Loading...
HomeMy WebLinkAbout992 - Ordinance ORDINANCE NO. 992 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, CONSENTING TO ANNEXATION DRC2020- 00185 AND APPROVING PREZONING DRC2020-00186 IN CONNECTION WITH THE PROPOSED DEVELOPMENT OF TWO NEW INDUSTRIAL BUILDINGS TOTALING APPROXIMATELY 655,878 SQUARE FEET ON AN APPROXIMATE 35-ACRE PROJECT SITE LOCATED EAST OF ETIWANDA AVENUE AND NORTH OF NAPA STREET, AND MAKING FINDINGS IN SUPPORT THEREOF—APNs: 0229-291-23, 46 AND 54. A. Recitals. 1. WHEREAS, Kimley-Horn and Associates, on behalf of Hillwood Enterprises, L.P. (the "Applicant"), filed an application for the approval of Prezoning DRC2020-00186 (the "Prezoning"), as described in the title of this ResolutionThe Prezoning is part of a proposed development of two new industrial buildings totaling approximately 655,878 square feet on an approximately 35-acre project site located approximately 650 feet east of Etiwanda Avenue and north of Napa Street, APNs: 0229-291-23, 46 and 54 (the"Project Site"); and 2. WHEREAS, the portion of the Project Site located within the City and identified as APN 0229-291- 54 is currently zoned as Industrial Employment (IE); and 3. WHEREAS, Prezoning DRC2020-00186 is depicted in Exhibit "A," attached hereto and incorporated herein by this reference, and would pre-zone a portion of the Project Site, specifically a 2.9-acre parcel identified as APN: 0229-291-46 and a 0.69-acre portion of a parcel identified as APN: 0229-291-23 currently located within unincorporated San Bernardino County and within the City of Fontana's Sphere of Influence (the "Annexation Area"), and ultimately incorporate these parcels and portions thereof into the City's official Zoning Map. To accomplish this objective, the Prezoning would result in the entire Project Site being zonedas Industrial Employment (IE), which would implement the General Plan's regulating zones across the Project Area; and 4. WHEREAS, the Applicant is expected to submit a petition to annex the unincorporated portions of the Project Site into the City of Rancho Cucamonga. The Applicant has submitted a request to the City to concsent to this annexation, DRC2020-00185 (the "Annexation"). To that end, the City and the Rancho Cucamonga Fire Protection District must consent to the annexation and approve plans of service for their respective agencies; and 5. WHEREAS, on December 8t", 2021, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on Annexation DRC2020-00185 and Prezoning DRC2020-00186 and voted unanimously to recommend that the City Council consent to Annexation DRC2020-00185 and approve Prezoning DRC2020-00186; and 6. WHEREAS, on January 51h, 2022, the City Council of the City of Rancho Cucamonga conducted a noticed public hearing and introduced for First Reading of Ordinance 992 adopting Annexation DRC2020- 00185 and Prezoning DRC2020-00186 and concluded said hearing on that date; and 7. WHEREAS, All legal prerequisites prior to the adoption of this Ordinance have occurred. B. Ordinance. The City Council of the City of Rancho Cucamonga does ordain as follows: Ordinance No. 992- Page 1 of 4 SECTION 1: This City Council hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Ordinance are true and correct. SECTION 2: Based upon the substantial evidence presented to the City Council during the above-referenced public hearing on January 51h, 2022, including written and oral staff reports, together with public testimony, the City Council hereby specifically finds as follows: a. In addition to Annexation DRC2020-00185 and Prezoning DRC2020-00186, the project scope includes: General Plan Amendment (DRC2020-00184), to assign a land use designation of Industrial Employment District to the Annexation Area; Tentative Parcel Map (SUBTPM20251) to create two new parcels; and Design Review (DRC2020-00177), Conditional Use Permit (DRC2021-00317), and Uniform Sign Program (DRC2020-00178) to permit the use, construction and signage of the proposed project. The project also includes a Development Agreement (DRC2021-00180); and b. The Project Site includes APN 0229-291-46 which is currently located within unincorporated San Bernardino County and within the City of Fontana's Sphere of Influence and currently has a zoning designation of Regional Industrial (I-R) under San Bernardino County and General Industrial (M-2) under the City of Fontana; and C. The application also requests the Annexation and Prezoning of an additional 0.69-acre portion of a parcel identified as APN: 0229-291-23. This parcel, also currently located within unincorporated San Bernardino County and the City of Fontana's Sphere of Influence currently has a zoning designation of Regional Industrial (I-R) under San Bernardino County and a zoning designation of Public Utility (P-UC) under the City of Fontana; and d. Upon approval of the Prezoning and following approval of the Annexation by the Local Agency Formation Commission (LAFCO), both parcels APN: 0229-291-46 and APN: 0229-291-23 will be