Loading...
HomeMy WebLinkAbout2016-08-10 - Supplemental BProject #: DRC2015-01191 LLA2015-00003 Recfrd Cify Project Name: Minor Design Review Location: Project Type: 7201 HAVEN AVE - 107648125-0000 Minor Design Review Lot Line Adjustment ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Planning Department Standard Conditions of Approval 15. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein and the Development Code regulations. 16. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 17. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. Engineering Services Department Please be advised of the following Special Conditions 1. Lot Line Adjustment- The separate parcels contained within the project boundaries shall be legally adjusted and recorded prior to issuance of Building Permits. (related file LLA2015-00003 & ENG2016-00010) Please provide preliminary title report for ALL properties involved; no less than 60 days old. 2. Transportation fees applicable. Prior to issuance of building permit, transportation fee must be paid. $45,010.00 per new gas pump subject to fee adjustment 3. Per Traffic Engineering 1. Restripe Valencia Avenue to include westbound 8' shoulder, 12' right turn lane, 12' left turn pocket, 12' two left turn lane between the project driveway on the south and the easterly driveway to the north, eastbound 14' through lane, and a 14' right turn lane into the project. _(X, I.C+C. 6t 1i re &-i o r rk 3. Restripe on -site striping to include southbound striping to project limits. Fire Prevention / New Construction Unit Standard Conditions of Approval 1. UG tanks and dispensing also require San Bernardino Fire County Approval Dal e. fL Oyedition Building and Safety Services DepartmenPlease be advised of the following Special Conditions 1. When the Minor design Review is approved submit complete construction drawingsstructural calculations to Building and Safety for plan review in accordance with the curre of the CA Building and Fire Codes. 1 spfawWe+s. A soils report is required for new structures. Disabled access improvements to the site and building must be made to the in accordance to the State of CA published thresholds at the time of plan check submittal. www.CityofRC.us Printed: 7/19/2016 � � Page 3 of 8 0 /_ ee a or4 00,0 y Project #: DRC2015-01191 LLA2015-00003 Project Name: Minor Design Review Location: 7201 HAVEN AVE - 107648125-0000 Project Type: Minor Design Review Lot Line Adjustment ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Plannina Department Standard Conditions of Approval 15. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein and the Development Code regulations. 16. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the Planning Director. 17. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. Enaineerina Services Department Please be advised of the following Special Conditions 1. Lot Line Adjustment- The separate parcels contained within the project boundaries shall be legally adjusted and recorded prior to issuance of Building Permits. (related file LLA2015-00003 & ENG2016-00010) Please provide preliminary title report for ALL properties involved; no less than 60 days old. 2. Transportation fees applicable. Prior to issuance of building permit, transportation fee must be paid. $45,010.00 per new gas pump subject to fee adjustment 3. Per Traffic Engineering 1. Restripe Valencia Avenue to include westbound 8' shoulder, 12' right turn lane, 12' left turn pocket, 12' two-way left turn lane between the project driveway on the south and the easterly driveway to the north, eastbound 14' through lane, and a 14' right turn lane into the project. 2. Due to the condition to restrioe the east lea of the intersection of Valencia Avenue at Haven Nnl specifications. The work shall include, but is not limited to, Type D loops at the limit line, Type E loops elsewnere, I ype u ana type t loops on separate aetector cnannels, ana new detector 3. Restripe on -site striping to include southbound striping to project limits. Fire Prevention I New Construction Unit Standard Conditions of Approval 1. UG tanks and dispensing also require San Bernardino Fire County Approval Building and Safety Services Department Please be advised of the following Special Conditions Printed: 8/1012016 �'+ www.CityofRC.us /• e—w rn f \ Page 3 of 8