times a day, preferably in the midmorning, afternoon, and after work is done for the day. 3) The contractor shall ensure that traffic speeds on unpaved roads and Project site areas are reduced to 15 miles per hour or less. 4) All construction equipment shall be maintained in good operating condition so as to reduce operational emissions. The contractor shall ensure that all construction equipment is being properly serviced and maintained as per manufacturers' specifications. Maintenance records shall be available at the construction site for City verification. 5) Prior to the issuance of any Grading Permits, the developer shall submit construction plans to City denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction equipment will be utilized, or that their use was investigated and found to be infeasible for the project. Contractors shall also conform to any construction measures imposed by the South Coast Air Quality Management District (SCAQMD) as well as City Planning Staff. 6) The construction contractor shall utilize electric or clean alternative fuel powered equipment where feasible. 7) The construction contractor shall ensure that construction-grading plans include a statement that work crews will shut off equipment when not in use. 8) All asphalt shall meet or exceed performance standards noted in SCAQMD Rule 1108. 9) All paints and coatings shall meet or exceed performance standards noted in SCAQMD Rule 1113. Paints and coatings shall be applied either by hand or high-volume, low-pressure spray. 10) The project shall comply with South Coast Air Quality Management District Rule 1403 (Asbestos Emissions from Demolition/Renovation) for the demolition of the existing on-site structure, and all construction equipment shall comply with SCAQMD Rules 402 and 403. Additionally, all contractors shall include the following provisions: PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 5 • Reestablish ground cover on the construction site through seeding and watering. • Pave or apply gravel to any on-site haul roads. • Phase grading to prevent the susceptibility of large areas to erosion over extended periods of time. • Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods. • Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices. • Sweep streets according to a schedule established by the City if silt is carried over to adjacent public thoroughfares or occurs as a result of hauling. Timing may vary depending upon the time of year of construction. • Suspend grading operations during high winds (i.e., wind speeds exceeding 25 mph) in accordance with Rule 403 requirements. • Maintain a minimum 24-inch freeboard ratio on soils haul trucks or cover payloads using tarps or other suitable means. 11) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and Regional Water Quality Control Board [RWQCB]) daily to reduce PM,() emissions, in accordance with SCAQMD Rule 403. 12) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,() emissions. 13) Landscape with native and/or drought-resistant species to reduce water consumption and to provide passive solar benefits. 14) Provide lighter color roofing and road materials and tree planting programs to comply with the AQMP Miscellaneous Sources MSC-01 measure. 15) Comply with the AQMP Miscellaneous Sources PRC-03, and Stationary Sources Operations Enhanced Inspection and Maintenance and ADV-MISC to reduce emissions of restaurant operations. 16) All residential and commercial structures shall be required to incorporate high-efficiency/low-polluting heating, air conditioning, appliances, and water heaters. 17) All residential and commercial structures shall be required to incorporate thermal pane windows and weather-stripping. 18) All new development in the City of Rancho Cucamonga shall comply with South Coast Air Quality Management District's Rule 445, Wood Burning Devices. Rule 445 was adopted in March 2008 to reduce emissions of PM2.5 PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 - RC1 HOMES, LLC February 8, 2017 Page 6 and precludes the installation of indoor or outdoor wood burning devices (i.e. fireplaces/hearths) in new development on or after March 9, 2009. Biological Resources 1) Three days prior to the removal of vegetation or ground-disturbing activities, a breeding bird survey that is in conformance with the Migratory Bird Treaty Act shall be required to determine whether nesting is occurring. Occupied nests shall not be disturbed unless a qualified biologist verifies through non- invasive methods that either (a) the adult birds have not begun egg-laying or incubation; or (b) the juveniles from the occupied nests are foraging independently and are capable of independent survival. If the biologist is unable to verify one of the above conditions, then no disturbance shall occur within 300 feet of non-raptor nests, and within 5,000 feet of raptor nests, during the breeding season to avoid abandonment of young. If nests are discovered, they shall be avoided through the establishment of an appropriate buffer setback, as determined by a qualified wildlife biologist. The temporary "no construction" area shall be maintained until the nest has completed its cycle, as determined by a qualified wildlife biologist. Once the nest cycle is complete and all nestlings have fledged and have left the nest, construction in the area may resume. 