assigned a zoning designation of Industrial Employment (IE) by the City of Rancho Cucamonga, which is consistent with the existing zoning classification of the remainder of the Project Site which is currently located within the City; and e. The City Council and Fire Protection District Board must consent to the Annexation and adopt plans for service for the Annexation Area. f. As reflected in Exhibit "A," upon approval of the Annexation by LAFCO, these parcels will be assigned a land use designation of Industrial Employment District pursuant to the City of Rancho Cucamonga General Plan with a zoning designation of Industrial employment (IE). SECTION 3: Based upon the substantial evidence presented to this Council during the above-referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Council hereby finds and concludes as follows: a. The City Council has independently reviewed the General Plan Consistency Analysis included as Table 4.11-5 in the EIR. The City Council has also considered the changes to the General Plan adopted on December 15, 2021 as the 2020 PlanRC General Plan Update. Based on this comprehensive consistency analysis, the Planning Commission finds that, subject to the City Council's approval of the related documents and approvals associated with the Project (Annexation DRC2020-00185, Prezoning DRC2020-00186, General Plan Amendment DRC2020-00184, Tentative Parcel Map SUBTPM20251, Design Review (DRC2020-00177), Conditional Use Permit (DRC2021-00317), Uniform Sign Program (DRC2020-00178) and Development Agreement DRC2021-00180, the Annexation and Prezoning would be consistent with the goals, policies and implementation programs of the General Plan and will not conflict with any specific plan applicable to the Ordinance No. 992- Page 2 of 4 Project Area. Given that this Prezoning affects parcels located outside of the City and its Sphere of Infuence, the General Plan does not currently address the Annexation Area. The approval of General Plan Amendment DRC2020-00184 will designate the Annexation Area as Industrial Employment under the General Plan and will ensure consistency between the zoning and General Plan. b. Approval of the Annexation and Prezoning would not be materially injurious or detrimental to adjacent properties based on the finding sin the Project's EIR. c. The findings set forth in this Ordinance reflect the independent judgment of the City Council. SECTION 4: The Annexation and Prezoning, in addition to the General Plan Amendment, Tentative Parcel Map, Design Review Conditional Use Permit, Uniform Sign Program and Development Agreement (collectively, the "Project") were environmentally reviewed pursuant to the California Environmental Quality Act (CEQA) and the State CEQA Guidelines. Pursuant to CEQA Guidelines Section 15060(d), the City determined that an EIR would clearly be required for the Project, and therefore prepared an environmental impact report (EIR) that focused on the potentially significant effects of the Project. By separate Resolution No. 2022-006, the City Council has: (i) made the required CEQA findings and determinations, (ii) certified the Final EIR; and (iii) adopted a Mitigation Monitoring and Reporting Program for the Project. Resolution No. 2022-006is incorporated herein by reference, and made a part hereof as if fully set forth herein. The documents and other materials that constitute the record on which this determination was made are located in the Planning Department and are in the custody of the Planning Director. Further, the mitigation measures set forth therein are made applicable to the Project. SECTION 5: The City Council hereby adopts Prezoning DRC2020-00186. The Official Zoning Map for the City of Rancho Cucamonga is hereby amended to assign a zoning designation of "Industrial Employment (IE) Pre-District" for the Annnexation Area parcels of land, as shown in Attachment A. Pursuant to Section 17.22.050 of the Rancho Cucamonga Municipal Code, the zoning of the Annexation Area shall become effective at the time the proposed annexation for such area becomes effective. Until such time, the Official Zoning Map shall show the prezoning classification with the label "PRE DISTRICT" SECTION 6: The City Council hereby consents to the San Bernardino County LAFCO's approval of an annexation into the City of Rancho Cucamonga and related sphere of influence amendment for the Annexation Area parcels identified as APNs 0229-291-23 and 0229-291-46. The City Council further approves the plan for service for the Annexation Area attached hereto as Exhibit "B". SECTION 7: If any section, subsection, sentence, clause, phrase, or word of this Ordinance is, for any reason, deemed or held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, or preempted by legislative enactment, such decision or legislation shall not affect the validity of the remaining portions of this Ordinance. The City Council of the City of Rancho Cucamonga hereby declares that it would have adopted this