Loading...
HomeMy WebLinkAbout19-32 - ResolutionRESOLUTION NO.19-32 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT MAP SUBTT20240, A REQUEST TO SUBDIVIDE A VACANT 4.75-ACRE PARCEL INTO TWO (2) NUMBERED AND THREE (3) LETTERED LOTS FOR CONDOMINIUM PURPOSES FOR THE DEVELOPMENT OF 80 FOR -SALE DETACHED RESIDENTIAL CONDOMINIUMS LOCATED WITHIN PLANNING AREA S-20 IN THE VILLAGE NEIGHBORHOOD (VN) DISTRICT OF THE EMPIRE LAKES SPECIFIC PLAN, PLANNING AREA 1, LOCATED NORTH OF 4TH STREET, SOUTH OF 6TH STREET, WEST OF MILLIKEN AVENUE, AND EAST OF UTICA/CLEVELAND AVENUES. THE SPECIFIC LOCATION OF THE PROJECT SITE IS NORTH OF 4TH STREET ON THE EAST SIDE OF THE FUTURE ALIGNMENT OF THE RESORT PARKWAY AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 0210-102-05. A. Recitals. 1. Tri Pointe Homes, Inc., filed an application for the issuance of Tentative Tract Map SUBTT20240 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2. On the 10th day of April 2019, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above - referenced public hearing on April 10, 2019, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to a project site located within the Empire Lakes Specific Plan, Planning Area 1, located north of 4th Street, south of 6th Street, west of Milliken Avenue, and east of Utica/Cleveland Avenues. The specific location of the project site is north of 4th Street on the east side of the future alignment of the Resort Parkway; and b. The project site has an area of 4.75 acres of land which is bound to the west by the future street The Resort Parkway and has a street frontage of approximately 490 feet; and PLANNING COMMISSION RESOLUTION NO. 19-32 TENTATIVE TRACT MAP SUBTT20240 — TRI-POINTE HOMES INC. APRIL 10, 2019 Page 2 C. The project site is currently undeveloped and has been "mass' graded to prepare for development. Currently, underground utility infrastructure is being installed beneath what will eventually be the right-of-way for The Resort Parkway; and d. The General Plan Land Use designation of the project site and the properties surrounding the subject property is Mixed Use; and e. The properties to the north, south, and west are also within the Empire Lakes Specific Plan, Planning Area 1 and are vacant. The property to the east is within the Empire Lakes Specific Plan, Planning Areas 6 and 8, and is developed with an apartment complex; and f. The application is for the subdivision of the 4.75-acre project site into two (2) numbered lots and three (3) lettered lots to facilitate the maintenance, financing, and the sale of the individual units for condominium purposes; and g. The related Design Review application, DRC2018-00851, proposes the construction of 80 for sale, detached residential condominium units. 3. Based upon the substantial evidence presented to this Commission during the above - referenced public hearing and upon the speck findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The design and layout of the subject Tentative Tract Map will be consistent with the General Plan, Development Code, and Empire Lakes Speck Plan. The project site is being subdivided to facilitate the development of a residential project which will be consistent with the Mixed -Use zoning of the project site. b. The site is physically suitable for the subdivision which will create two (2) numbered lots and three (3) lettered lots for condominium purposes. The project site is part of a larger Mixed -Use development that is designed to accommodate the level of traffic proposed by the proposed project and the overall development. C. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat. The applicant's environmental consultant, Psomas, prepared an Environmental Technical Analysis Memorandum dated February 22, 2019 that demonstrates that the subject project is within the scope of the approved overall project and analysis included in the Final EIR. d. The tentative tract map is not likely to cause serious public health problems. The proposed project is for the development of 80 for sale detached residential condominium units. The applicant's environmental consultant, Psomas, prepared an Environmental Technical Analysis Memorandum dated February 22, 2019 that demonstrates that the subject project is within the scope of the approved overall project and analysis included in the Final EIR. e. The design of the tentative tract will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed subdivision. Access to the property will be from existing public streets surrounding the project site and access to the individual future homes will be from private streets to be constructed on the subject property. PLANNING COMMISSION RESOLUTION NO. 19-32 TENTATIVE TRACT MAP SUBTT20240 — TRI-POINTE HOMES INC. APRIL 10, 2019 Page 3 4. Based upon the facts and information contained in the Final Environmental Impact Report (FEIR) and Environmental Technical Analysis Memorandum, together with all written and oral reports included for the environmental assessment for the application, the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment based upon the findings as follows: a. Pursuant to the California Environmental Quality Act ("CEQA") and the City's local CEQA Guidelines, the City certified an Environmental Impact Report (EIR) on May 18, 2016 (SCH No. 2015041083) in connection with the City's approval of General Plan Amendment DRC2015-00114, Specific Plan Amendment DRC2015-00040, and Development Code Amendment DRC2015-00115. Pursuant to CEQA Guidelines Section 15162, no subsequent or supplemental EIR or Negative