2) Perform a Burrowing Owl Survey that is in conformance with the Department of Fish and Wildlife Staff Report on Burrowing Owl Mitigation and submit the written report outlining the findings to the California Department of Fish and Wildlife (CDFW) and the Planning Department within 30 days of groundbreaking activity. The survey shall include a habitat assessment, survey and impact analysis. The Burrowing Owl Survey shall follow the following protocol: Burrowing Owl Survey methodology shall be based on Appendix D (Breeding and Non-breeding Season Surveys and Reports) of the CDFW Staff Report. Results of the pre-construction survey shall be provided to CDFW and the City. If the pre-construction survey does not identify burrowing owls on the project site, then no further mitigation is required. If burrowing owls are found to be utilizing the project site during the pre-construction survey, measures shall be developed by the qualified biologist in coordination with CDFW to avoid Impacting occupied burrows during the nesting period. These measures shall be based on the most current CDFW protocols and will at minimum include establishment of buffer setbacks from occupied burrows and owl monitoring. If ground-disturbing activities are delayed or suspended for more than 30 days after the pre-construction survey, the site shall be resurveyed for owls. During the non-breeding season from September 1 through January 31, if burrows are occupied by migratory or non-migratory resident burrowing owls during a pre-construction survey, burrow exclusion and/or closure may be used to exclude owls from those burrows. Burrow exclusion and/or closure PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 7 should only be conducted by a qualified wildlife biologist in coordination with CDFW using the most current CDFW guidelines. During the avian nesting season from February 1 through August 31, if nests are discovered, they shall be avoided through establishment of an appropriate buffer setback, as determined by a qualified wildlife biologist. The temporary "no construction" area would have to be maintained until the nest has completed its cycle, as determined by a qualified wildlife biologist. Once the nest cycle is complete and all nestlings have fledged and have left the nest, construction in the area may resume. 3) Replace the western sycamore with the largest available nursery grown specimen available (typically 24" box). 4) A good faith effort shall be made to relocate the Washington palm on-site. If Cultural Resources 1) If any prehistoric archaeological resources are encountered before or during grading, the developer will retain a qualified archaeologist to monitor construction activities, to take appropriate measures to protect or preserve them for study. With the assistance of the archaeologist, the City of Rancho Cucamonga will: • Enact interim measures to protect undesignated sites from demolition or significant modification without an opportunity for the City to establish its archaeological value. • Consider establishing provisions to require incorporation of archaeological sites within new developments, using their special qualities as a theme or focal point. • Pursue educating the public about the archaeological heritage of the area. • Prepare a mitigation plan consistent with Section 21083.2 Archaeological resources of CEQA to eliminate adverse project effects on significant, important, and unique prehistoric resources, including but not limited to, avoiding archaeological sites, capping or covering sites with soil, planning the site as a park or green space or paying a in-kind mitigation fee. • Prepare a technical resources management report, documenting the inventory, evaluation, and proposed mitigation of resources within the project area. Submit one copy of the completed report with original illustrations, to the San Bernardino County Archaeological Information Center for permanent archiving. 2) If any paleontological resource (i.e. plant or animal fossils) are encountered before or during grading, the developer will retain a qualified paleontologist to PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 8 monitor construction activities, to take appropriate measures to protect or preserve them for study. The paleontologist shall submit a report of findings that will also provide specific recommendations regarding further mitigation measures (i.e., paleontological monitoring) that may be appropriate. Where mitigation monitoring is appropriate, the program must include, but not be limited to, the following measures: • Assign a paleontological monitor, trained and equipped to allow the rapid removal of fossils with minimal construction delay, to the site full- time during the interval of earth-disturbing activities. • Should fossils be found within an area being cleared or graded, divert earth-disturbing activities elsewhere until the monitor has completed salvage. If construction personnel make the discovery, the grading contractor should immediately divert construction and notify the monitor of the find. • Prepare, identify, and curate all recovered fossils for documentation in the summary report and transfer to an appropriate depository (i.e., San Bernardino County Museum). • Submit summary report to City of Rancho Cucamonga. Transfer collected specimens with a copy of the report to San Bernardino County Museum. Geology and Soils 1) The site shall be treated with water or other soil-stabilizing agent (approved by SCAQMD and RWQCB) daily to reduce PM,o emissions, in accordance with SCAQMD Rule 403 or re-planted with drought resistant landscaping as soon as possible. 2) Frontage public streets shall be swept according to a schedule established by the City to reduce PM,() emissions associated with vehicle tracking of soil off-site. Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM,o emissions from the site during such episodes. 4) Chemical soil-stabilizers (approved by SCAQMD and RWQCB) shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM,o emissions. Greenhouse Gasses 1) The project must comply with all rules that assist in reducing short-term air pollutant emission in compliance with SCAWMD Rule 403 regarding fugitive dust including treating the site with water or other soil-stabilizing agent twice daily or replanting disturbed areas as quickly as possible. PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 9 2) The construction contractor shall select construction equipment based on low-emission factors and high energy efficiency and submit a statement on the grading plan that ensures all construction equipment will be tuned and maintained in accordance with the manufactures specification. 