Ordinance and each section, subsection, sentence, clause, phrase, or words thereof, regardless of the fact that anyone or more sections, subsections, clauses, phrases, or words might subsequently be declared invalid or unconstitutional or preempted by subsequent legislation. SECTION 7. The City Clerk shall certify to the adoption of this Ordinance and shall cause the same to be published in the manner prescribed by law. Ordinance No. 992- Page 3 of 4 PASSED, APPROVED, AND ADOPTED this 19th day of January, 2022. Z4, n ichael, Mayo ATTEST: ,6 *eC. nolds, Clerk STATE OF CALIFORNIA ) COUNTY OF SAN BERNARDINO ) ss CITY OF RANCHO CUCAMONGA ) I, JANICE C. REYNOLDS, City Clerk of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Ordinance was introduced at a Regular Meeting of the City Council of the City of Rancho Cucamonga held on the 5th day of January 2022, and was passed at a Regular Meeting of the City Council of the City of Rancho Cucamonga held on the 19th day of January 2022. AYES: Hutchison, Kennedy, Michael, Scott, Spagnolo NOES: None ABSENT: None ABSTAINED: None Executed this 20th day of January 2022, at Rancho Cucamonga, California. nice C. Reynolds, Clerk Ordinance No. 992 - Page 4 of 4 EXHIBIT B PLAN FOR SERVICE dta 5000 Birch Street, Suite/ewportBeach, CA 92660 %x�NxN FinanceDTA cony CITY OF RANCHO CUCAMONGA C CUCgMOA.G9� � 9= m 111 y il�'J rnn z id Class Coca PLAN FOR SERVICE ANNEXATION OF 4.8 ACRES IN CONNECTION WITH PROPOSED SPEEDWAY COMMERCE CENTER PROJECT Prepared for: City of Rancho Cucamonga 10500 Civic Center Drive Rancho Cucamonga, CA 91730 TABLE OF CONTENTS SECTION PAGE I INTRODUCTION.........................................................1 11 DESCRIPTION OF PROPOSED SPEEDWAY COMMERCE CENTER PROJECT AND THE 4.8 ACRE ANNEXATION AREA..................................................3 A Description of the Project Site........................................ 3 B Description of the Annexation Area.............................4 III PLAN FOR SERVICE BEFORE AND AFTER ANNEXATION OF 4.8 ACRES ....................................6 IV General Government and Administrative Services.. 8 A Fire Protection and Emergency Response Services..9 V Wildland Fire Prevention and Protection...................10 VI Law Enforcement.......................................................... 10 VIILibrary............................................................................ 10 VI I I Parks and Recreation ....................................................11 IX Animal Control..............................................................11 XStreet Lighting..................................................................11 XI Landscape Maintenance...............................................12 XIIWater..................................................................................12 XIII Wastewater....................................................................12 XIV Transportation...............................................................13 XV Flood Control and Drainage........................................ 13 XVIUtilities...............................................................................14 XVIISchools........................................................................... 14 XVIII Solid Waste Management.............................................14 XIX ONE-TIME DEVELOPMENT IMPACT FEES.............. 15 SECTION I dta INTRODUCTION www.FinanceDTA.com I INTRODUCTION The Speedway Commerce Center project (the "Project") is currently under consideration for approval by the City of Rancho Cucamonga (the "City") City Council. The Project siteincludes an estimated 35.73 acres of vacant land in the eastern portion of the City located approximately 1.3 miles east of Interstate 15 and approximately 1.5 miles north of Interstate 10. An estimated 92% of the Project site is currently located within the City,with the remainder located in unincorporated San Bernardino County (the "County") within the City of Fontana Sphere of Influence. The Project has submitted a pre-zone application and annexation proposal for the portion of the Project located in the unincorporated County and certain adjacent property to the west to create a logical boundary into the City from the centerline of Napa Street, east of Etiwanda Avenue andwest of the San Sevaine Channel. While all of the Project's building square footage is to be constructed within 32.83 acresof the Project site that is already located within the City, a remaining 2.9-acre portion of the site consisting solely of a portion of the Project's parking lot is currently located in the unincorporated County and will need to be annexed into the City. The entire area to be annexed (the "Annexation Area") will also include 1.9 additional acres that consist of an unmanned parcel owned by Southern Cal Edison (the "SCE Parcel") on which transmission wires are located, and a portion of the right of way for Napa Street. The intent of this Plan for Service ("PFS") is to provide