Declaration is required in connection with subsequent discretionary approvals of the same project unless: (i) substantial changes are proposed to the project that indicate new or more severe impacts on the environment; (ii) substantial changes have occurred in the circumstances under which the project was previously reviewed that indicates new or more severe environmental impacts; or (iii) new important information shows the project will have new or more severe impacts than previously considered; or (iv) additional mitigation measures are now feasible to reduce impacts or different mitigation measures can be imposed to substantially reduce impacts. b. To demonstrate that no subsequent EIR is required, the applicant's environmental consultant, Psomas, prepared an Environmental Technical Analysis Memorandum dated February 22, 2019. Staff evaluated this memorandum and concluded that the project is within the scope of the approved overall project and analysis included in the Final EIR identified above and no additional environmental review is required in connection with the City's consideration of Tentative Tract Map 20240 and Design Review DRC2018-00851. Substantial changes to the project or the circumstances surrounding the project have not occurred which would create new or more severe impacts than those evaluated in the previous EIR. The previous environmental review analyzed the effects of the proposed project. Staff further finds that the project will not have one or more significant effects not discussed in the previous EIR, nor have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. The Planning Commission has reviewed the Planning Department's determination of exemption, and based on its own independent judgment, concurs in the staffs determination of exemption. C. Based on these findings and all evidence in the record, the Planning Commission concurs with the staff determination that no additional environmental review is required pursuant to CEQA in connection with the City's consideration of Tentative Tract Map SUBTT20240. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the attached Standard Conditions incorporated herein by this reference. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 10TH DAY OF APRIL 2019. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA PLANNING COMMISSION RESOLUTION NO. 19-32 TENTATIVE TRACT MAP SUBTT20240 — TRI-POINTE HOMES INC. APRIL 10, 2019 Page 4 mo, Chairman ATTEST: Candyc umett, Secretary I, Candyce Burnett, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 10th day of April 2019, by the following vote -to -wit: AYES: COMMISSIONERS: DOPP, GUGLIELMO, MUNOZ, OAXACA, WIMBERLY NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS: Conditions of Approval ff RANCHO Community Development Department CUCAMONGA CAM Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions 1. Plans submitted during building plan check shall include cut sheets for all proposed lighting on site, including street lamps, and wall -mounted lights. All wall -mounted lights shall be architecturally compatible to the architectural type for each unit it is mounted on. 2. Plans submitted during building plan check shall show details of all picnic tables and seating proposed inside the cabanas surrounding the Tai Chi Garden for Planning Department review and approval. 3. During building plan check, project plans shall show the full design of the proposed decorative crosswalk along Loop Road, connecting the project's two green areas. The design shall be subject to the review and approval of the Planning Department. 4. Prior to the Planning final of the first Art Deco unit, the applicant shall provide physical samples all design elements to be mounted on all Art Deco elevations for review and approval by the Planning Department. These design elements shall be mounted on smooth stucco surfaces in order to accentuate vertical and square forms as proposed on the approved elevations. Standard Conditions of Approval 5. For all residential development, provide conduit from each unit/lot and a pull box to connect to the street. Provide interior structured wiring for each house/building with minimum Category 5 copper wire, Radio Grade 6 coaxial cable, and a central distribution panel, prior to release of occupancy (fiber -to -the building, FTTB). Plans shall be submitted for Planning Director and Building Official review and approval prior to issuance of Building Permits. 6. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 7. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet(s) are for information only to all parties involved in the construction/grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 8. The applicant shall be required to pay California Department of Fish and Wildlife Notice of Exemption fee in the amount of $50.00. All checks are to be made payable to the Clerk of the Board Supervisors and submitted to the Planning Commission Secretary prior to public hearing or within 5 days of the date of project approval. www.CltyofRC.us Pnntetl: 411012019 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval 9. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 5 years from the date of approval or a time extension has been granted. 10. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 11. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 12. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 13. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and/or Master Plans in effect at the time of Building Permit issuance. 14. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 15. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations, and the Empire Lakes Specific Plan. 16. All ground -mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single-family residential developments, transformers shall be placed in underground vaults. 17. A uniform hardscape and street furniture design including seating benches, trash receptacles, free-standing potted plants, bike racks, light bollards, etc., shall be utilized and be compatible with the architectural style. Detailed designs shall be submitted for Planning Department review and approval prior to the issuance of Building Permits. 18. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for Planning Director and Engineering Services Department review and approved prior to the issuance of Building Permits. 19.Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. www.CityofRC.us Panted: 4/10/2019 Page 2 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Engineering Services Department Standard Conditions of Approval 1. Private drainage easements for cross -lot drainage shall be provided and shall be delineated or noted on the final map. Drainage over property boundaries/lot lines onto adjacent property(ies) shall be per a separate recorded instrument, and shall be recorded prior to the approval of the final map. 2. Easements for public sidewalks placed outside the public right-of-way shall be dedicated. 3. Reciprocal access easements shall be provided ensuring access to all parcels by CC&Rs or by deeds and shall be recorded concurrently with the map or prior to the issuance of Building Permits, where no map is involved. 4. Reciprocal parking agreements for all parcels and maintenance agreements ensuring joint maintenance of all common roads, drives, or parking areas shall be provided by CC & R's or deeds and shall be recorded prior to, or concurrent with, the final parcel map. 5. Vehicular access rights shall be dedicated to the City along The Resort Parkway, except for approved openings. 6. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of Building Permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. 7. Adequate provisions shall be made for acceptance and disposal of surface drainage entering the property from adjacent areas. 8. Trees are prohibited within 5 feet of the outside diameter of any public storm drain pipe measured from the outer edge of a mature tree trunk. 9. " CD Information Required Prior to Sign -Off for Building Permit Prior to the issuance of building permits, if valuation is greater or equal to $100,000, a Diversion Deposit and a related administrative fee shall be paid for the Construction and Demolition Diversion Program. The deposit is fully refundable if at least 65% of all wastes generated during construction and demolition are diverted from landfills, and appropriate documentation is provided to the City. Applicant must identify if they are self -hauling or utilizing Burrtec prior to issuance of a building permit. Proof of diversion must be submitted to the Environmental Engineering Division within 60 days following the completion of the construction and / or demolition project. Contact Marissa Ostos, Environmental Engineering, at (909) 774-4062 for more information. Instructions and forms are available at the City's website, www.cityofrc.us, under City Hall / Engineering / Environmental Programs / Construction & Demolition Diversion Program. 10. All required public landscaping and irrigation systems shall be continuously maintained by the developer. 11. A separate set of landscape and irrigation plans per Engineering Public Works Standards for The Resort Parkway shall be submitted to the Engineering Services Department for review and approval prior to final map approval or issuance of Building Permits, whichever occurs first. www.CityofRC.us Pnnteo: 4/10/2019 Page 3 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. - Engineering Services Department Standard Conditions of Approval 12. Add the following note to any private landscape plans that show street trees: "All improvements within the public right-of-way, including street trees, shall be installed per the public improvement plans." If there is a discrepancy between the public and private plans, the street improvement plans will govern. 13. Developer shall install a dark fiber conduit package fronting the development. Two 4" Schedule 40 PVC conduits, along with three 1 Y4" innerducts in one of the 4" conduits, per City Standard 145, with connection through the parkway to each lot or parcel (fiber -to -the curb, FTTC). The size, placement, and location of the conduit shall be shown on the Street Improvement Plans and subject to Engineering Services Department review and approval prior to issuance of Building Permits or final map approval, whichever comes first. 14. Construct the following perimeter street improvements including, but not limited to: Curb & Gutter A.C. Pvmt Side -walk Drive Appr. Street Lights Street Trees Bike Trail Other 15. Pursuant to Municipal Code Section 16.37.010, no person shall make connections from a source of energy, fuel or power to any building or structure which is regulated by technical codes and for which a permit is required unless, in addition to any and all other codes, regulations and ordinances, all improvements required by these conditions of development approval have been completed and accepted by the City Council, except: that in developments containing more than one building, structure or unit, the development may have energy connections made in equal proportion to the percentage of completion of all improvements required by these conditions of development approval, as determined by the City Engineer, provided that reasonable, safe and maintainable access to the property exists. In no case shall more than 95 percent of the buildings, structures or units be connected to energy sources prior to completion and acceptance of all improvements required by these conditions of development approval. w .CityofRC.us Printed: 4/1012019 Page 4 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Ennineerina Services Department Standard Conditions of Approval 16. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of Building Permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer. Notes: 1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. 2) Conduit shall be 3-inch pvc with pull rope or as specified. e. Access ramps for the disabled shall be installed on all corners of intersections per latest ADA standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single-family residential lots. h. Street names shall be approved by the Planning Manager prior to submittal for first plan check. www.0tyofRC.us Printed* 4/10/2019 Page 5 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Project Type: Tract 20240 - 021010205-0000 Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Ennineerina Services Department Standard Conditions of Approval 17.Install street trees per City street tree design guidelines and standards as follows. The completed legend (box below) and construction notes shall appear on the title page of the street improvement plans. Street improvement plans shall include a line item within the construction legend stating: "Street trees shall be installed per the notes and legend on Sheet _ (typically Sheet 1)." Where public landscape plans are required, tree installation in those areas shall be per the public landscape improvement plans. Street Name: The Resort Parkway Botanical Name Common Name Min. Grow Space Spacing Size Qty. Construction Notes for Street Trees: 1) All street trees are to be planted in accordance with City standard plans. 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City inspector. Any unusual toxicities or nutrient deficiencies may require backfill soil amendments, as determined by the City inspector. 3) All street trees are subject to inspection and acceptance by the Engineering Services Department. Street trees are to be planted per public improvement plans only. 18.Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. 19. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement, drive approaches, sidewalks, street lights, and street trees. 20. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 21. Developer shall execute a Line Extension Agreement for electric service and shall construct electrical distribution facilities in accordance with such agreement and shall construct electrical distribution facilities in accordance with such agreement and Rancho Cucamonga Municipal Utility requirements and dedicate such facilities to the Rancho Cucamonga Municipal Utility. The Rancho Cucamonga Municipal Utility shall be the electrical service provider for all project related development. www.CityotRC.us Printed: 4/10/2019 Page 6 of 14 Project#: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval 22. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 23. Approvals have not been secured from all utilities and other interested agencies involved. Approval of the final parcel map will be subject to any requirements that may be received from them. 24. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga Valley Water District (CVWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CVWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. 25. Rights -of -way and easements shall be dedicated to the City for all interior public streets, community trails, public paseos, public landscape areas, street trees, traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross -lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. Building and Safety Services Department Please be advised of the following Special Conditions 1. When the Entitlement Review is approved submit complete construction drawings including structural calculations, energy calculations and soils report to Building and Safety for plan review in accordance with the current edition of the CA Building and Fire Codes including all local ordinances and standards which are effective at the time of Plan Check Submittal. The new structures are required to be equipped with automatic fire sprinklers per the CBC and Current RCFPD Ordinance. Disabled access for the site and building must be in accordance to the State of CA and ADA regulations. If it is anticipated that there will be a need for temporary fire protection water supply and/or temporary fire access, submit a separate plan for review and approval that complies with RCFD Standard 33-3. The developer and architect are responsible for reproducing all the applicable fire standards on the plans and designing the project to meet all applicable regulations of the adopted standards at the time of plan check submittal. Grading Section Standard Conditions of Approval 1. Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout "Information for Grading Plans and Permit". w .CityofRC.us Printed. 