3) Trucks shall not idle continuously for more than 5 minutes. 4) Alternative fuel powered equipment shall be utilized in lieu of gasoline- or diesel-powered engines where feasible. 5) Construction should be timed so as not to interfere with peak-hour traffic. 6) Ridesharing and transit incentives shall be supported and encouraged for construction crew. 7) Construction and Building materials shall be produced and/or manufactured locally. Use "Green Building Materials" such as materials that are resource efficient, recycled and manufactured in an environmentally friendly way including low-volatile-organic-compound (VOC) materials. 8) Design all buildings to exceed California Building Code Title 24 energy standard including but not limited to any combination of: • Increased insulation • Limit air leakage through the structure • Incorporate Energy Star or better rated windows, space heating and cooling equipment, light fixtures, and appliances • Landscape and developed site utilizing shade, prevailing winds and landscaping • Install efficient lighting and lighting control systems • Install light colored "cool" roofs and cool pavements. • Install solar or light emitting diodes (LED's)for outdoor lighting. 9) Prepare a comprehensive water conservation strategy appropriate for the project and include the following: • Install water efficient landscapes and irrigation systems and devices in compliance with the City of Rancho Cucamonga Water Efficient Landscape Ordinance. • Use reclaimed water for landscaping within the project if available and/or install the infrastructure to deliver and use reclaimed water. PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 10 • Design building to be water efficient by installing water efficient fixtures and appliances including low flow faucets, dual flush toilets and waterless urinals/water heaters. • Design irrigation to control runoff and to remove water to non-vegetated surfaces. 10) Reuse and recycle construction and demolition waste. Provide interior and exterior storage areas for recyclables and green waste in public areas. Educated employees about reducing waste and about recycling. Hazard and Waste Materials 1) The developer shall provide all buyers with a real estate transaction disclosure identifying the ONT Airport in the City of Ontario and possible exposure to impacts associated with aircraft operations (e.g., aircraft noise). This disclosure shall be recorded against the property for future transactions. Hydrology and Water Quality 1) Prior to issuance of Grading Permits, the permit applicant shall submit to the Building Official for approval, a Storm Water Pollution Prevention Plan (SWPPP) specifically identifying Best Management Practices (BMPs) that shall be used on-site to reduce pollutants during construction activities entering the storm drain system to the maximum extent practical. 2) An Erosion Control Plan shall be prepared, included in the Grading Plan, and implemented for the proposed project that identifies specific measures to control on-site and off-site erosion from the time ground disturbing activities are initiated through completion of grading. This Erosion Control Plan shall include the following measures at a minimum: a) Specify the timing of grading and construction to minimize soil exposure to rainy periods experienced in Southern California, and b) An inspection and maintenance program shall be included to ensure that any erosion which does occur either on-site or off-site as a result of this project will be corrected through a remediation or restoration program within a specified time frame. 3) During construction, temporary berms such as sandbags or gravel dikes must be used to prevent discharge of debris or sediment from the site when there is rainfall or other runoff. 4) During construction, to remove pollutants, street cleaning will be performed prior to storm events and after the use of water trucks to control dust in order to prevent discharge of debris or sediment from the site. 5) Prior to issuance of grading or paving permits, the applicant shall obtain a Notice of Intent (NOI) to comply with obtaining coverage under the National Pollutant Discharge Elimination System (NPDES) General Construction Storm Water Permit from the State Water Resources Control Board. PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 11 Evidence that this has been obtained (i.e., a copy of the Waste Discharger's Identification Number) shall be submitted to the City Building Official for coverage under the NPDES General Construction Permit. 6) Prior to issuance of Building Permits, the applicant shall submit to the City Building Official for approval of a Water Quality Management Plan (WQMP), including a project description and identifying Best Management Practices (BMPs) that will be used on-site to reduce pollutants into the storm drain system to the maximum extent practicable. The WQMP shall identify the structural and non-structural measures consistent with the Guidelines for New Development and Redevelopment adopted by the City of Rancho Cucamonga in June 2004. 7) Landscaping plans shall include provisions for controlling and minimizing the use of fertilizers/pesticides/herbicides. Landscaped areas shall be monitored and maintained for at least two years to ensure adequate coverage and stable growth. Plans for these areas, including monitoring provisions for a minimum of two years, shall be submitted to the City for review and approval prior to the issuance of grading permits. 8) The developer shall implement the BMPs identified in the Water Quality Management Plan prepared by (Madole and Associates — February, 2016) to reduce construction pollutants from entering the storm drain system to the maximum extent practical. Noise 1) Prior to the issuance of any grading plans a construction-related noise mitigation plan shall be submitted to the City for review and approval. The Plan shall depict the location of the construction equipment and how the noise from this equipment would be mitigated during construction. 