the County of San Bernardino Local Agency Formation Commission ("LAFCO") with sufficient information to assess which public agencies will be responsible for providing municipal services to the Annexation Area once it has been absorbed by the City. DTA is also preparing a separate PFS focusingspecifically on the Cucamonga Valley Water District ("CVWD"), which will be annexing not just the Annexation Area, but also the remainder of the Project. As the remainder of the Project is already located in the City, it is not discussed in depth within this Annexation Area PFS, which is why the separate PFS is being prepared to cover the provision of wastewater services by CVWD. While a standard PFS typically also includes information on the fiscal impacts of an annexation action on the City General Fund and the General Funds of other municipal agencies that will be providing the annexed area, this Annexation Area is different because it is expected to include only very minimal development in terms of a 2.9-acre portion of a parking lot and a 1.9-acre SCE parcel containing only electrical transmission lines. Therefore, it is anticipated that no new revenues will be generated within the Annexation Area, and the services to be provided therein will be minimal. However, DTAhas previously prepared a fiscal impact analysis ("FIA") that has been reviewed and approved by the City that analyzes the impacts of the overall Project on the City General Fund. As this FIA (the "Project FIA") includes the small portion of the Project that is located in the Annexation Area, it will also be submitted separately from this PFS to theCity for review and certification in-lieu of a new FIA analyzing just the Annexation Area. City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 1 SECTION I dtaINTRODUCTION wN w.FinanceDTA.com In addition, as the fiscal impacts of the Project on the Rancho Cucamonga Fire Protection District ("RCFPD") and the CHWD were not included in the Project FIA, DTA will also be preparing separate FIAs specifically focusing on the entire Project's impacts on both of these agencies. Notably, the CHWD fiscal analysis will be packaged together with the separate PFS for CHWD wastewater services previously discussed because the area to be annexed into CHWD will include the entire 35.73-acre Project site, not just the 4.8-acre Annexation Area. City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 2 SECTION IIDESCRIPTION OF PROPOSED SPEEDWAY dta COMMERCE CENTERPROJECT "Avw,FinanceDTA-com AND THE 4.8 ACRE ANNEXATION AREA Table 1: Proposed Land Uses for the Project Land Use BSF Building A - Warehouse 500,648 Building B - Warehouse 155,230 Figure 2: Proposed Speedway Commerce Center Project 'e i / •:�� BUILDING A. R 500,648 S.F. rrk z BUILDING BI L—;7 156,230F NAPA ST BE.ET B Description of the Annexation Area The proposed Annexation Area consists of 4.8 acres that include 2.9 acres representing the southeast portion of the proposed Speedway Commerce Center project (the "Project"), aswell as 1.9 acres made up of an undeveloped parcel containing transmission wires owned by Southern Cal Edison ("SCE") and a portion of Napa Street right of way. A map delineatingthe Annexation Area is shown below in Figure 3. City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 4 SECTION IIIPLAN FOR SERVICE BEFORE AND aAFTER ANNEXATION OF 4.8 wwwTinanceDTA.com III PLAN FOR SERVICE BEFORE AND AFTER ANNEXATION OF 4.8 ACRES As noted previously, the Annexation Area consists of a 4.8-acre portion of the Project and adjacent SCE Site that is currently being serviced by the County that will need to be annexedinto the City. However, as neither the City nor the County provide certain required municipal services, the Annexation Area will also be subject to annexations to additional districts, as detailed below. However, as noted previously, the entire Project, as opposed to just the Annexation Area, will be annexed into CVWD to obtain sewer services. As the entire Project encompasses 35.7 acres, which is significantly larger than the 4.8-acre AnnexationArea, DTA has prepared an entirely separate PFS covering wastewater services that will besubmitted directly to CHWD for review and confirmation, and is not included in this PFS. The list of municipal services necessary to serve the Annexation Area are the following: ■ General Government and Administrative Services; ■ Fire Protection and Emergency Response Services; ■ Sheriff/Police and Public Safety Services; ■ Library; ■ Parks and ■ Recreation;Ani mat ■ Control; Street Lighting; ■ Landscape Maintenance; ■ Water; ■ Wastewater; ■ Transportation; ■ Flood Control and Drainage; ■ Utilities; ■ Schools; and ■ Solid Water Management. Table 2, below, provides a summary of which public agencies are currently responsible for providing each type of municipal service now, prior to the annexation, as well as which public agency is anticipated to be providing that same service after the annexation. In addition, one- time