4/10/2019 Page 7 or 14 Project#: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Grading Section Standard Conditions of Approval 2. Grading of the subject property shall be in accordance with current adopted California Building Code and/or the California Residential Code, City Grading Standards, and accepted grading practices. The Grading and Drainage Plan(s) shall be in substantial conformance with the approved conceptual Grading and Drainage Plan. 3. A soils report shall be prepared by a qualified Engineer licensed by the State of California to perform such work. Two copies will be provided at grading and drainage plan submittal for review. Plans shall implement design recommendations per said report. 4. The final Grading and Drainage Plan, appropriate certifications and compaction reports shall be completed, submitted, and approved by the City Engineer, or his designee, prior to the issuance of building permits. 5. A separate Grading and Drainage Plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading and Drainage Plan shall be prepared, stamped, and wet signed by a California licensed Civil Engineer prior to the issuance of a grading or building permit. 6. The applicant shall comply with the City of Rancho Cucamonga Dust Control Measures and place a dust control sign on the project site prior to the issuance of a grading permit. All dust control sign (s) shall be located outside of the public right of way. 7. If a Rough Grading and Drainage Plan/Permit are submitted to the Engineering Services Department for review, the rough grading plan shall be a separate plan submittal and permit from Precise Grading and Drainage Plan/Permit. 8. Prior to issuance of a grading permit the Final Grading and Drainage Plan shall show the accessibility path from the public right of way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code. All accessibility ramps shall show sufficient detail including gradients, elevations, and dimensions and comply with the current adopted California Building Code. 9. The Grading and Drainage Plan shall implement City Standards for on -site construction where possible, and shall provide details for all work not covered by City Standard Drawings. 10. Prior to issuance of a grading permit the grading plan shall show that all manufactured slopes shall be a minimum 2-foot offset from the public right of way, permitted line, or the adjacent private property. All slope offsets shall meet the requirements of the current adopted California Building Code. 11. Prior to the issuance of a grading plan for multi -family projects, the private streets and drive aisles within multi -family developments shall include street plans as part of the Grading and Drainage Plan set. The private street plan view shall show typical street sections. The private street profile view shall show the private street/drive aisle centerline. 12. Prior to issuance of a grading permit, the grading and drainage plan shall show the maximum parking stall gradient at 5 percent. Accessibility parking stall grades shall be constructed per the, current adopted California Building Code. www.CityofRC.us Printed: 4/10/2079 Page 8 of'14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 13. The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Building and Safety Official. 14. The final grading and drainage plan shall show existing topography a minimum of 100-feet beyond project boundary. 15. This project shall comply with the accessibility requirements of the current adopted California Building Code. 16. Grading Inspections: a) Prior to the start of grading operations the owner and grading contractor shall request a pre -grading meeting. The meeting shall be attended by the project owner/representative, the grading contractor and the Building Inspector to discuss about grading requirements and preventive measures, etc. If a pre -grading meeting is not held within 24 hours from the start of grading operations, the grading permit may be subject to suspension by the Building Inspector; b) The grading contractor shall call into the City of Rancho Cucamonga Building and Safety Department at least 1 working day in advance to request the following grading inspections prior to continuing grading operations: i) The bottom of the over -excavation; ii) Completion of Rough Grading, prior to issuance of the building permit; iii) At the completion of Rough Grading, the grading contractor or owner shall submit to the Permit Technicians (Building and Safety Front Counter) an original and a copy of the Pad Certifications to be prepared by and properly wet signed and sealed by the Civil Engineer and Soils Engineer of Record; iv) The rough grading certificates and the compaction reports will be reviewed by the Associate Engineer or a designated person and approved prior to the issuance of a building permit. 17. Prior to issuance of a grading or building permit, the permitted grading plan (or architectural site plan) set shall show in each of the typical sections and the plan view show how the separations between the building exterior and exterior ground surface meet the requirements of Sections CBC1804.3/CRC R401.3, CBC2304.11.2.2/CRC R317.1(2) and CBC2512.1.2/CRC R703.6.2.1 of the current adopted California Building Code/Residential Code. 18. Prior to approval of the project -specific storm water quality management plan, the applicant shall submit to the City Engineer, or his designee, a precise grading plan showing the location and elevations of existing topographical features, and showing the location and proposed elevations of proposed structures and drainage of the site. 19. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Engineering Services Department for review and approval for on -site storm water drainage prior to issuance of a grading permit. The report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. Printed: 4/10/2019 w .CityofRC.us Page 9 of 14 Project#: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 20. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 21. Prior to the issuance of the Certificate of Occupancy or final sign off by the Building Inspector the engineer of record shall certify the functionality of the storm water quality management plan (WQMP) storm water treatment devices and best management practices (BMP). 22. Prior to approval of the Water Quality Management Plan (WQMP), the WQMP shall include a copy of the project Conditions of Approval. 23. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural/treatment devices and best management practices (BMP) as provided for in the project's Storm Water Quality Management Plan, shall be provided for by CC&R's or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC&R's and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan. 24. Prior to the issuance of a Grading Permit the City of Rancho Cucamonga's "Memorandum of Agreement of Storm Water Quality Management Plan" shall be submitted for review and approval by the Building Official and recorded with the County Recorder's Office. 25. Prior to issuance of a Grading Permit the applicant shall obtain a Waste Discharge Identification Number (WDID). The WDID number shall also be shown on the WQMP Site and Drainage Plan document. 26. The applicant shall provide a copy of a completed EPA Form 7520-16 (Inventory of Injection Wells) for each underground infiltration device, with the Facility ID Number assigned, to the City Engineer, or his designee, prior to issuance of the Grading Permit and/or approval of the project -specific Water Quality Management Plan. A copy of EPA Form 7520-16 shall be scanned and pasted onto the permitted grading plan set, and a copy of said form shall be included in the project -specific Water Quality Management Plan. 27. The land owner shall provide an inspection report by a qualified person/company on a biennial basis for the Class V Injection Wells/underground infiltration chambers to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis all best management practices (BMP"s) as described in the Storm Water Quality Management Plan (WQMP) prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. 28. The land owner shall provide an inspection report on a biennial basis for the structural storm water treatment devices, commonly referred to as BMPs, to the City of Rancho Cucamonga Environmental Program Manager. The land owner shall maintain on a regular basis as described in the Storm Water Quality Management Plan prepared for the subject project. All costs associated with the underground infiltration chamber are the responsibility of the land owner. Printed: 4/10/2019 w .CityofRC.us Page 10 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. - Grading Section Standard Conditions of Approval 29. The land/property owner shall follow the inspection and maintenance requirements of the approved project specific Water Quality Management Plan and shall provide a copy of the inspection reports on a biennial basis to the City of Rancho Cucamonga Environmental Program Manager. 30. A final project -specific Storm Water Quality Management Plan (WQMP) shall be approved by the City Engineer, or his designee, and the City of Rancho Cucamonga's "Memorandum of Storm Water Quality Management Plan" shall be recorded prior to the issuance of a grading permit or any building permit. 31. The Site and Drainage Plan in the final project -specific Water Quality Management Plan shall show the locations of all roof downspout drains. if required for storm water quality purposes, the downspouts shall include filters. 32. The final project -specific water quality management plan (WQMP) shall include executed maintenance agreements along with the maintenance guidelines for all proprietary structural storm water treatment devices (BMP's). In the event the applicant cannot get the proprietary device maintenance agreements executed prior to issuance of a grading permit, the applicant is required to submit a letter to be included within the WQMP document, and scanned and pasted onto the Site and Drainage Plan which states that prior to issuance of a certificate of occupancy with applicant shall enter into a contract for the maintenance of the proprietary storm water treatment device. If the proprietary storm water treatment device is part of a residential subdivision, prior to the sale of the residential lot, the developer shall include maintenance agreement(s) as part of the sale of the residential lot to the buyer. A copy of the maintenance agreements to be included in the sale of the property shall be included within the WQMP document. 33. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project -specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the "Inspection and Maintenance Responsibility for Post Construction BMP" section of the final project -specific water quality management plan. 34. Prior to issuance of a grading permit the Final Project -Specific Water Quality Management Plan shall include a completed copy of "Worksheet H: Factor of Safety and Design Infiltration Worksheet" located in Appendix D "Section VII — Infiltration Rate Evaluation Protocol and Factor of Safety Recommendations, of the San Bernardino County Technical Guidance Document for Water Quality Management Plans. The infiltration study shall include the Soil Engineer's recommendations for Appendix D, Table VII.3: Suitability Assessment Related Considerations for Infiltration Facility Safety Factors". 