2) Construction contracts shall specify that all construction equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers and other State required noise attenuation. 3) Construction haul routes shall be designed to avoid noise sensitive uses (e.g. residences, convalescent house, etc.) to the extent feasible. 4) During construction, stationary construction equipment shall be placed such that emitted noise is directed away from sensitive noise receivers. Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. • 5) Construction or grading shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 12 6) Construction or grading noise levels shall not exceed the standards specified in Development Code Section 17.66.050, as measured at the property line. Developer shall hire a consultant to perform weekly noise level monitoring as specified in Development Code Section 17.66.050. Monitoring at other times may be required by the Building Official. Said consultant shall report their findings to the Building Official within 24 hours; however, if noise levels exceed the above standards, then the consultant shall immediately notify the Building Official. If noise levels exceed the above standards, then construction activities shall be reduced in intensity to a level of compliance with above noise standards or halted. 7) The perimeter block wall shall be constructed as early as possible in first phase. 8) Haul truck deliveries shall not take place between the hours of 8:00 p.m. and 6:30 a.m. on weekdays, including Saturday, or at any time on Sunday or a national holiday. Additionally, if heavy trucks used for hauling would exceed 100 daily trips (counting both to and from the construction site), then the developer shall prepare a noise mitigation plan denoting any construction traffic haul routes. To the extent feasible, the plan shall denote haul routes that do not pass sensitive land uses or residential dwellings. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 8TH DAY OF FEBRUARY 2017. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Francisco Oaxaca, Chairman ATTEST: Can yce Burnett, Secretary I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 8th day of February 2017, by the following vote-to-wit: PLANNING COMMISSION RESOLUTION NO. 17-07 SUBTT19918 — RC1 HOMES, LLC February 8, 2017 Page 13 AYES: COMMISSIONERS: MACIAS, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: FLETCHER ABSTAIN: COMMISSIONERS: NONE Conditions of Approval jhti<.;uo Community Development Department UC;A 116NG N Project#: SUBTT19918, DRC2014-00732, DRC2016-00657, DRC2016-00658, DRC2015-00310 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Tentative Tract Map, Design Review, Minor Exceptions, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 1. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. 2. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners' Association are subject to the approval of the Planning and Engineering Services Department and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of Building Permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Department a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 3. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein and the Development Code regulations. 4. For multi-family residential and non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 5. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 6. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls. 7. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 8. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. www.CityofRC.us Printed:1/3/2017 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 9. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Exemption and Mitigated Negative Declaration fee in the amount of $2,266.25. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing. 10. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. 11. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 12. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. Engineering Services Department Please be advised of the following Special Conditions 1. Hellman Avenue frontage improvements to be in accordance with City "Secondary" standards as required and including: a. Dedicate right-of-way to total of 44 feet from centerline of street to west right-of-way. b. Remove and replace curb, gutter, street lights, catch basin, lateral and sidewalk as required. c. Provide traffic signing and striping as required. 2. Reconstruct access ramp at the southwest corner of Hellman Avenue and 6th Street to comply with current ADA requirements. The City's Standard Drawing 102 access ramp, does not comply with current ADA requirements. The City is in the process of updating our standards however no time frame yet exactly when this will be done. Therefore a detail will have to be added to the street improvement plan showing the design details, elevations, and grades of the access ramp to substantiate they comply with ADA requirements. • www.CityofRC.us Printed:1/3/2017 Page 2 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo/// SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Please be advised of the following Special Conditions 3. 6th Street frontage improvements to be in accordance with City `Secondary" standards as required and including: a. Dedicate right-of-way to total of 44 feet from centerline of street to south right-of-way. b. Provide curb, gutter, sidewalk, access ramp and street trees as required. c. Install one (1) 9500 Lumen, HPSV-equivalent LED streetlight. The street light shall be owned by the City. Developer shall be responsible to coordinate and pay all costs to provide SCE power on City owned street lights. Coordinate with City staff for design and installation requirements. d. Provide traffic signing and striping as required. e. Access to/from 6th Street shall be for emergency vehicle access only. The Emergency Access shall be 26 feet wide and shall be constructed as a limited access curb per City Std. 105-C. The material to be installed within the City right-of-way shall be reviewed and approved by The Rancho Cucamonga Fire District. No accent paving allowed within the City right-of-way. f. Pavement reconstruction and overlays will be from the centerline of the street. 