development impact fees ("DIFs") are collected by a number of publicagencies to fund the capital costs of public facilities, as summarized in Section IV of this Study. City of Rancho Cucamonga November S,2021 Speedway Commerce Center Plan for Service 6 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 www.FinanceDTA.com Table 2: Municipal Services Providers for Proposed Annexation Area ' Municipal Services Current Municipal Provider General Government and dministrative Services' County of San Bernardino City of Rancho Cucamonga ■ Fontana Fire Protection District Fire Protection and • Rancho Cucamonga Fire Protection Emergency Response ("FFPD") contract with County of San District("RCFPD"); and Services Bernardino Fire Department; and ■ American Medical Response ■ American Medical Response. heriff/Police and Public County of San Bernardino Sheriff's City contract with County of San Safety Department Bernardino Sheriff's Department Library San Bernardino County Public Library Rancho Cucamonga Public Library Parks and Recreation Regional Facilities County of San BernardinoNone County of San Bernardino Local Facilities Rancho Cucamonga Community Services Department Animal Control an Bernardino County Animal Care and Rancho Cucamonga Animal Care and Control Services Department ■ Rancho Cucamonga Municipal Street Lighting None Utility("RCMU"); and • Citywide street lighting district. Landscape Maintenance San Bernardino County Rancho Cucamonga Public WorksServices Department ■ Inland Empire Utilities Agency ■ IEUA-wholesale; and Water ("IEUA")-wholesale; and FWC. ■ Fontana Water Company ("FWC"). Sewer ■ IEUA- regional. • IEUA- regional; and ■ Cucamonga Valley Water District. Transportation • Freeways and Cal Trans Omnitrans Cal Trans Omnitrans Interchanges • Transit ' Some of the municipal services listed may not apply to the Proposed Annexation Area because it is anticipated that only a parking tot and unmanned utility easement will be located within that area. However, should future development plans change, the municipal services providers responsible for managing the public facilities associated with that future development are listed in this table. z Including General municipal administration, planning and community development services, economic development, local road operation and maintenance ("OftM"), street lighting C&M, local parks OFtM, and human resources, among other services. City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 7 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 Nvxvw.FinanceDTA.com MunicipalMunicipal Services Current Municipal Provider Future • •- After Flood Control and Drainage Annexation San Bernardino County Flood Control San Bernardino County Flood Control • Regional Facilities District District • Local Facilities San Bernardino County - Public Works Rancho Cucamonga Public Works Services Department Utilities . Cable/Internet Charter Communications, Spectrum, and Charter Communications, Frontier, and Provider/Phone Frontier RCMU . Power Southern California Edison Southern RCMU • Natural Gas California Gas Company Southern California Gas Company • Etiwanda School District (K-8); and • Etiwanda School District (K-8); and Schools Chaffey Joint Union High School . Chaffey Joint Union High School District(9-12) District(9-12) Burrtec Waste Management Industries Burrtec Waste Management Industries olid Waste Management through franchise agreement with San through franchise agreement with Cityof Bernardino County Solid Waste Rancho Cucamonga. Management Division. A written narrative describing the pre-annexation and post-annexation provision of each service listed above follows: A General Government and Administrative Services A,1 Before Annexation The County currently provides general government and administrative services to the Annexation Area. These include certain services that the County only provides in the unincorporated County, such as planning and community development services, economic development, arterial, collector and other local road operation and maintenance ("OEM'), street lighting and local parks O&M and human resources,among other services. In addition, the County provides certain services on a Countywide basis to both cities and the unincorporated County, such as criminal justice services related to jails and courts, which include district attorney, public defender and probation services, as well as health and welfare services and other Countywide functions. A,2 After Annexation The City will assume responsibility for all of the administrative and genera[government services that had been previously provided by the County exclusively for unincorporated County areas. As discussed above, these would include planning City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 8 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 \NN \NTinanceDTA.com and community development services, economic development, local road and street light O&M, etc. within the Annexation