35. Prior to approval of the final project -specific water quality management plan the applicant shall have a soils engineer prepare a project -specific infiltration study for the project for the purposes of storm water quality treatment. The infiltration study and recommendations shall follow the guidelines in the current adopted "San Bernardino County Technical Guidance Document for Water Quality Management Plans". vnvw.CityofRC.us Printed: 4/10/2018 Page 11 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Project Type: Tract 20240 - 021010205-0000 Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval 36. The subject project, shall accept all existing off -site storm water drainage flows and safely convey those flows through or around the project site. If existing off -site storm water drainage flows mix with any on -site storm water drainage flows, then the off -site storm water drainage flows shall be treated with the on -site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 37. Prior to the issuance of a certificate of occupancy by the Building Official, or his designee, the civil engineer of record shall file a Water Quality Management Plan (WQMP) Post Construction Storm Water Treatment Devices As -Built Certificate with the Environmental Programs Coordinator, City of Rancho Cucamonga Engineering Services Department. 38. As the use of drywells are proposed for the structural storm water treatment device, to meet the infiltration requirements of the current Municipal Separate Storm Sewers Systems (MS4) Permit, adequate source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration shall be evaluated prior to infiltration and discussed in the final project -specific Water Quality Management Plan document. www.CityofRC.us Printed: 4/10/2019 Page 12 M 14 Project#: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. Grading Section Standard Conditions of Approval 39. GROUND WATER PROTECTION: Prior to approval of the final project specific water quality management plan (WQMP), the WQMP document shall meet the requirements of the State Water Resources Control Board Order No. R8-2010-0036 (NPDES No. CAS 618036), the San Bernardino County Municipal Separate Storm Sewers Separation (MS4) Permit reads: Section XI.D(Water Quality Management Plan Requirements).8(Groundwater Protection): Treatment Control BMPs utilizing infiltration [exclusive of incidental infiltration and BMPs not designed to primarily function as infiltration devices (such as grassy swales, detention basins, vegetated buffer strips, constructed wetlands, etc.)] must comply with the following minimum requirements to protect groundwater: a. Use of structural infiltration treatment BMPs shall not cause or contribute to an exceedance of ground water quality objectives. b. Source control and pollution prevention control BMPs shall be implemented to protect groundwater quality. The need for pre-treatment BMPs such as sedimentation or filtration should be evaluated prior to infiltration. c. Adequate pretreatment of runoff prior to infiltration shall be required in gas stations and large commercial parking lots. (NOTE: The State Water Quality Control Board defines a large commercial parking lot as '100,000 sq. ft. or more of commercial development to include parking lot (with 100 or more vehicle traffics), OR, by means of 5,000sgft or more of allowable space designated for parking purposes'). d. Unless adequate pre-treatment of runoff is provided prior to infiltration structural infiltration treatment BMPs must not be used for areas of industrial or light industrial activity{77), areas subject to high vehicular traffic (25,000 or more daily traffic); car washes; fleet storage areas; nurseries; or any other high threat to water quality land uses or activities. e. Class V injection wells or dry wells must not be placed in areas subject to vehicular{78) repair or maintenance activities{79), such as an auto body repair shop, automotive repair shop, new and used car dealership, specialty repair shop (e.g., transmission and muffler repair shop) or any facility that does any vehicular repair work. f. Structural infiltration BMP treatment shall not be used at sites that are known to have soil and groundwater contamination. g. Structural infiltration treatment BMPs shall be located at least 100 feet horizontally from any water supply wells. h. The vertical distance from the bottom of any infiltration structural treatment BMP to the historic high groundwater mark shall be at least 10-feet. Where the groundwater basins do not support beneficial uses, this vertical distance criteria may be reduced, provided groundwater quality is maintained. i. Structural infiltration treatment BMPs shall not cause a nuisance or pollution as defined in Water Code Section 13050. 40. Prior to issuance of a grading permit for residential projects the applicant shall show on the electrical plans and the permitted grading plan set the location for a future installation of an Electric Vehicle (EV) charging station/parking area per the current adopted California Green Building Standards Code, section 4.106.4. www.CityofRC.us Printed: 4/1012019 Page 13 of 14 Project #: DRC2018-00851 DRC2018-00852, SUBTT202401 Project Name: Location: Tract 20240 - 021010205-0000 Project Type: Design Review Sign Permit Notice of Filing, Tentative Tract Map ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT; Grading Section w .CityofRC.us Printed. 4/10/2019 Page 14 of 14