4. Transition to existing curb and gutter on the west project boundary on 6th Street shall be to the satisfaction of the City Engineer. 5. The existing overhead utilities (telecommunications) on the project side of 6th Street shall be undergrounded from the first pole off-site west of the west project boundary to the first pole west of Hellman Avenue, prior to public improvement acceptance or occupancy, whichever comes first. All services crossing 6th Street shall be undergrounded at the same time. In addition, an in-lieu fee as contribution to the future undergrounding of the utilities on the opposite side of 6th Street shall be paid to the City prior to map approval or issuance of building permits, whichever comes first. The fee shall be one-half the difference between the undergrounding cost of the utilities (electrical) on the opposite side of the street minus those (telecommunications) on the project side times the length from the center of Hellman Avenue to the west project boundary. a. The existing power pole on the west side of Hellman Avenue shall be removed and existing utility service lines have to be undergrounded. 6. Provide a transition design from the southerly drive approach on Hellman Avenue. The limits of removal and a.c. pavement replacement shall be determined during plan check south of said drive approach. Standard Conditions of Approval • 7. Corner property line cutoffs shall be dedicated per City Standards. www.CityofRC.us Printed:1/3/2017 Page 3 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: . 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST - 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 8. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new streetlights for the first six months of operation, prior to final map approval or prior to Building Permit issuance if no map is involved. 9. Prior to the issuance of building permits, a Diversion Deposit and related administrative fees shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 50% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Permits issued on or after June 2, 2014, must complete the reimbursement process through the City's Accelerate online portal within 60 days following the completion of the construction and/or demolition project or the deposit will be forfeited. Permits issued before June 2, 2014, require the following when applying for a deposit reimbursement: a completed CD-2 form, a copy of the cashier's receipt showing the deposit amount, and all weight tickets. Instructions and forms are available at the City's web site, www.CityofRC.us, under City Hall; Engineering; Environmental Programs. 10. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the Engineering Services Department prior to final map approval or issuance of Building Permits whichever occurs first. Formation costs shall be borne by the developer. 11. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 12. All existing easements lying within future rights-of-way shall be quit-claimed or delineated on the final map. www.CityofRC.us Printed:1/3/2017 Page 4 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo/// SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 13. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of Building Permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer. Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch galvanized steel with pull rope or as specified. e. Access ramps for the disabled shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single-family residential lots. h. Street names shall be approved by the Planning Manager prior to submittal for first plan check. 14. A permit from the San Bernardino County Flood Control District is required for work within its right-of-way. 15. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy, fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be . connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. www.CityofRC.us Printed.1/3/2017 Page 5 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST - 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 16. Construct the following perimeter street improvements including, but not limited to: Hellman Avenue Curb & Gutter A.C. Pavement Sidewalk Drive Approach 17. The developer shall be responsible for the relocation of existing utilities as necessary. 18. Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on Sheet (typically Sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. 6th Street Magnolia grandiflora 'St Mary' No Common Name Min. Grow Space- 3' Spacing - 20' O.C. Size- 15 gallon Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services . Department. Street trees are to be planted per public improvement plans only. 19. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from street centerline): 44 total feet on 6th Street 44 total feet on Hellman Avenue 20. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 21. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. • www.CityofRC.us Printed:1/3/2017 Page 6 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo/// SWC 6th and Hellman Location: 9287 6TH ST - 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 22. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. Fire Prevention / New Construction Unit Standard Conditions of Approval 1. Mapping Site Plan: Prior to the issuance of a Certificate of Occupancy, an 81/2" x 11" or 11" x 17" Site Plan of the site in accordance with RCFPD Standard shall be revised by the applicant to reflect the actual location of all devices and building features as required in the standard. The Site Plan must be reviewed and accepted by the Fire Inspector. 