Area. The City's road maintenance responsibilities would include the operations and maintenance of the 1/2 width of Napa Street that is being annexed into the City. However, the other services currently provided by the County on a Countywide basis, as also discussed above, will continue to be the County's responsibility within the Annexation Area. These would include criminal justice services, health and welfare services, etc. B Fire Protection and Emergency Response Services B,1 Before Annexation FFPD currently provides the fire protection and emergency response services to theAnnexation Area. FFPD, through contract with the San Bernardino County Fire Department, serves approximately 52.4 square miles ("SM"), encompassing 42.4 SMwithin the limits of the City of Fontana and 10 SM within Fontana's Sphere of Influence area ("S01"). The Annexation Area is primarily served by Fire Station 73, located at 14360 Arrow Boulevard in Fontana. American Medical Response providesprivate ambulance services. 6,2 After Annexation The RCFPD will provide the fire protection and emergency response services to theAnnexation Area after its annexation. RCFPD encompasses approximately 50 SM of service area within the City limits and the City's 501. The Annexation Area will be served by (i) the Jersey Fire Station, located at 11297 Jersey Boulevard, which is approximately 3 roadway miles west of the Annexation Area, and (ii) Day Creek Fire Station, located at 12270 Firehouse Court, which is approximately 3.3 roadway milesto the northwest of the Annexation Area. Based on its proximity to two existing firestations, the Annexation Area will be adequately served by fire protection services,and no new or expanded unplanned facilities would be required. In addition, the entire Project site, including the portion within the Annexation Area,is required to be annexed into Community Facilities District ("CFD") No. 85-1 as oneof the City's conditions of development approval. CFD No. 85-1 was initially approved by the qualified voters within the CFD in a special election to authorize thelevy of a special tax to fund fire suppression services and facilities within the boundaries of Archibald Avenue, Etiwanda Avenue, Highland Avenue and Fourth Street. The American Medical Response, a private ambulance service, provides ambulance services to the Annexation Area. AMR is located at 7925 Center Avenue in Rancho Cucamonga. City of Rancho Cucamonga November S,2021 Speedway Commerce Center Planfor Service 9 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 www.FinanceDTA.com C Wildland Fire Prevention and Protection C.1 Before Annexation FFPD, through a contract with the San Bernardino County Fire Department, currentlyprovides the wildfire prevention and protection services to the Annexation Area. C.2 After Annexation RCFPD will provide the wildfire prevention and protection services to the AnnexationArea after its annexation. D Law Enforcement D.1 Before Annexation The San Bernardino County Sheriff's Department ("SBCSD") provides public safety services to the unincorporated areas. D,2 After Annexation Since incorporation in 1977, law enforcement services in the City have been provided through a contract with SBCSD. The closest police station to the Annexation Area isthe Victoria Gardens Substation, located at 7743 Kew Avenue, which is approximately 2.5 roadway miles northwest of the Annexation Area. In addition, the Police Department Headquarters (SBCSD Rancho Cucamonga Patrol Station) is located at 10510 Civic Center Drive, which is approximately 3.9 roadway miles northwest of theAnnexation Area. Furthermore, a joint facility including a police substation and several other municipal offices, is proposed at the Empire Lakes development located approximately 3.8 roadway miles west of the Annexation Area. Based on its proximity to these existing and proposed police stations and their projected staffing levels, the Annexation Area will be adequately served by existing police protection services, and no new or expanded unplanned facilities would be required. E Library E.1 Before Annexation Currently, the Annexation Area is served by the San Bernardino County Library system. The nearest County library is the Fontana Lewis Library Et Technology Center, located at 8437 Sierra Avenue in Fontana. E,2 After Annexation The Rancho Cucamonga Public Library will serve the Annexation Area after its annexation. The closest City library to the Annexation Area is the Paul A. Biane Library, located at 12505 Cultural Center Drive, which is approximately 2.4 roadway miles northwest of the Annexation Area. City of Rancho Cucamonga November S,2021 Speedway Commerce Center Plan for Service 10 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 wN%Nv.Finance DTA.com F Parks and Recreation F.1 Before Annexation The County Regional Parks Department ("CRPD") provides regional park services toall residents and employed persons within the County, including located in both incorporated and unincorporated areas. The closest regional park is Cucamonga Guasti Regional Park in Ontario, which includes recreational areas for water sports,hiking and picnicking. But CRPD's mandate is only to provide regional park facilities,so it does not support the construction, operations or maintenance of local parks anywhere within its jurisdiction, including within the Annexation Area. F.2 After Annexation The City's Community Services Department will operate and maintain the City's local parks and recreation facilities after annexation. This City Department currently supports the operations and maintenance of over 30 local park sites within the City which are available for use by residents and employed persons located within the Annexation Area., The largest park and recreational facilities operated by this CityDepartment includes the Community Center at Lions East and Lions West, Family Resource Center, Central Park Senior/Community Center, Rancho Cucamonga Sports Center, Epicenter/Sports Complex, and Victoria Gardens Cultural Center. G Animal Control 6.1 Before Annexation The San Bernardino County Animal Care and Control Program currently operates two animal shelters within the County, located in Big Bear and Devore, both of which are relatively distant from the Annexation Area. G.2 After Annexation The Rancho Cucamonga Animal Care and Services Department will provide animal control services to the Annexation Area after its annexation. The Department's animal shelter facilities are located at 11780 Arrow Route in the City. H Street Lighting H,1 Before Annexation The Annexation Area presently does not contain any streetlights. H.2 After Annexation Upon annexation, RCMU will be responsible for operating and maintaining streetlights in the Annexation Area. The Annexation Area is conditioned by the Cityto be annexed into SLD No. 1, which is the City's street lighting finance district, City of Rancho Cucamonga November S,2021 Speedway Commerce Center Plan for Service 1 1 1 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 w«w.NnanceDTA.corn I Landscape Maintenance 1,1 Before Annexation Currently, the County is responsible for the limited amount of landscape maintenance required within the Annexation Area. 1,2 After Annexation Upon annexation, the City's Public Works Department will be responsible for providing operations and maintenance services for the landscaping of any publicly owned parkways and medians within the Annexation Area, including operations andmaintenance work on the Yz width of Napa Street that is being annexed into the City. J Water J.1 Before Annexation FWC is a local water company currently providing water treatment, storage, and distribution of domestic water to the Annexation Area. FWC owns and operates threewater treatment facilities, treating a combination of well and surface water. In 2020, water utilized within the City originated from three main sources; (i) approximately60% groundwater, (ii) 15% local surface water, and (iii) 25% water from the State Water Project. Groundwater is produced from Chino Basin, Rialto Basin and Lytle Basin, and an unnamed basin. Local surface water from Lytle Creek and imported surface water from the State Water Project originating in Northern California are treated at the SandhiR Water Treatment Plant, a 29 million-gallon-per-day (MGD) treatment plant that is comprised of a 12 MGD Conventional filtration treatment facility and a 17 MGD Diatomaceous Earth filtration treatment facility. IEUA is a state water contractor for the Metropolitan Water District of Southern California ("MWD"), and is a regional wholesaler that delivers water at an average of 1.5 billion gallons of water per day to a 5,200 square mile service area. J.2 After Annexation FWC will continue to be the retail water service provider for the Annexation Area after its annexation, and IEUA will continue to be its wholesale water supplier. K Wastewater K,1 Before Annexation IEUA is a regional wastewater treatment agency and wholesale distributor of imported water that operates wastewater treatment facilities. The entire Project site,including the portion within the Annexation Area, currently does not receive anylocal wastewater services. City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 1 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 wxN%N TinanceDTA.com K.2 After Annexation IEUA will continue to be the regional wastewater treatment agency for the Annexation Area, while the CVWD will be the local wastewater service provider forthe Annexation Area. CVWD currently operates and maintains approximately 421 miles of wastewater collection system ranging from 8 to 36 inches in diameter. Wastewater generated by the Project site would be transported through thiscollection system and conveyed to IEUA's RP-1 and RP-4 regional water recycling plants where it is processed into recycled water. IEUA owns and operates a systemof regional trunk and interceptor sewers that transport wastewater to