2. Private Water Supply (Fire) Systems: The applicant shall submit construction plans, specifications, flow test data and calculations for the private water main system for review and approval by the Fire District. Plans and installation shall comply with Fire District Standards. Approval of the on-site (private) fire underground and water plans is required prior to any Building Permit issuance for any structure on the site. Private on-site combination domestic and fire supply system must be designed in accordance with RCFPD Standards. The Building and Safety Services Department and Fire Construction Services will perform plan checks and inspections. All private on-site fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. Fire construction Services will inspect the installation, witness hydrant flushing and grant a clearance before lumber is dropped. 3. Public Water Supply (Domestic/Fire) Systems: The applicant shall submit a plan showing the locations of all new public fire hydrants for the review and approval by the Fire District and CVWD. On the plan, show all existing fire hydrants within a 600-foot radius of the project. All required public fire hydrants shall be installed, flushed and operable prior to delivering any combustible framing materials to the site. CVWD personnel shall inspect the installation and witness the hydrant flushing. Fire Construction Services shall inspect the site after acceptance of the public water system by CVWD. Fire Construction Services must grant a clearance before lumber is dropped. 4. Fire lanes must be constructed as approved and per the RCFPD Standards, a private fire service may be required for on site fire hydrants. all the homes and garages must be equipped with automatic fire sprinklers. Building and Safety Services Department Standard Conditions of Approval 1. The home must be equipped with automatic fire sprinklers in accordance with NFPA 13D. 2. Exterior walls shall be constructed of the required fire rating in accordance with CBC. 3. Fire resistive construction of the multi-family dwellings shall be in accordance with the CBC. 4. Provide compliance with the California Building Code (CBC) for property line clearances considering use, area, and fire-resistive construction. www.CityofRC.us Printed:1/3/2017 Page 7 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Building and Safety Services Department Standard Conditions of Approval 5. Provide compliance with the California Building Code for required occupancy separations. 6. Openings in exterior walls shall be protected in accordance with CBC. 7. Roofing material shall be installed per the manufacturer's "high wind" instructions. 8. The Building and Safety Official shall provide street addresses after tract/parcel map recordation and prior to issuance of Building Permits. 9. Construction activity shall only occur in accordance with the times noted in Chapter 17.66 050 D-4 of the Development Code. 10. Prior to issuance of Building Permits for a new residential project or major addition, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Check Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Services Department prior to permit issuance. 11. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., TT, CUP, DR, etc.). The applicant shall comply with the latest adopted California Codes, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Contact the Building and Safety Services Department for availability of the Code Adoption Ordinance and applicable handouts. 12. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). 13. Submit two sets of structural calculations, two sets of energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet" signature are required prior to plan check submittal. 14. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan and reverse foundation plan (when applicable); c. Floor Plan; d. Roof and Floor Framing Plan and reverse Roof and Floor Framing Plan (when applicable); e. Electrical Plans (2 sets, detached) including the size of main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Department Project Number (i.e., TT, CUP, DR, etc.) clearly identified on the outside of all plans. 15. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 16. Separate permits are required for fencing and/or walls. www.CityofRC.us Printed:1/3/2017. Page 8 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST - 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Building and Safety Services Department Standard Conditions of Approval 17. NOTE: ANY REVISIONS MAY VOID THESE REQUIREMENTS AND NECESSITATE ADDITIONAL REVIEW(S). Grading Section Standard Conditions of Approval 1. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 2. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). 3. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment best management practices (BMP) devices, as provided for in the project's Storm Water Quality Management Plan, shall be provided for by CC&R's or deeds and shall be recorded prior to the issuance a grading permit. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 4. Prior to issuance of a wall permit, on engineered combination garden/retaining walls along the property boundary the structural calculations for the wall shall assume a level toe/heel at the adjacent off-site property (i.e. a manufactured slope is not present). 5. Prior to issuance of a wall permit, a copy of the Grading Special Conditions of Approval shall be included within the engineered wall plans and calculations. 6. Prior to removing fences or walls along common lot lines and prior to constructing walls along common lot lines the applicant shall provide a letter from the adjacent property owner(s) allowing work on the adjacent property. 