the regional wastewater treatment plants. In order to avoid overloading issues at any one facility, wastewater can be diverted from one regional plant to another. As the entire Project, not just the Annexation Area, will be annexed into CVWD, aPFS and FIA are required to analyze the annexation of the entire Project into CVWD. These two analyses are being prepared separately from this Annexation Area PFS, and will be submitted to CVWD upon their completion. L Transportation L.1 Before Annexation Caltrans currently operates and maintains freeways located in unincorporated County, while, as noted in Section A.1 of this study, arterials, collectors and otherlocal roads are operated and maintained by the County Public Works Department. Omnitrans provide public transit in the unincorporated County. L,2 After Annexation Caltrans and Omnitrans will continue to provide freeway and public transit services to the Annexation Area once the annexation has been completed. As noted previously in Section A.2, the City will be responsible for the operations and maintenance of local roads within the Annexation Area. M Flood Control and Drainage Al Before Annexation The County Flood Control District provides operations and maintenance services for regional flood control facilities, while any local drainage facilities, such as neighborhood detention basins, channels and bioswales are managed by the County's Public Works Department. M,2 After Annexation The County Flood Control District will continue to manage regional flood control facilities on behalf of the Annexation Area, whereas the City's Department of Public Works will take over responsibilities for the local drainage facilities cited above. City of Rancho Cucamonga November S,2021 Speedway Connnerce Center Plan for Service 13 SECTION IIIPLAN FOR SERVICE BEFORE AND dta AFTER ANNEXATION OF 4.8 \%«\N.hnanceDTA_com N Utilities N.1 Before Annexation The current providers of cable television and internet service within the area are Charter Communications, Spectrum and Frontier Communications. Telephone services are also provided by Frontier Communications, whereas electricity is supplied by Southern California Edison and natural gas by Southern California Gas Company. N.2 After Annexation Most of the utility services in the Annexation Area will continue to be maintained bythe same private parties, with the exception of cable service and electricity, whichwitl be furnished by RCMU. 0 Schools 0.1 Before Annexation The local primary elementary school is being operated by the Etiwanda School District ("ESD"). High School facilities are the responsibility of Chaffey Joint Union High School District ("CJUHSD"). 0.2 After Annexation Both primary and secondary school services will continue to be the responsibility of ESD and CJUHSD, respectively. P Solid Waste Management P.1 Before Annexation Burrtec Waste Management Industries currently provides waste and recycling services to the Annexation Area through a franchise agreement with the County Solid Waste Management Division. P.2 After Annexation Burrtec Waste Management Industries will continue to provide waste and recycling services to the Annexation Area after its annexation, although its franchise agreement will be executed with the City rather than with the County, City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 14 SECTION ONE-TIME DEVELOPMENT IMPACT dta FEES www.Fin an ceDT A.com IV ONE-TIME DEVELOPMENT IMPACT FEES Development impact fees ("DIFs") are one-time fees utilized to fund a project's fair share of a municipality's infrastructure and capital needs, and are generally paid upon issuance of building permits and/or Certificates of Occupancy. As noted previously, the Annexation Area consists of 4.8 acres that will include the following anticipated land uses: ■ 2.9 acres representing the southeast portion of the Project that is anticipated to be used solely as a portion of the Project's parking lot; ■ 1.9 acres of SCE-owned parcel containing transmission wires; and ■ A portion of the Napa Street right of way. Based on these currently proposed land uses within the Annexation Area, no structures are to be built within the area, so no DIFs are anticipated to be collected within the Annexation Area itself. Only portions of the Project outside of the Annexation Area on which structures are to be built would require the payment of DIFs, and they would be paying DIFs equal to the Project's fair share of the capital costs of public facilities necessitated by the structures built on the Project site. Notably, if the development planfor the Project changes such that the Annexation Area would include actual developmentother than the currently anticipated parking lot, DIFs could be collected. However, as DIFlevels generally vary dependent upon the land use types being constructed, specific feelevels cannot be assigned to the Annexation Area at this time. City of Rancho Cucamonga November 5,2021 Speedway Commerce Center Plan for Service 15