7. A Storm Water Quality Management Plan (WQMP) shall be approved by the Building and Safety Official and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan"shall be recorded prior to the issuance of a grading permit. 8. This project shall comply with the accessibility requirements of the current adopted California Building Code. 9. The precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout"Information for Grading Plans and Permit". www.CityofRC.us Printed:1/3/2017 Page 9 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 10. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre-grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre-grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over-excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 11. Prior to the issuance of the Certificate of Occupancy the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) best management practices (BMP) devices. 12. The Water Quality Management Plan (WQMP) shall include a copy of the project Conditions of Approval. 13. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment best management practices (BMP) devices as provided for in the project's Storm Water Quality Management Plan shall be provided for by CC&R's or deeds and shall be recorded prior to the issuance of a grading permit. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 14. Grading of the subject property shall be in accordance with current adopted California Building Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 15. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 16. A geologic report shall be prepared by a qualified Engineer or Engineering Geologist and submitted at the time of application for Grading and Drainage Plan review. 17. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the Building and Safety Official prior to the issuance of building permits. www.cityofRc.us Printed: 1/3/2017 Page 10 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST - 021034174-0000 Project Type: Design Review CEQA Review ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 18. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer. 19. The applicant 'shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. 20. If a Rough Grading and Drainage Plan/Permit are submitted to the Building and Safety Official for review, that plan shall be a separate plan/permit from Precise Grading and Drainage Plan/Permit. 21. A drainage study showing a 100-year, AMC 3 design storm event for on-site drainage shall be prepared and submitted to the Building and Safety Official for review and approval for on-site storm water drainage prior to issuance of a grading permit. All reports shall be wet signed and sealed by the Engineer of Record. 22. It shall be the responsibility of the applicant to acquire any required off-site drainage easements prior to the issuance of a grading permit. 23. It shall be the responsibility of the applicant to obtain written permission from the adjacent property owner(s) to construct wall on property line or provide a detail(s) showing the perimeter wall(s) to be constructed offset from the property line. 24. The Grading and Drainage Plan shall implement City Standards for on-site construction where possible, and provide details for all work not covered by City Standard Drawings. 25. All slopes shall be a minimum 2-foot offset from the public right of way or adjacent private property. 26. Private sewer, water, and storm drain improvements will be designed per the, latest adopted California Plumbing Code. 27. Private streets and driveaisles for multifamily developments will include street plans as part of the Grading and Drainage Plan set. Plan view to show typical street sections. Profile view to show centerline profiles. 28. The maximum parking stall gradient is 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. 29. Roof storm water is not permitted to flow over the public parkway and shall be directed to an under parkway culvert per City of Rancho Cucamonga requirements prior to issuance of a grading permit. 30. Prior to the start of landscaping operations, the landscape architect and the landscape contractor shall provide a sample of the weed fabric barrier to the Project Planner, City of Rancho Cucamonga Planning Department. The weed barrier shall be permeable. owvw.CityofRC.us Printed:1/3/2017 Page 11 of 12 Project#: DRC2014-00732 CEQA2014-00015 Project Name: 8-Unit Condo///SWC 6th and Hellman Location: 9287 6TH ST- 021034174-0000 Project Type: Design Review CEQA Review • ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section • Standard Conditions of Approval 31. The final project-specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. 32. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project-specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project-specific water quality management plan. 33. Prior to approval of the project-specific storm water quality management plan, the applicant shall submit to the Building Official, or his designee, a precise grading plan showing the location and elevations of existing topographical features, and showing the location and proposed elevations of proposed structures and drainage of the site. 34. Prior to approval of the final project-specific water quality management plan the applicant shall have a soils engineer prepare a project-specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". 35. As the use of drywells are proposed for the structural storm water treatment device, to meet the infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit, adequate source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be evaluated prior to infiltration and discussed in the final project-specific Water Quality Management Plan document. 36. Prior to issuance of a grading permit the Final Project-Specific Water Quality Management Plan shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, ..." of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table VI1.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". www.CityofRC.us Printed: 1/3/2017 Page 12 of 12